J-1502000-06 DHA Systems Descriptions.xlsx
XLSX spreadsheet 144 KB Posted
- Solicitation number
- N6247025R0020
About this file
This file is a comprehensive system description attachment (J-1502000-06) for a Base Operations Support (BOS) contract at U.S. Naval Air Station Sigonella in Sicily, Italy. The document provides an extensive inventory of mechanical, electrical, and infrastructure systems across multiple buildings (Buildings 272, 273, 310, and 550), detailing equipment specifications, quantities, locations, and maintenance requirements. Key systems include HVAC and refrigeration systems, fire protection systems, electrical systems, medical gas and vacuum systems, communication systems, intrusion detection systems, and various specialized equipment like boilers, pumps, air handling units, chillers, and medical refrigeration units.
The attachment outlines preventive maintenance (PM) and integrated maintenance program (IMP) requirements for diverse systems, specifying the contractor's responsibilities for developing and implementing maintenance programs. Each system description includes precise details such as equipment manufacturer, model numbers, electrical specifications, location, and unique maintenance considerations. The document covers critical infrastructure components including lighting systems, vertical transportation equipment, auxiliary generators, medical air and gas systems, water purification systems, fire extinguishers, and emergency systems, providing a comprehensive technical overview of the facility's mechanical and electrical infrastructure that would be maintained under the Base Operations Support contract.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX
| ATTACHMENT J-1502000-06 | |
| INDEX | |
| Defense Health Agency (DHA) Preventive Maintenance (PM) Program | |
| Spec Item | Asset Type |
| 3.3.1 | Interior and Exterior Lighting Systems |
| 3.3.2 | Lightning Arrestors and Grounding Devices |
| 3.3.3 | Vertical Transportation Equipment (VTE) |
| 3.3.4 | Compressed Air Systems |
| 3.3.5 | Auxiliary Generators |
| 3.3.6 | Uninterruptable Power Supply System (UPS) |
| 3.3.7 | Medical Air, Gas and Vacuum Systems |
| 3.3.8 | Communication Systems |
| 3.3.9 | Intrusion Detection Systems |
| 3.3.10 | Closed Circuit Surveillance Systems |
| 3.3.11 | Automatic, Fire and Roll-Up Doors |
| 3.3.13 | Facility Electrical Systems |
| 3.3.14 | Reverse Osmosis and Water Purification System |
| 3.3.15 | Aboveground (AST) and Underground (UST) Storage Tanks |
| 3.3.16 | Overhead and Roll-Up Doors |
| 3.3.18 | Drinking Fountains/Water Coolers |
| 3.3.20 | Emergency Eye Wash |
| 3.3.21 | Irrigation Systems |
| Defense Health Agency (DHA) Integrated Maintenance Program (IMP) | |
| Spec Item | Asset Type |
| 3.4.1 | HVAC and Refrigeration Systems |
| 3.4.2 | Fire Protection Systems |
| 3.4.3 | Boilers and UPVs |
| Defense Health Agency (DHA) Other Recurring Services Program | |
| Spec Item | Asset Type |
| 3.6.1 | Exhaust Hoods and Ducts |
| 3.6.11 | Miscellaneous Equipment |
| 3.6.16 | Lift Station Maintenance |
SYSTEM DESCRIPTIONS
| ATTACHMENT J-1502000-06 | ||
| SYSTEM DESCRIPTIONS | SYSTEM DESCRIPTIONS | |
| Preventive Maintenance (PM) | ||
| 3.2.1 | Interior and Exterior Lighting Systems | Interior and Exterior Lighting Systems commence at, and includes the utility isolation point of connection. The Contractor shall develop and implement a Lighting Systems Preventive Maintenance (PM) Program to clean, re-lamp, and make all necessary repairs to the Interior and Exterior Lighting Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Lighting Systems, such as: replacement of defective bulbs, batteries, lamps, tubes, ballasts, fuses, starters, switches, diffusers, covers, reflectors, photocells, controls, etc. |
| 3.2.2 | Cathodic Protection Systems | Lightning Arresting and Grounding Systems commence at, and includes the utility isolation point of connection and terminate at foundation. The Contractor shall develop and implement a Preventive Maintenance (PM) Program for the Weight Handling Equipment and Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Weight Handling Equipment and Systems, such as: brakes, cables, circuit breakers, frequency drives, hoist, hooks, inverters, latches, surge suppressors, trackage, transformers, motors, wiring, monitoring and controls systems, etc |
| 3.2.3 | Lightning Arrestors and Grounding Devices | Lightning Arresting and Grounding Systems commence at, and includes the utility isolation point of connection and terminate at foundation. The Contractor shall develop and implement a Preventive Maintenance (PM) Program for the Weight Handling Equipment and Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Weight Handling Equipment and Systems, such as: brakes, cables, circuit breakers, frequency drives, hoist, hooks, inverters, latches, surge suppressors, trackage, transformers, motors, wiring, monitoring and controls systems, etc |
| 3.2.4 | Vertical Transportation Equipment (VTE) | Vertical Transportation Equipment Systems commence at and include the utility isolation point of connection. The Contractor shall develop and implement a Preventive Maintenance (PM) program for the Vertical Transportation Equipment Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Vertical Transportation Equipment Systems, such as: doors, cars, tracks, lighting, rails, guides, governors, motors, cables, pulleys, switches, hydraulic cylinders, piping, pumps, tanks, weights, monitoring and control systems, electrical disconnects, etc. |
| 3.2.5 | Compressed Air Systems | Compressed Air Systems commence at and includes the utility isolation point of connection and terminate at the compressed air point of delivery. The Contractor shall develop and implement a PM program for the Compressed Air Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Compressed Air Systems, such as: compressors, regulators, unfired pressure vessels, air drying systems, distribution systems, air supply connectors, monitoring and control systems, electrical disconnects, etc. |
| 3.2.6 | Auxiliary Generators | Auxiliary Generator Systems commence at and include the utility isolation point of connection. The Contractor shall develop and implement a PM program for the Auxiliary Generator Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Auxiliary Generator Systems, such as: batteries, fuel tanks, generator, inverters, rectifiers, regulators, prime mover, pumps, piping, transfer switches, switchgear, meters, monitoring and control systems, uninterruptible power supply, wiring, etc. |
| 3.2.7 | Uninterruptable Power Supply System (UPS) | The Uninterruptible Power Supply (UPS) System commences at and includes the utility isolation point of connection and terminates at the UPS-protected electrical load. The Contractor shall develop and implement a PM program for the UPS System and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: UPS units, batteries, inverters, rectifiers, bypass switches, cooling systems, monitoring and control systems, electrical disconnects, and associated wiring. |
| 3.2.8 | Medical Air, Gas and Vacuum Systems | The Medical Air, Gas, and Vacuum Systems commence at and include the utility isolation point of connection and terminate at the designated medical equipment connection points. The Contractor shall develop and implement a PM program for the Medical Air, Gas, and Vacuum Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: compressors, regulators, pressure relief valves, piping, fittings, vacuum pumps, manifolds, monitoring and alarm systems, electrical disconnects, and associated controls. |
| 3.2.9 | Communication Systems | The Communication System commences at and includes the main communication distribution panel and terminates at the end-user communication devices. The Contractor shall develop and implement a PM program for the Communication System and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: fiber optic and copper cabling, distribution panels, network switches, routers, communication outlets, patch panels, monitoring and control systems, and associated power supplies. |
| 3.2.10 | Intrusion Detection Systems (IDS) | The Intrusion Detection System (IDS) commences at and includes the power and communication source and terminates at the detection and monitoring devices. The Contractor shall develop and implement a PM program for the IDS and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: motion detectors, door/window sensors, alarm panels, control units, power supplies, communication interfaces, monitoring systems, and associated wiring. |
| 3.2.11 | Closed Circuit Surveillance Systems (CCSS) | The Closed Circuit Surveillance System (CCSS) commences at and includes the power and communication source and terminates at the surveillance monitoring and recording equipment. The Contractor shall develop and implement a PM program for the CCSS and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: cameras, monitors, recording devices, network video recorders (NVRs), cabling, control panels, power supplies, and associated wiring. |
| 3.2.12 | Automatic, Fire and Roll-Up Doors | The Automatic, Fire, and Roll-Up Door Systems commence at and include the power and control source and terminate at the door assemblies. The Contractor shall develop and implement a PM program for the Automatic, Fire, and Roll-Up Door Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: door operators, motors, guide rails, counterweights, limit switches, control panels, emergency release mechanisms, monitoring and control systems, electrical disconnects, and associated hardware. |
| 3.2.14 | Facility Electric Systems | The Facility Electric System commences at and includes the utility isolation point of connection and terminates at the electrical outlets, fixtures, and connected loads. The Contractor shall develop and implement a PM program for the Facility Electric System and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: transformers, switchgear, circuit breakers, distribution panels, wiring, receptacles, grounding systems, surge protection devices, monitoring and control systems, and electrical disconnects. |
| 3.2.15 | Reverse Osmosis and Water Purification System | The Reverse Osmosis and Water Purification System commences at and includes the raw water supply connection and terminates at the treated water distribution point. The Contractor shall develop and implement a PM program for the Reverse Osmosis and Water Purification System and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: filtration units, pumps, membranes, pressure vessels, chemical injection systems, monitoring and control systems, storage tanks, electrical disconnects, and associated piping. |
| 3.2.16 | Aboveground (AST) and Underground (UST) Storage Tanks | The Above Ground (AST) and Underground (UST) Storage Tank Systems commence at and include the fill and vent connections and terminate at the distribution outlet. The Contractor shall develop and implement a PM program for the AST and UST Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: tanks, pumps, valves, piping, leak detection systems, cathodic protection, monitoring and control systems, spill containment systems, and associated electrical components. |
| 3.2.17 | Overhead and Roll-Up Doors | The Overhead and Roll-Up Door System commence at and include the power and control source and terminate at the door assemblies. The Contractor shall develop and implement a PM program for the Automatic, Fire, and Roll-Up Door Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: door operators, motors, guide rails, counterweights, limit switches, control panels, emergency release mechanisms, monitoring and control systems, electrical disconnects, and associated hardware. |
| 3.2.19 | Drinking Fountains/Water Coolers | The Drinking Fountain and Water Cooler Systems commence at and include the water supply connection and terminate at the fixture discharge point. The Contractor shall develop and implement a PM program for the Drinking Fountain and Water Cooler Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: chillers, filters, water dispensers, pressure regulators, monitoring and control systems, and associated plumbing and electrical connections. |
| 3.2.21 | Emergency Eye Wash | The Emergency Eyewash System commences at and includes the water supply connection and terminates at the eyewash station outlet. The Contractor shall develop and implement a PM program for the Emergency Eyewash System and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: eyewash stations, safety showers, flow control valves, pressure regulators, monitoring and control systems, and associated plumbing components. |
| Integrated Maintenance Program (IMP) | ||
| 3.3.1 | HVAC and Regrigeration Systems | The HVAC and Refrigeration Systems commence at and include the power and utility connections and terminate at the conditioned air distribution or refrigeration points. The Contractor shall develop and implement an IMP for the HVAC and Refrigeration Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: air handling units, chillers, condensers, compressors, evaporators, cooling towers, heat exchangers, ductwork, dampers, fans, filters, thermostats, monitoring and control systems, electrical disconnects, and associated piping. |
| 3.3.2 | Fire Protection Systems | The Fire Protection Systems commence at and include the water supply or power connection and terminate at the fire suppression or alarm notification devices. The Contractor shall develop and implement an IMP for the Fire Protection Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: fire pumps, sprinkler heads, standpipes, risers, valves, deluge systems, fire suppression agents, fire alarms, smoke detectors, control panels, monitoring and control systems, and associated electrical and plumbing components. |
| 3.3.3 | Boilers and Unfired Pressure Vessel (UPV) System | The Boiler and Unfired Pressure Vessel (UPV) Systems commence at and include the utility supply connections and terminate at the distribution points. The Contractor shall develop and implement an IMP for the Boiler and UPV Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: boilers, pressure vessels, burners, heat exchangers, pumps, valves, regulators, expansion tanks, safety relief devices, monitoring and control systems, electrical disconnects, and associated piping. |
3.3.1 INTERIOR EXTERIOR LIGHT
| ATTACHMENT J-1502000-06 |
| INTERIOR AND EXTERIOR LIGHTING DESCRIPTION |
| SITE | BLDG | DESCRIPTION | USE | LOCATION | ||||
| GROUND FLOOR - BLOCK A | GROUND FLOOR - BLOCK B | FIRST FLOOR | SECOND FLOOR | PENTHOUSE | ||||
| NAS I | 273 | Disano 727 Comfort | General | 28 | 68 | 23 | 73 | |
| NAS I | 273 | Disano 827 Comfort | General | 24 | 11 | 8 | ||
| NAS I | 273 | Disano 826 Comfort | General | 109 | 238 | 282 | 115 | |
| NAS I | 273 | Disano 601 Dialens | General | 2 | 30 | |||
| NAS I | 273 | Disano 875 Comfort | General | 46 | ||||
| NAS I | 273 | Disano 852 Comfort | General | 72 | 163 | 131 | 59 | |
| NAS I | 273 | Disano 825 Comfort | General | 122 | 5 | 15 | 88 | |
| NAS I | 273 | Disano 410 Rigo | General | 5 | ||||
| NAS I | 273 | Disano 773 Comfort | General | 9 | 18 | |||
| NAS I | 273 | 3F Filippi | General | 37 | 55 | |||
| NAS I | 273 | Disano 925 Hydro | General | 4 | ||||
| NAS I | 273 | Disano 725 Comfort | General | 2 | ||||
| NAS I | 273 | Exterior Electrical Signs | Outside | 2 | ||||
| NAS I | 273 | Lights | Penthouse | 30 (21 Emerg.) | ||||
| NAS I | 273 | Exit Signs | Penthouse | 7 | ||||
| NAS I | 272 | Emergency light fixtures & signs | General | 6 | ||||
| NAS II | 550 | Emergency light fixtures & signs | General | 22 |
J-1502000-06 System Description
Page &P of &N
3.3.2 LIGHTING ARREST AND GROUN
| ATTACHMENT J-1502000-06 |
| LIGHTING ARRESTORS AND GROUNDING DEVICES DESCRIPTION |
| BLDG | SITE | FACILITY DESCRIPTION | REMARKS |
| 272 | NAS I | Reference Section C, Annex 0200000 Management and Administration, Spec Item 2.6.2 Dissemination of Information | Rooftop |
| 273 | NAS I | Rooftop | |
| 310 | NAS I | Rooftop | |
| 550 | NAS II | Rooftop |
Page &P of &N
3.3.3 VTE
| ATTACHMENT J-1502000-06 | ||||||||||||||||||||||||||||||||||||
| VERTICAL TRANSPORATION EQUIPMENT (VTE) DESCRIPTION | ||||||||||||||||||||||||||||||||||||
| BLDG | SITE | FACILITY DESCRIPTION | TYPE | CAPACITY (KG) | MANUFACTURER | YEAR INSTALLED | SPEED (m/sec) | DOOR TYPE | NO. OF STOPS | 3-YEAR INSPECTION | 5-YEAR INSPECTION | INSTALL DATE: | SPEC 7/VALUE: | SPEC 7/VALUE: | SPEC 8/VALUE: | SPEC 8/VALUE: | SPEC 9/VALUE: | SPEC 9/VALUE: | SPEC 10/VALUE: | SPEC 10/VALUE: | SPEC 11/VALUE: | SPEC 11/VALUE: | SPEC 12/VALUE: | SPEC 12/VALUE: | SPEC 13/VALUE: | SPEC 13/VALUE: | SPEC 14/VALUE: | SPEC 14/VALUE: | SPEC 15/VALUE: | SPEC 15/VALUE: | NOTES: | TIMESTAMP: | TAGGER: | SECTION NAME | CONDITION RATING | COPIED TO COBIE |
| 550 | NAS II | Reference Section C, Annex 0200000 Management and Administration, Spec Item 2.6.2 Dissemination of Information | PHE | 1500 | Maspero | 2000 | 0.6 | Power | 3 | 02/2010 | 02/2012 | NATHAN | ||||||||||||||||||||||||
| 273 | NAS I | PHE | 1600 | Schindler | 1992 | 0.45 | Power | 3 | 01/2010 | 02/2012 | NATHAN | |||||||||||||||||||||||||
| 273 | NAS I | PHE | 2000 | Schindler | 1992 | 0.45 | Power | 3 | 02/2010 | 02/2012 | NATHAN | |||||||||||||||||||||||||
| 273 | NAS I | PHE | 2000 | Schindler | 1992 | 0.45 | Power | 3 | 02/2010 | 02/2012 | NATHAN | |||||||||||||||||||||||||
| Note: PHE – Passenger Hydraulic Elevator |
Page &P of &N
3.3.4 COMPRESSED AIR SYSTEMS
| ATTACHMENT J-1502000-06 |
| COMPRESSED AIR SYSTEMS DESCRIPTION |
| BLDG | SITE | FACILITY DESCRIPTION | SYSTEM | QTY | LOCATION | SPEC 7/VALUE: | SPEC 7/VALUE: | SPEC 8/VALUE: | SPEC 8/VALUE: | SPEC 9/VALUE: | SPEC 9/VALUE: | SPEC 10/VALUE: | SPEC 10/VALUE: | SPEC 11/VALUE: | SPEC 11/VALUE: | SPEC 12/VALUE: | SPEC 12/VALUE: | SPEC 13/VALUE: | SPEC 13/VALUE: | SPEC 14/VALUE: | SPEC 14/VALUE: | SPEC 15/VALUE: | SPEC 15/VALUE: | NOTES: | TIMESTAMP: | TAGGER: | SECTION NAME | CONDITION RATING | COPIED TO COBIE |
| 273 | NAS I | Reference Section C, Annex 0200000 Management and Administration, Spec Item 2.6.2 Dissemination of Information | Dental trailer air compressor (duplex) | 1 | Mezzanine between ground and first floor | ||||||||||||||||||||||||
| 550 | NAS II | Air compressor (duplex) “Cattani” | 1 | Room 1-17 Mechanical Room | |||||||||||||||||||||||||
| 550 | NAS II | Air Dryer unit ABAC Mod EA350 | 1 | Room 1-17 Mechanical Room |
Page &P of &N
3.3.5 AUXILIARY GENERATORS
| ATTACHMENT J-1502000-06 | |||||||||||||||||||||||||||||||||||
| AUXILIARY GENERATORS DESCRIPTION | |||||||||||||||||||||||||||||||||||
| BLDG | SITE | FACILITY DESCRIPTION | MANUFACTURER | MODEL | Kw | VOLTAGE | Hz | PHASE | QTY | LOCATION | REMARKS | SPEC 7/VALUE: | SPEC 7/VALUE: | SPEC 8/VALUE: | SPEC 8/VALUE: | SPEC 9/VALUE: | SPEC 9/VALUE: | SPEC 10/VALUE: | SPEC 10/VALUE: | SPEC 11/VALUE: | SPEC 11/VALUE: | SPEC 12/VALUE: | SPEC 12/VALUE: | SPEC 13/VALUE: | SPEC 13/VALUE: | SPEC 14/VALUE: | SPEC 14/VALUE: | SPEC 15/VALUE: | SPEC 15/VALUE: | NOTES: | TIMESTAMP: | TAGGER: | SECTION NAME | CONDITION RATING | COPIED TO COBIE |
| 273 | NAS I | Reference Section C, Annex 0200000 Management and Administration, Spec Item 2.6.2 Dissemination of Information | Diesel Generator Radiator | FACO | 4.42KW | 400 | 50 Hertz | 3 Phase | 4 | Roof | |||||||||||||||||||||||||
| 273 | NAS I | MARGEN | GPE 1510 | 1510 KVA | 380 | 50 | 3 | 2 | 1B-106A | ||||||||||||||||||||||||||
| 550 | NAS II | Caterpillar | 550 KVA | 380/220 | 50 Hertz | 3 Phase | Outside |
Page &P of &N
3.3.6 UPS
| ATTACHMENT J-1502000-06 | |||||||||||||||||||||||||||||||
| UNINTERRUPTABLE POWER SUPPLY SYSTEMS (UPS) DESCRIPTION | |||||||||||||||||||||||||||||||
| BLDG | SITE | EQUIPMENT DESCRIPTION | MRF | MODEL NO. | LOCATION | QTY | REMARKS | SPEC 7/VALUE: | SPEC 7/VALUE: | SPEC 8/VALUE: | SPEC 8/VALUE: | SPEC 9/VALUE: | SPEC 9/VALUE: | SPEC 10/VALUE: | SPEC 10/VALUE: | SPEC 11/VALUE: | SPEC 11/VALUE: | SPEC 12/VALUE: | SPEC 12/VALUE: | SPEC 13/VALUE: | SPEC 13/VALUE: | SPEC 14/VALUE: | SPEC 14/VALUE: | SPEC 15/VALUE: | SPEC 15/VALUE: | NOTES: | TIMESTAMP: | TAGGER: | SECTION NAME | CONDITION RATING | COPIED TO COBIE |
| 273 | NAS I | Uninterruptable Power System | Silentron | 60 KVA | Reference Section C, Annex 0200000 Management and Administration, Spec Item 2.6.2 Dissemination of Information | 1 | Emergency distribution, (OR, fire alarm, etc.) | ||||||||||||||||||||||||
| 273 | NAS I | Uninterruptable Power System | Riello | 150 KVA | 1 | CT Scan | |||||||||||||||||||||||||
| 273 | NAS I | Uninterruptable Power System | Piller | 1000 KVA | 1 | Rotary UPS | |||||||||||||||||||||||||
| 273 | NAS I | Uninterruptable Power System for breakers control (main electrical space) | Sentinel Dual | 5 KVA | 1 | ||||||||||||||||||||||||||
| 273 | NAS I | Uninterruptable Power System | Enerconv CMP T3M | 1 | Substation auxiliary circuits |
Page &P of &N
3.3.7 MED AIR, GAS, VACUUM SYS
| ATTACHMENT J-1502000-06 |
| MEDICAL AIR, GAS AND VACUUM SYSTEMS DESCRIPTION |
| NON-FLAMMABLE MEDICAL GAS | |||||||||
| BLDG | SITE | SYSTEM | QUANTITY OF CYLINDER | AUTO CHANGEOVER VALVE | PRESSURE REGULATORS | INSTALL DATE: | |||
| DESCRIPTION | LOCATION | PRIMARY | SECONDARY | THIRD | |||||
| 273 | NAS I | Oxigen System | Reference Section C, Annex 0200000 Management and Administration, Spec Item 2.6.2 Dissemination of Information | 10 | 10 | 6 | Yes | Yes | |
| 273 | NAS I | Nitrous Oxide | 2 | 2 | 2 | Yes | Yes | ||
| 273 | NAS I | Nitrogen | 4 | 4 | 2 | Yes | Yes |
| NON-FLAMMABLE MEDICAL GAS - GAS OUTLETS | |||||||
| BLDG | SITE | COMPONENTS | FIRST FLOOR | SECOND FLOOR | THIRD FLOOR | NOTES | |
| BLOCK A | BLOCK B | ||||||
| 273 | NAS I | Vacuum | 1 | ||||
| 273 | NAS I | O2/Vacuum | 9 | 11 | 5 | ||
| 273 | NAS I | Med Air | |||||
| 273 | NAS I | O2/Vacuum | 6 | 16 | |||
| 273 | NAS I | Air/Vacuum | 1 | 1 | 2 | ||
| 273 | NAS I | NO/ Med Air | |||||
| 273 | NAS I | O2/N2O/Vacuum | 4 | 2 | 1 | ||
| 273 | NAS I | Anesthetic Evac | |||||
| 273 | NAS I | Oral Evacuation | 9 | ||||
| NON-FLAMMABLE MEDICAL GAS - GAS VALVES | |||||||
| 273 | NAS I | Nitrogen | 2 | 1 | |||
| 273 | NAS I | O2/Vacuum | 1 | 1 | |||
| 273 | NAS I | Med Air | |||||
| 273 | NAS I | O2/Vacuum | 1 | 2 | 2 | ||
| 273 | NAS I | NO/ Med Air | |||||
| 273 | NAS I | O2/N2O/Vacuum | 2 | 2 | 2 | ||
| 273 | NAS I | Anesthetic Evac | |||||
| 273 | NAS I | Oral Evacuation | 1 | ||||
| NON-FLAMMABLE MEDICAL GAS - GAS ALARMS | |||||||
| 273 | NAS I | Oxygen | 3 | 3 | 2 | 3 | |
| 273 | NAS I | Nitrogen | 2 | 1 | 2 | ||
| 273 | NAS I | Nitrous Oxide | 1 | 1 | 2 | 1 | |
| 273 | NAS I | Vacuum | 3 | 2 | 1 | 3 | |
| 273 | NAS I | Anesthetic Evac | 1 | 1 |
| MEDICAL AIR AND VACUUM SYSTEMS | |||||||
| BLDG | SITE | EQUIPMENT DESCRIPTION | MFR | MODEL NO. | LOCATION | QTY | REMARKS |
| 273 | NAS I | Medical Air System (medical) | Atlas Copco | SF11 | Reference Section C, Annex 0200000 Management and Administration, Spec Item 2.6.2 Dissemination of Information | 1 | |
| 273 | NAS I | Medical Air System (dental) | Atlas Copco | SF11 | 1 | ||
| 273 | NAS I | Medical Vacuum System | Rietschle Thomas | VC100x3 | 1 | ||
| 273 | NAS I | Medical Vacuum System | Ramvac | BISON 9 | 2 | ||
| 550 | NAS II | Medical Vacuum System | Ramvac | BISON 9 | 2 |
Page &P of &N
3.3.8 COMMUNICATON SYS
| ATTACHMENT J-1502000-06 |
| COMMUNICATION SYSTEM DESCRIPTION |
| NURSE CALL SYSTEM | ||||||
| SITE | BLDG | CONTROL PANE | LOCATION | ZONE - GROUND FLOOR | ZONE - FIRST FLOOR | ZONE - SECOND FLOOR |
| NAS I | 273 | Management Control Unit | Reference Section C, Annex 0200000 Management and Administration, Spec Item 2.6.2 Dissemination of Information | 1 | ||
| NAS I | 273 | Call Cancel Pushbutton | 3 | 2 | 2 | |
| NAS I | 273 | General Call Cancel Pushbutton | 1 | |||
| NAS I | 273 | Repeater Display Panel | 3 | 1 | 0 | |
| NAS I | 273 | Display Panel | 1 | 1 | 1 | |
| NAS I | 273 | Outside Door Signal | 17 | 7 | 21 | |
| NAS I | 273 | Room Entrance Combination | 16 | 7 | 21 | |
| NAS I | 273 | Room Distributor | 15 | 7 | 22 | |
| NAS I | 273 | Pear-Switch Pushbutton Panel | 9 | 0 | 21 | |
| NAS I | 273 | Call Pushbutton With Cord Pull | 11 | 8 | 35 | |
| NAS I | 273 | Concentrator | 1 | |||
| MUSIC AND PAGING SYSTEM | ||||||
| SITE | BLDG | EQUIPMENT - DESIGNATION | LOCATION | NOTES | ||
| NAS I | 272 | Central Panel Board RCF CP 4100 | Reference Section C, Annex 0200000 Management and Administration, Spec Item 2.6.2 Dissemination of Information | |||
| NAS I | 273 | Central Panel Board | ||||
| NAS I | 273 | Microphone Station With 9 Line Selector | ||||
| NAS I | 273 | Microphone Station With 9 Line Selector | ||||
| NAS I | 273 | Wall Mount Microphone In Housing For Evacuation System | ||||
| NAS I | 273 | Loud Speaker | 95 | |||
| NAS I | 273 | Loud Speaker | 85 | |||
| NAS I | 273 | Loud Speaker | 116 | |||
| NAS II | 550 | Central Panel Board | ||||
| NAS II | 550 | Microphone Station With 9 Line Selector | ||||
| NAS II | 550 | Microphone Station With 9 Line Selector | ||||
| NAS II | 550 | Loud Speaker | 75 | |||
| NAS I | 310 | Loud Speaker | 3 | |||
| MASTER TV ANTENNA | ||||||
| SITE | BLDG | EQUIPMENT - DESIGNATION | LOCATION | NOTES | ||
| NAS I | 273 | AFN Decoders (#10) | Reference Section C, Annex 0200000 Management and Administration, Spec Item 2.6.2 Dissemination of Information | |||
| NAS I | 273 | Satellite Dish | ||||
| NAS II | 550 | UHF Converter | ||||
| NAS II | 550 | Broadband Converter | ||||
| NAS II | 550 | AFN Decoders (#10) |
Page &P of &N
3.3.9 INTRUSION DETECTION SYS
| ATTACHMENT J-1502000-06 | ||||||||
| INTRUSION DETECTION SYSTEM DESCRIPTION | ||||||||
| SITE | BLDG | CONTROL PANEL | LOCATION | ZONE | SWITCH | INFRARED DETECTOR | DIGITAL KEYPAD | |
| DOOR | FOOT OPERATED | |||||||
| NAS I | 273 | Control Panel | Reference Section C, Annex 0200000 Management and Administration, Spec Item 2.6.2 Dissemination of Information | 1 | ||||
| NAS I | 273 | Aluminum Reed Contacts | 22 | |||||
| NAS I | 273 | Infrared Sensor | 3 | |||||
| NAS I | 273 | Feet Operated Contact | 2 | |||||
| NAS II | 550 | Control Panel | 1 | 10 | ||||
| NAS II | 550 | 2 | 1 | 1 | 1 | |||
| NAS II | 550 | 3 | 1 |
Page &P of &N
3.3.10 CLOSED CIRC SURVEILLANCE
| ATTACHMENT J-1502000-06 |
| CLOSED CIRCUIT SURVEILLANCE SYSTEMS DESCRIPTION |
| SITE | BLDG | CONTROL PANEL | LOCATION | ZONE - GROUND FLOOR | ZONE - FIRST FLOOR | ZONE - SECOND FLOOR |
| NAS I | 273 | Control Panel | Reference Section C, Annex 0200000 Management and Administration, Spec Item 2.6.2 Dissemination of Information | 3 | ||
| NAS I | 273 | Monitors | 4 | |||
| NAS I | 273 | Console | 1 | |||
| NAS I | 273 | Video Cameras | 14 | 20 | 7 |
Page &P of &N
3.3.11 AUTOMATIC AND FIRE DOORS
| ATTACHMENT J-1502000-06 |
| AUTOMATIC AND FIRE DOORS DESCRIPTION |
| SITE | BLDG | LOCATION | EQUIPMENT DESCRIPTION | QUANTITY | REMARKS |
| NAS I | 273 | Reference Section C, Annex 0200000 Management and Administration, Spec Item 2.6.2 Dissemination of Information | Automatic Doors Operating Rooms | 5 | 2 double, 3 single |
| NAS I | 273 | Automatic Doors External | 6 | single | |
| NAS II | 550 | Automatic Door | 1 | ||
| NAS I | 273 | Fire Doors | 73 |
Page &P of &N
3.3.13 FACILITY ELECTRIC SYS
| ATTACHMENT J-1502000-06 | |||||||||||||||||||||||||||||||||
| FACILITY ELECTRIC SYSTEMS DESCRIPTION | |||||||||||||||||||||||||||||||||
| SITE | BLDG | PANEL | MAIN BUS AMPS | POWER SOURCE | REMARKS | NOTES | |||||||||||||||||||||||||||
| DESIGNATION | FUNCTION | LOCATION | DESIGNATION | LOCATION | SPEC 7/VALUE: | SPEC 7/VALUE: | SPEC 8/VALUE: | SPEC 8/VALUE: | SPEC 9/VALUE: | SPEC 9/VALUE: | SPEC 10/VALUE: | SPEC 10/VALUE: | SPEC 11/VALUE: | SPEC 11/VALUE: | SPEC 12/VALUE: | SPEC 12/VALUE: | SPEC 13/VALUE: | SPEC 13/VALUE: | SPEC 14/VALUE: | SPEC 14/VALUE: | SPEC 15/VALUE: | SPEC 15/VALUE: | NOTES: | TIMESTAMP: | TAGGER: | SECTION NAME | CONDITION RATING | COPIED TO COBIE | |||||
| SWITCHBOARD - 380/220 VOLT, 3 PHASES/ 5 WIRES, 50 HERTZ | |||||||||||||||||||||||||||||||||
| NAS I | 272 | MDPA | Main Switchboard | Reference Section C, Annex 0200000 Management and Administration, Spec Item 2.6.2 Dissemination of Information | 400 | External substation | Bldg 228 | 1 | |||||||||||||||||||||||||
| NAS I | 272 | Main Circuit Breaker | 400 | Key Interlock, coil trip | |||||||||||||||||||||||||||||
| NAS I | 273 | HVS | High Voltage Supply 20KV | 630 | External substation | Bldg 276 | Key interlock, coil trip | 1 | |||||||||||||||||||||||||
| NAS I | 273 | LVS | Low Voltage Supply 280/220 V | 4000 | Key interlock, coil trip | ||||||||||||||||||||||||||||
| NAS I | 273 | TRX1 | Transformer 20,000V/380V | Transformer Dry type | Bldg 273 | 2,500 KVA | |||||||||||||||||||||||||||
| NAS I | 273 | TRX2 | Transformer 20,000V/380V | Transformer Dry Type | Bldg 273 | 2,500 KVA | |||||||||||||||||||||||||||
| NAS I | 273 | ATS 5 | Automatic Transfer Switch | 4000 | LVS/EMP | 1B-115 | |||||||||||||||||||||||||||
| NAS I | 273 | ATS 4 | Automatic Transfer Switch | 630 | Fire Pump | Waiting for manufacturer User manual | |||||||||||||||||||||||||||
| NAS I | 273 | Automatic Bypass Piller System | |||||||||||||||||||||||||||||||
| NAS I | 273 | Generators Control Panel | Key interlock, coil trip | ||||||||||||||||||||||||||||||
| NAS I | 273 | QIM | 160 | PQB | 1B-108 | ||||||||||||||||||||||||||||
| NAS I | 273 | BP | Boiler Panel | 100 | PQA | 1B-108 | |||||||||||||||||||||||||||
| NAS I | 273 | EMP | Emergency Main Panel | 2500 | LVS | 1B-115 | |||||||||||||||||||||||||||
| NAS I | 273 | MTS 1 | Manual Transfer Switch | 600 | NMPE/EMP | ||||||||||||||||||||||||||||
| NAS I | 273 | MTS 2 | Manual Transfer Switch | 400 | NMPE/EMP | ||||||||||||||||||||||||||||
| NAS I | 273 | MTS 3 | Manual Transfer Switch | 2500 | NMPE/EMP | ||||||||||||||||||||||||||||
| NAS I | 273 | MTS 4 | Manual Transfer Switch | 400 | LVS/EMP | ||||||||||||||||||||||||||||
| NAS I | 273 | MCQA | AHU Panel | 400 | |||||||||||||||||||||||||||||
| NAS I | 273 | MCQ4B | AHU Panel | 400 | |||||||||||||||||||||||||||||
| NAS I | 273 | MCQ3A | AHU Panel | 400 | |||||||||||||||||||||||||||||
| NAS I | 273 | MCQ3B | AHU Panel | 250 | |||||||||||||||||||||||||||||
| NAS II | 550 | MSB | Main Switchboard | 800 | External substation | Bldg # 531 | 1 | ||||||||||||||||||||||||||
| NAS II | 550 | Main Circuit Breaker | 800 | Key Interlock, coil trip | |||||||||||||||||||||||||||||
| NAS II | 550 | EGP | Emergency Generator Power | 1400 | 550 KVA GENERATOR | OUTSIDE | |||||||||||||||||||||||||||
| NAS II | 550 | Parallel Main Circuit Breaker | Motor Operated | ||||||||||||||||||||||||||||||
| DISTRIBUTION PANEL - 380/220 VOLT, 3 PHASES/ 5 WIRES, 50 HERTZ | |||||||||||||||||||||||||||||||||
| NAS I | 272 | 1AL1 | Light/Receptacle | Reference Section C, Annex 0200000 Management and Administration, Spec Item 2.6.2 Dissemination of Information | 63 | MDPA | A026 | ||||||||||||||||||||||||||
| NAS I | 272 | 1AL2 | Light/Receptacle | 63 | MDPA | A026 | |||||||||||||||||||||||||||
| NAS I | 272 | 1AL3 | Light/Receptacle | 63 | MDPA | A026 | |||||||||||||||||||||||||||
| NAS I | 272 | 1AM1 | Equipment | 160 | MDPA | A026 | |||||||||||||||||||||||||||
| NAS I | 272 | 1AB1 | Equipment | 63 | MDPA | A026 | |||||||||||||||||||||||||||
| NAS I | 272 | Hot Water Sys. DDC Panel | Equipment | ||||||||||||||||||||||||||||||
| NAS I | 272 | MS/P1 | Panel Motor Starter /P1 Heating System | ||||||||||||||||||||||||||||||
| NAS I | 272 | MS/P2 | Panel Motor Starter /P1 Heating System | ||||||||||||||||||||||||||||||
| NAS I | 272 | MS/P3 | Panel Motor Starter /P 1 Chilled Water | ||||||||||||||||||||||||||||||
| NAS I | 272 | MS/P4 | Panel Motor Starter /P1 Chilled Water | ||||||||||||||||||||||||||||||
| NAS I | 272 | VDF | Panel Motor Starter Ahu1 | ||||||||||||||||||||||||||||||
| NAS I | 272 | Air Heating A1 Exhaust Fan A1 DDC Control Panel | |||||||||||||||||||||||||||||||
| NAS I | 273 | NMP | Not Essential Loads | 800 | LVS | 1B-115 | |||||||||||||||||||||||||||
| NAS I | 273 | NMPE | Essential Electrical Distribution | 2500 | LVS | 1B-115 | |||||||||||||||||||||||||||
| NAS I | 273 | L1M | Not Essential Load | 100 | PDNB | 1B-108 | |||||||||||||||||||||||||||
| NAS I | 273 | LOL | Not Essential Load | 100 | PDNB | 1B-108 | |||||||||||||||||||||||||||
| NAS I | 273 | PDNA | Not Essential Load | 250 | NMP | 1B-108 | |||||||||||||||||||||||||||
| NAS I | 273 | PCA | Critical Branch | 100 | PDCA | 1B-108 | |||||||||||||||||||||||||||
| NAS I | 273 | PDCA | Critical Branch | 400 | NMPE | 1B-108 | |||||||||||||||||||||||||||
| NAS I | 273 | PQB | Critical Branch | 630 | PDQA | 1B-108 | |||||||||||||||||||||||||||
| NAS I | 273 | PQA | Critical Branch | 250 | PDQA | 1B-108 | |||||||||||||||||||||||||||
| NAS I | 273 | PDQA | Equipment Branch | 2500 | NMPE | 1B-108 | |||||||||||||||||||||||||||
| NAS I | 273 | E1M | Life Safety Branch | 100 | PDEA | 1B-108 | |||||||||||||||||||||||||||
| NAS I | 273 | PDEA | Life Safety Branch | 250 | NMPE | 1B-108 | |||||||||||||||||||||||||||
| NAS I | 273 | PCB | Critical Branch | 250 | PDQA | 1B-108 | |||||||||||||||||||||||||||
| NAS I | 273 | PDNC | Not Essential Load | 400 | NMP | 1B-108 | |||||||||||||||||||||||||||
| NAS I | 273 | PDNB | Not Essential Load | 250 | NMP | 1B-108 | |||||||||||||||||||||||||||
| NAS I | 273 | L1A | 100 | ||||||||||||||||||||||||||||||
| NAS I | 273 | E1A | 63 | ||||||||||||||||||||||||||||||
| NAS I | 273 | C1A | 63 | ||||||||||||||||||||||||||||||
| NAS I | 273 | Q1A | 63 | ||||||||||||||||||||||||||||||
| NAS I | 273 | W1A | |||||||||||||||||||||||||||||||
| NAS I | 273 | E1B | 63 | ||||||||||||||||||||||||||||||
| NAS I | 273 | L1B | 100 | ||||||||||||||||||||||||||||||
| NAS I | 273 | C1B-1 | Blood Depot Trans. Panel | 400 | |||||||||||||||||||||||||||||
| NAS I | 273 | C1B | 400 | ||||||||||||||||||||||||||||||
| NAS I | 273 | QIB | 100 | ||||||||||||||||||||||||||||||
| NAS I | 273 | Q1B-39 | 50 | ||||||||||||||||||||||||||||||
| NAS I | 273 | L1C | 100 | ||||||||||||||||||||||||||||||
| NAS I | 273 | C1C | 100 | ||||||||||||||||||||||||||||||
| NAS I | 273 | Q1C | 250 | ||||||||||||||||||||||||||||||
| NAS I | 273 | E1C | 100 | ||||||||||||||||||||||||||||||
| NAS I | 273 | E1D | 100 | ||||||||||||||||||||||||||||||
| NAS I | 273 | L1D | 125 | ||||||||||||||||||||||||||||||
| NAS I | 273 | C1D | 100 | ||||||||||||||||||||||||||||||
| NAS I | 273 | Q1D | 100 | ||||||||||||||||||||||||||||||
| NAS I | 273 | L2A | 100 | ||||||||||||||||||||||||||||||
| NAS I | 273 | E2A | 63 | ||||||||||||||||||||||||||||||
| NAS I | 273 | C2A | 63 | ||||||||||||||||||||||||||||||
| NAS I | 273 | Q2A | 63 | ||||||||||||||||||||||||||||||
| NAS I | 273 | L2B | 100 | ||||||||||||||||||||||||||||||
| NAS I | 273 | C2B | 63 | ||||||||||||||||||||||||||||||
| NAS I | 273 | Q2B | 63 | ||||||||||||||||||||||||||||||
| NAS I | 273 | E2B | 63 | ||||||||||||||||||||||||||||||
| NAS I | 273 | L3A | 100 | ||||||||||||||||||||||||||||||
| NAS I | 273 | E3A | 63 | ||||||||||||||||||||||||||||||
| NAS I | 273 | C3A | 63 | ||||||||||||||||||||||||||||||
| NAS I | 273 | Q3A | 100 | ||||||||||||||||||||||||||||||
| NAS I | 273 | L3B | 100 | ||||||||||||||||||||||||||||||
| NAS I | 273 | C3B | 63 | ||||||||||||||||||||||||||||||
| NAS I | 273 | E3B | 63 | ||||||||||||||||||||||||||||||
| NAS I | 273 | Q3B | 63 | ||||||||||||||||||||||||||||||
| NAS I | 273 | C3DP | 125 | ||||||||||||||||||||||||||||||
| NAS I | 273 | SP | 100 | ||||||||||||||||||||||||||||||
| NAS I | 273 | Q-1B31A | 32 | ||||||||||||||||||||||||||||||
| NAS I | 273 | Q-1B41A | 32 | ||||||||||||||||||||||||||||||
| NAS I | 273 | Q-1B11 | 50 | ||||||||||||||||||||||||||||||
| NAS I | 273 | CP6 | 63 | ||||||||||||||||||||||||||||||
| NAS I | 273 | DTP | Dental Trailer Main Panel | ||||||||||||||||||||||||||||||
| NAS I | 273 | DOR #70 Panel | |||||||||||||||||||||||||||||||
| NAS I | 273 | DOR #71 Panel | |||||||||||||||||||||||||||||||
| NAS I | 273 | DOR #72 Panel | |||||||||||||||||||||||||||||||
| NAS I | 273 | DOR #73 Panel | |||||||||||||||||||||||||||||||
| NAS I | 273 | DOR #74 Panel | |||||||||||||||||||||||||||||||
| NAS I | 273 | DOR #75 PaneL | |||||||||||||||||||||||||||||||
| NAS I | 273 | DOR #76 Panel | |||||||||||||||||||||||||||||||
| NAS I | 273 | DOR #93 Panel | |||||||||||||||||||||||||||||||
| NAS I | 273 | DOR #91 Panel | |||||||||||||||||||||||||||||||
| NAS I | 273 | DOR #90 Panel | |||||||||||||||||||||||||||||||
| NAS I | 273 | EP | Room 1B-117 and 1B-118 | ||||||||||||||||||||||||||||||
| NAS I | 273 | Light Panel Penthouse? | LPP2 | 40 | |||||||||||||||||||||||||||||
| NAS I | 273 | Light Panel Penthouse? | LPP1 | 40 | |||||||||||||||||||||||||||||
| NAS I | 273 | Light Panel Penthouse? | LPP3 | 40 | |||||||||||||||||||||||||||||
| NAS I | 310 | LW | Seat Panel (BLDG. #310) | 100 | |||||||||||||||||||||||||||||
| NAS II | 550 | NGP | Light/Receptacle | 300 | MSB | G-23 | |||||||||||||||||||||||||||
| NAS II | 550 | IP | Receptacle/Exam Lights | 200 | MSB | G-23 | |||||||||||||||||||||||||||
| NAS II | 550 | N1P | Light/Receptacle | 300 | MSB | G-23 | |||||||||||||||||||||||||||
| NAS II | 550 | N1PU | Dental Chairs | 200 | MSB | G-23 | |||||||||||||||||||||||||||
| NAS II | 550 | MP | Equipment | 300 | MSB | G-23 | |||||||||||||||||||||||||||
| NAS II | 550 | MP1 | Equipment | 300 | MSB | G-23 | |||||||||||||||||||||||||||
| NAS II | 550 | BP | Equipment | 150 | MSB | G-23 | |||||||||||||||||||||||||||
| NAS II | 550 | EP | Elevator Panel | MSB | G-23 |
Page &P of &N
3.3.14 REVERSE OSM WATER PURIF
| ATTACHMENT J-1502000-06 |
| REVERSE OSMOSIS AND WATER PURIFICATION SYSTEMS DESCRIPTION |
| SITE | BLDG | EQUIPMENT DESCRIPTION | MRF | MODEL NO. | LOCATION | QTY | REMARKS |
| NAS I | 273 | Reverse Osmosis System | Cillichemie | GIGA UO2000 | Reference Section C, Annex 0200000 Management and Administration, Spec Item 2.6.2 Dissemination of Information | 1 | |
| NAS I | 273 | Carbon Filter | Cillichemie | Filtromat Plus CA 3,5 PF | 1 | ||
| NAS I | 273 | Deferrizzatore Chiarificatore | Cillichemie | Filtromat Plus EE4N | 1 | ||
| NAS I | 273 | Sand filter | Cillichemie | Filtromat SF 2A | 1 | ||
| NAS I | 273 | UV disinfection system | Cillichemie (Sterilight) | SP320-HO/2 | 1 | ||
| NAS II | 550 | Reverse Osmosis System | OSMOMEDICAL | 1 |
Page &P of &N
3.3.15 AST AND UST
| ATTACHMENT J-1502000-06 |
| ABOVEGROUND (AST) AND UNDERGROUND (UST) STORAGE TANKS DESCRIPTION |
| SITE | BLDG | DESCRIPTION | MANUFACTURER | MODEL NO. | LOCATION | QTY | YEAR INSTALLED | REMARKS |
| NAS I | 273 | Underground Sewage Storage Tank | Reference Section C, Annex 0200000 Management and Administration, Spec Item 2.6.2 Dissemination of Information | 1 | 12000 gal, underground w/200 GPM@40 ft lift pump | |||
| NAS I | 273 | Underground Decontamination Storage Tank | 1 | 12000 gal, underground w/200 GPM@40 ft lift pump | ||||
| NAS I | 273 | Aboveground Fuel Oil Storage Tank | Supervault | MH | 2 | 2012 / 2016 | 15,000 liters each | |
| NAS I | 273 | Aboveground Fuel Oil Day Tank | Di Martino | 1 | 2012 | 2000 liters | ||
| NAS II | 550 | Aboveground Fuel Tank | 1 | 2001 | Concrete Convault Tank Of 2000 Gallons (7570 Liters) |
Page &P of &N
OVERHEAD AND ROLL-UP DOORS DESC
| ATTACHMENT J-1502000-06 |
| OVERHEAD AND ROLL-UP DOORS DESCRIPTION |
| SITE | BLDG | LOCATION | EQUIPMENT DESCRIPTION | QUANTITY | REMARKS |
| NAS I | 273 | Reference Section C, Annex 0200000 Management and Administration, Spec Item 2.6.2 Dissemination of Information | Roll-Up Shutter | 3 | |
| NAS I | 310 | Roll-Up Door Operator | 2 | w/electric motor | |
| NAS II | 550 | Electric Shutter | 8 |
3.3.18 DRINK FOUNT & WATER COOL
| ATTACHMENT J-1502000-06 | |||
| DRINKING FOUNTAINS AND WATER COOLERS DESCRIPTION | |||
| SITE | BLDG | DESCRIPTION | QTY |
| NAS I | 273 | Drinking Fountain & Water Cooler | 8 |
| NAS I | 272 | Drinking Fountain & Water Cooler | 1 |
| NAS I | 310 | Drinking Fountain & Water Cooler | 1 |
| NAS II | 550 | Electric Water Cooler - R2202 | 4 |
Page &P of &N
3.3.20 EMERGENCY EYEWASH STAT
| ATTACHMENT J-1502000-06 | |||||||
| EMERGENCY EYEWASH STATIONS DESCRIPTION | |||||||
| BLDG | SITE | EQUIPMENT DESCRIPTION | GROUND FLOOR | 1ST FLOOR | 2ND FLOOR | 3RD FLOOR | OTHER |
| 273 | NAS I | Eye Wash With Mixing Valve | 6 | 4 | |||
| 273 | NAS I | Emergency Shower & Eye Wash/Mixing Valve - Safety Deluge | 2 | 1 Outside | |||
| 550 | NAS II | Eyewash Station / P1960 | 3 | 2 |
3.3.21 IRRIGATION SYSTEM
| ATTACHMENT J-1502000-06 |
| IRRIGATION SYSTEM |
| Location: NAS I | |||||
| Proximity | Type (Automated/ Manual) | Control Valve Boxes | Electrical Connection Boxes | Timers | Remarks |
| Bldg. 272 | Automated | 6 | 1 | Main electrical control panel and timer are located in Bldg. 272 / 1"1/4 Solenoid Valve: 8 ea. / Irrigator: 130 ea. |
Bldg. 273 Automated 7 1 Main electrical control panel and timer are located in Bldg. 273 / 2" Solenoid Valve: 5 ea. / 3" Solenoid Valve: 2 ea. / Irrigator: 70 ea.
Bldg. 310 Manual 1
3.4.1 HVAC AND REFRIGERATION
| ATTACHMENT J-1502000-06 | ||||||||
| HVAC AND REFRIGERATION SYSTEMS AND EQUIPMENT DESCRIPTION | ||||||||
| FANS | ||||||||
| BLDG | SITE | FAN NO. | LOCATION | MOTOR | FAN TYPE | EMERGENCY POWER DURING | ||
| KW | VOLTS | NORMAL MODE | BC MODE | |||||
| 272 | NAS I | EF-A1 | A028 | Centrifugal In Line Direct Driven | ||||
| 272 | NAS I | SF-A1 | A028 | Centrifugal In Line Direct Driven | ||||
| 273 | NAS I | EF 1-1 | See Note (1) | 0.75 | 220/1/50 | Centrifugal In-Line, Direct Driven | * | |
| 273 | NAS I | EF 1-2 | 0.75 | 380/3/50 | Centrifugal In-Line, Direct Driven | * | ||
| 273 | NAS I | EF 3-1 | 0.75 | 380/3/50 | Centrifugal In-Line, Direct Driven | * | ||
| 273 | NAS I | EF 3-2 | 4 | 380/3/50 | Centrifugal In-Line, Direct Driven | * | ||
| 273 | NAS I | EF 3-3 | 0.75 | 380/3/50 | SWSI Centrifugal Fan, Belt Driven, | * | ||
| 273 | NAS I | EF 4-1 | 4 | 380/3/50 | Mixed Flow, Belt Driven | * | ||
| 273 | NAS I | EF 4-2 | 1.1 | 380/3/50 | Centrifugal In-Line, Direct Driven | * | ||
| 273 | NAS I | EF 4-3 | 0.55 | 220/1/50 | Centrifugal In-Line, Direct Driven | * | ||
| 273 | NAS I | EF 5-1 | 1.1 | 380/3/50 | Centrifugal In-Line, Direct Driven | * | ||
| 273 | NAS I | EF 5-2 | 1.1 | 380/3/50 | Centrifugal In-Line, Direct Driven | * | ||
| 273 | NAS I | EF 5-3 | 1.5 | 380/3/50 | SWSI Centrifugal Fan, Belt Driven, | * | ||
| 273 | NAS I | EF 5-4 | 1.5 | 380/3/50 | SWSI Centrifugal Fan, Belt Driven, | * | ||
| 273 | NAS I | EF 6-1 | 0.75 | 220/1/50 | Centrifugal In-Line, Direct Driven | * | ||
| 273 | NAS I | EF 6-2 | 1.1 | 380/3/50 | Centrifugal In-Line, Direct Driven | * | ||
| 273 | NAS I | EF 6-3 | 1.1 | 380/3/50 | Centrifugal In-Line, Direct Driven | * | ||
| 273 | NAS I | EF 6-4 | 0.37 | 220/1/50 | Centrifugal In-Line, Direct Driven | * | ||
| 273 | NAS I | EF 6-5 | 0.75 | 380/3/50 | SWSI Centrifugal Fan, Belt Driven, | * | ||
| 273 | NAS I | EF 7-1 | 0.55 | 220/1/50 | Centrifugal Roof Exhauster, Belt | * | ||
| 273 | NAS I | EF 7-2 | 0.37 | 220/1/50 | Centrifugal Roof Exhauster, Belt | * | ||
| 273 | NAS I | EF 8-1 | 0.37 | 220/1/50 | Centrifugal Roof Exhauster, Belt | * | ||
| 273 | NAS I | EF 9-1 | 0.37 | 220/1/50 | Centrifugal Roof Exhauster, Belt | * | ||
| 273 | NAS I | EF 9-2 | 0.37 | 220/1/50 | Centrifugal Roof Exhauster, Belt | * | ||
| 273 | NAS I | EF 10-1 | 0.37 | 220/1/50 | Centrifugal Roof Exhauster, Belt | * | ||
| 273 | NAS I | EF 11-1 | 0.37 | 220/1/50 | Centrifugal Roof Exhauster, Belt | * | ||
| 273 | NAS I | EF 11-2 | 0.37 | 220/1/50 | Centrifugal Roof Exhauster, Belt | * | ||
| 273 | NAS I | EF 12-1 | 0.37 | 220/1/50 | Centrifugal Roof Exhauster, Belt | * | ||
| 273 | NAS I | EF 13-1 | 0.37 | 220/1/50 | Centrifugal Roof Exhauster, Belt | * | ||
| 273 | NAS I | EF 13-2 | 0.37 | 220/1/50 | Centrifugal Roof Exhauster, Belt | * | ||
| 273 | NAS I | EF 13-3 | 0.37 | 220/1/50 | Centrifugal Roof Exhauster, Belt | * | ||
| 273 | NAS I | EF 14-1 | 0.37 | 220/1/50 | Centrifugal Roof Exhauster, Belt | * | ||
| 273 | NAS I | EF 14-2 | 0.37 | 220/1/50 | Centrifugal Roof Exhauster, Belt | * | ||
| 273 | NAS I | EF 15 | 2.2 | 380/3/50 | Vaneaxial Fan, Aerofoil Blade | * | ||
| 273 | NAS I | EF 16 | 9 | 380/3/50 | Variable-Pitch-in-Motion Fan, | * | * | |
| 273 | NAS I | EF 17 | 9 | 380/3/50 | Variable-Pitch-in-Motion Fan, Aerofoil Blade, Single-Stage | * | * | |
| 273 | NAS I | EF 18 | 0.75 | 380/3/50 | SWSI Centrifugal Fan, Belt Driven, Corr. Resist. Expl proof | * | * | |
| 273 | NAS I | EF 19 | 1.5 | 380/3/50 | Vane axial Fan, Aerofoil Blade Single-Stage, Direct driven | * | ||
| 273 | NAS I | EF 20 | 1.1 | 380/3/50 | Vane axial Fan, Aerofoil Blade Single-stage, Direct driven | * | * | |
| 273 | NAS I | EF-22 | 3 | 380/3/50 | Vane axial Fan, Aerofoil Blade Single Stage, Direct Driven | * | ||
| 273 | NAS I | SF-1 | 2.2 | 380/3/50 | Vane axial Fan, Aerofoil Blade Single stage, Direct driven | |||
| 273 | NAS I | SF-2 | 30 | 380/3/50 | Variable-Pitch-in-Motion Fan, Aerofoil Blade, Single Stage | |||
| 273 | NAS I | SF-3 | 2.2 | 380/3/50 | Vaneaxial Fan, Aerofoil Blade Two stage, Single Driven | |||
| 273 | NAS I | SF 4 | 0.37 | 220/1/50 | Centrifugal In-Line, Direct Driven | |||
| 273 | NAS I | SF-5 | 9 | 380/3/50 | Vane axial Fan, Aerofoil Blade Single stage Direct Driven | |||
| 273 | NAS I | SF-6 | 9 | 380/3/50 | Vane axial Fan, Aerofoil Blade Single stage, Direct Driven | |||
| 273 | NAS I | SF-8 | 2.2 | 380/3/50 | Vane axial Fan, Aerofoil Blade Single Stage, Direct Driven | |||
| 550 | NAS II | EF-1 | 0.37 | 380 | Centrifugal In Line Direct Driven | |||
| 550 | NAS II | EF-2 | 0.55 | 380 | Centrifugal In Line Direct Driven | |||
| 550 | NAS II | VF-1 | 0.25 | 220 | Centrifugal In Line Direct Driven | |||
| 550 | NAS II | VF-2 | 0.18 | 220 | Centrifugal In Line Direct Driven | |||
| 550 | NAS II | VF-3 | 0.75 | 380 | Centrifugal In Line Direct Driven | |||
| 550 | NAS II | VF-4 | 0.48 | 380 | Centrifugal In Line Direct Driven | |||
| 550 | NAS II | VF-5 | 0.25 | 380 | Centrifugal In Line Direct Driven | |||
| 550 | NAS II | VF-6 | 1 | 380 | Centrifugal In Line Direct Driven | |||
| 550 | NAS II | VF-7 | 1 | 380 | Centrifugal In Line Direct Driven | |||
| 550 | NAS II | PF-1 | 0.25 | 220 | Centrifugal In Line Direct Driven | |||
| 550 | NAS II | PF-2 | 0.18 | 220 | Centrifugal In Line Direct Driven | |||
| 310 | NAS I | EF-1 | ||||||
| 310 | NAS I | EF-2 |
| 550 | NAS II | AHU-1 | G-22 | 11 | 380 | 11 | 380 | 122.6 | * | * | * | |||||||
| 550 | NAS II | AHU-2 | 27426 | 11 | 380 | 11 | 380 | 120 | * | * | * | |||||||
| 310 | NAS I | AHU-1 | Outside | * | * | * | ||||||||||||
| AIR HANDLING UNITS NEW SETUP | ||||||||||||||||||
| BLDG | SITE | AHU NO. | LOCATION | FAN MOTOR | COIL | HUM. | ||||||||||||
| (kW) | FILTERS* (Supply) | FILTERS* (Return/Exhaust/Recovery) | SOUND | |||||||||||||||
| SUPPLY AIR | RETURN AIR | |||||||||||||||||
| KW | VOLTS | KW | VOLTS | COOL | HEAT | PRE | AFTER | EXHAUST | RETURN | RECOVERY | ATTENUATOR | NORMAL MODE | ||||||
| 272 | NAS I | AHU-A1 | A028 | 7.5 | 230/3 | 7.5 | 230/3 | * | * | * | * | * | * | |||||
| 273 | NAS I | AHU-1 | See Note (1) | 11.00 (2ea) | 400/3/50 | 2.50 (ea2) | 400/3/50 | 2 | G4 | F9 | G4 | * | * | |||||
| 273 | NAS I | AHU-2 | 11.0 (2ea) | 400/3/50 | 5.05 (ea2) | 400/3/50 | 2 | G4 | F9 | M5 | G4 | * | * | |||||
| 273 | NAS I | AHU-3 | 15.00 (2ea) | 400/3/50 | 3.45 (ea2) | 400/3/50 | 2 | G4 | F9 | G4 | * | * | ||||||
| 273 | NAS I | AHU-4 | 5.05 (ea2) | 400/3/50 | 2.90 (ea2) | 400/3/50 | 2 | 2 | G4 | F9 | G4 | * | ||||||
| 273 | NAS I | AHU-5 | 15.00 (2ea) | 400/3/50 | 3.45 (ea2) | 400/3/50 | 2 | 2 | 26.25 | G4 | F9 | M5 | G4 | * | * | |||
| 273 | NAS I | AHU-6 | 18.50 (2ea) | 400/3/50 | 5.70 (ea2) | 400/3/50 | 2 | G4 | F9 | G4 | * | * | ||||||
| 273 | NAS I | AHU-7 | 22.00 (2ea) | 400/3/50 | 15.00 (ea2) | 400/3/50 | 2 | G4 | F9 | M5 | G4 | * | * | |||||
| 273 | NAS I | AHU-8 | 4.00 (2ea) | 400/3/50 | 1.23 (ea2) | 400/3/50 | 2 | G4 | F9 | M5 | G4 | * | * | |||||
| 273 | NAS I | AHU-9 | 7.50 (2ea) | 400/3/50 | 3.45 (ea2) | 400/3/50 | 2 | G4 | F9 | G4 | * | * | ||||||
| 273 | NAS I | AHU-10 | 0.82 (1 ea) | 400/3/50 | 400/3/50 | 1 | 1 | 3.75 | F9 | * | ||||||||
| 273 | NAS I | AHU-11 | 7.50 (2ea) | 400/3/50 | 2.50 (ea2) | 400/3/50 | 2 | 2 | 11.25 | G4 | F9 | M5 | * | * | ||||
| 273 | NAS I | AHU-12 | 7.50 (2ea) | 400/3/50 | 2.50 (ea2) | 400/3/50 | 2 | G4 | F9 | M5 | G4 | * | * | |||||
| 273 | NAS I | AHU-13 | 5.50 (2ea) | 400/3/50 | 1.74 (ea2) | 400/3/50 | 2 | G4 | F9 | G4 | * | * | ||||||
| 273 | NAS I | AHU-14 | 7.50 (2ea) | 400/3/50 | 2.50 (ea2) | 400/3/50 | 2 | G4 | F9 | M5 | G4 | * | * | |||||
| 273 | NAS I | AHU-15 | 7.50 (2ea) | 400/3/50 | 2.50 (ea2) | 400/3/50 | 2 | 2 | 13.5 | G4 | F9+H14 | M5 | G4 | * | * | |||
| 273 | NAS I | AHU-16 | 2.95 (2ea) | 400/3/50 | 1.05 (ea2) | 400/3/50 | 2 | 2 | 11.25 | G4 | F9+H14 | M5 | * | * | ||||
| * See separated filter schedule for more details |
| COMPUTER ROOM AIR CONDITIONING | ||||||||||||||
| BLDG | SITE | AHU NO. | LOCATION | COOLING CAPACITY | FAN | ELECTRIC HEATING | ELECTRICAL DATA | |||||||
| TOTAL | SENSIBLE | ENTERING AIR TEMP. | Qty | AIR FLOW | ESP | N. POWER | STEPS | ABS. POWER | ||||||
| KW | KW | DB (°C) | RH (%) | l/s | Pa | KW | Kw | V/Ph/Hz | ||||||
| 272 | NAS I | AHU-A1 | A028 | 7.5 | 230/3 | 7.5 | 230/3 | * | * | * | * | |||
| 273 | NAS I | CRAC-1 | See Note (1) | 11.00 (2ea) | 400/3/50 | 2.50 (ea2) | 400/3/50 | 1 | 3190 | 20 | 2.4 | 3 | 13.5 | 400/3/50 |
| 273 | NAS I | CRAC-2 | 11.0 (2ea) | 400/3/50 | 5.05 (ea2) | 400/3/50 | 1 | 3190 | 20 | 2.4 | 3 | 13.5 | 400/3/50 |
| CONSTANT VOLUME TERMINAL REHEAT BOXES | ||||||
| BLDG | SITE | AHU NO. | QTY OF BOXES | VALVES | NOTES | |
| 3-WAY | 2-WAY | |||||
| 272 | NAS I | 1 | 11 | 11 Valves | ||
| 273 | NAS I | 1 | 14 | 1 | 13 | |
| 273 | NAS I | 2 | 8 | 2 | 6 | |
| 273 | NAS I | 3 | 25 | 1 | 24 | |
| 273 | NAS I | 5 | 25 | 3 | 22 | |
| 273 | NAS I | 6 | 17 | 3 | 14 | |
| 273 | NAS I | 7 | 36 | 2 | 34 | |
| 273 | NAS I | 8 | 8 | 1 | 7 | |
| 273 | NAS I | 9 | 15 | 1 | 14 | |
| 273 | NAS I | 11 | 13 | 2 | 11 | |
| 273 | NAS I | 12 | 15 | 1 | 14 | |
| 273 | NAS I | 13 | 10 | 1 | 9 | |
| 273 | NAS I | 14 | 14 | 0 | 14 | |
| 273 | NAS I | 15 | 2 | 0 | 2 | |
| 550 | NAS II | 1 | 20 | 20 Valves | ||
| 550 | NAS II | 2 | 18 | 18 Valves |
| PACKAGED AIR COOLED WATER CHILLER | |||||||||||
| BLDG | SITE | CHILLER NO. | LOCATION | MFG | MODEL NO. | SERIAL NO. | CAPACITY | MOTOR | SUMP HTR | CHEMICAL FEED SYSTEM | |
| KW | VOLTS | ||||||||||
| 272 | NAS I | CH-1 | See Note (1) | TRANE | CGAM 026 | 70 kW | 25 kW | 400/3/50 | TRANE | ||
| 550 | NAS II | CH-1 | TRANE | 242.5 KW | 110 | 380 | |||||
| 310 | NAS I | CH-1 | BLUEBOX | 400/3/50 | * |
| HERMETIC CENTRIFUGAL WATER CHILLER | |||||||||||
| BLDG | SITE | CHILLER NO. | LOCATION | MFG | MODEL NO. | SERIAL NO. | CAPACITY | MOTOR | NORMAL MODE | STARTER TYPE | |
| KW | VOLTS | ||||||||||
| 273 | NAS I | WCU-1 | See Note (1) | 360 | 214 | 380/3/50 | * | Star-Delta | |||
| 273 | NAS I | WCU-2 | 360 | 214 | 380/3/50 | * | Star-Delta | ||||
| 273 | NAS I | Air Cooled Ref. Reclaim | 220/1/50 | * | Star-Delta |
| COOLING TOWER | |||||||||||
| BLDG | SITE | CHILLER NO. | LOCATION | MFG | MODEL NO. | SERIAL NO. | CAPACITY | MOTOR | NORMAL MODE | STARTER TYPE | |
| KW | VOLTS | ||||||||||
| 273 | NAS I | CT-1 | See Note (1) | 1015 | 22 | 380/3/50 | * | ||||
| 273 | NAS I | CT-2 | 1015 | 22 | 380/3/50 | * |
| VARIABLE FREQUENCY DRIVE | ||||||||||
| BLDG | SITE | FAN NO. | LOCATION | MFG | MODEL NO. | MOTOR | FAN TYPE | NOTES | ||
| KW | VOLTS | |||||||||
| UNIT | LOCATION | VFD | Qnt | BRUSHLESS | Qnt | |||||
| RF AHU16 | See Note (1) | Y | 2 | |||||||
| SF AHU16 | Y | 2 | ||||||||
| RF AHU15 | Y | 2 | ||||||||
| SF AHU15 | ABB ACH 580 | 2 | ||||||||
| RF AHU14 | Y | 2 | ||||||||
| SF AHU14 | ABB ACH 580 | 2 | ||||||||
| RF AHU13 | Y | 2 | ||||||||
| SF AHU13 | ABB ACH 580 | 2 | ||||||||
| RF AHU12 | Y | 2 | ||||||||
| SF AHU12 | ABB ACH 580 | 2 | ||||||||
| RF AHU11 | Y | 2 | ||||||||
| SF AHU11 | ABB ACH 580 | 2 | ||||||||
| SF AHU10 | Y | 1 | ||||||||
| RF AHU9 | Y | 2 | ||||||||
| SF AHU9 | ABB ACH 580 | 2 | ||||||||
| RF AHU8 | Y | 2 | ||||||||
| SF AHU8 | ABB ACH 580 | 2 | ||||||||
| RF AHU7 | ABB ACH 580 | 2 | ||||||||
| SF AHU7 | ABB ACH 580 | 2 | ||||||||
| RF AHU6 | Y | 2 | ||||||||
| SF AHU6 | ABB ACH 580 | 2 | ||||||||
| RF AHU5 | Y | 2 | ||||||||
| SF AHU5 | ABB ACH 580 | 2 | ||||||||
| RF AHU4 | Y | 2 | ||||||||
| SF AHU4 | Y | 2 | ||||||||
| RF AHU3 | Y | 2 | ||||||||
| SF AHU3 | ABB ACH 580 | 2 | ||||||||
| RF AHU2 | Y | 2 | ||||||||
| SF AHU2 | ABB ACH 580 | 2 | ||||||||
| RF AHU1 | Y | 2 | ||||||||
| SF AHU1 | ABB ACH 580 | 2 | ||||||||
| 273 | NAS I | CZP2 | See Note (1) | GHISALBA | 6 | 380/3/50 | Centrifugal In Line Direct Driven | |||
| 273 | NAS I | CZP3 | GHISALBA | 15 | 380/3/50 | Centrifugal In Line Direct Driven | ||||
| 273 | NAS I | CT1 | GHISALBA | 40 | 380/3/50 | Centrifugal In Line Direct Driven | ||||
| 273 | NAS I | CT2 | GHISALBA | 40 | 380/3/50 | Centrifugal In Line Direct Driven | ||||
| 272 | NAS I | SF AHU-1 | ABB | 110/3/50 | Centrifugal In Line Direct Driven | |||||
| 550 | NAS II | SF AHU-1 | GHISALBA | VFD | 380/3/50 | Centrifugal In Line Direct Driven | ||||
| 550 | NAS II | SF AHU-2 | GHISALBA | VFD | 380/3/50 | Centrifugal In Line Direct Driven |
| HUMIDIFIERS | |||||||
| BLDG | SITE | HUMIDIFIER NO. | LOCATION | GENERATOR | VOLTS | NORMAL MODE | NOTES |
| 273 | NAS I | HU-11 | See Note (1) | * | 380/3/50 | * | QTY 1 |
| 273 | NAS I | HU-15 | * | 380/3/50 | * | QTY 1 | |
| 273 | NAS I | HU-16 | * | 380/3/50 | * | QTY 1 |
| PUMPS | ||||||||||||||
| BLDG | SITE | PUMP NO. | LOCATION | MFG | MODEL NO. | PUMP | MOTOR | APPL. | TYPE | NEMA STARTER | NOTE | |||
| L/S | KPa | KW | RPM | VOLTS | ||||||||||
| 272 | NAS I | P1 | See Note (1) | Grundfos | TP 3280/4 | Heating Water | Centrifugal end suction | One stand by | ||||||
| 272 | NAS I | P2 | Grundfos | TP 3280/4 | Heating Water | Centrifugal end suction | One stand by | |||||||
| 272 | NAS I | P3 | Grundfos | TP 50190/4 | Chilled Water | Centrifugal end suction | One stand by | |||||||
| 272 | NAS I | P4 | Grundfos | TP 50190/4 | Chilled Water | Centrifugal end suction | One stand by | |||||||
| 273 | NAS I | CWP1 | Grundfos | NK125-250 | 17.1 | 16/120 | 18.5 | 1460 | 380 | Chiller | ||||
| 273 | NAS I | CWP2 | Grundfos | NK125-250 | 17.1 | 16/120 | 18.5 | 1460 | 380 | Chiller | ||||
| 273 | NAS I | HW2P1 | KSB | ANORM | 92 | 16/120 | 380 | Chiller | ||||||
| 273 | NAS I | HW2P2 | KSB | ANORM | 92 | 16/120 | 380 | Chiller | ||||||
| 273 | NAS I | CLP1 | Grundfos | NK125 | 13 | 16/120 | 11 | 1460 | 380 | Chiller | ||||
| 273 | NAS I | CLP2 | Grundfos | NK125 | 13 | 16/120 | 11 | 1460 | 380 | Chiller | ||||
| 273 | NAS I | CZP1 | Grundfos | 3MOT | 19.7 | 16/120 | 3.5 | 84 | 220 | Chiller | ||||
| 273 | NAS I | CZP2 | Grundfos | 3MOT | 19.7 | 16/120 | 3.5 | 84 | 220 | Chiller | ||||
| 273 | NAS I | CZP3 | Grundfos | 3MOT | 19.7 | 16/120 | 3.5 | 84 | 220 | Chiller | ||||
| 273 | NAS I | CWP3 | Grundfos | MG1325-02 | 37.8 | 16/120 | 7.5 | 88 | 380 | Chiller | ||||
| 273 | NAS I | CWP4 | Grundfos | MG1325-02 | 37.8 | 16/120 | 7.5 | 88 | 380 | Chiller | ||||
| 273 | NAS I | N/A | Luigi Biraghi | R41-C | 4.2 | 10 | 1.6 | 0.33 | 220 | Recirc. Hot Water | ||||
| 273 | NAS I | N/A | Bosetti | CVC80 | 14.5 | 43145 | 11.2 | 1710 | 380 | Lift Station | ||||
| 273 | NAS I | N/A | Bosetti | CVC80 | 14.5 | 43145 | 11.2 | 1710 | 380 | Lift Station | ||||
| 273 | NAS I | HWPP1 | Ksb | 5.5 | 14/15 | 11 | 1415 | 380 | Hot Water System | |||||
| 273 | NAS I | HWPP2 | Ksb | 5.5 | 14/15 | 11 | 1415 | 380 | Hot Water System | |||||
| 273 | NAS I | DHWP1 | Ksb | R10VAR | N | N | 11 | 1400 | 380 | DHW Recir. | ||||
| 273 | NAS I | DHWP2 | Ksb | R10VAR | N | N | 11 | 1400 | 380 | DHW Recir. | ||||
| 273 | NAS I | DCWP1 | DAB | 5.5 | 15/39 | 5.5 | 2910 | 380 | Dom. Cold Water | Vertical | ||||
| 273 | NAS I | DCWP2 | DAB | 5.5 | 15/39 | 5.5 | 2910 | 380 | Dom. Cold Water | Vertical | ||||
| 273 | NAS I | DCWP3 | DAB | 5.5 | 15/39 | 5.5 | 2910 | 380 | Dom. Cold Water | Vertical | ||||
| 273 | NAS I | FP1 | US Elect. Motors | A959 | 16 | 16/8 | 16 | 2900 | 380 | Fire System | ||||
| 273 | NAS I | FP2 | Reliance | 1MAF | N | 52/73 | 75 | 2945 | 380 | Fire System | ||||
| 273 | NAS I | DP1 | Hydra | EM4470 | 0.65 | 3.4/2 | 0.55 | 1700 | 220 | Daily Tank | ||||
| 273 | NAS I | DP2 | Hydra | EM4470 | 0.65 | 3.4/2 | 0.55 | 1700 | 220 | Daily Tank | ||||
| 273 | NAS I | DP3 | Hydra | EM4470 | 0.65 | 3.4/2 | 0.55 | 1700 | 220 | Boiler | ||||
| 273 | NAS I | DP3 | Hydra | EM4470 | 0.65 | 3.4/2 | 0.55 | 1700 | 220 | Boiler | ||||
| 273 | NAS I | Autoclave | Grundfos | F44502106 | 6.7 | 33025 | 31,3 | 1460 | 220 | Sterilizer Water | ||||
| 273 | NAS I | SP1 | Calpeda | 1209391499 | 16438 | 1.1 | 2900 | 380 | Steam Boiler | Vertical | ||||
| 273 | NAS I | SP2 | Calpeda | 1209391499 | 16438 | 1.1 | 2900 | 380 | Steam Boiler | Vertical | ||||
| 550 | NAS II | CHP-1 | 11.58 | 257 | 5.5 | 2900 | 380 | Chilled Water | Centrifugal end suction | 1 | One stand by | |||
| 550 | NAS II | CHP-2 | 11.58 | 257 | 5.5 | 2900 | 380 | Chilled Water | Centrifugal end suction | 0 | One stand by | |||
| 550 | NAS II | HWP-1 | 4.22 | 104 | 1.1 | 1450 | 380 | Heating Water | Centrifugal end suction | 0 | One stand by | |||
| 550 | NAS II | HWP-2 | 4.22 | 104 | 1.1 | 1450 | 380 | Heating Water | Centrifugal end suction | 0 | One stand by | |||
| 550 | NAS II | HWP-3 | 1.23 | 6 | 0.15 | 2000 | 220 | Boiler Recirculation | In-Line | 0 | ||||
| 550 | NAS II | CP-1 | 0.23 | 40 | 0.1 | 1400 | 220 | DHW Recirculation | In-Line | 0 | ||||
| 273 | NAS I | KSB | RIOVAR 24-8E | Heating Water AHU4 | In-Line | |||||||||
| 273 | NAS I | KSB | RIOVAR 44-18D | Heating Water AHU5 | In-Line | |||||||||
| 273 | NAS I | Ksb | RIOVAR 25-07 | Heating Water AHU11 | In-Line | |||||||||
| 273 | NAS 2 | Fuel Pump | In-line |
| DDC EQUIPMENT | ||||
| SITE | SITE | EQUIPMENT DESCRIPTION | LOCATION | NOTES |
| 272 | NAS I | Operator’s Terminal | See Note (1) | |
| 272 | NAS I | Controller | ||
| 273 | NAS I | Operator’s Terminal | ||
| 273 | NAS I | Controller | ||
| 273 | NAS I | Alarm Monitor | ||
| 273 | NAS I | Computer | ||
| 273 | NAS I | Operator Room Temp Display | ||
| 273 | NAS I | Operator Room Temp Display | ||
| 273 | NAS I | Operator Room Temp Display | ||
| 273 | NAS I | AHU DDC Panel | QTY. 16 | |
| 273 | NAS I | CRAC Units DDC Panel | QTY. 2 | |
| 550 | NAS II | Operator’s Terminal | ||
| 550 | NAS II | Controller | ||
| 550 | NAS II | Alarm Monitor | ||
| 550 | NAS II | Computer | ||
| 550 | NAS II | Printer | ||
| 310 | NAS I | Controller AHU |
| OTHER MECHANICAL/ELECTRICAL SYSTEMS AND EQUIPMENT - NON- COMMERCIAL REFRIGERATORS | |||||||||
| COMPLETE OZONE DEPLETING SUBSTANCE (ODS) & NON-ODS SURVEY OF AIR CONDITIONING AND REFRIGERATION USNH Sigonella, Sicily, Italy EQUIPMENT | |||||||||
| DATE OF SURVEY | BLDG | SITE | MANUFACTURER | MFR DATE | EQUIMENT DESCRIPTION | LOCATION OF EQUIMENT (or SERVICE) | MODEL NO. | SERIAL NO. | REFRIG. |
| 5/6/11 | 272 | NAS I | GE | Commercial Refer. | See Note (1) | GTG22FBMARWN | VG300586 | R-134A | |
| 7/22/11 | 273 | NAS I | Harris | 2011 | Hematology Freezer #20 | MBF-700LSAW-R17 | O25W-301422-PW | R-134A/R-404A | |
| 7/22/11 | 273 | NAS I | Harris | 2011 | Hematology Freezer #16 | MBF-700LSAW-R17 | O25W-301423-PW | R-134A/R-404A | |
| 5/6/11 | 273 | NAS I | Revco | N/A | Freezer Lab. ECN: 042104 | ULT2140-3-V36 | R28N-631854-SN | R-134A/R-404A |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .