J.25 Relevant Corporate Experience.pdf

PDF 212 KB Posted

Attached to
Power Systems Installation Services Federal contract opportunity
Solicitation number
6973GH-21-R-00088
Issued by
Department of Transportation Federal Aviation Administration Franchise Acquisition Services

About this file

This document contains a federal solicitation for power systems installation services and a related corporate experience submission form. The Federal Aviation Administration is seeking proposals for the design and installation of power systems and ancillary equipment, including generators 20kW or larger, UPS 10kVA or larger, fuel storage tanks 250 gallons or more with monitoring, underground electrical distribution cabling of 1,000 feet or more including splicing and terminations, and lightning protection, grounding and bonding. Offerors must submit evidence of relevant past performance on these types of projects using the provided corporate experience submission form, including details of at least one installation project. Proposals are due by March 10, 2021 and must be emailed to the specified point of contact. Offerors will need to demonstrate both the required scope of experience and complexity of simultaneously performing overlapping projects when completing the corporate experience submission form.

View the file

Other files for this federal contract opportunity

Other files attached to Power Systems Installation Services, newest first.
File Type Posted
Public Announcement.xlsx XLSX spreadsheet
J.27 Engineering Proposal Evaluation Questions_rev1.pdf PDF
J.01 Statement of Work_rev 1.pdf PDF
J.02 Contract Data Requirements List_rev 1.pdf PDF
Amendment 0001 to Soliciation 6973GH-21-R-00088.pdf PDF
QA_Phase I_6973GH-21-R-00088_2nd set.pdf PDF
QA_Phase I_6973GH-21-R-00088.pdf PDF
J.25 Relevant Corporate Experience_Rev 1.pdf PDF
J.26 Past Performance Questionnaire_Rev 1.pdf PDF
J.05 6010-5 CAI Form.pdf PDF
J.21 JO 1050.17A.pdf PDF
J.26 Past Performance Questionnaire.pdf PDF
J.29 IDIQ Schedule B Cost Worksheet.xlsx XLSX spreadsheet
J.11 FAA-C-1217H.pdf PDF
J.08 SF25A Payment Bond.pdf PDF
J.27 Engineering Proposal Evaluation Questions.pdf PDF
J.16 FAA-STD-032.pdf PDF
J.01 Statement of Work.pdf PDF
J.13 FAA-D-2494B.pdf PDF
J.24 FST Program Specifications.pdf PDF
J.23 FST Guidlines.pdf PDF
J.12 FAA-C-1391E.pdf PDF
J.10 DOT Form F4220.3_Preconstruction Conference Agenda and Checklist.pdf PDF
J.07 SF25 Performance Bond.pdf PDF
J.03 Data Item Description.pdf PDF
6973GH-21-R-00088.pdf PDF
J.02 Contract Data Requirements List.pdf PDF
J.22 JO 6950.2E.pdf PDF
J.28 Key Personnel Evaluation.pdf PDF
J.18 FAA JO 3900.57A CHG 1.pdf PDF
J.17 FAA Order 1050.10D.pdf PDF
J.14 FAA-STD-002H.pdf PDF
J.20 FAA Order 6950.27A.pdf PDF
J.04 Government Furnished Equipment.pdf PDF
J.09 Form_3900-18.pdf PDF
J.19 FAA Order JO 3900.64.pdf PDF
J.15 FAA-STD-019F Chg 3.pdf PDF
J.30 Contractor Release, DOT 4220.4.pdf PDF
J.06 Travel Authorization Form.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J.25 Relevant Corporate Experience

PROCUREMENT SENSITIVE WHEN COMPLETED, FOR OFFICIAL USE ONLY

Offeror must submit this form, Relevant Corporate Experience, addressing the following and per the below instructions:

• Offers may check off both Design and Installation if those services were performed on the example contract.

• Offerors may reference the same contract (A, B, C) for multiple citations in question 8.

• This J.25 Submission must be an independent PDF with no other attachments.

• Estimated Value on this form refers to the example contracts submitted for Relevant Corporate Experience and should make no reference to cost associated with this SIR proposal.

• If work was performed on a specific Task Order, site both the Task Order number and the Base/Parent Contract number.

Factor 1, Scope - The Offeror must demonstrate scope for Relevant Corporate Experience, provide no more than three (3) recent contracts/projects, within five (5) years of the issuance of this SIR. The Offeror must provide three (3) different types of design (SOW Section 3.2.6) and/or installation (SOW Section 3.2.7) projects of the five (5) following classifications, a minimum of one submission must be for an installation project:

i. Engine Generator (EG), 20 kW or larger;

ii. Uninterruptible Power Supplies (UPS), facility size 10 kVA or larger;

iii. Fuel Storage Tank (FST) Systems, 250 gallon tank or larger with environmental monitoring;

iv. Underground cabling (direct buried) for Electrical Line Distribution (ELD) of a minimum of 1,000 feet, to include splicing and terminations; and

v. Lightning Protection, Grounding, Bonding and Shielding (LPGBS).

Factor 2, Complexity - Must demonstrate complexity by completion of Block 9 of the contracts/projects submitted simultaneously at multiple facilities throughout the United States and/or its territories that overlap by a minimum of fourteen (14) calendar days. If two (2) of the three (3) projects listed in Block 8 do not have Project Start/Completion dates that overlap by a minimum of fourteen (14) calendar days, the Offeror must supply associated information for another project that meets the scope of Section 1.0 of the SOW. The work identified from Section 1.0 must overlap by a minimum of fourteen (14) calendar days with another project submitted in Block 8.

This form must be completed, in its entirety in 12 point Times New Roman font, to be considered. Offerors submitting an incomplete form may be considered non-responsive and given no further consideration.

PROCUREMENT SENSITIVE WHEN COMPLETED, FOR OFFICIAL USE ONLY

This form can be on completed government and/or commercial sector design and/or installations. Scope and complexity may be represented on one contract/project or be represented on separate contract(s)/project(s) providing same or similar services; within five (5) years of the issuance of the SIR. Offeror must not use more space than provided and must not modify the form in anyway.

Block 2 must be completed with only one email address, and be for the individual authorized to communicate on behalf of the Offeror.

REST OF PAGE INTENTIONALLY LEFT BLANK

1. Offeror Name:

2. Offeror Email Address:

3. Contract Number(s):

A.

B.

C.

4. Issuing Office:

A.

5. Total Estimated Value of the Contract/Projects (s):

A.

6. Period of Performance(s): A.

7. Place(s) of Performance: A.

8. Factor 1, Scope - The information provided in this Block must reference the information submitted in Blocks 3 through 7. Provide no more than three (3) recent contracts/projects, within five (5) years of the issuance of the SIR directly relating to design (SOW Section 3.2.6) and/or installation (SOW Section 3.2.7) projects of the five

(5) following types:

EG, 20 kW or larger? YES ☐ or NO ☐

Project Title Select the letter(s) for the contract number from Block 3 for this project.

A ☐ B ☐ C ☐

Please check the appropriate box(es). DESIGN ☐ INSTALLATION ☐

START DATE: COMPLETION DATE: FACILITY TYPE:

If yes, provide details of effort to include type of facility:

PROCUREMENT SENSITIVE WHEN COMPLETED, FOR OFFICIAL USE ONLY

UPS, 10 kVA facility size or larger? YES ☐ or NO ☐ Project Title

Select the letter(s) for the contract number from Block 3 for this project.

A ☐ B ☐ C ☐

Please check the appropriate box(es). DESIGN ☐ INSTALLATION ☐

FST Systems, 250 gallon tank or larger with environmental monitoring?

YES ☐ or NO ☐

Project Title Select the letter(s) for the contract number from Block 3 for this project.

Underground cabling (direct buried) for Electrical Line Distribution of a minimum of 1,000 feet, to include splicing and terminations?

YES ☐ or NO ☐

Project Title Select the letter(s) for the contract number from Block 3 for this project.

Lightning Protection, Grounding, Bonding and Shielding (LPGBS)?

YES ☐ or NO ☐

Project Title Select the letter(s) for the contract number from Block 3 for this project.

9. Factor 2, Complexity - Select A or B.

☐ A) Which work, outlined in Block 8, was performed simultaneously and overlaps by a minimum of 14 Calendar days? Select at least two of the following:

I. EG ☐

II. UPS ☐

III. FST ☐

IV. ELD ☐

V. LPGBS ☐

☐ B) If 2 of the 3 projects listed in Block 8 do not have Project Start/Completion dates that overlap by a minimum of 14 Calendar days, the offeror must supply associated information for another project that meets the scope of Section 1.0 of the SOW. The work identified from Section 1.0 must overlap by a minimum of 14 Calendar days with another project submitted in Block 8.

Please check the appropriate box(es. DESIGN ☐ INSTALLATION ☐ Provide details of effort to include type of facility:

1 Offeror Name:
2 Offeror Email Address:
A:
B:
C:
A_2:
B_2:
C_2:
A_3:
B_3:
C_3:
A_4:
B_4:
C_4:
A_5:
B_5:
C_5:
A Which work outlined in Block 8 was performed simultaneously and overlaps by a: Off
EG: Off
UPS: Off
FST: Off
ELD: Off
LPGBS: Off
B If 2 of the 3 projects listed in Block 8 do not have Project StartCompletion dates: Off
Please check the appropriate boxes DESIGN: Off
INSTALLATION_6: Off
Group7: Off
EG Project Title:
undefined: Off
undefined_2: Off
undefined_3: Off
DESIGN: Off
INSTALLATION: Off
EG START DATE:
EG COMPLETION DATE:
EG FACILITY TYPE:
START DATE:
COMPLETION DATE:
FACILITY TYPE:
LPGBS START DATE:
LPGBS COMPLETION DATE:
LPGBS FACILITY TYPE:
ELD START DATE:
ELD COMPLETION DATE:
ELD FACILITY TYPE:
UPS START DATE:
UPS COMPLETION DATE:
UPS FACILITY TYPE:
EG Description:
UPS Project Title:
Contract Number Letters: Off
UPS Yes or No: Off
UPS Description:
FST START DATE:
FST COMPLETION DATE:
FST FACILITY TYPE:
FST Description:
FST DESIGN: Off
FST INSTALLATION: Off
ELD Yes or No: Off
ELD Project Title:
ELD Description:
FST Project Title:
FST Yes or No: Off
LPGBS Yes or No: Off
LPGBS Project Title:
LPGBS Description:
Description:

File details come from the government source that posted it. Updated .