J.05 6010-5 CAI Form.pdf

PDF 517 KB Posted

Attached to
Power Systems Installation Services Federal contract opportunity
Solicitation number
6973GH-21-R-00088
Issued by
Department of Transportation Federal Aviation Administration Franchise Acquisition Services

About this file

This document contains a Contractor Acceptance Inspection (CAI) form and a related federal contract opportunity solicitation. The CAI form is used to document the inspection and acceptance of work completed under a federal contract. It includes fields to capture details of the project such as the job control number, related job order numbers, project implementer, location, description of work, real property assets delivered, and signatures of the inspecting FAA representative.

The related federal contract opportunity is a solicitation from the FAA Power Services Group to provide design and installation services for power systems and ancillary equipment. Interested offerors should review the solicitation in full, including the requirement for Phase I proposals to be emailed to the specified address no later than March 10, 2021 at 2:00PM Central Standard Time.

View the file

Other files for this federal contract opportunity

Other files attached to Power Systems Installation Services, newest first.
File Type Posted
Public Announcement.xlsx XLSX spreadsheet
J.27 Engineering Proposal Evaluation Questions_rev1.pdf PDF
J.01 Statement of Work_rev 1.pdf PDF
J.02 Contract Data Requirements List_rev 1.pdf PDF
Amendment 0001 to Soliciation 6973GH-21-R-00088.pdf PDF
QA_Phase I_6973GH-21-R-00088_2nd set.pdf PDF
QA_Phase I_6973GH-21-R-00088.pdf PDF
J.25 Relevant Corporate Experience_Rev 1.pdf PDF
J.26 Past Performance Questionnaire_Rev 1.pdf PDF
J.08 SF25A Payment Bond.pdf PDF
J.27 Engineering Proposal Evaluation Questions.pdf PDF
J.16 FAA-STD-032.pdf PDF
J.01 Statement of Work.pdf PDF
J.13 FAA-D-2494B.pdf PDF
J.24 FST Program Specifications.pdf PDF
J.23 FST Guidlines.pdf PDF
J.12 FAA-C-1391E.pdf PDF
J.10 DOT Form F4220.3_Preconstruction Conference Agenda and Checklist.pdf PDF
J.21 JO 1050.17A.pdf PDF
J.26 Past Performance Questionnaire.pdf PDF
J.29 IDIQ Schedule B Cost Worksheet.xlsx XLSX spreadsheet
J.25 Relevant Corporate Experience.pdf PDF
J.11 FAA-C-1217H.pdf PDF
J.07 SF25 Performance Bond.pdf PDF
J.03 Data Item Description.pdf PDF
6973GH-21-R-00088.pdf PDF
J.02 Contract Data Requirements List.pdf PDF
J.22 JO 6950.2E.pdf PDF
J.28 Key Personnel Evaluation.pdf PDF
J.18 FAA JO 3900.57A CHG 1.pdf PDF
J.17 FAA Order 1050.10D.pdf PDF
J.14 FAA-STD-002H.pdf PDF
J.20 FAA Order 6950.27A.pdf PDF
J.04 Government Furnished Equipment.pdf PDF
J.09 Form_3900-18.pdf PDF
J.19 FAA Order JO 3900.64.pdf PDF
J.15 FAA-STD-019F Chg 3.pdf PDF
J.30 Contractor Release, DOT 4220.4.pdf PDF
J.06 Travel Authorization Form.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FAA Form 6010-5 (10/16) Page 1 of 3

Contractor Acceptance Inspection (CAI) Cover Sheet

INSTRUCTIONS FOR COMPLETING FAA FORM 6010-5

Form Block

Description

1 CAI number. Electronically assigned by national database: The first character represents the Service Area, the next two characters represent the calendar year that the CAI was performed; then a dash followed by the letter ‘C’, which designates CAI; and the last five characters are sequentially assigned.

2 Date of Inspection. The date the JAI checklist was completed.

3 Job Control Number (JCN). Service Area unique number assigned to specific projects.

4 Related Job Order Number(s) (JONs). Budgetary Control Number.

5 Project Implementer. The entity implementing the project.

6 District. The affected District identifier.

7 SSC. The affected Systems Service Center identifier.

8 Cost Center Code. The cost center of the affected facility, system, or equipment.

9 Location Identifier. Alpha Numeric location identifier (LOCID) where the facility, system, or equipment is physically located (can be found in FSEP).

10 FSEP Facility Type. The Facility Type published in the FSEP.

11 City. Full name of the location where the facility, system, or equipment is actually located.

12 State. The two-letter abbreviation of the State where facility, system, or equipment is actually located.

13 Facility Ident Code. From the FSEP, lists the facility, system, or equipment features and capabilities in a six-digit code. The digits are broken out below:

S = System C = Category F = Facility T = Type M = Model C = Class

14 Runway number. If applicable, list of the runway impacted by this JAI. Typically, if the Facility Ident Code System Code (S) is a ‘3’, then a runway must be listed here.

15 Project Title. Short title of project.

16 Contractor. The business name of the contractor performing the work.

17 Contract Number. The number of the contract that authorized the expenditure of funds required to complete this work.

18 Contract Date. The date that the contract was awarded.

19 Description of Project. Describes the work accomplished by the project.

20 Description of Real Property Assets. Describes each real property asset that was accepted from the contractor.

pxantus Typewritten Text Electronic Version (PDF) pxantus Typewritten Text

FAA Form 6010-5 (10/16) Page 2 of 3

21 PI Representative Performing the Inspection or Acceptance. The PI Representative or COTR that performed the inspection must be an FAA employee. The PI Representative or COTR signs and dates the CAI Cover Sheet.

22 Remarks. Any comments or discrepancies necessary to clarify the CAI.

23 Punch List. The appropriate box is checked to indicate if a punch list was completed. Also lists the date that any punch list items will be completed.

Electronic Version (PDF)

FAA Form 6010-5 (10/16) Page 3 of 3

CONTRACTOR ACCEPTANCE

INSPECTION REPORT

CAI COVER

SHEET

CAI Number Date of Inspection

Job Control Number (JCN) Related Job Order Number(s) (JONs) Project Implementer District SSC

Cost Center Code

Location Identifier

Facility Type

(FSEP)

Physical Location Facility Ident. Code Runway City State S C F T M C

Project Title:

Contractor: Contract Number: Contract Date:

Description of Project:

Description of Real Property Assets (List each asset separately):

Name and Title of Person Performing the Inspection or Acceptance:

Print Name and Title Signature Date

Remarks:

Punch List Attached. Recommended Date of Completion for Punch List Items:

No Punch List. All Contract Deliverables Received by the FAA.

FAA Form 6010-5 (07/08)

Electronic Version (PDF)

Rectangle

Job Control Number JCNRow1:
Related Job Order Numbers JONsRow1:
Project ImplementerRow1:
DistrictRow1:
SSCRow1:
Cost Center CodeRow1:
Location IdentifierRow1:
Facility Type FSEPRow1:
CityRow1:
StateRow1:
SRow1:
CRow1:
FRow1:
TRow1:
MRow1:
CRow1_2:
RunwayRow1:
Project Title:
ContractorRow1:
Contract NumberRow1:
Contract DateRow1:
Description of Project:
Description of Real Property Assets List each asset separately:
Print Name and Title:
Date:
Remarks:
Punch List Attached Recommended Date of Completion for Punch List Items: Off
No Punch List All Contract Deliverables Received by the FAA: Off
undefined:
Text1:
0:
1:

File details come from the government source that posted it. Updated .