J-0200000 -12 ELINs Sigonella.xlsx
XLSX spreadsheet 956 KB Posted
- Solicitation number
- N6247025R0020
About this file
This is an Excel-based Line Item Number (ELIN) pricing document for a Base Operations Support (BOS) contract at Naval Air Station Sigonella in Sicily, Italy. The document details an extensive list of recurring and non-recurring work items across multiple facility management categories, including facility investment, custodial services, pest control, solid waste management, grounds maintenance, transportation, and environmental services for various Navy and Department of Defense organizations.
The pricing template covers 21 distinct organizational units (such as Commander Naval Region Europe, MWR, NEXCOM, DHA, DeCA, and others), with each unit having multiple line items for specific services like emergency/urgent/routine work, preventive maintenance, facility inspections, utility management, and specialized services like bus transportation and chemical product procurement. The document is structured to capture unit prices for 12-month periods across base, first, second, third, and fourth option years, with each ELIN representing a specific service category and sub-category. While no actual pricing is filled in, the template provides a comprehensive framework for detailed service pricing across naval facilities at Sigonella.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN 001 - Base Period - RW
| ATTACHMENT J-0200000-XX |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N62470-XX-R-00XX |
| EXHIBIT A - BASE PERIOD - RECURRING WORK |
| CLIN 0001 |
| Line Item 0001 - Recurring Work - Base Period | |||||
| PROVIDE PRICES TO PERFORM RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELIN/Sub-ELINs A001 THROUGH A021 | |||||
| ELIN / Sub ELIN | Annex/Sub-annex | ||||
| Spec Item | Description | Quantity | Unit of Issue | Unit Price | Total Price |
| A001 | Commander Naval Region Europe (CNRE) | |||||
| 1501000 | Facility Management | |||||
| A001AA | 3.1 | Infrastructure Condition Assessment Program (ICAP) Services | 12 | MO | $ - 0 | |
| 1502000 | Facility Investment | |||||
| 3.1 | Emergency, Urgent, and Routine (E/U/R) Work | |||||
| A001AB | 1502000 | 3.1.1 | Emergency | 12 | MO | $ - 0 |
| A001AC | 1502000 | 3.1.2 | Urgent | 12 | MO | $ - 0 |
| A001AD | 1502000 | 3.1.3 | Routine | 12 | MO | $ - 0 |
| 3.2 | Facility Bullets | |||||
| A001AE | 1502000 | Facility Bullet | 12 | MO | $ - 0 | |
| 3.3 | Preventive Maintenance (PM) Program | |||||
| A001AF | 1502000 | 3.3.2 | Lightning Arrestors and Grounding Devices | 12 | MO | $ - 0 |
| A001AG | 1502000 | 3.3.3 | Vertical Transportation Equipment (VTE) | 12 | MO | $ - 0 |
| A001AH | 1502000 | 3.3.5 | Auxiliary Generator Systems | 12 | MO | $ - 0 |
| A001AJ | 1502000 | 3.3.12 | Swimming Pool Maintenance | 12 | MO | $ - 0 |
| A001AK | 1502000 | 3.3.15 | Aboveground (AST) and Underground (UST) Storage Tanks | 12 | MO | $ - 0 |
| A001AL | 1502000 | 3.3.16 | Overhead and Roll-up Doors | 12 | MO | $ - 0 |
| A001AM | 1502000 | 3.3.17 | Hangar Doors | 12 | MO | $ - 0 |
| A001AN | 1502000 | 3.3.18 | Drinking Fountains/Water Coolers | 12 | MO | $ - 0 |
| A001AP | 1502000 | 3.3.19 | Airfield Light Tower | 12 | MO | $ - 0 |
| A001AQ | 1502000 | 3.3.21 | Irrigation System | 12 | MO | $ - 0 |
| 3.4 | Integrated Maintenance Program (IMP) | |||||
| A001AR | 1502000 | 3.4.1 | HVAC and Refrigeration Systems | 12 | MO | $ - 0 |
| A001AS | 1502000 | 3.4.2 | Fire Protection Systems | 12 | MO | $ - 0 |
| A001AT | 1502000 | 3.4.3 | Boilers and UPVs | 12 | MO | $ - 0 |
| 3.5 | Inspection, Testing, and Certification Program | |||||
| A001AU | 1502000 | 3.5.2 | Vertical Transportation Equipment (VTE) | 12 | MO | $ - 0 |
| 3.6 | Other Recurring Services Program | |||||
| A001AV | 1502000 | 3.6.1 | Exhaust Hoods and Ducts | 12 | MO | $ - 0 |
| A001AW | 1502000 | 3.6.2 | HVAC Water Testing and Treatment Services | 12 | MO | $ - 0 |
| A001AX | 1502000 | 3.6.3 | Boiler Water Testing and Treatment Services | 12 | MO | $ - 0 |
| A001AY | 1502000 | 3.6.4 | Solar Panel Maintenance | 12 | MO | $ - 0 |
| A001AZ | 1502000 | 3.6.5 | Gutter and Roof Inspections | 12 | MO | $ - 0 |
| A001BA | 1502000 | 3.6.7 | Magnetic Key Card System Maintenance | 12 | MO | $ - 0 |
| A001BB | 1502000 | 3.6.9 | Vehicle Lift Maintenance | 12 | MO | $ - 0 |
| A001BC | 1502000 | 3.6.10 | Swimming Pool Water Testing and Treatment Services | 12 | MO | $ - 0 |
| A001BD | 1502000 | 3.6.13 | Oil-Water Separators and Grease Traps Maintenance | 12 | MO | $ - 0 |
| A001BE | 1502000 | 3.6.14 | Car Wash Water Treatment System | 12 | MO | $ - 0 |
| A001BF | 1502000 | 3.6.15 | Fire Extinguisher Inspection and Maintenance | 12 | MO | $ - 0 |
| 1503010 | Custodial | |||||
| A001BG | 1503010 | 3.1 | Scheduled Services | 12 | MO | $ - 0 |
| A001BH | 1503010 | 3.1 | Scheduled Services for AMC (29% FX Pro-Rata) | 12 | MO | $ - 0 |
| 1503020 | Pest Control | |||||
| A001BJ | 1503020 | 3.1 | Scheduled Pest Control | 12 | MO | $ - 0 |
| A001BK | 1503020 | 3.2 | Pest Control Service Orders | 12 | MO | $ - 0 |
| A001BL | 1503020 | 3.3 | Pest Management Reporting | 12 | MO | $ - 0 |
| 1503030 | Integrated Solid Waste Management | |||||
| A001BM | 1503030 | 3.1 - 3.5 | Recurring Work | 12 | MO | $ - 0 |
| A001BN | 1503030 | 3.6 | Special Collection Services | 12 | MO | $ - 0 |
| 1503050 | Grounds Maintenance and Landscaping | |||||
| A001BP | 1503050 | 3.1 | Improved Grounds | 12 | MO | $ - 0 |
| A001BQ | 1503050 | 3.2 | Operational Areas | 12 | MO | $ - 0 |
| A001BR | 1503050 | 3.3 | Storm Drainage Systems | 12 | MO | $ - 0 |
| A001BS | 1503050 | 3.4 | Outdoor Waste Collection | 12 | MO | $ - 0 |
| A001BT | 1503050 | 3.5 | Playgrounds Maintenance | 12 | MO | $ - 0 |
| 1503060 | Pavement Clearance | |||||
| A001BU | 1503060 | 3.1 | Pavement Sweeping Services | 12 | MO | $ - 0 |
| A001BW | 1503060 | 3.2 | Pavement Clearance Service Orders | 12 | MO | $ - 0 |
| 1601000 | Utility Management | |||||
| 3.1 | Utility Service Orders | |||||
| A001BX | 1601000 | 3.1.1 | Emergency Service Orders | 12 | MO | $ - 0 |
| A001BY | 1601000 | 3.1.2 | Routine Service Orders | 12 | MO | $ - 0 |
| A001BZ | 1601000 | 3.2 | Utility Operations Management | 12 | MO | $ - 0 |
| A001CA | 1601000 | 3.3 | Utility Infrastructure Condition Assessment (UICAP) Support | 12 | MO | $ - 0 |
| 1602000 | Electrical | ` | ||||
| 3.1 | Preventive Maintenance (PM) Program | |||||
| A001CB | 1602000 | 3.1.1 | High Voltage Systems Maintenance | 12 | MO | $ - 0 |
| 3.2 | Other Recurring Services Program | |||||
| A001CC | 1602000 | 3.2.1 | Photo Voltaic Systems Maintenance | 12 | MO | $ - 0 |
| 1603000 | Natural Gas | |||||
| A001CD | 1603000 | 3.1 | Integrated Maintenance Program (IMP) | 12 | MO | $ - 0 |
| 1604000 | Wastewater | |||||
| A001CE | 1604000 | 3.1 | Preventive Maintenance (PM) Program | 12 | MO | $ - 0 |
| A001CF | 1604000 | 3.2 | Other Recurring Services | 12 | MO | $ - 0 |
| 1606001 | Water (Overseas) | |||||
| A001CG | 1606001 | 3.1 | Preventive Maintenance (PM) Program | 12 | MO | $ - 0 |
| A001CH | 1606001 | 3.2 | Unidirectional Flushing (UDF) Plan | 12 | MO | $ - 0 |
| A001CJ | 1606001 | 3.3 | Well Development and Water Treatment and Distribution System Support | 12 | MO | $ - 0 |
| 1700000 | Transportation | |||||
| A001CK | 1700000 | 3.1 | Bus Services | 12 | MO | $ - 0 |
| 1800000 | Environmental | |||||
| A001CL | 1800000 | 3.1 | Oil and Hazardous Substance (OHS) Spill Response and Cleanup Ashore | 12 | MO | $ - 0 |
| CNRE SUBTOTAL: | $ - 0 |
| AMC - Specification 1503010, Spec Item 3 | |||
| Scheduled Custodial Services, Spec Item 3.1 | 12 | MO | $ - 0 |
| Reserved | |||
| AMC - CNRE Funded SUBTOTAL: | $ - 0 |
| A002 | MWR (Morale, Welfare, and Recreation) - CNRE FUNDED | |||||
| 1502000 | Facility Investment | |||||
| 3.1 | Emergency, Urgent, and Routine (E/U/R) Work | |||||
| A002AA | 1502000 | 3.1.1 | Emergency | 12 | MO | $ - 0 |
| A002AB | 1502000 | 3.1.2 | Urgent | 12 | MO | $ - 0 |
| A002AC | 1502000 | 3.1.3 | Routine | 12 | MO | $ - 0 |
| 3.4 | Integrated Maintenance Program (IMP) | |||||
| A002AD | 1502000 | 3.4.2 | Fire Protection Systems | 12 | MO | $ - 0 |
| 3.6 | Other Recurring Services Program | |||||
| A002AE | 1502000 | 3.6.1 | Exhaust Hoods and Ducts | 12 | MO | $ - 0 |
| A002AF | 1502000 | 3.6.9 | Vehicle Lift Maintenance | 12 | MO | $ - 0 |
| A002AG | 1502000 | 3.6.13 | Oil-Water Separators and Grease Traps Maintenance | 12 | MO | $ - 0 |
| 1503010 | Custodial | |||||
| A002AH | 1503010 | 3.1 | Scheduled Services | 12 | MO | $ - 0 |
| 1503020 | Pest Control | |||||
| A002AJ | 1503020 | 3.1 | Scheduled Pest Control | 12 | MO | $ - 0 |
| A002AK | 1503020 | 3.3 | Pest Management Reporting | 12 | MO | $ - 0 |
| MWR - SUBTOTAL: | $ - 0 |
| A003 | NEXCOM (Navy Exchange) - CNRE FUNDED | |||||
| 1502000 | Facility Investment | |||||
| 3.4 | Integrated Maintenance Program (IMP) | |||||
| A003AA | 1502000 | 3.4.2 | Fire Protection Systems | 12 | MO | $ - 0 |
| 3.6 | Other Recurring Services Program | |||||
| A003AB | 1502000 | 3.6.1 | Exhaust Hoods and Ducts | 12 | MO | $ - 0 |
| 1503020 | Pest Control | |||||
| A003AC | 1503020 | 3.1 | Scheduled Pest Control | 12 | MO | $ - 0 |
| A003AD | 1503020 | 3.2 | Pest Control Service Orders | 12 | MO | $ - 0 |
| A003AE | 1503020 | 3.3 | Pest Management Reporting | 12 | MO | $ - 0 |
| 1503030 | Integrated Solid Waste Management | |||||
| A003AF | 1503030 | 3.1 - 3.5 | Recurring Work | 12 | MO | $ - 0 |
| NEXCOM - SUBTOTAL: | $ - 0 |
| A004 | HAZMIN Center - CNRE FUNDED | |||||
| 1503010 | Custodial | |||||
| A004AA | 1503010 | 3.1 | Scheduled Services | 12 | MO | $ - 0 |
| 1503030 | Integrated Solid Waste Management | |||||
| A004AB | 1503030 | 3.1 - 3.5 | Recurring Work | 12 | MO | $ - 0 |
| HAZMIN Center - SUBTOTAL: | $ - 0 |
| A005 | BOA (Bank of America) | |||||
| 1503010 | Custodial | |||||
| A005AA | 1503010 | 3.1 | Scheduled Services | 12 | MO | $ - 0 |
| 1503030 | Integrated Solid Waste Management | |||||
| A005AB | 1503030 | 3.1 - 3.5 | Recurring Work | 12 | MO | $ - 0 |
| BOA SUBTOTAL: | $ - 0 |
| A006 | AMC (Air Mobility Command) | |||||
| 1502000 | Facility Investment | |||||
| 3.6 | Other Recurring Services Program | |||||
| A006AA | 1502000 | 3.6.1 | Exhaust Hoods and Ducts | 12 | MO | $ - 0 |
| A006AB | 1502000 | 3.6.13 | Oil-Water Separators and Grease Traps Maintenance | 12 | MO | $ - 0 |
| 1503010 | Custodial | |||||
| A006AC | 1503010 | 3.1 | Scheduled Services | 12 | MO | $ - 0 |
| 1503020 | Pest Control | |||||
| A006AD | 1503020 | 3.1 | Scheduled Pest Control | 12 | MO | $ - 0 |
| A006AE | 1503020 | 3.2 | Pest Control Service Orders | 12 | MO | $ - 0 |
| A006AF | 1503020 | 3.3 | Pest Management Reporting | 12 | MO | $ - 0 |
| 1503030 | Integrated Solid Waste Management | |||||
| A006AG | 1503030 | 3.1 - 3.5 | Recurring Work | 12 | MO | $ - 0 |
| AMC SUBTOTAL: | $ - 0 |
| A007 | DHA (Defense Health Agency) | |||||
| 1502000 | Facility Investment | |||||
| 3.1 | Emergency, Urgent, and Routine (E/U/R) Work | |||||
| A007AA | 1502000 | 3.1.1 | Emergency | 12 | MO | $ - 0 |
| A007AB | 1502000 | 3.1.2 | Urgent | 12 | MO | $ - 0 |
| A007AC | 1502000 | 3.1.3 | Routine | 12 | MO | $ - 0 |
| 3.1 | Preventive Maintenance (PM) Program | |||||
| A007AD | 1502000 | 3.3.1 | Interior and Exterior Lighting Systems | 12 | MO | $ - 0 |
| A007AE | 1502000 | 3.3.2 | Lightning Arrestors and Grounding Devices | 12 | MO | $ - 0 |
| A007AF | 1502000 | 3.3.3 | Vertical Transportation Equipment (VTE) | 12 | MO | $ - 0 |
| A007AG | 1502000 | 3.3.4 | Compressed Air Systems | 12 | MO | $ - 0 |
| A007AH | 1502000 | 3.3.5 | Auxiliary Generators | 12 | MO | $ - 0 |
| A007AJ | 1502000 | 3.3.6 | Uninterruptable Power Supply Systems (UPS) | 12 | MO | $ - 0 |
| A007AK | 1502000 | 3.3.7 | Medical Air, Gas, and Vacuum Systems | 12 | MO | $ - 0 |
| A007AL | 1502000 | 3.3.8 | Communication Systems | 12 | MO | $ - 0 |
| A007AM | 1502000 | 3.3.9 | Intrusion Detection Systems | 12 | MO | $ - 0 |
| A007AN | 1502000 | 3.3.10 | Closed Circuit Surveillance Systems | 12 | MO | $ - 0 |
| A007AP | 1502000 | 3.3.11 | Automatic, Fire, and Roll-Up Doors | 12 | MO | $ - 0 |
| A007AQ | 1502000 | 3.3.13 | Facility Electric System | 12 | MO | $ - 0 |
| A007AR | 1502000 | 3.3.14 | Reverse Osmosis and Water Purification System | 12 | MO | $ - 0 |
| A007AS | 1502000 | 3.3.15 | Aboveground (AST) and Underground (UST) Storage Tanks | 12 | MO | $ - 0 |
| A007AT | 1502000 | 3.3.16 | Overhead and Roll-Up Doors | 12 | MO | $ - 0 |
| A007AU | 1502000 | 3.3.18 | Drinking Fountains/Water Coolers | 12 | MO | $ - 0 |
| A007AV | 1502000 | 3.3.20 | Emergency Eye Wash Station | 12 | MO | $ - 0 |
| A007AW | 1502000 | 3.3.21 | Irrigation System | 12 | MO | $ - 0 |
| 3.4 | Integrated Maintenance Program (IMP) | |||||
| A007AX | 1502000 | 3.4.1 | HVAC and Refrigeration Systems | 12 | MO | $ - 0 |
| A007AY | 1502000 | 3.4.2 | Fire Protection Systems | 12 | MO | $ - 0 |
| A007AZ | 1502000 | 3.4.3 | Boilers and UPVs | 12 | MO | $ - 0 |
| 3.5 | Inspection, Testing, and Certification Program | |||||
| A007BA | 1502000 | 3.5.1 | Boilers and UPVs | 12 | MO | $ - 0 |
| A007BB | 1502000 | 3.5.2 | Vertical Transportation Equipment (VTE) | 12 | MO | $ - 0 |
| 3.6 | Other Recurring Services Program | |||||
| A007BC | 1502000 | 3.6.1 | Exhaust Hoods and Ducts | 12 | MO | $ - 0 |
| A007BD | 1502000 | 3.6.2 | HVAC Water Testing and Treatment Services | 12 | MO | $ - 0 |
| A007BE | 1502000 | 3.6.3 | Boiler Water Testing and Treatment Services | 12 | MO | $ - 0 |
| A007BF | 1502000 | 3.6.11 | Miscellaneous Equipment | 12 | MO | $ - 0 |
| A007BG | 1502000 | 3.6.16 | Lift Station Maintenance | 12 | MO | $ - 0 |
| 1503010 | Custodial | |||||
| A007BH | 1503010 | 3.1 | Scheduled Services | 12 | MO | $ - 0 |
| A007BJ | 1503010 | 3.2 | MTF Other/Special Cleaning Services (DHA) | 12 | MO | $ - 0 |
| 1503020 | Pest Control | |||||
| A007BK | 1503020 | 3.1 | Scheduled Pest Control | 12 | MO | $ - 0 |
| A007BL | 1503020 | 3.3 | Pest Management Reporting | 12 | MO | $ - 0 |
| 1503030 | Integrated Solid Waste Management | |||||
| A007BM | 1503030 | 3.1 - 3.5 | Recurring Work | 12 | MO | $ - 0 |
| 1503050 | Grounds Maintenance and Landscaping | |||||
| A007BN | 1503050 | 3.1 | Improved Grounds | 12 | MO | $ - 0 |
| A007BP | 1503050 | 3.4 | Outdoor Waste Collection | 12 | MO | $ - 0 |
| DHA SUBTOTAL: | $ - 0 |
| A008 | DeCA (Defense Commissary Agency) | |||||
| 1502000 | Facility Investment | |||||
| 3.1 | Emergency, Urgent, and Routine (E/U/R) Work | |||||
| A008AA | 3.1.2 | Urgent | 12 | MO | $ - 0 | |
| 3.1 | Preventive Maintenance (PM) Program | |||||
| A008AB | 1502000 | 3.3.3 | Vertical Transportation Equipment (VTE) | 12 | MO | $ - 0 |
| 3.4 | Integrated Maintenance Program (IMP) | |||||
| A008AC | 1502000 | 3.4.2 | Fire Protection Systems | 12 | MO | $ - 0 |
| 3.5 | Inspection, Testing, and Certification Program | |||||
| A008AD | 1502000 | 3.5.2 | Vertical Transportation Equipment (VTE) | 12 | MO | $ - 0 |
| 3.6 | Other Recurring Services Program | |||||
| A008AE | 1502000 | 3.6.13 | Oil-Water Separators and Grease Traps Maintenance | 12 | MO | $ - 0 |
| 1503020 | Pest Control | |||||
| A008AF | 1503020 | 3.1 | Scheduled Pest Control | 12 | MO | $ - 0 |
| A008AG | 1503020 | 3.2 | Pest Control Service Orders | 12 | MO | $ - 0 |
| A008AH | 1503020 | 3.3 | Pest Management Reporting | 12 | MO | $ - 0 |
| 1503030 | Integrated Solid Waste Management | |||||
| A008AJ | 1503030 | 3.1 - 3.5 | Recurring Work | 12 | MO | $ - 0 |
| DeCA SUBTOTAL: | $ - 0 |
| A009 | DCS (Defense Courier Service) | |||||
| 1502000 | Facility Investment | |||||
| 3.4 | Integrated Maintenance Program (IMP) | |||||
| A009AA | 1502000 | 3.4.2 | Fire Protection Systems | 12 | MO | $ - 0 |
| DCS SUBTOTAL: | $ - 0 |
| A010 | DoDEA (Department of Defense Education Activity) | |||||
| 1503030 | Integrated Solid Waste Management | |||||
| A010AA | 1503030 | 3.1 - 3.5 | Recurring Work | 12 | MO | $ - 0 |
| DoDEA SUBTOTAL: | $ - 0 |
| A011 | DLA DISTRIBUTION | |||||
| 1502000 | Facility Investment | |||||
| 3.1 | Emergency, Urgent, and Routine (E/U/R) Work | |||||
| A011AA | 1502000 | 3.1.1 | Emergency | 12 | MO | $ - 0 |
| A011AB | 1502000 | 3.1.2 | Urgent | 12 | MO | $ - 0 |
| A011AC | 1502000 | 3.1.3 | Routine | 12 | MO | $ - 0 |
| 3.1 | Preventive Maintenance (PM) Program | |||||
| A011AD | 1502000 | 3.5.2 | Vertical Transportation Equipment (VTE) | 12 | MO | $ - 0 |
| A011AE | 1502000 | 3.3.15 | Aboveground (AST) and Underground (UST) Storage Tanks | 12 | MO | $ - 0 |
| 3.4 | Integrated Maintenance Program (IMP) | |||||
| A011AF | 1502000 | 3.4.2 | Fire Protection Systems | 12 | MO | $ - 0 |
| 3.5 | Inspection, Testing, and Certification Program | |||||
| A011AG | 1502000 | 3.5.2 | Vertical Transportation Equipment (VTE) | 12 | MO | $ - 0 |
| 3.6 | Other Recurring Services Program | |||||
| A011AH | 1502000 | 3.6.4 | Solar Panel Maintenance | 12 | MO | $ - 0 |
| A011AJ | 1502000 | 3.6.5 | Gutter and Roof Inspections | 12 | MO | $ - 0 |
| A011AK | 1502000 | 3.6.12 | Fall Protection Lifeline Systems Inspection and Certification | 12 | MO | $ - 0 |
| 1503020 | Pest Control | |||||
| A011AL | 1503020 | 3.1 | Scheduled Pest Control | 12 | MO | $ - 0 |
| A011AM | 1503020 | 3.2 | Pest Control Service Orders | 12 | MO | $ - 0 |
| A011AN | 1503020 | 3.3 | Pest Management Reporting | 12 | MO | $ - 0 |
| 1503030 | Integrated Solid Waste Management | |||||
| A011AP | 1503030 | 3.1 - 3.5 | Recurring Work | 12 | MO | $ - 0 |
| DLA DISTRIBUTION SUBTOTAL: | $ - 0 |
| A012 | DLA DISPOSITION | |||||
| 1503010 | Custodial | |||||
| A012AA | 1503010 | 3.1 | Scheduled Services | 12 | MO | $ - 0 |
| 1503020 | Pest Control | |||||
| A012AB | 1503020 | 3.1 | Scheduled Pest Control | 12 | MO | $ - 0 |
| A012AC | 1503020 | 3.2 | Pest Control Service Orders | 12 | MO | $ - 0 |
| A012AD | 1503020 | 3.3 | Pest Management Reporting | 12 | MO | $ - 0 |
| DLA DISPOSITION SUBTOTAL: | $ - 0 |
| A013 | NAVSUP FUELS - DLA ENERGY FUNDED | |||||
| 1502000 | Facility Investment | |||||
| 3.1 | Emergency, Urgent, and Routine (E/U/R) Work | |||||
| A013AA | 1502000 | 3.1.1 | Emergency | 12 | MO | $ - 0 |
| A013AB | 1502000 | 3.1.2 | Urgent | 12 | MO | $ - 0 |
| A013AC | 1502000 | 3.1.3 | Routine | 12 | MO | $ - 0 |
| 3.1 | Preventive Maintenance (PM) Program | |||||
| A013AD | 1502000 | 3.3.2 | Lightning Arrestors and Grounding Devices | 12 | MO | $ - 0 |
| A013AE | 1502000 | 3.3.15 | Aboveground (AST) and Underground (UST) Storage Tanks | 12 | MO | $ - 0 |
| A013AF | 1502000 | 3.3.18 | Drinking Fountains/Water Coolers | 12 | MO | $ - 0 |
| A013AG | 1502000 | 3.3.23 | POL Fuel Depot Facilities and Distribution Systems | 12 | MO | $ - 0 |
| A013AH | 1502000 | 3.3.24 | Aviation Fuel Support Systems | 12 | MO | $ - 0 |
| A013AJ | 1502000 | 3.3.25 | Vehicle Fueling Station Systems | 12 | MO | $ - 0 |
| 3.4 | Integrated Maintenance Program (IMP) | |||||
| A013AK | 1502000 | 3.4.2 | Fire Protection Systems | 12 | MO | $ - 0 |
| 3.6 | Other Recurring Services Program | |||||
| A013AL | 1502000 | 3.6.5 | Gutter and Roof Inspections | 12 | MO | $ - 0 |
| A013AM | 1502000 | 3.6.13 | Oil-Water Separators and Grease Traps Maintenance | 12 | MO | $ - 0 |
| 1503010 | Custodial | |||||
| A013AN | 1503010 | 3.1 | Scheduled Services | 12 | MO | $ - 0 |
| NAVSUP FUELS - DLA ENERGY FUNDED SUBTOTAL: | $ - 0 |
| A014 | HOUSING | |||||
| 1401000 | Family Housing | |||||
| A014AA | 1401000 | 3.1 | Family Housing (FH) Maintenance and Repairs | |||
| A014AB | 1401000 | 3.1.1.1 | Emergency | 12 | MO | $ - 0 |
| A014AC | 1401000 | 3.1.1.2 | Urgent | 12 | MO | $ - 0 |
| A014AD | 1401000 | 3.1.1.3 | Routine | 12 | MO | $ - 0 |
| A014AE | 1401000 | 3.1.2 | Scheduled Roof Cleaning | 12 | MO | $ - 0 |
| 1502000 | Facility Investment | |||||
| 3.1 | Preventive Maintenance (PM) Program | |||||
| A014AF | 1502000 | 3.3.21 | Irrigation System | 12 | MO | $ - 0 |
| 3.4 | Integrated Maintenance Program (IMP) | |||||
| A014AG | 1502000 | 3.4.1 | HVAC and Refrigeration Systems | 12 | MO | $ - 0 |
| A014AH | 1502000 | 3.4.3 | Boilers and UPVs | 12 | MO | $ - 0 |
| 3.6 | Other Recurring Services Program | |||||
| A014AJ | 1502000 | 3.6.2 | HVAC Water Testing and Treatment Services | 12 | MO | $ - 0 |
| A014AK | 1502000 | 3.6.4 | Solar Panel Maintenance | 12 | MO | $ - 0 |
| 1503010 | Custodial | |||||
| A014AL | 1503010 | 3.1 | Scheduled Services | 12 | MO | $ - 0 |
| 1503020 | Pest Control | |||||
| A014AM | 1503020 | 3.2.1 | Unscheduled Pest Control Services | 12 | MO | $ - 0 |
| A014AN | 1503020 | 3.3 | Pest Management Reporting | 12 | MO | $ - 0 |
| 1503030 | Integrated Solid Waste Management | |||||
| A014AP | 1503030 | 3.1 - 3.5 | Recurring Work | 12 | MO | $ - 0 |
| 1503050 | Grounds Maintenance and Landscaping | |||||
| A014AQ | 1503050 | 3.1 | Improved Grounds | 12 | MO | $ - 0 |
| 1503060 | Pavement Clearance | |||||
| A014AR | 1503060 | 3.1 | Improved Grounds | 12 | MO | $ - 0 |
| HOUSING SUBTOTAL: | $ - 0 |
| A015 | UNACCOMPANIED HOUSING | |||||
| 1402000 | 3 | Recurring Work | ||||
| A015AA | 1402000 | 3.1 | Unaccompanied Housing (UH) Maintenance and Repairs | 12 | MO | $ - 0 |
| A015AB | 1402000 | 3.2 | Change of Occupancy Maintenance (COM) Services | 12 | MO | $ - 0 |
| A015AC | 1402000 | 3.3 | Laundry Room Servicing | 12 | MO | $ - 0 |
| UNACCOMPANIED HOUSING SUBTOTAL: | $ - 0 |
| A016 | GLOBAL HAWK | |||||
| 1502000 | Facility Investment | |||||
| 3.1 | Emergency, Urgent, and Routine (E/U/R) Work | |||||
| A016AA | 1502000 | 3.1.1 | Emergency | 12 | MO | $ - 0 |
| A016AB | 1502000 | 3.1.2 | Urgent | 12 | MO | $ - 0 |
| A016AC | 1502000 | 3.1.3 | Routine | 12 | MO | $ - 0 |
| 3.1 | Preventive Maintenance (PM) Program | |||||
| A016AD | 1502000 | 3.3.1 | Interior and Exterior Lighting Systems | 12 | MO | $ - 0 |
| A016AE | 1502000 | 3.3.2 | Lightning Arrestors and Grounding Devices | 12 | MO | $ - 0 |
| A016AF | 1502000 | 3.3.4 | Compressed Air Systems | 12 | MO | $ - 0 |
| A016AG | 1502000 | 3.3.5 | Auxiliary Generators | 12 | MO | $ - 0 |
| A016AH | 1502000 | 3.3.6 | Uninterruptable Power Supply Systems (UPS) | 12 | MO | $ - 0 |
| A016AJ | 1502000 | 3.3.13 | Facility Electric Systems | 12 | MO | $ - 0 |
| A016AK | 1502000 | 3.3.15 | Aboveground (AST) and Underground (UST) Storage Tanks | 12 | MO | $ - 0 |
| A016AL | 1502000 | 3.3.16 | Overhead and Roll-Up Doors | 12 | MO | $ - 0 |
| A016AM | 1502000 | 3.3.17 | Hangar Door | 12 | MO | $ - 0 |
| A016AN | 1502000 | 3.3.18 | Drinking Fountains/Water Coolers | 12 | MO | $ - 0 |
| A016AP | 1502000 | 3.3.20 | Emergency Eyewash Station | 12 | MO | $ - 0 |
| A016AQ | 1502000 | 3.3.25 | Vehicle Arrestor System | 12 | MO | $ - 0 |
| A016AR | 1502000 | 3.3.26 | Flood Gate | 12 | MO | $ - 0 |
| 1502000 | 3.4 | Integrated Maintenance Program (IMP) | ||||
| A016AS | 1502000 | 3.4.1 | HVAC and Refrigeration Systems | 12 | MO | $ - 0 |
| A016AT | 1502000 | 3.4.2 | Fire Protection Systems | 12 | MO | $ - 0 |
| A016AU | 1502000 | 3.4.3 | Boilers and UPVs | 12 | MO | $ - 0 |
| 3.5 | Inspection, Testing, and Certification Program | |||||
| A016AV | 1502000 | 3.4.3 | Boilers and UPVs | 12 | MO | $ - 0 |
| Other Recurring Services Program | ||||||
| A016AW | 1502000 | 3.6.2 | HVAC Water Testing and Treatment Services | 12 | MO | $ - 0 |
| A016AX | 1502000 | 3.6.3 | Boiler Water Testing and Treatment Services | 12 | MO | $ - 0 |
| A016AY | 1502000 | 3.6.4 | Solar Panel Maintenance | 12 | MO | $ - 0 |
| A016AZ | 1502000 | 3.6.6 | Gutter Maintenance | 12 | MO | $ - 0 |
| A016BA | 1502000 | 3.6.15 | Fire Extinguisher Inspection and Maintenance | 12 | MO | $ - 0 |
| A016BB | 1502000 | 3.6.15 | Lift Station Maintenance | 12 | MO | $ - 0 |
| 1503010 | Custodial | |||||
| A016BC | 1503010 | 3.1 | Scheduled Services | 12 | MO | $ - 0 |
| 1503020 | Pest Control | |||||
| A016BD | 1503020 | 3.1 | Scheduled Pest Control | 12 | MO | $ - 0 |
| A016BE | 1503020 | 3.2 | Pest Control Service Orders | 12 | MO | $ - 0 |
| A016BF | 1503020 | 3.3 | Pest Management Reporting | 12 | MO | $ - 0 |
| 1503030 | Integrated Solid Waste Management | |||||
| A016BG | 1503030 | 3.1 - 3.5 | Recurring Work | 12 | MO | $ - 0 |
| GLOBAL HAWK SUBTOTAL: | $ - 0 |
| A017 | NCIS | |||||
| 1502000 | Facility Investment | |||||
| 1502000 | 3.4 | Integrated Maintenance Program (IMP) | ||||
| A017AA | 1502000 | 3.4.2 | Fire Protection Systems | 12 | MO | $ - 0 |
| 1503010 | Custodial | |||||
| A017AB | 1503010 | 3.1 | Scheduled Services | 12 | MO | $ - 0 |
| NCIS SUBTOTAL: | $ - 0 |
| A018 | NAVY LODGE | |||||
| 1502000 | Facility Investment | |||||
| 3.1 | Emergency, Urgent, and Routine (E/U/R) Work | |||||
| A018AA | 1502000 | 3.1.1 | Emergency | 12 | MO | $ - 0 |
| A018AB | 1502000 | 3.1.2 | Urgent | 12 | MO | $ - 0 |
| A018AC | 1502000 | 3.1.3 | Routine | 12 | MO | $ - 0 |
| 1502000 | 3.4 | Integrated Maintenance Program (IMP) | ||||
| A018AD | 1502000 | 3.4.2 | Fire Protection Systems | 12 | MO | $ - 0 |
| NAVY LODGE SUBTOTAL: | $ - 0 |
| A019 | NGIS | |||||
| 1502000 | Facility Investment | |||||
| 3.1 | Emergency, Urgent, and Routine (E/U/R) Work | |||||
| A019AA | 1502000 | 3.1.1 | Emergency | 12 | MO | $ - 0 |
| A019AB | 1502000 | 3.1.2 | Urgent | 12 | MO | $ - 0 |
| A019AC | 1502000 | 3.1.3 | Routine | 12 | MO | $ - 0 |
| 1503010 | Custodial | |||||
| A019AD | 1503010 | 3.1 | Scheduled Services | 12 | MO | $ - 0 |
| 1503030 | Integrated Solid Waste Management | |||||
| A019AE | 1503030 | 3.1 - 3.5 | Recurring Work | 12 | MO | $ - 0 |
| NGIS SUBTOTAL: | $ - 0 |
| A020 | SPACE FORCE | |||||
| 1502000 | Facility Investment | |||||
| 3.1 | Emergency, Urgent, and Routine (E/U/R) Work | |||||
| A020AA | 1502000 | 3.1.1 | Emergency | 12 | MO | $ - 0 |
| A020AB | 1502000 | 3.1.2 | Urgent | 12 | MO | $ - 0 |
| A020AC | 1502000 | 3.1.3 | Routine | 12 | MO | $ - 0 |
| 3.1 | Preventive Maintenance (PM) Program | |||||
| A020AD | 1502000 | 3.3.5 | Auxiliary Generators | 12 | MO | $ - 0 |
| A020AE | 1502000 | 3.3.13 | Facility Electric Systems | 12 | MO | $ - 0 |
| A020AF | 1502000 | 3.3.18 | Drinking Fountains/Water Coolers | 12 | MO | $ - 0 |
| 1502000 | 3.4 | Integrated Maintenance Program (IMP) | ||||
| A020AG | 1502000 | 3.4.1 | HVAC and Refrigeration Systems | 12 | MO | $ - 0 |
| A020AH | 1502000 | 3.4.2 | Fire Protection Systems | 12 | MO | $ - 0 |
| A020AJ | 1502000 | 3.4.3 | Boilers and UPVs | 12 | MO | $ - 0 |
| Other Recurring Services Program | ||||||
| A020AK | 1502000 | 3.6.2 | HVAC Water Testing and Treatment Services | 12 | MO | $ - 0 |
| A020AL | 1502000 | 3.6.4 | Solar Panel Maintenance | 12 | MO | $ - 0 |
| 1503010 | Custodial | |||||
| A020AM | 1503010 | 3.1 | Scheduled Services | 12 | MO | $ - 0 |
| 1503020 | Pest Control | |||||
| A020AN | 1503020 | 3.1 | Scheduled Pest Control | 12 | MO | $ - 0 |
| A020AP | 1503020 | 3.2 | Pest Control Service Orders | 12 | MO | $ - 0 |
| A020AQ | 1503020 | 3.3 | Pest Management Reporting | 12 | MO | $ - 0 |
| 1503030 | Integrated Solid Waste Management | |||||
| A020AR | 1503030 | 3.1 - 3.5 | Recurring Work | 12 | MO | $ - 0 |
| SPACE FORCE SUBTOTAL: | $ - 0 |
| A021 | DLA ENERGY | |||||
| 1503010 | Custodial | |||||
| A021AA | 1503010 | 3.1 | Scheduled Services | 12 | MO | $ - 0 |
| 1503020 | Pest Control | |||||
| A021AB | 1503020 | 3.1 | Scheduled Pest Control | 12 | MO | $ - 0 |
| A021AC | 1503020 | 3.3 | Pest Management Reporting | 12 | MO | $ - 0 |
| DLA ENERGY SUBTOTAL: | $ - 0 |
TOTAL FOR LINE ITEM 0001 - BASE PERIOD - RECURRING WORK (ELINs A001 THROUGH A021) $ - 0
&"Times New Roman,Regular"Page &P of &N
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
CLIN 002 - Base Period - NRW
| ATTACHMENT J-0200000-XX |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N62470-XX-R-00XX |
| EXHIBIT A - BASE PERIOD - NON-RECURRING WORK |
| CLIN 0002 |
| Non-Recurring Work Price - Base Period | |||||||
| PROVIDE PRICES TO PERFORM NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4, AND TO PRICE ADDITIONS AND DELITIONS TO THE RECURRING WORK REQUIREMENTS - IN ACCORDANCE WITH ANNEX 0200000, SPEC ITEM 2.14.1, RECURRING WORK PREPARATION OF PROPOSAL | |||||||
| ELINs A700 THROUGH A1032 | |||||||
| ELIN | Annex/Sub-Annex | Short Description | Long Description | Unit Price (USD) | Unit of Issue | Estimated Quantities | Extended Price (USD) |
| UNIT PRICED TASK (UPT) WORK |
| 200000 | Management and Administration | |||||
| A700 | Naval Hospital Disaster Exercise Staff Support Requirements | Provide labor, management, supervision, tools, material and equipment to provide onsite labor at Building 273, NAS I, to support Naval Hospital disaster exercises within response and completion times specified in J-0200000-10, Naval Hospital Disaster Exercise Support Requirements (Non-Recurring/IDIQ), Section J. Respond within 1 working day or as specified in the orders. | EA | 5 | $0.00 | |
| A701-A705 | Reserved | |||||
| 1401000 | Family Housing | |||||
| A706 | FH Change of Occupancy Maintenance (COM) | Provide labor, management, supervision, tools, material and equipment to perform Change of Occupancy Maintenance including all requirements per J-1401000-07 Performance Objectives and Standards, J-1401000-08 Change of Occupancy Maintenance Notice of Vacancy and Work Completion, J-1401000-09 FH Change of Occupancy Maintenance Checklist, and J-1401000-10 Listing of FH Change of Occupancy Maintenance Tasks, Section J, at the ordered location. Complete all work within 3 working days or as specified in the order. | ||||
| EA | 4 | $0.00 | ||||
| A707 | FH Bathtub Replacement | Provide labor, management, supervision, tools, material and equipment to replace a bathtub with a new commercial grade fixture including removal of existing tub and installation of new shower valves and caulking at the ordered location. Where appropriate, single handle control valves shall be used. Complete all work within 3 working days during COM or as specified in the order. | EA | 4 | $0.00 | |
| A708 | FH Bathtub Liner Replacement | Provide labor, management, supervision, tools, material and equipment to replace a bathtub liner with a new commercial grade to match existing tub color including removal of existing liner and caulking of joints at the ordered location. Finished product shall be free of voids, loose spots, and cover tub from edge to edge and floor. Complete all work within 3 working days during COM or as specified in the order. | EA | 4 | $0.00 | |
| A709 | FH Bathtub and Shower Control Valves Replacement | Provide labor, management, supervision, tools, material and equipment to replace bathtub and shower control valves having new commercial grade bright chrome finish to match existing including removal of existing valves and caulking of joints at the ordered location. Complete all work within 3 working days during COM or as specified in the order. | EA | 8 | $0.00 | |
| A710 | FH Kitchen Sink Replacement | Provide labor, management, supervision, tools, material and equipment to replace a kitchen sink with new sink to match existing to include removal of existing sink, single chrome finish control high spout kitchen faucet with spray arm, continuous waste drain and p-trap at the ordered location. Completed installation shall be free of leaks and present a finished appearance. Complete all work within 3 working days during COM or as specified in the order. | EA | 4 | $0.00 | |
| A711 | FH Countertop Replacement | Provide labor, management, supervision, tools, material and equipment to replace a countertop to include removal of existing top, removal and reinstallation of sink, and installation of new granite top as specified, sealing/grouting of joints per manufacturer's recommendations, 10 centimeter back splash, and drip edge at the ordered location. Complete all work within 3 working days during COM or as specified in the order. | EA | 4 | $0.00 | |
| A712 | FH Cabinet Doors Replacement | Provide labor, management, supervision, tools, material and equipment to replace cabinet doors with new doors to match existing door style, materials and finish to include removal of existing doors, new hinges, latch and handle hardware at the specified location. Complete all work within 3 working days during COM or as specified in the order. | EA | 4 | $0.00 | |
| A713 | FH Exhaust Hood Replacement | Provide labor, management, supervision, tools, material and equipment to replace a range exhaust hood with new hood to match existing to include removal of existing hood at the ordered location. New hood shall be complete with removable washable filtering element, 3 speed fan, and 2 level light. Complete all work within 3 working days during COM or as specified in the order. | EA | 4 | $0.00 | |
| A714 | FH Screen Door Replacement | Provide labor, management, supervision, tools, material and equipment to replace an exterior screen door with new aluminum security type door (approx. 210 x 85 centimeters) to match existing opening to include removal of existing door, new deadbolt locking system and minimum of 2 sets of keys at the ordered location. Complete all work within 3 working days during COM or as specified in the order. | EA | 4 | $0.00 | |
| A715 | FH Door Replacement (Exterior and Interior) | Provide labor, management, supervision, tools, material and equipment to replace an exterior or interior door with new door to match existing style, wood species and finish to include removal of existing door, touchup of scratches and nicks in adjoining frame, and reinstallation of existing hardware where unrepairable at the ordered location. Exterior doors shall be solid core (not core filled) and replaced the same day work is started. Metal exterior doors shall meet the industrial standards requirements for thermos insulated pre-factory finished exterior doors and frames. Doors shall be plumbed and planed (to include appropriate bevel) to provide a minimum 3 millimeter finished clearance between door and adjoining head and jambs, and trimmed to provide adequate clearance above the floor. Complete all work within 3 working days during COM or as specified in the order. | EA | 10 | $0.00 | |
| A716 | FH Ceramic Tile Replacement | Provide labor, management, supervision, tools, material and equipment to replace ceramic tile with new tile to match existing on floors, walls, and window stools where broken, missing, cracked or discolored to include removal of existing tiles and grouting of new tiles at the ordered location. Marble saddles shall be replaced where damaged. Floor tiles shall be grouted as required to provide a waterproof seal. Where exact match is no longer available, remove and replace nondefective tiles to create a pattern to minimize visual effect of the style/color mismatch. Complete all work within 3 working days during COM or as specified in the order. | SM | 300 | $0.00 | |
| A717 | FH Terrazzo Tile Replacement | Provide labor, management, supervision, tools, material and equipment to replace terrazzo tile with new tile to match existing where broken, missing, cracked, spalled or discolored to include removal of defective tiles and grouting of new tiles at the ordered location. Floor tiles shall be regrouted as required to provide a waterproof seal. Where exact match is no longer available, remove and replace nondefective tiles to create a pattern to minimize visual effect of the style/color mismatch. Complete all work within 3 working days during COM or as specified in the order. | SM | 300 | $0.00 | |
| A718-A729 | Reserved | |||||
| 1402000 | Unaccompanied Housing | |||||
| A730 | Bachelor Quarters Small Unit COM (Single Bedroom) | Provide labor, management, supervision, tools, material and equipment to perform complete Change of Occupancy Maintenance in a small BQ unit including all requirements per J-1402000-04 Change of Occupancy Maintenance Objectives and Standards and J-1402000-05 Listing of Change of Occupancy Maintenance Tasks in Section J at the ordered location. Complete all work within 2 working days during COM or as specified in the order. | EA | 50 | $0.00 | |
| A731 | Bachelor Quarters Common Area COM (Kitchette/Bathroom) | Provide labor, management, supervision, tools, material and equipment to perform complete Change of Occupancy Maintenance in a BQ unit common area including all requirements per J-1402000-04 Change of Occupancy Maintenance Objectives and Standards and J-1402000-05 Listing of Change of Occupancy Maintenance Tasks in Section J at the ordered location. Complete all work within 2 working days during COM or as specified in the order. | EA | 40 | $0.00 | |
| A732 | Bachelor Quarters Small Unit Painting (Single Bedroom) | Provide labor, management, supervision, tools, material and equipment to perform complete painting of a BQ small unit at the designated location. Complete all work within 2 working days during COM or as specified in the order. | EA | 50 | $0.00 | |
| A733 | Bachelor Quarters Common Area Painting (Kitchette/Bathroom) | Provide labor, management, supervision, tools, material and equipment to perform complete painting of a BQ common area including labor and materials at the designated location. Complete all work within 2 working days during COM or as specified in the order. | EA | 40 | $0.00 | |
| A734-A749 | Reserved | |||||
| 1502000 | Facility Investment | |||||
| A750 | Roof Surface Cleaning | Provide labor, management, supervision, tools, material and equipment to clean entire surfaces of a facility roof including strainer(s) at the designated location. Complete all work within 3 working days or as specified in the order. | SM | 3,000 | $0.00 | |
| A751 | Multi-story Roof Gutter Cleaning | Provide labor, management, supervision, tools, material and equipment to clean all roof gutters on a multi-story facility roof including downspouts and any underground drainage systems at the designated location(s). Work includes realigning and resecuring of gutters and downspouts where loose, sealing where leaking, and repair or replacement where damaged or missing. Complete all work within 3 working days or as specified in the order. | MR | 3,000 | $0.00 | |
| A752 | Interior Painting | Provide labor, management, supervision, tools, material and equipment to paint interior surfaces of facilities using washable interior latex paint having a flat, semi-gloss or gloss finish and color as specified in the task order. Work includes surface preparation, priming and application of 2 finish coats of paint. All products shall be lead-free, odorless, nontoxic, and compatible with surfaces where being used. Complete all work within 3 working days or as specified in the order. | SM | 2,000 | $0.00 | |
| A753 | Exterior Painting | Provide labor, management, supervision, tools, material and equipment to paint exterior surfaces of facilities using acrylic resin exterior type paint with and without quartz having a flat, semi-gloss or gloss finish and color as specified in the task order. Work includes surface preparation, priming and application of 2 roller applied finish coats of paint. All products shall be lead-free, odorless, nontoxic, and compatible with surfaces where being used. Complete all work within 3 working days or as specified in the order. | SM | 2,000 | $0.00 | |
| A754 | Septic Tank Sludge Removal | Provide labor, management, supervision, tools, material and equipment to remove, weight and dispose of sludge from septic tanks at the designated location(s). Work includes pumping, removal of sludge, disposal of sludge and all transportation and disposal costs. Minimum quantity 500Kg. Sewage pipe cleaning not included. Complete all work within 3 working days or as specified in the order. | KG | 19,500 | $0.00 | |
| A755 | Magnetic Key Card Locking Mechanism Replacement | Provide labor, management, supervision, tools, material and equipment to replace magnetic key card locksets in doors per technical specification 1502000, Section C. Complete all work within 1 working days or as specified in the order. | EA | 10 | $0.00 | |
| A756 | Portable Toilet Cabin | Provide labor, management, supervision, tools, material and equipment required to provide, deliver, clean and service portable toilet cabin(s) to specified location(s). Unit price per day/per toilet. General characteristics of the toilet cabins shall be as follows: Chemical operating WC; Thermosetting plastic composition white walls; Anti-skid plastic composition footboard; Sling hook for crane; Air grids and locks; Male/female external selector; Soap and toilet paper dispensers; Cleaning brush; Pedal flush; Pedal sink faucet; Mirror, Anti-vandalism door. Autonomy: approx. 250 uses. The Contractor shall clean and service portable toilet cabin(s) once per day as specified in the order to ensure all surfaces are cleaned, disinfected and deodorized, supplies are restocked, waste is removed and disposed of, and chemical are provided. The Contractor shall dispose of waste resulting from the use of portable toilet cabin(s) in accordance with all applicable Italian regulations. Portable toilet cabin(s) shall be removed within 1 working day past requirement termination. Delivery shall be completed within 2 calendar days or as specified in the order. Cost is based on a minimum 3 calendar days per unit (unit cost shall be per calendar day). | EA | 25 | $0.00 | |
| A757 | Bathroom Fixtures Replacement - Soap Dispenser | Provide labor, management, supervision, tools, material and equipment to supply and install new stainless steel soap dispenser. Provide customer with standard pre-approved fixture cut-sheets prior to installation for review. Complete all work within 3 working days or as specified in the order. | EA | 38 | $0.00 | |
| A758 | Bathroom Fixtures Replacement - Paper Towel Dispenser | Provide labor, management, supervision, tools, material and equipment to supply and install new stainless steel paper towel dispenser. Provide customer with standard pre-approved fixture cut-sheets prior to installation for review. Complete all work within 3 working days or as specified in the order. | EA | 38 | $0.00 | |
| A759 | Bathroom Fixtures Replacement - Toilet Paper Dispenser | Provide labor, management, supervision, tools, material and equipment to supply and install new stainless steel toilet paper dispenser. Provide customer with standard pre-approved fixture cut-sheets prior to installation for review. Complete all work within 3 working days or as specified in the order. | EA | 38 | $0.00 | |
| A760 | Leak Detection Services | Provide labor, management, supervision, tools, material and equipment to perform acoustic or other types of testing to find leaks and other subsurface utilities up to 100 linear meters. Contractor shall submit results of testing in duplicate hard copy format consistent with accepted standards and practices indicating locations o potential leaks. Complete all work within 2 working days or as specified in the order. | EA | 14 | $0.00 | |
| A761 | Video Inspection | Provide labor, management, supervision, tools, material and equipment required to perform video inspection of pipes and other confined spaces with video equipment up to 100 linear meters. Provide inspections results on DVD for government review and approval in duplicate prior to finalizing payment. Complete all work within 2 working days or as specified in the order. | EA | 14 | $0.00 | |
| A762 | Manlift Rental with Operator | Provide labor, management, supervision, tools, material and equipment required to rent manlift including operator per day. Manlift boom length shall be up to 35 meters. Contractor shall submit site-specific fall protection plan and provide daily safety and operational brief for personnel. This item is restricted to Public Works Department ordering. Complete all work within 2 working days or as specified in the order. | DA | 35 | $0.00 | |
| A763 | Hangar High Bay LED Lighting Fixture Replacement | Provide labor, management, supervision, tools, material and equipemnt required to replace 10-15 meters high hangar lighting. This requirment includes the use of appropriate equipment like scissor lift, scaffolding, or bucket truck (must be able to reach between 10 and 15 meters high depending on the hangar location). The Contractor shall follow all safety procedures for working at heights, such as using harnesses and ensuring proper fall protection is in place. Lights are up to 2500lumen, 400W each (230V/110V depending on the location). The Contractor shall replace entire lighting fixtures IAW manufacturers’ recommended procedures and OEM standards. Complete all work within 2 working days or as specified in the order. | EA | 50 | $0.00 | |
| A764 | Roads and Parking Lots Maintenance - Asphalt | Provide labor, management, supervision, tools, material and equipemnt required to road and parking lots maintenance and reparis, to include repair of of potholes on asphal roads. Tasks include but are not limited to: |
i. Preparation:
a. - Identify and Mark:
Locate the pothole and mark the area to be repaired, usually extending slightly beyond the damaged area.
b. Remove Debris:
- Clear the pothole of loose material, water, and any debris that might hinder the repair.
c. Cut and Excavate: If necessary, cut the edges of the pothole to create a square or rectangular shape and remove damaged pavement to reach a stable base.
d. Trim and Compact Base: Ensure the base of the pothole is trimmed and compacted for proper support.
ii. Application:
a. Tack Coat: Apply a bonding agent (tack coat) to the edges of the excavation to ensure a strong bond between the existing pavement and the new patching material.
b. Fill with Patching Material: Backfill the pothole with appropriate patching material, which could be hot mix asphalt or a heated cold mix.
iii. Compaction:
Compact the patching material thoroughly using a roller, plate compactor, or other suitable equipment.
iv. Finishing:
a. Seal Joints: Seal the edges of the patch to prevent water infiltration.
b. Clean Up: Remove any excess material or debris from the repaired area.
| c. Restriping: Where needed, restripe horizontal markings (road limits, stop signs and/or pedestrian crossing lines and similar). Complete all work within 5 working days or as specified in the order. | SM | 1,500 | $0.00 | |
| A765 | Roads and Parking Lots Maintenance | Provide labor, management, supervision, tools, material and equipemnt required to road and parking lots maintenance and reparis, to include repair of of potholes, bumps and erosion on dirt road. Tasks include but are not limited to: |
i. Grading:
Level the road surface, removing ruts and wash boarding, and reshaping the road crown
ii. Pothole Patching:
Backfill potholes with approved material for the area involved iii Drainage Maintenance:
Clearing ditches and culverts to ensure water can flow freely away from the road surface
iv. Shoulder Maintenance:
| Provide a stable edge to the road and ensure proper drainage Complete all work within 5 working days or as specified in the order. | SM | 2,500 | $0.00 | ||||
| A766 | Pressure Washing Service - Dirt Road | Provide labor, management, supervision, tools, materials, and equipment required to perform pressure washing of asphalt and concrete roads, parking areas, sidewalks, exterior stairs, and exterior walls at designated locations. This includes the removal of debris, dirt, grime, oil, grease, moss, algae, mildew, and other surface contaminants. Surfaces shall be pre-treated as necessary to ensure effective cleaning while preventing damage." This may require work after normal working hours to prevent disruption to operations. Complete all work within 3 working days or as specified in the order. | SM | 2,000 | $0.00 | ||
| A767-A779 | Reserved | ||||||
| 1503010 | Custodial | ||||||
| A780 | Vacuum Carpets and Rugs | Provide labor, management, supervision, tools, material, and equipment required to vacuum carpets and rugs to ensure they are clean. Complete all work within 3 working days or as specified in the order. | SM | 500 | $0.00 | ||
| A781 | Carpet and Rug Deep Cleaning | Provide labor, management, supervision, tools, material, and equipment required to carpet and rug deep cleaning. The Contractor shall deep clean carpets and rugs to ensure that floors are clean and sightly. Acceptable methods for deep cleaning include shampooing, chemical extraction, steam cleaning, and other similar deep cleaning processes. Complete all work within 3 working days or as specified in the order. | SM | 500 | $0.00 | ||
| A782 | Machine Scrub Floors | Provide labor, management, supervision, tools, material, and equipment required to machine scrub floors. Floor surfaces, including joints and corners, are clean and sightly, without embedded dirt, cleaning solution, film debris, stains, marks, wads of gum, tar and similar substances. Complete all work within 3 working days or as specified in the order. | SM | 1,000 | $0.00 | ||
| A783 | Damp Mop Floors | Provide labor, management, supervision, tools, material, and equipment required to damp mop floors. Kitchen and restroom floors shall be sanitized. This service includes the floors to be swept prior to wet-mopping. Complete all work within 3 working days or as specified in the order. | SM | 1,000 | $0.00 | ||
| A784 | Low Area Cleaning | Provide labor, management, supervision, tools, material, and equipment required to clean low areas. All dust and debris shall be removed. Low area cleaning includes all furniture and fixtures (e.g., doors, partitions, radiators, equipment, hand railings in stairways, grills, ledges, sills, walls, doors, light fixtures, chalk and dry boards and trays, miscellaneous hardware and bright metal work, and similar dust catching surfaces) to a maximum height of 2.1 meters above floor level. Complete all work within 3 working days or as specified in the order. | SM | 1,000 | $0.00 | ||
| A785 | High Area Cleaning | Provide labor, management, supervision, tools, material, and equipment required to clean high areas. High area cleaning includes all areas that are vertical and horizontal above 2.1 meters and can exceed 4 meters from floor level. Cleaning may be performed with extension tools or step ladders. All dust and debris shall be removed. Surfaces below the work shall be protected from dust and debris. Complete all work within 3 working days or as specified in the order. | SM | 1,000 | $0.00 | ||
| A786 | Interior Window Cleaning | Provide labor, management, supervision, tools, material, and equipment required to clean interior window surfaces and adjacent areas to ensure that surfaces are clean. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas. Complete all work within 3 working days or as specified in the order. | SM | 1,000 | $0.00 | ||
| A787 | Exterior Ground Floor Window Cleaning | Provide labor, management, supervision, tools, material, and equipment required to clean exterior window surfaces and adjacent areas to ensure that surfaces are clean. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas. Complete all work within 3 working days or as specified in the order. | SM | 500 | $0.00 | ||
| A788 | Exterior Elevated Floor Window Cleaning | Provide labor, management, supervision, tools, material, and equipment required to clean exterior window surfaces above ground floors and adjacent areas to ensure that surfaces are clean. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas. Complete all work within 3 working days or as specified in the order. | SM | 500 | $0.00 | ||
| A789 | Window Blinds Cleaning | Provide labor, management, supervision, tools, material, and equipment required to remove, clean, and rehang window blinds. Complete all work within 3 working days or as specified in the order. | SM | 500 | $0.00 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .