J.25 Relevant Corporate Experience_Rev 1.pdf

PDF 879 KB Posted

Attached to
Power Systems Installation Services Federal contract opportunity
Solicitation number
6973GH-21-R-00088
Issued by
Department of Transportation Federal Aviation Administration Franchise Acquisition Services

About this file

This document contains a federal contract solicitation for power systems installation services and a template for offerors to submit relevant corporate experience. The solicitation requests proposals for the design and installation of power systems and ancillary equipment for the Federal Aviation Administration Power Services Group. Proposals for Phase I are due by March 10, 2021 at 2:00PM Central Time and should be emailed to the address provided. The template requires offerors to provide details on up to three recent contracts within the last five years involving engine generators 20kW or larger, uninterruptible power supplies of 10kVA or larger, fuel storage tanks 250 gallons or larger with monitoring, underground electrical distribution cabling of 1,000 feet or more with splicing and terminations, and lightning protection, grounding and bonding systems. Offerors must also demonstrate complexity by having performed two of the listed scopes simultaneously across multiple U.S. facilities for a minimum 14-day overlap.

View the file

Other files for this federal contract opportunity

Other files attached to Power Systems Installation Services, newest first.
File Type Posted
Public Announcement.xlsx XLSX spreadsheet
Amendment 0001 to Soliciation 6973GH-21-R-00088.pdf PDF
J.27 Engineering Proposal Evaluation Questions_rev1.pdf PDF
J.01 Statement of Work_rev 1.pdf PDF
J.02 Contract Data Requirements List_rev 1.pdf PDF
QA_Phase I_6973GH-21-R-00088_2nd set.pdf PDF
J.26 Past Performance Questionnaire_Rev 1.pdf PDF
QA_Phase I_6973GH-21-R-00088.pdf PDF
J.19 FAA Order JO 3900.64.pdf PDF
J.15 FAA-STD-019F Chg 3.pdf PDF
J.30 Contractor Release, DOT 4220.4.pdf PDF
J.06 Travel Authorization Form.pdf PDF
J.05 6010-5 CAI Form.pdf PDF
J.21 JO 1050.17A.pdf PDF
J.26 Past Performance Questionnaire.pdf PDF
J.29 IDIQ Schedule B Cost Worksheet.xlsx XLSX spreadsheet
J.25 Relevant Corporate Experience.pdf PDF
J.11 FAA-C-1217H.pdf PDF
J.07 SF25 Performance Bond.pdf PDF
J.03 Data Item Description.pdf PDF
6973GH-21-R-00088.pdf PDF
J.02 Contract Data Requirements List.pdf PDF
J.22 JO 6950.2E.pdf PDF
J.28 Key Personnel Evaluation.pdf PDF
J.18 FAA JO 3900.57A CHG 1.pdf PDF
J.17 FAA Order 1050.10D.pdf PDF
J.14 FAA-STD-002H.pdf PDF
J.20 FAA Order 6950.27A.pdf PDF
J.04 Government Furnished Equipment.pdf PDF
J.09 Form_3900-18.pdf PDF
J.08 SF25A Payment Bond.pdf PDF
J.27 Engineering Proposal Evaluation Questions.pdf PDF
J.16 FAA-STD-032.pdf PDF
J.01 Statement of Work.pdf PDF
J.13 FAA-D-2494B.pdf PDF
J.24 FST Program Specifications.pdf PDF
J.23 FST Guidlines.pdf PDF
J.12 FAA-C-1391E.pdf PDF
J.10 DOT Form F4220.3_Preconstruction Conference Agenda and Checklist.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J.25 Relevant Corporate Experience

Offeror must submit this form, Relevant Corporate Experience, addressing the following and per the below instructions:

• Offers may check off both Design and Installation if those services were performed on the example contract.

• Offerors may reference the same contract (A, B, C) for multiple citations in question 8.

• This J.25 Submission must be an independent PDF with no other attachments.

• Estimated Value on this form refers to the example contracts submitted for Relevant Corporate Experience and should make no reference to cost associated with this SIR proposal.

• If work was performed on a specific Task Order, site both the Task Order number and the Base/Parent Contract number.

Factor 1, Scope - The Offeror must demonstrate scope for Relevant Corporate Experience, provide no more than three (3) recent contracts/projects, within five (5) years of the issuance of this SIR. The Offeror must provide three (3) different types of design (SOW Section 3.2.6) and/or installation (SOW Section 3.2.7) projects of the five (5) following classifications, a minimum of one submission must be for an installation project:

i. Engine Generator (EG), 20 kW or larger;

ii. Uninterruptible Power Supplies (UPS), facility size 10 kVA or larger;

iii. Fuel Storage Tank (FST) Systems, 250 gallon tank or larger with environmental monitoring;

iv. Underground cabling (direct buried) for Electrical Line Distribution (ELD) of a minimum of 1,000 feet, to include splicing and terminations; and

v. Lightning Protection, Grounding, Bonding and Shielding (LPGBS).

Factor 2, Complexity - Must demonstrate complexity by completion of Block 9 of the contracts/projects submitted simultaneously at multiple facilities throughout the United States and/or its territories that overlap by a minimum of fourteen (14) calendar days. If two (2) of the three (3) projects listed in Block 8 do not have Project Start/Completion dates that overlap by a minimum of fourteen (14) calendar days, the Offeror must supply associated information for another project that meets the scope of Section 1.0 of the SOW. The work identified from Section 1.0 must overlap by a minimum of fourteen (14) calendar days with another project submitted in Block 8.

This form must be completed, in its entirety in 12 point Times New Roman font, to be considered. Offerors submitting an incomplete form may be considered non-responsive and given no further consideration.

This form can be on completed government and/or commercial sector design and/or installations. Scope and complexity may be represented on one contract/project or be represented on separate contract(s)/project(s) providing same or similar services; within five (5) years of the issuance of the SIR. Offeror must not use more space than provided and must not modify the form in anyway.

Block 2 must be completed with only one email address, and be for the individual authorized to communicate on behalf of the Offeror.

REST OF PAGE INTENTIONALLY LEFT BLANK

1. Offeror Name:

2. Offeror Email Address:

3. Contract Number(s): A.

B.

C.

4. Issuing Office: A.

B.

C.

5. Total Estimated Value of the Contract/Projects (s):

A.

B.

C.

6. Period of Performance(s): A.

B.

C.

7. Place(s) of Performance: A.

B.

C.

8. Factor 1, Scope - The information provided in this Block must reference the information submitted in Blocks 3 through 7. Provide no more than three (3) recent contracts/projects, within five (5) years of the issuance of the SIR directly relating to design (SOW Section 3.2.6) and/or installation (SOW Section 3.2.7) projects of the five

(5) following types:

EG, 20 kW or larger? YES ☐ or NO ☐ Project Title

Select the letter(s) for the contract number from Block 3 for this project.

A ☐ B ☐ C ☐

Please check the appropriate box(es). DESIGN ☐ INSTALLATION ☐

START DATE: COMPLETION DATE: FACILITY TYPE:

If yes, provide details of effort to include type of facility:

UPS, 10 kVA facility size or larger? YES ☐ or NO ☐ Project Title

Select the letter(s) for the contract number from Block 3 for this project.

A ☐ B ☐ C ☐

Please check the appropriate box(es). DESIGN ☐ INSTALLATION ☐

FST Systems, 250 gallon tank or larger with environmental monitoring?

YES ☐ or NO ☐

Project Title Select the letter(s) for the contract number from Block 3 for this project.

A ☐ B ☐ C ☐

Please check the appropriate box(es). DESIGN ☐ INSTALLATION ☐

Underground cabling (direct buried) for Electrical Line Distribution of a minimum of 1,000 feet, to include splicing and terminations?

YES ☐ or NO ☐

Project Title Select the letter(s) for the contract number from Block 3 for this project.

A ☐ B ☐ C ☐

Please check the appropriate box(es). DESIGN ☐ INSTALLATION ☐

Lightning Protection, Grounding, Bonding and Shielding (LPGBS)?

YES ☐ or NO ☐

Project Title Select the letter(s) for the contract number from Block 3 for this project.

A ☐ B ☐ C ☐

Please check the appropriate box(es). DESIGN ☐ INSTALLATION ☐

9. Factor 2, Complexity - Select A or B.

☐ A) Which work, outlined in Block 8, was performed simultaneously and overlaps by a minimum of 14 Calendar days? Select at least two of the following:

I. EG ☐

II. UPS ☐

III. FST ☐

IV. ELD ☐

V. LPGBS ☐

☐ B) If 2 of the 3 projects listed in Block 8 do not have Project Start/Completion dates that overlap by a minimum of 14 Calendar days, the offeror must supply associated information for another project that meets the scope of Section 1.0 of the SOW. The work identified from Section 1.0 must overlap by a minimum of 14 Calendar days with another project submitted in Block 8.

Please check the appropriate box(es. DESIGN ☐ INSTALLATION ☐ Provide details of effort to include type of facility:

Blank Page

1 Offeror Name:
2 Offeror Email Address:
EG Project Title:
EG START DATE:
EG COMPLETION DATE:
EG FACILITY TYPE:
LPGBS START DATE:
LPGBS COMPLETION DATE:
LPGBS FACILITY TYPE:
ELD START DATE:
ELD COMPLETION DATE:
ELD FACILITY TYPE:
UPS START DATE:
UPS COMPLETION DATE:
UPS FACILITY TYPE:
EG Description:
UPS Project Title:
UPS Description:
FST START DATE:
FST COMPLETION DATE:
FST FACILITY TYPE:
FST Description:
FST DESIGN: Off
FST INSTALLATION: Off
ELD Project Title:
ELD Description:
FST Project Title:
LPGBS Project Title:
LPGBS Description:
EGA: Off
EGB: Off
EGC: Off
UPSA: Off
UPSB: Off
UPSC: Off
FSTA: Off
FSTB: Off
FSTC: Off
ELDA: Off
ELBB: Off
ELDC: Off
LPGBSA: Off
LPGBSB: Off
LPGBSC: Off
9EG: Off
9UPS: Off
9FST: Off
9ELD: Off
9LPGBS: Off
9BDesign: Off
9BInstallation: Off
EGDESIGN: Off
EGINSTALLATION: Off
UPSDESIGN: Off
UPSINSTALLATION: Off
ELD INSTALLATION: Off
ELD DESIGN: Off
LPGBS DESIGN: Off
LPGBS INSTALLATION: Off
9BSTART DATE:
9BCOMPLETION DATE:
9BFACILITY TYPE:
9BDescription:
FST Yes or No: Off
ELD Yes or No: Off
LPGBS Yes or No: Off
Block 3A:
Block 3B:
Block 3C:
Block 4A:
Block 4B:
Block 4C:
Block 5A:
Block 5B:
Block 5C:
Block 6A:
Block 6B:
Block 6C:
Block 7A:
Block 7B:
Block 7C:
EG Yes or No: Off
Block 9 Option A or B: Off
UPS Yes or No: Off

File details come from the government source that posted it. Updated .