This file is an engineering drawing showing typical structural details for the Long-Baseline Neutrino Facility (LBNF) project at Fermilab, dated November 10, 2023. The drawing contains three detailed sections: typical housekeeping pads, typical control/construction joint details, and typical wall/footing reinforcement specifications.

The drawing provides specific construction requirements including #4 reinforcement bars at 12" on center, vapor retarder and drainage course specifications, and detailed joint construction methods. It includes precise measurements for dowel bars, corner bars, and concrete pad specifications. The drawing is stamped by registered professional engineer Alex R. Weiers of South Dakota and was prepared by TSP, Inc. in Rapid City, SD in collaboration with Arup USA Inc. The drawing has gone through multiple revisions from 30% design submission in July 2018 to the final "Issued for Construction" version in November 2023.

View the file

Other files

File Type Posted
J-2 2025 INSURANCE REQUIREMENTS FOR FRA SUBCONTRACTED WORK AT SURF Risk category 3 (Rev 01.pdf PDF
Amendment 06--RFP LBNF-357714-JD.pdf PDF
J-1 FFDG General Terms and Conditions for Subcontracts Combining Supplies and Services Performed at SURF (01.2025).pdf PDF
Amendment 05--RFP LBNF-357714-JD.pdf PDF
Amendment 04--RFP LBNF-357714-JD.pdf PDF
QA - Appendix 1 - ARF Layout with labels.png PNG image
S-FD-A-103.09.IFC.09.01.pdf PDF
S-FD-A-104.09.IFC.09.01.pdf PDF
S-FD-S-002.09.IFC.09.01.pdf PDF
S-FD-S-801.10.IFC.10.01.pdf PDF
S-FD-S-401.10.IFC.10.01.pdf PDF
S-FD-C-401.08.IFC.08.01.pdf PDF
Amendment 03--RFP LBNF-357714-JD-Approved.pdf PDF
S-FD-C-402.05.IFC.05.01.pdf PDF
Amendment 02--RFP LBNF-357714-JD.pdf PDF
Amendment 01--RFP LBNF-357714-JD.pdf PDF
F10028336.04_Receiving_Facilities._Gas_Analyzers_.pdf PDF
F10028336.01_Receiving_Facilities._Track_Connections.pdf PDF
F10028336.02_Receiving_Facilities._Storage_Ar_Dewars_1_and_2.pdf PDF
F10028336.03_Receiving_Facilities._Storage_Ar_Dewars_3_and_4.pdf PDF
J-2 INSURANCE REQUIREMENTS FOR FRA SUBCONTRACTED WORK AT SURF Risk category 3 (Rev 8.2024).pdf PDF
J-3 SDSTA Risk Transfer Protocols with Exhibits Final.pdf PDF
J-4 - SOW Appendix A - Instructions for Downloading.docx DOCX document
J-4 - ARF - Appendix B - Argon Receiving Facilities Interface Matrix.xlsx XLSX spreadsheet
J-5 - Exhibit A 7020 For Supply and Services SURF-ARF.pdf PDF
J-7 Section 013300 Submittals 02-14-2024.pdf PDF
J-8 - Section 014100 Cryo Quality Requirements_02-16-2024.pdf PDF
PUR-466_Proposal Certifications.pdf PDF
SMALL BUSINESS SUBCONTRACTING PLAN template Far 52.219-9.docx DOCX document
FRA Safety Questionnaire (Rev. 08-17)_URV.pdf PDF
RFP LBNF-357714-JD 09-13-2024 final.pdf PDF
J-1 FRA General Terms and Conditions for Subcontracts Combining Supplies and Services Performed at SURF (03.2024).pdf PDF
J-4 Statement of Work - Argon Receiving 07-16-2024.pdf PDF
J-4 - ARF - Appendix C - Tanks from CERN - Datasheet.pdf PDF
J-6 - Section 010010 General Requirements Installation Feb 2024.pdf PDF
J-13 Project Schedule - ARF 07-18-2024.pdf PDF
Mandatory Site Visit Registration Questionnaire_ARF_Sept 2024.docx DOCX document
SARC_Subcontractor Annual RepsCerts Rev 3.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11332

ALEX R.

WEIERS

R E

G

IS

TE

RED PROFESSIONAL ENG

IN

E ER

REG. NO.

S

O

U TH D A KO

T

A

DATE:

DOWEL BAR SAME SIZE

& SPACING AS LONG

BAR x 2'-6" LONG

CORNER BAR SAME

SIZE & SPACING AS

LONG BAR x 4'-0"

LONG

#4 @ 12" OC EW

REF PLANS

TOOLED EDGE

CLEAN TOP OF CIPC FLOOR OF ALL

DELETERIOUS MATERIALS PRIOR TO

CASTING HOUSEKEEPING SLAB

NOTE:

COORDINATE EXACT SIZE AND LOCATION OF

HOUSEKEEPING PADS WITH MECHANICAL/ELECTRICAL

DRAWINGS & CONTRACT(S)/EQUIPMENT SUPPLIER(S)

[0 .1 m

4"

M

IN

(T

YP

#4 @ 12" OC DOWELED INTO

CONCRETE SLAB PERIMETER

W/ HILTI HIT-HY 200 SYSTEM

(4" MIN EMBED)

CONTINUOUS FORMED CONTROL JOINT (KCJ)

w/ SEALANT @ EXPOSED TO VIEW AREAS AND

JOINT FILLER (REF SPEC 033000) @ COVERED

AREAS PER FLOOR COVER MFR

SAWED CONTROL JOINT (CJ) w/ SEALANT

@ EXPOSED TO VIEW AREAS AND JOINT

FILLER (REF SPEC 033000) @ COVERED

AREAS PER FLOOR COVER MFR

VAPOR RETARDER

DRAINAGE COURSE

KCJ

CJ

D /4

D /4

VAPOR RETARDER

DRAINAGE COURSE

D D

2D

CONTINUE SLAB REINF THRU

(REF PLAN FOR REINF)

SLAB REINF

(REF PLAN FOR REINF)

[0 .0 m

2"

C

LR

[0 .0 m

2"

C

LR

11/10/2023

TSP, Inc.

600 Kansas City St.

Rapid City, SD 57701 phone: (605) 343-6102 fax: (605) 343-7159 www.teamtsp.com

Arup USA Inc 77 Water Street, New York NY 10005, T 212 896 3000 www.arup.com

DRAWING NO.

SCALE:

REV.

REVISIONS

DESIGNED

DRAWN

CHECKED

DESCRIPTIONDATEREV.

Fermilab Long-Baseline Neutrino Facility

/1 /2

/9

/2

4:

:4

P

M L:

T

S P

R ev it Lo ca l\0

9.

T

S P

L B

N F

S

_w ei er sa r@ te am ts p.

co m .r vt

915-1-6J S-FD-S-701

SURFACE

LBNF - FSCF - BSI

TMH

ARW

ARW TSP

STRUCTURAL

TYPICAL DETAILS

TSP

TSP

SCALE: 3/4" = 1'-0"

3TYPICAL WALL/FTG REINF

SCALE: 3/4" = 1'-0"

1TYP HOUSEKEEPING PADS

SCALE: 3/4" = 1'-0"

TYP CONTROL

/CONSTRUCTION JOINT

AS NOTED

1 07/27/18 30% FD SUBMISSION

2 11/16/18 60% FD SUBMISSION

3 02/22/19 90% FD SUBMISSION

4 05/03/19 100% FD SUBMISSION

5 08/21/20 90% DRAFT FD UPDATE

6 10/01/20 90% FD UPDATE

7 11/20/20 100% FD UPDATE

8 05/21/21 ISSUED FOR CONSTRUCTION - BSI HEADFRAME HEATERS

9 11/10/23 ISSUED FOR CONSTRUCTION