J-1606001-06 Unidirectional Flushing Plan NAS I.pdf
PDF 185 KB Posted
- Solicitation number
- N6247025R0020
About this file
This document is a Unidirectional Flushing (UDF) Plan for Naval Air Station (NAS) I Sigonella, detailing a systematic water infrastructure maintenance procedure. The plan outlines a comprehensive safety protocol for performing water main flushing, which involves directing water flow in a single direction to achieve higher velocity, better pipe cleaning, and reduced water consumption. The procedure will be implemented annually and requires a minimum two-person crew using specific personal protective equipment and safety measures.
The plan provides detailed technical specifications for the flushing process, including recommended minimum flow rates for different main sizes (ranging from 6-inch to 14-inch pipes), and a precise sequence of hydrant and valve operations across three distinct loops. Each loop has specific valves to be secured and a predetermined sequence of hydrants to operate, with instructions to flow each hydrant until the water runs clear. The document emphasizes safety precautions such as traffic control, use of warning devices, maintaining communication, and notifying sensitive facilities like hospitals and fire departments before initiating the unidirectional flushing process.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT J-606001-06
UNIDIRECTIONAL FLUSHING PLAN NAS I
(*) Reference Section C, Annex 0200000 Management and Administration, Spec Item 2.6.2 Dissemination of Information
This plan outlines the work required to perform the “Unidirectional flushing” at NAS I. This results in water flowing toward the hydrant in only one direction resulting in higher flow velocity, more scouring and better cleaning of the pipes with less water use than the “Conventional flushing” This plan will be implemented once per year.
Safety procedure.
Apply before and during the UDF.
1. Necessary personal protective equipment and the correct tools:
a. Personal Protective Equipment (PPE)
i. Safety shoes
ii. Hard hat
iii. Hearing protection
iv. Safety glasses
v. Protective gloves
vi. Reflective vest (CAT 2)
b. Site Safety Equipment Required
i. Availability of communications (telephone or radio)
2. Employees tasked to complete flushing tasks need be minimum two-person due to the distances between hydrants and valves.
3. At least one crew member should be designated to control traffic while the other crew members are operating the distribution system valves.
4. Traffic signs, cones, flags, and/or vehicles with warning lights should be used as necessary to alert motorists of flushing activities.
5. Brightly colored safety vests shall be worn by all crew members.
6. Keep the public away from flushing activities. Children are often attracted to such activities and should be kept away.
7. Open hydrant valves completely to prevent water from discharging through the barrel drain at pressure.
8. Open and close hydrants slowly to prevent the development of dangerous pressure surges and water-hammer.
9. Use well-restrained energy dissipaters designed to prevent the water pouring out of the valve from damaging government and private property.
10. Discharge flushing water directly into a sanitary or storm sewer whenever possible to avoid flooding streets and underground electrical vaults. If street flooding is unavoidable, use signs, flags, and other warning devices to direct traffic away from the area. Notify Security and Fire Department about the UDF situation.
Unidirectional Flushing (UDF) Plan – NAS I Sigonella
The desired minimum velocity is 6 feet per second. A single 2-1/2 inch outlet should be sufficient for the 6-inch and 8-inch mains. For larger mains, it may be more advantageous to open additional hydrants and open the 4-1/2 inch nozzle. Utilize pitot gauges with flow diffusers to minimize grounds damage.
Main Size Suggested
Minimum Flow
(in) (gpm) 6 550 8 950 10 1500 12 2100 14 2800
Note: In most cases, customers will not notice any changes to their water delivery during the UDF process, but UEM staff must inform the Fire Department and the sensitive customer (Hospital, school etc.) before to start the UDF.
Loop 1: (*) (Total of 6 Valves to Be Secured)
Valve Size Location
(mm)
W22A 315 (*) W24A 315 W138A 200 W13A 200 W157A 200 W17A 200
Listed below is the sequence of hydrants to operate. Secure each hydrant before proceeding to the next location. Flow each hydrant until the flowing water is clear. Record the approximate minutes of flushing performed at each location.
Sequence Hyd ID Location
1 FH1A (*)
2 FH37A
3 FH40A
4 FH41A
5 FH44A
6 FH29A
7 FH20A
8 FH19A
9 FH28A
10 FH24A
11 FH23A
Valves to be reopened:
W138A 200 (*) W13A 200 W157A 200 W17A 200
Loop 2: (*) (Total of 1 Valve to Be Secured 2 valves already secured during loop1 )
W22A 315 (*) W24A 315 W152A 150 next location. Flow each hydrant until the flowing water clears. Record the approximate minutes of flushing performed at each location.
1 FH14A (*)
2 FH46A
3 FH13A
4 FH11A
5 FH2A
6 FH10A
7 FH4A
8 FH6A
9 FH35A
W22A 315 (*) W24A 315 W152A 150
Loop 3: (*) (Total of 2Valves to Be Secured)
W28A 315 (*) W35A 315 next location. Flow each hydrant until the flowing water clears. Record the approximate minutes of flushing performed at each location.
1 FH2A (*)
2 FH35A
W28A 315 (*) W35A 315
File details come from the government source that posted it. Updated .