S-FD-C-402.05.IFC.05.01.pdf

PDF 607 KB Posted

Attached to
LBNF Argon Receiving System
Solicitation number
LBNF-357714-JD
Issued by

About this file

This is a detailed engineering drawing showing pipe profiles and details for the LBNF (Long-Baseline Neutrino Facility) Surface Civil project at Fermilab. The drawing (S-FD-C-402) contains multiple technical sections including culvert profiles, precast trench box details, and riprap channel specifications.

The drawing includes detailed specifications for two culvert profiles with elevation measurements, a riprap channel typical section, culvert deadman detail, and three different trench box configurations (connection at headframe, typical section, and at argon pad). Notable technical details include dimensions for a 37-foot precast trench box section, specific pipe specifications, and drainage requirements. The drawing is dated 11/10/23 and was designed by RESPEC with multiple engineering approval stamps, indicating this is an official construction document meant to guide the installation of underground infrastructure supporting the argon receiving system described in the associated contract opportunity.

View the file

Other files

File Type Posted
J-2 2025 INSURANCE REQUIREMENTS FOR FRA SUBCONTRACTED WORK AT SURF Risk category 3 (Rev 01.pdf PDF
Amendment 06--RFP LBNF-357714-JD.pdf PDF
J-1 FFDG General Terms and Conditions for Subcontracts Combining Supplies and Services Performed at SURF (01.2025).pdf PDF
Amendment 05--RFP LBNF-357714-JD.pdf PDF
Amendment 04--RFP LBNF-357714-JD.pdf PDF
S-FD-S-801.10.IFC.10.01.pdf PDF
S-FD-S-401.10.IFC.10.01.pdf PDF
S-FD-C-401.08.IFC.08.01.pdf PDF
S-FD-S-701.08.IFC.08.01.pdf PDF
QA - Appendix 1 - ARF Layout with labels.png PNG image
S-FD-A-103.09.IFC.09.01.pdf PDF
S-FD-A-104.09.IFC.09.01.pdf PDF
S-FD-S-002.09.IFC.09.01.pdf PDF
Amendment 03--RFP LBNF-357714-JD-Approved.pdf PDF
Amendment 02--RFP LBNF-357714-JD.pdf PDF
F10028336.02_Receiving_Facilities._Storage_Ar_Dewars_1_and_2.pdf PDF
Amendment 01--RFP LBNF-357714-JD.pdf PDF
F10028336.04_Receiving_Facilities._Gas_Analyzers_.pdf PDF
F10028336.01_Receiving_Facilities._Track_Connections.pdf PDF
F10028336.03_Receiving_Facilities._Storage_Ar_Dewars_3_and_4.pdf PDF
RFP LBNF-357714-JD 09-13-2024 final.pdf PDF
J-1 FRA General Terms and Conditions for Subcontracts Combining Supplies and Services Performed at SURF (03.2024).pdf PDF
J-4 Statement of Work - Argon Receiving 07-16-2024.pdf PDF
J-4 - ARF - Appendix C - Tanks from CERN - Datasheet.pdf PDF
J-2 INSURANCE REQUIREMENTS FOR FRA SUBCONTRACTED WORK AT SURF Risk category 3 (Rev 8.2024).pdf PDF
J-3 SDSTA Risk Transfer Protocols with Exhibits Final.pdf PDF
J-4 - SOW Appendix A - Instructions for Downloading.docx DOCX document
J-4 - ARF - Appendix B - Argon Receiving Facilities Interface Matrix.xlsx XLSX spreadsheet
J-5 - Exhibit A 7020 For Supply and Services SURF-ARF.pdf PDF
J-7 Section 013300 Submittals 02-14-2024.pdf PDF
J-8 - Section 014100 Cryo Quality Requirements_02-16-2024.pdf PDF
PUR-466_Proposal Certifications.pdf PDF
SMALL BUSINESS SUBCONTRACTING PLAN template Far 52.219-9.docx DOCX document
FRA Safety Questionnaire (Rev. 08-17)_URV.pdf PDF
J-6 - Section 010010 General Requirements Installation Feb 2024.pdf PDF
J-13 Project Schedule - ARF 07-18-2024.pdf PDF
Mandatory Site Visit Registration Questionnaire_ARF_Sept 2024.docx DOCX document
SARC_Subcontractor Annual RepsCerts Rev 3.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PIPE PROFILES AND DETAILS

S-FD-C-402

AS NOTED

TSP, Inc.

600 Kansas City St.

Rapid City, SD 57701 phone: (605) 343-6102 fax: (605) 343-7159 www.teamtsp.com

DRAWING NO.

SCALE:

REV.

REV. DATE DESCRIPTION

REVISIONS

DESIGNED

DRAWN

CHECKED

LBNF - FSCF - BSI

Arup USA Inc 77 Water Street, New York NY 10005, T 212 896 3000 www.arup.com

SURFACE

CIVIL

15-1-6J

WATER & NATURAL RESOURCES

720 S COLORADO BLVD.

SUITE 410S

DENVER, CO 80246

PHONE (303) 757-3655

Fermilab Long-Baseline Neutrino Facility

/1

/2

SWB

ACT

TMS/SWB TSP/RESPEC

RESPEC

RESPEC

100% FD SUBMISSION 05/03/19

SCALE:

1CULVERT DEADMAN DETAIL

N.T.S.

SCALE:

2RIPRAP CHANNEL TYP SECTION

N.T.S.

2 90% FD UPDATE 10/01/20

SCALE:

6TRENCH BOX - CONNECTION AT HEADFRAME

N.T.S.

SCALE:

7PRECAST TRENCH BOX - TYPICAL SECTION

N.T.S.

SCALE:

8PRECAST TRENCH BOX AT ARGON PAD

N.T.S.

SCALE:

4CULVERT 2 PROFILE

1" = 10' VERT AND HORIZ

SCALE:

5CULVERT 1 PROFILE

1" = 10' VERT AND HORIZ

3 100% FD UPDATE 11/20/20

4 ISSUED FOR CONSTRUCTION - BSI HEADFRAME HEATERS 05/21/21

5 ADDENDUM 3 03/17/23

ISSUED FOR CONSTRUCTION 11/10/23 6

File details come from the government source that posted it. Updated .