GU_NONE_GU-KA-568-01_RevNONE_Sht1 THRU 76_N_A_GU-KA-568-01 TUNNEL THRUSTER MODEL S-300-L SERIAL NOS. 86.000.435 AND 86.000.436.pdf
PDF 47 MB Posted
- Attached to
- FY27 NOAA Ship Gordon Gunter Drydock REFERENCES
- Solicitation number
- 1305M226Q0144REF
About this file
This file is a technical instruction manual and maintenance documentation for a Schottel Tunnel Thruster Model S-300-L bow thruster unit manufactured for the Military Sealift Command (MSC). The document covers tunnel thrusters with serial numbers 86.000.435 and 86.000.436, which are installed on T-AGOS 13 and T-AGOS 14 vessels under MSC Contract No. N00024-85-2046. The thruster is a right-angle reduction gearbox designed for underwater operations to provide port-starboard thrust for slow-speed maneuvering and docking applications. The unit operates using gear oil EP lubricant, weighs approximately 4,300 pounds with propeller, and has a maximum operating temperature of 185 degrees Fahrenheit. The system must remain fully submerged during operation, with air operation limited to 60 seconds or less.
The manual provides comprehensive maintenance and operational guidance, including scheduled maintenance recommendations, troubleshooting procedures, service instructions for gearbox removal and installation, drive flange seal replacement, and propeller shaft seal replacement. Operator maintenance is minimal, requiring only daily checks of the oil level in the lube oil tank. The document includes detailed parts lists with general arrangement drawings, drive flange assembly, propeller hub assembly, skeg assembly, and lower gearbox assembly illustrations. Safety procedures are emphasized throughout, covering pre-operation, during-operation, and post-operation protocols. The manual also references special tools required, such as a propeller nut wrench and propeller puller plate, and includes reference data on articulated shafts and recommended lubricants. This documentation supports the FY27 NOAA Ship Gordon Gunter Drydock reference solicitation (1305M226Q0144REF).
View the file
Other files
Show 40 more
Latest 50 of 134 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
O T9568-AD-MMC-010/32862
TUT4NEL THRUSTER
o
MODEL S-300-L
MILITARY SEALIFT COMMAND
T-AGOS 13 THRU 18
o
08/04/2883 14:42 3685684173
CANYON MOTOR REWIND
CANYON MOTOR REWIND, INC
502 N. MAPLE STREET
SNOHOMISH, WA
98290-2530
Email: canvonniqtoiTewlnd.lnc(aqte.ngt Bus: 360-568-4171 FAX: 360>668-4173
1.800.805.8881
FACSIMILE TRANSMITTAL SHEET
CANYON MOTOR REWIND: A name that has been recognized as a leader in the electrical induatry for mora than 29 years. When it comes to quality assurance - none have been known to rise to the chattenge - time after time - and still maintain a good solid working relationship with all who have had the unique opportunity to have us do their work! All work is perfomned to the highest of standards as per EASA's exacting requirements for consistent quality. Call us today for you next motor repair Job.
To: Dava Hatchell Date: 6/4/2003
Company: NOAA
Total number of pages including cover
FAX: (206) 553-4340 .
^ Phone; (206) 553-̂
Re: Bow Thnjster D.C. Motor
Comments: Hope thattttb will help you a litHe. As you can see the copy shows a single twaring only- Runs In oil.I will try to transpose GE # for a bearing size
_88/a4/2e83 14:42 3685684173
FROM MARINE ENGINEERING DIVISION PACIFIC
THRUSTER MOTORS
CANYON MOTOR REWIND pf^^
(WED) 7 30 2003 1 1:51 /ST. 11;50/N0,501 2847790 P
CHAPTKR 4. SCHEDULED AND
CORRECTIVE MAINTENANCE
I
0 o ^ a o C
0 ( frfftw
Pig. 4-3 Sketch DC644
4-31
88/84/2803 14:42 36856841 73 iTO M l f : t'NGINEERING DIVISION PACIFIC
CANVON MOTOR REWIND
(WED) 7 30 2003 11:51/31.11:50/̂ 0.5012847790 P 2
CHAPTER 4, SCHEDULED AND
CORRECTIVE MAINTENANCE ! THRUSTER MOTORS
1. GREASE INLET, CE (fAR SIK) 23. BEARING. DE
2. EREASE OUTLET, CE (NEAft SIDE) 24. GREASE INLET. OE (FAR SIDE)
a. BEARING CAP, CE 25. GREASE OUTLET, DE (HEAR SIDE)
4. BEARING RETAINER, CE 26. SHAFT KEY
5. BEARING. CE 27. SHAFT
6. BEARING CARTRIDGE4 C£ 2S. ARMATURE SPIDER
7. SPLIT RING 29. RADIAL AIR vENTS
8. LABtRlNTH RING 30- CORE LAWNATIOWS
9. BEARINU BRACKET, CE 31. WINDING SUPPORT, DE
10. YOKE 32. WINDING SUPPORT. CE
n. INSULATION BLOCK 33. ARMATURE COILS
BRUSH hOLCCR STUD 34. ARl̂ TURE-ENO-TURn BANDING GLASS
13. MAGNET FRAME 3S. ARMATURE FLA.NGE. DE
14, POLE BOLT 36. ARMATURE aA.NG£, CE
15. POLE SHIHS 37. EQUALIZER
16. MAIN POLE 3B: COMMUTATOR
17. IXAIN COIL 39. CONDUIT BOX
IB. C0MMUTATIN6 POLS 40. COVER, HANOHOLE
19. COMMUTATING COlL 41. GREASE INLET HYDRAULIC HOSE
20. BEARING BRACKET, DE 42. GREASE OUTLET HYDRAULIC HOSE
21. BEARING CARTRIDGE, DE
22. BEARING CAP, OE
•COUNTER BORED
SIDE*
DC644-1
^ig. 4-4 Sketch DC644-1
4-32
TUMHEL THRUSTER
MODEL S-300-L
SERIAL NOS. 86.000.435 AND 86.000.436
MANUFACTURED BY:
SCHOTTEL OF AMERICA, IMC,
8375 N.W. 56TH STREET
MIAMI, FLORIDA, 33166-4806
o
T.O. NO.:
DATE ISSUED:
: I ;
|3 I I
[ l i t
[ i l l : • :
[I'l :
I'.'' | : I :
[ i l l
[ i i ' l
[ iT i liii [ i i ;
I^' | j i I
[ / i t
, 1 1 1
[ i l l
[ i l l
\m lil'i la;
in) i i j l im ;ifi liri im :m [I f't
[ l i t
I n 't
Jm [m l i i -
S C H O T T E L S C N O T T I L WCRFT J u » l t c c i i i i CmbHACo. KG - D S40t S p a y / R h a l n
A b n a h m e p r C l f f z e u g n i s T e s t C e r t i l i c a t e
C e r t i f f i c a t d ' E s s a l s e n U s i n e
DIN 5CX)49-3. 1 B
HALTER MARINE, INC.
Kunde Cuf tomar C l isn t
Projekt-Nr Pro(«ct-No n " d * p ro ja t
Gcrat U n i t a r t i l
Klassifikation C l a u i f i c a t i o n CtcMi f i ca t ion
Schot te l - TUNNEL THRUSTER Typ
S-300-L SRP Typ SRP Trp« W Typ*
Bau-Nr.
S«risl N o .
Bau-Nr.
Serial N o .
NO d t Mr i« .
86.000.435 86.000.436
Autf. Nr.
C o n t t r . N o .
N " d * c o n i t r u c t i o n .
Ausf. Nr.
Const r . N o .
N * d« c o n i t r u c t i o n .
Motor Fabrikat P r i m * Movar Manu tac t .
Mo tau r Fabr ica t ion
Kupplung Q u t c h Embraya f l *
Leistung KW/UPM Powar K W / R P M Puistanca k M t r / m n . .
Fabrikat Manufac t .
Fabr ica t ion
Autf.-Nr.
C o n t t r N o .
N " da c o n i t r u c t i o n .
Typ Typa T y p *
Bau-Nr.
Serial N o .
NO do M r i a .
Typ Typo T y p o
B«u.Nr.
Sarial N o .
NO da ia r ia
Hydr. Systtm S y t i o m a hyd rau l i quo
K raftubertragu rtg Powor T r a m m i t a i o n T r a n i m i u i o n da f o r e *
S t a u a r u n g T y p Staaring Typo T y p * du l y i t l m * d ' o r w n t a t i o n .
Bdrrwrkung Ranvark Ramarquot
Elactr. System S y t t ^ n M a l a c t r i q u *
Propeller Nr.
Propaltor N o .
NO d-hal ic*
Nr.
m mi mi m mi mi mi mi mi mi mi mi mi m m m mi mi mi mi mi mi mi mi
\i mz
•i mi mi mi m mi mi mi m m m mi mi
A h »en d* r F * n > f u n f unabhangi f l * P r u H t o l k b* i ta t t f f *n w i r a u f g r u n d ¥on zahtannu&igan E r t * b n i i i * n au> Pr i i fungon on 4 * r L ia fa-r u n f to lbat , da> dat G a r i t dan Vara i i tbarungan d* r B a i t a t l u n f , in ibaaondar*
a) dan M a r k t t o H o r d a r u n g a n b l dar MaSha l t i gka i l c) dar F u n k t i o m t i k h t i g k a i t a n t i p r i c h l .
Wir MbarrMtiman h iar f i i r dia var t ragi ich varainbarta Oa ran t i * .
:o, I aipcMidt t o t t ia agroatnantt Ma . indapandant c o n t r o l d a p a r t m a n l . haraby c o r t i f y , baaad o n numara l raau l t i o f t a t t t , tha t t tM u n i t ci of tha ordar , a tpacia l ly
a) t o matar ia l r aqu i t i t i o fN b l t o roapoct o f d i m a n i i o n t c ) t o a f f i c i ancy .
Ma harawntti o v a r u k a tha cont rac twal fy agraad guaranta* .
N o u i , K H i u i g r w t . du dapar tamant con t ro ta , indapandant du l iapar ta i iMnt p r o d u c t i o n , c a r t i f i o m par la p ra ian t d o c u m a n t , baaa l u r laf r t au t t a t i c h i f f r a , d*> ( u a i i . i)ua l aqu ipamant cor raapond bian a la c o m m a n d * , an par t icu l ia r an ca q u i conoarna:
a l lat ma t ia ra , pramwraa b) la ra ipact das d i m a n t i o n i c l la b o n f o n c t i o n n a m o n t .
N O U I p r o n o n i done an charga la garanl ia oont rac tua l la .
Spay,2Z..-J.anuar*.19a7..
S C H O T Qualitalssic
^ t t i a i i t a t w i e f i a Q u a l i t y Aaturarwa C o n t r A I * Qual i ty
• • » • • • • • • • « • » » ^ ^ » « » " » i » ^ ^ ^ » T > ^ ^ ^ a a ^ a * a a a " a ^ ^ a ^ a ^ a a V a ^ ^ o ^ w * » i » a a a « m mi mi mi mi mi mi mi mi mi mi mi mv mi mi mi
] i
SAFETY PROCEDURES
Before Operation
Make certain the operating area i s clear of obstructions and personnel.
Keep excess grease, o i l and other spillage from around exposed surfaces of the bow thruster unit.
During Operation
Always use the simple and fundamental rules of safety when operating this unit.
Do not perform maintenance on the unit while running.
After Operation
(^^^ Make certain that the throttle is f u l l y closed and the prime mover is properly secured.
Stop a l l operations when cleaning, adjusting or lubricating the unit.
Keep excess grease, o i l and other spillage cleaned off the unit at a l l times.
When performing maintenance on the un i t remember that due to size and weight of components, ex t reme care shou ld be t aken when m o v i n g , p o s i t i o n i n g , e tc . , to prevent personal i n j u r y as w e l l as damage to components.
Use proper l i f t i n g procedures and proper equipment to l i f t , move and pos i t ion components.
When maintenance procedures are terminated, take inventory of too l s , shop c l o t h s , e tc . , t o ensure no f o r e i g n ob jec t s are i n s i d e the u n i t t o cause p o t e n t i a l l y hazardous s i tua t ions .
o RECORD OF CHANGES
CHANGE
No.
DATE TITLE OR BRIEF
DESCRIPTION
ENTERED BY
Q:
SCHOTTEL "nniNEL BOW THRUSTEB
MODEL S-300-L
Schottel of America Contract No, MILITARY SEALIFT COMMAND
Contract No. N00024-85-2046
Date of Contract:
Hull No.: T-AGOS 13 No. 1123 T-AGOS 14 No. 1124
NAVSHIPS I.D. NO.
TABLE OF CONTENTS
SECTION PAGE
1 GENERAL INFORMATION
Introduction and Description 1-1 General Arrangement Drawing 1-2 Bow Thruster Description 1-3 Lubrication Instructions 1-4
2 MAINTENANCE & TROUBLESHOOTING
Scheduled Maintenance Recommendations 2-1 Troubleshooting Data Chart 2-2
3 SERVICE
Gearbox Removal 3-1 Gearbox Installation 3-12 Drive Flange Seal Replacement 3-21 Propeller Shaft Seal Replacement 3-24
4 PARTS LIST
General Arrangement 4-2 Drive Flange Assembly 4-4 Prop Hub Assembly 4-6 Skeg Assembly 4-8 Lower Gearbox Assembly 4-10
5 SPECIAL TOOLS
Prop Nut Wrench 5-1 Prop Puller Plate 5-2
6 REFERENCE DATA
Articulated Shafts 6-1 Recommended Lubricants 6-11 Schottel Group Companies 6-12
SECTION I
GENERAL INFORMATION
O o GENERAL INFORMATION
INTRODUCTION
This instruction Manual applies to the Type S-300-L Tunnel Thruster manufactued by Schottel of America, Inc., 8375 N.W. 56 Street, Miami, Florida 33166.
The Tunnel Thruster is a right-angle reduction gearbox designed for underwater operations and provides port-starboard thrust for slow speed maneuvering and docking applications.
The Thruster is designed to operated in either a clockwise or counter clockwise direction as selected by the controls, and must be f u l l y submerged during operation. Operation in air must be limited to 60 seconds or less.
The only operator's maintenance required is to check the o i l level of the lube o i l tank on a daily basis.
DESCRIPTION
Manufacturer;
Part Number;
Operating Fluid:
Mounting:
Oil Operating Temp.
Weight;
Lubrication;
Schottel of America, Inc.
S-3OO-L
Gear Oil EP
Gearbox bolted on Tunnel Flange
Max. 185° Fahrenheit, 85° Celsius
Approximately 4,300 Lbs.
(1,954 Kg), with propeller
External supply is required to maintain static head pressure on gearbox
1 - 1
S Z . S T U M M C U I . O . , S 4 . O TUMMICI. O . O
o n r P t E S H I P : l e a .
SHipBuiLcecs joe> Kjofo: M^so-^3<s-l3 t Mesi-aoft-'*- S H I P O U l l D E E S A w e C V A L LETTE* . F I L E >4o. * O a t * " -
AeBAPfVcvAL Ltnte riLcMo. f narc:
u s o Q A P o i z o ^ i L L C T T t e FILE Wo. i OorTE; i s i g r r e o o
I. T H I S U M i r « - T a w r > A P f > a O O a X C K ^ T CT>C ftMJCO A*s(0 e « E r « e E K I C E I 3 v « 0 « . I O C 2 . * . « S - I 4 - i F O t C A S O C T S J L S .
i r n i c A i i i i imiitt OTHIRWtSI I P E C I F I I D :
• l i T u r i i T u n i i i I I t c c i i a « a c i
• I t ! m i l l l l l P i l K I I H I I t
• MMItCI I M M H I I I M i l
DCIVC F L A M J E 6SSY.
PPOP UUO i^SSY.
SkEC ASSV
• l U I I M I I I l i t t i l t I t • I
• l l l l l t L a a t i i i i i
• n i
I I I » I [ i T T c m m i l
S C H O T T E L OF A M E R I C A I N C
H f A V T B U f T M A B I H I P I O r U l l t O M i a W I P M I M T
M I A M I , f l O I I * .
• i i a i L O L I Q I W I A O
I 5 J A M l t>afe
GENL2AL APeANGEIILKJT " S:3BD-LTUNNJ:LTHeuSTC2 T/A^OS
\6GZA50
m A
S C H CTT f I .^F ' 1 11-. I
CHAPTER I
SECTIOM 1-2
0?: "•
THIS MANUAL COVERS SCHOTTEL TUNNEL
BOW THRUSTER TYPE S-300-L
1-1
1-2
1-3
1-4
1-5
1-6
The bow thruster is driven by a prime mover to be rated 550 h.p. at 1200 r.p.ra.
The bow thruster w i l l give equal thrust to port and starboard
The propeller shaft taper is 1 to 10.
Propeller Information , , Diameter:
Pitch: (mean) Number of Blades;
Blade Area Ratio;
51.18 inches (300 mm)
40.51 inches (1029 mm) .617
A separate header o i l tank is provided.
Tunnel Dimensions |
Inside Diameter:
Length;
Steel Plate Thickness:
Bow Thruster Weight:
52.5 inches 44 inches .75 inch
4300 lbs. (approx.)
1-3
•4f \
LUBRICATION INSTRUCTIONS
TO MAINTAIN VALIDITY OF THE GUARANTEE AND INSURE TROUBLE-FREE OPERATION, IT IS
IMPERATIVE THAT THE FOLLOWING INSTRUCTIONS BE FOLLOWED:
The transverse thruster unit must be completely f i l l e d with o i l . A separate tank is supplied and must be mounted above the loaded v/ater line. All oil connections must in accordance with lube oil system drawing.
be
VISCOSITY
c St/50°C 30-53
VISCOSITY
DIN C-LP49 DIN 51 517
COMPANY
AGIP Blasia 57
ARAL BG 24
BP Energol GR-XPG8 The load stage of the gearbox o i l used must be above 12 of the FZG Test AB.3/90 accor ding to DIN 59 354. CALTEX
Multipurpose Thuban LP 30
The load stage of the gearbox o i l used must be above 12 of the FZG Test AB.3/90 accor ding to DIN 59 354.
CASTROL
Alpha 21Z Alpha 31Z
CHEVRON
Non-Leaded Gear Compound 68
EXXON Spartan EP-58
MOBIL Mobilgear 626
SHELL Omala 68
TEXACO
Multigear Lubricant EP80 Rando HD 315
Check the oil level regularly during the f i r s t few hours of operation. The oil level will drop due to air trapped in the system; this makes periodic checks essential, as the addition of oil may be necessary.
OIL CHANGE
As with most machinery, the Schottel Bow Thruster unit has a breaking-in period, requiring that the oil be changed for the f i r s t time after 250 operating hours;
thereafter, the oil should be changed every 2500 hours or at least once a year.
1 - 4
SECTION 2
MAINTENANCE & TROUBLESHOOTING
MAINTENANCE
RECOMMENDED MAINTENANCE SCHEDULE
DAILY Check oil level in lube oil tank.
MONTHLY Perform visual check for oil leaks.
SEMI-ANNUALLY Check all fastenings. ••, ANNUALLY Change o i l .
BI-ANNUALLY Check propeller and propeller seals
2 - 1
THRUSTER TROUBLESHOOTING DATA
TROUBLE
PROBABLE CAUSE
(REF. SECTION 4) REMEDY
Banging Noise Debris in Thruster Tunnel Diver sent down to clear tunnel
Excess Vibration Propeller Blade Damaged Remove propeller for repai r
Oil Leak \ (Visible)
Defective Seal or O'Ring Dwg. SK-0035 - 7, 8, 9 ., Locate defective part(s) and replace
Oil Leak (Loss of oil in tank, no visible signs of leak)
Defective Seal or O'Ring Dwg. SK-0035 - 11
SK-0037 - 1, 5, 7
SK-0038 - 4, 8, 44,
40-42, 23
Locate defective part(s) and replace
Water in Oil Defective Seal or O'Ring Dwg. SK-0035 - 11
SK-0037 - 1, 5, 7
SK-0038 - 4, 8, 44,
40-42, 23
Locate defective part(s) and replace
Water Leak Defective O'Ring, Loose Fastening Dwg. SK-0035 - 10, 1
Locate defective part(s) and replace
No Power Out-Put Engine Operating Normally
Defective Gears Dwg. SK-0028 - 29, 34
Remove defective part(s) and replace
2 - 2
SECTION 3
SERVICE
GEARBOX
REMOVAL
3-1
S C H O T T E L O F A M E R I C A . INC . -
LOWER GEARBOX REMOVAL
I . PURPOSE: ^
To establish procedures for removal and reinstallation of the LOWER GEARBOX unit from Schottel's Type S-300-L Tunnel Thruster.
I I . REFERENCED DRAWINGS: '
The following drawings are referenced in these procedures for parts identification and torque specifications:
SK-0028 - General Arrangement j^ .i , . i;^ SK-0029 - Drive Flange Assembly v". , . r j , ;
SK-0030 - Prop Hub Assembly SK-0031 - Skeg Assembly t
• ,. • . V ' '
I I I . TOOLS/EQUIPMENT/MATERIALS REQUIRED:
The following must be on hand to implement these procedures: ' , A. YARD SUPPLIED
•A
1. Lifting Equipment
2. Metric Wrenches '
3. Hydraulic Jack
4. Torque Wrench
5. Sealer - "Atmosit", Loctite "Master Gasket Eliminator" or equivalent.
6. Loctite "271"
7. Gear Puller
8. Metric Allen Wrenches
9. Snap Ring Pliers
B. S.O.A. SUPPLIED (With Thruster)
1. Propeller Nut Wrench: Drawing SK-0040
2. Threaded Rods, 3 each M20 x 8" Ig; 3 each Nuts M20
3. Propeller Puller Plate: Drawing SK-0039
NOTE: Metric sizes used throughout. '
3-2 rSl S C H O T T E L OF A M E R I C A I N C ' S f ' H E A V Y D U T Y M A R I N E P t O P U L S I O N E Q U I P M E N T ^ I M I A M I . F L O R I D A
DRAWN
CHECK
ENSR
STRESS
GENERAL ARRANGEMENT
S K - 0 0 2 8
3 -3
DRIVE FLANGE REMOVAL: (Ref. Drawing SK-0029)
NOTE: The following may be done with the Tunnel Thruster submerged:
1. Drain Oil - Remove plug found under VENT connection at , thruster input flange.
2. Disconnect intermediate drive shaft from DRIVE FLANGE (3) and remove.
3. Remove drive flange SNAP RING (4). -
4. Remove drive flange COVER PLATE (5).
5. Remove hex head BOLT (6), nylon WASHER (7), and steel f l a t
WASHER (7A).
6. Remove DRIVE FLANGE (3) using gear puller.
7. Remove SNAP RING (2) and SEALS (9). . .
3-4
• Torque 180 ft. lbs.
••Torque 100 ft. lbs.
o Locktlte 271
S C H O T T E L O F A M E R I C A I N C H E A V Y D U T Y M A R I N E P R O P U L S I O N I Q U I P M E N T
M I A M I . F L O R I D A
DRAWN
CHECK
ERSR
STRESS
DRIVE FLANGE ASSY.
S K - 0 0 2 9
3 - 5
CAUTION: All procedures from this point MUST be done with TUNNEL
THRUSTER OUT OF THE WATER.
PROPELLER REMOVAL: (Ref. Drawing SK-0030)
' 1. Remove CAP SCREW (5). >- v
2. Remove PROP CAP (6).
3. Remove oil seal O'RING (8). - " :
4. Remove TAPWASHERS (2), i f supplied, or remove lockwire, as applicable.
5. Remove HEX SCREWS (3).
6. Loosen PROP NUT (7) 2 turns using special wrench supplied.
Thread is LEFT HAND.
CAUTION: Do not remove prop nut at this time.
7. Install the 3 threaded rods supplied into prop hub.,, '
8. Install the prop puller plate supplied and secure with supplied nuts.
9. Jack prop off taper using hydraulic jack. Heat hub i f v necessary.
10. Remove PROP NUT (7) from prop shaft and remove prop from tunnel.
3 - 6
• Torque 47 ft. lbs.
••Torque 200 ft. lbs.
o Locktite 271
S C H O T T E L OF A M E R I C A I N C
H E A V Y D U T Y M A R I N E P R O P U L S I O N I Q U I P M E N T
M I A M I . F L O R I D A
DRAWN
CHECK
ElfiR
STRESS
PROP HUB ASSY.
S K - 0 0 3 0
3-7
SKEG REMOVAL: (Ref. Drawing SK-0031)
1. Remove skeg flange BOLTS and LOCKWASHER (3,2).
2. Work SKEG FLANGE (4) up as high as possible using bolts removed as jacking bolts.
3. Remove O'RING (5).
4. Remove skeg fin BOLTS (3,2). '\.
CAUTION: SKEG (9) is heavy and will f a l l when all bolts are removed; support as required during disassembly.
5. Lower SKEG (9) and remove. ?S
3-8 y / / / / / / / / / / / / / A
-I k 1 1 ^ 1
• Torque 54 ft. lbs.
oLocktlte271
Z
S C H O T T E L O F A M E R I C A I N C H E A V Y D U T Y M A R I N E P R O P U L S I O N I Q U I P M E N T
M I A M I . F L O R I D A
DRAWN
CHECK
.NCR
STRESS
SKEG ASSY.
S K - 0 0 3 ]
3-9
LOWER GEARBOX REMOVAL: (Ref. Drawing SK-0029)
CAUTION: Gearbox must be adequately supported by a chainfall at this point. The gearbox weighs approximately 1200 Lbs. •
1. Remove NUTS ( l ) .
2. Lower gearbox into tunnel by means of chainfall.
3. Remove gearbox from tunnel. i ... ^
NOTE: It may be necessary to weld pad eyes inside tunnel to facilitate gearbox removal.
fa* • o Locktite 271
S C H O T T E L O F A M E R I C A I N C H E A V Y D U T Y M A R I N E P R O P U L S I O N E Q U I P M E N T
M I A M I . F L O R I D A
DRAWN
CHECK
ENSR
STRESS
DRIVE FLANGE ASSY.
S K - 0 0 2 9
3-11
GEARBOX
INSTALLATION
3-12
CAUTION: Disassembly of the lower gearbox should not be attempted.
If repair is indicated, the gearbox exchange program maintained by Schottel for the covenience of its customers should be utilized. Contact Schottel of America, Inc.
for details.
A. GEARBOX INSTALLATION: (Ref. Drawing SK-0029) i
NOTE: Thoroughly clean all mounting surfaces prior to reassembly. •
1. Install new O'RINGS (10, 11). Apply sealer on and around O'Ring and sealing surfaces.
2. Lift gearbox into position, install NUTS (1) handtiqht;
do not tighten fully at this time.
NOTE: Leave chainfall in position.
3-13 o Locktite 271
L O F A M E R I C A I N C .
A R I N E P R O P U L S I O N E Q U I P M E N T
M I A M I . F L O R I D A
DRAWN
CHECK . DRIVE FLANGE ASSY.
CN6R
STRESS SK-0029
3-14
B. SKEG INSTALLATION: (Ref. Drawing SK-0031)
1. Install new O'RINGS (1, 7) and seal flange with sealer.
2. Install BOLTS (3) using Loctite "271". Torque as _ .
specified on drawing.
3. Install new O'RING (5) and seal with sealer.
4. Draw SKEG FLANGE (4) down to meet SKEG PLATE, install BOLTS (3) using Loctite "271", and torque as per drawing.
NOTE: Check that prop shaft is centered in tunnel before torquing nuts.
5. Remove NUTS (1) one at a time, coat threads with loctite "271", and reinstall. Torque as per drawing.
6. Remove chainfall.
I
3 - 15
• Torque 54 ft. lbs.
oLocktite 271
S C H O T T E L O F A M E R I C A I N C H E A V Y D U T Y M A R I N E P R O P U L S I O N E Q U I P M E N T
M I A M I . F L O R I D A
DRAWN
£NECK
ENfiR
STRESS
SKEG ASSY.
S K - 0 0 3 ]
3-16
PROPELLER INSTALLATION: (Ref. Drawing SK-0030)
NOTE: Thoroughly clean prop shaft, key, and inside of hub prior to assembly. Prop shaft to be blued.
1. Fit taper for minimum 80% contact.
2. Check clearance of PROPELLER KEY (9) in accordance with Drawing SK-0030 Detail A.
3. Insure that taper is clean and dry.
4. Install prop on shaft, slide up as far as i t will go, and take a reading of gearcase-to-prop hub clearance.
5. Take the chill off prop hub, heat to between 90° - 110° F.
NOTE: Heating not necessary in tropical areas. „ .̂,t
6. Harden PROP NUT (7) with special wrench provided. Take another clearance reading as in Step 4, above. Reading should be .020" minimum, preferably more.
7. Install TAP WASHERS (2), i f supplied, and LOCKING BOLTS (3).
Torque as per drawing and bend edges of tapwashers or safety wire bolt heads to lock in position, as applicable.
8. Install new O'RING (8) on PROP CAP (6) and seal with sealer.
9. Pack PROP CAP (6) with grease or tallow and install using CAP SCREWS (5) and new USIT RING (4). Torque as per drawing.
1̂ .
3 - 17
• Torque 47 ft. lbs.
••Torque 200 ft. lbs.
o Locktite 271
S C H O T T E L OF A M E R I C A I N C
H E A V Y D U T Y M A R I N E P R O P U L S I O N I Q U I P M E N T
M I A M I , F L O R I D A
DRAWN
CHECK
EI6R
STRESS
PROP HUB ASSY.
S K - 0 0 3 0
3-18
D. DRIVE FLANGE INSTALLATION: (Ref. Drawing SK-0029) "
1. Install new SEALS (9) and SNAP RING (2).
2. Install DRIVE FLANGE (3) using HEX HEAD BOLT (6) and new NYLOC WASHER (7). Install steel f l a t WASHER (7A) and torque as per drawing.
3. Install drive flange COVER (5) using new O'RING (8).
4. Install SNAP RING (4). , ^
5. Reconnect intermediate drive shaft.
6. Fil l gearbox with specified oil through head tank.
7. Thoroughly inspect all mounting surfaces for oil leaks, i.e.: skeg and skeg flange, lower gearbox mounting flange and drive flange.
8. Submerge tunnel thruster, test run.
3-19
••Torque 100 ft. lbs. ^ 0 Locktite 271
L A R
M
O F A M E R I C A I N C .
I N E P R O P U L S I O N E Q U I P M E N T l A M I . F L O R I D A
DRAWN
DRIVE FLANGE ASSY. CHECK DRIVE FLANGE ASSY.
IHBR
DRIVE FLANGE ASSY.
STRESS S K - 0 0 2 9
3-20
DRIVE FLANGE SEAL REPLACEMENT
3-21
DRIVE FLANGE SEAL REPLACEMENT: (Ref. Drawing SK-0032)
NOTE: The following may be done with the Tunnel Thruster submerged:
1. Drain Oil - Remove plug found under VENT connection at thruster input flange.
2. Disconnect intermediate drive shaft from DRIVE FLANGE (2) and remove.
3. Remove drive flange SNAP RING (3).
4. Remove drive flange COVER PLATE (4).
5. Remove hex head BOLT (5), nylon WASHER (6) and steel f l a t
WASHER (6A).
6. Remove DRIVE FLANGE (2) using gear puller. '
7. Remove SNAP RING (1) and SEALS (9). ' r ̂
8. Remove SEALS (8) and replace with new seals.
9. Install SNAP RING (1).
10. Install DRIVE FLANGE (2) using HEX HEAD BOLT (5) and new NYLOC WASHERS (6). Install f l a t steel WASHER (6A) and torque as per drawing.
11. Install drive flange COVER PLATE (4) using new O'RING (7).
12. Install SNAP RING (3). ,:f''\
13. Reconnect intermediate drive shaft.
14. F i l l gearbox with specified oil through head tank.
15. Inspect for oil leaks and test run thruster. -
3 - 22
•Torque 100 ft.lbs.
OLocktite 271
S C H O T T E L O F A M E R I C A I N C .
H E A V Y D U T Y ' M A R I N E P R O P U L S I O N E Q U I P M E N T
M I A M I . F L O R I D A
DRAWN
CHECK
EH8R
STRESS
DRIVE FLANGE
S K - 0 0 3 2
3-23
PROP SHAFT SEAL REPLACEMENT
PROP SHAFT SEAL REPLACEMENT
NOTE: The following must be done with Thruster out of the water.
1. Drain Oil - Remove plug found under VENT connection at thruster input flange.
2. Remove propeller in accordance with procedures outlined v ' on page 3 - 6 of this manual. * -
' 3. Remove CAP SCREWS (2).
4. Remove COVER (1), SEALS (7) and SEAL RUNNING RING (4) as an assembly using 3 Jacking Bolts M12 in holes provided in COVER (1).
5. Inspect SEAL RUNNING RING (4), seal surface, and general !"
condition to determine i f replacement is necessary.
6. Remove SEALS (7), O'RINGS (3), (5), and (6).
7. Thoroughly clean all surfaces.
8. Replace SEALS (7): Lip on prop side must face water, lip on gearbox side must face o i l .
NOTE: I t is possible to receive 2 different seal case materials: the prop side seal should be stainless steel case, gearbox side can be either stainless steel or steel. Check with magnet before installation.
9. Lubricate seals with EPZ grease after installation.
10. Install new O'RING (3). / '
11. Install COVER (1) Atmosit sealer between gearbox and cover.
12. Install BOLTS (2) using loctite 271 on threads, torque as per drawing SK-0033.
13. Replace O'RINGS (5) (6) on SEAL RUNNING RING (4).
14. Heat SEAL RUNNING RING (4) in water to 212° F (100°C), • quickly place seal running ring on prop shaft and slide into place.
3 - 24
15. Install propeller in accordance with procedures outlined on page 3 - 17 of this manual.
16. Fill gearbox with specified oil through head tank. | '
17. Inspect for oil leaks before submerging Thruster.
V- •
3 - 25
•Torque 51 ft.lbs.
OLocktite 271
S C H O T T E L O F A M E R I C A I N C H E A V Y D U T Y M A R I N E P R O P U L S I O N E Q U I P M E N T
M I A M I . F L O R I D A
DRAWN
CHECK
<lfiR
STRESS
PROP SHAFT
S K - 0 0 3 3
3-26
SECTION 4
PARTS LIST
*i"''..
-err. . .
SECTION IV
( ^ S K r 0 0 3 6
0 SK-0031
I
S C H O T T E L O F A M E R I C A I N C H E A V Y D U T Y M A R I N E P R O P U L S I O N I Q U I P M E N T
M I A M I . F L O R I D A
DRAWN
CHECK
EN6II
STRESS
GENERAL ARRANGEMENT
SK-0034
4-2
S C H O T T E L O F A M E R I C A . I N C .
' PARTS L IST
Assy: DRIVE FLANGE Dwg. No.: S K - 0 0 3 5
POS. QTY. PART NO. DESCRIPTION
1 12 1001031 NUT, M24
2 1 N5000-525 RING, retaining, Truarc
3 1 1038924 FLANGE, drive
4 1 N5000-400 RING, snap,Truarc
5 1 1038925 PLATE, cover
6 1 1013920 BOLT, 30x70
7,7A 1 (7)WASHER, M30 Nyloc,(7A)Ftat,sti.M30
8 1 1001379 0-RING, 95» 3 Neoprene
9 2 1001174 SEAL, 110x1 BOX 13
10 12 0 - R I N G , 4 x 2 4
11 1 1001414 0 - RING, 4x160
12 12 1001575 LOCKWASHER, M24
13 12 1011480 STUD,M24x80,DIN939,B--38,L:80
• - -i-: -
Page 4-5
1'
S C H O T T E L O F A M E R I C A I N C H E A V Y D U T Y M A R I N E P R O P U L S I O N E Q U I P M E N T
M I A M I . F L O R I D A
DRAWN
CHECK
ENSR
STRESS
PROP HUB ASSY.
SK-0036
4-6
' 'W'aft'yy^yffltî îifillegal.';'
S C H O T T E L O F A M E R I C A . INC .
PARTS LIST
Assy : S - 3 0 0 L GENERAL ARRGMT Dwg. No.: SK-0034
POS. QTY. PART NO. DESCRIPTION
1 1 SK-0035 DRIVE FLANGE ASSY.
2 1 SK-0036 PROP HUB ASSY.
3 1 SK-0037 SKEG ASSY.
4 1 SK-0038 LOWER GEARBOX ASSY.
It" •
Page 4-3
H E A V Y D U T Y M A R I N E P R O P U L S I O N E Q U I P M E N T
M I A M I , F L O R I D A
ORAWH
CHECK
IR6R
STRESS
DRIVE FLANGE ASSY.
S K - 0 0 3 5
A -A
PARTS L IST
Assy: PROP HUB Dwg. No.: S K - 0 0 3 6
POS. QTY PART NO. DESCRIPTION
1 1 1008872 PROPELLER
2 2 1003852 TAP WASHER
3 2 1000718 HEX. SCREW
4 1 1005990 USIT-RING
5 1 1000949 CAP SCREW
6 1 1008882 PROPELLER CAP
7 1 1004826 PROPELLER NUT
8 1 1001424 OIL SEAL
9 1 1003853 KEY
10 1 1005968 SPLIT SLEEVE
Page 4-7 y / / / / / / / / / / / / / A
^ L - L J 1 U
1 .̂ 1 m r- -1 k j ; 1 ij / 1
1 r ^ 1 \ \ \ 2 ^
S C H O T T E L O F A M E R I C A I N C H E A V Y D U T Y M A R I N E P R O P U L S I O N E Q U I P M E N T
M I A M I . F L O R I D A
DRAWN
CHECK
ENSR
STRESS
SKEG ASSY.
SK-0037
4-8
Assy: SKEG Dwg. No.: S K - 0037
POS. QTY. PART NO. DESCRIPTION
1 1 1001511 0 - R I N G , 4 x 2 3 0
2 22 1021604 LOCKWASHER, M16ss
3 22 1000704 BOLT, M 16 X 40 ss
4 1 1038756 FLANGE, Skeg
5 1 1001383 0-RING, 100x3
6 1 PLUG, 1/2" NPT, StI.
7 2 1020805 0 -R ING, 0 5.7x89.2
8 1 1038756 PIN, Skeg
9 1 1038963 SKEG
Page 4-9
H E A V Y D U T Y M A R I N E P R O P U L S I O N E Q U I P M E N T
M I A M I . F L O R I D A
DRAWN
CHECK
ENER
STRESS
LOWER GEARBOX
S K - 0 0 3 8
4-10
Assy: LOWER GEARBOX Dwg. No.: S K - 0 0 3 8
POS. QTY PART NO. DESCRIPTION
1 1 1009082 SHAFT, Prop
2 1 1003851 SPACER
3 1 1009160 COVER
4 1001705 SEAL 160x190x15
5 1 1001425 SEAL, Oil
6 1 1004831 BUSHING
7 1 1001402 SEAL,Oil
8 1 1001450 SEAL, Oil
9 1000855 CAP SCREW
10 1 1004161 BEARING
11 1 1005343 BEARING
12 1 1002050 WASHER, Lock
13 1 1002075 NUT, Lock
14 1 1008886 GEARCASE
15 10 1000962 CAPSCREW
16 1 1001314 SEAL,Oil
17 1 1014983 PLUG
18 1 1003749 SHIM
19 1 1002044 WASHER, Lock
20 1 1002069 NUT, Lock
21 1 1003747 DISTANCE RING
22 6 1003859 SPRING
Page 4-11
Assy: LOWER GEARBOX Dwg. No.: S K - 0 0 3 8
POS. QTY PART NO. DESCRIPTION
23 1 1001437 SEAL,Oi l
24 1 1004833 RING
25 1 1008860 FLANGE
26 1 1005319 BEARING
27 1 1003748 RING
28 1 1004127 BEARING
29 1 1012180 GEARSET
30 18 1000896 CAP SCREW
31 9 1000744 HEX. SCREW
32 1 1004900 RING
33 1 1008880 CAP
34 1 1012180 GEARSET
35 1 1008896 COVER
36 3 1000918 CAP SCREW
37 3 1005975 USIT RING
38 6 1003857 SPRING
39 1 1003750 SHIM
40 1 1001510 SEAL, Oil
41 1 1005320 BEARING
42 1 1001470 SEAL, Oil
43 1 1008884 COVER, Bearing
44 1 1001473 SEAL, Oil
Page 4-12
S C H O T T E L O F A M E R I C A . INC .
PARTS LIST
Assy: LOWER GEARBOX Dwg. No.: S K - 0 0 3 8
POS. QTY PART NO. DESCRIPTION ~- •
45 1 1004023 BEARING
46 3 1002191 KEY
Page 4-13 t;..
SECTION 5
SPECIAL TOOLS
"1, Mati: 5 /8 s t I .
H E A V Y D U T Y M A R I N E P R O P U L S I O N E Q U I P M E N T
M I A M I . F L O R I D A
DRAWN LouQu/^D
CHECK
ENfiR
STRESS
NCTv. l a . i2)e.^
WRENCH, Prop Nut S K - 0 0 4 0
5 1
Drill 7/8 0 thru
3 pIcs Mati: 5 /8 stI.
S C H O T T E L O F A M E R I C A I N C H E A V Y D U T Y M A R I N E P R O P U L S I O N E Q U I P M E N T
M I A M I , F L O R I D A
DRAWN LOU OU>:xD
CHECK
iHfiR
STRESS
NOV-13, lf)5Z
PLATE,Prop Puller S K - 0 0 3 9
5-2 i
Thd. M20X2.5 Pitch
3 Rods Required
S C H O T T E L O F A M E R I C A I N C H E A V Y D U T Y M A R I N E P R O P U L S I O N E Q U I P M E N T
M I A M I , F L O R I D A
DRAWN
CHECK
ENCR
STRESS
ROD,THREADED
S K - 0 0 4 0
5 - 3
SECTION 6
REFERENCE DATA
ARTICULATED SHAFTS FOR SCHOTTEL SYSTEMS
Operating Instructions
Section
1.
1.1 . -
1.2 ^
1.3 .
1.4
DESCRIPTION
. General ..
Theory of Articulated Shafts
Types of Arrangement
Transportation and Storage
Page
2.
2.1
2.2
INSTALLATION
I n s t a l l a t i o n Instructions
Flange Unions
3.
3.1
3.2
MAINTENANCE
Lubricating the Art i c u l a t e d Shafts
Checks
Tightening Torques 10
Recommended Lubricants 11
6-1
1. DESCRIPTION ,̂.4
1.1 GENERAL - '
In SCHOTTEL propulsion systems, a r t i c u l a t e d shafts are mainly used:
a) as a power transmission element between the clutch at the prime mover and the SCHOTTEL Rudder Propeller (SRP);
b) to transmit steering d i r e c t i o n between the axio-meter l i n e and the SRP steering flange;
c) for a u x i l i a r y systems (pumps, etc.) driven d i r e c t l y o f f the forward end of the prime mover. However, as t h i s application i s r e l a t i v e l y rare, i t w i l l not be covered herein.
A r t i c u l a t e d shafts are service proven and v e r s a t i l e ele ments of motive power engineering. They make i t possible to connect two shafts o f f s e t i n r e l a t i o n to each other.
Changes in length during assembly and in service (such as for the SRP v e r t i c a l adjustment) are compensated for by shaped s l i d i n g parts. The use of a r t i c u l a t e d shafts permits assembly without expensive alignment of the mach inery sets to be connected.
Art i c u l a t e d drive shafts are mechanically balanced accord ing to t h e i r max. r o t a t i o n a l speed in service. The bal ancing plates tacked to the shafts are not to be removed under any circumstances. The shafts must be rebalanced upon completion of any repair work undertaken.
1.2 THEORY OF ARTICULATED SHAFTS
Whenever a simple Cardan j o i n t or a ball-and-socket j o i n t i s evenly turned in a deflected condition, i t s out-i put end w i l l show a nonuniform motion (Fig. 1).
C-2
F i g .
Uniform input
Nonuniform output
This misalignment i s compensated for when two simple j o i n t s are connected to form an ar t i c u l a t e d shaft. Complete compensation of the ax i a l misalignment i s subject to the following conditions:
a) Same i n f l e c t i o n angles at both j o i n t s
' < 1 = 2 >•
b) The two inner j o i n t forks must be in the same plane.
c) Input and output shaft must also be in the same plane.
NOTE:
Incorrectly assembled a r t i c u l a t e d shafts increase a x i a l misalignment at the output end. This may cause damage to the bearings in the j o i n t s , shaped sections of the splined shafts, and gears arranged downstream. Accordingly, care must be taken to insure that the marking arrows on the splined shaft and splined hub are opposed to each other when assembling the a r t i c u l a t e d shafts halves. -
F i g . 2
6-3
1.3 TYPES OF ARRANGEMENT
Z-type arrangement: Input and output shaft are p a r a l l e l to each other in the same plane ( F i g . 3 ) . .̂
F i g . 3
Common plane of deflection
/3T = /32
W-type arrangement: The axes of input and output shaf t s arranged i n the same plane in tersec t in a point ( F i g . 4)
F i g . 4
Common plane of deflection
6-4
1.4 TRANSPORTATION AND STORAGE i*
Articulated shafts are supplied as mechanically balanced and lubricated units ready for installation.
F i g . 5
F i g . 6
Art icu la ted shaf t s should be transported i n a horizontal pos i t i o n . When transport ing them i n the v e r t i c a l pos i t ion , they must be addi t ional ly secured against t h e i r separat ing. The cap of ;
the shaped sea l i s not to be s tressed by the weight of the ar t i cu la ted s h a f t . Use hemp or nylon rope. ( F i g . 5 ) .
Do not remove balancing pieces or p la te s . An out-of-balance condition causes uneven operation which leads to premature destruc t ion of the jo in t and connecting bearings.
Avoid shocks and impacts during transportat ion and storage, as the sea l ing cap ( F i g . 6/1) could be pressed out.
F i g . I f possible, store shafts side by side with the flanges resting on a suitable wooden platform (Fig. 7)
6-5
2.
2.1
INSTALLATION
INSTALLATION INSTRUCTIONS
Remove anticorrosive agents, dirt, grease, burrs, and paint from articulated shaft flanges and counterflanges.
Upon installation and prior to placing in service, the articulated shafts are to be lubricated in accordance with Section 3.1.
Check fork position (Fig. 8/1) while observing the marking arrows (Fig. 8/2). Remove any securing used during transportation. ;
F i g. 8
Check counterflanges for radial and axial run-out and center f i t .
Do not turn articulated shaft by means of assembling levers inserted into the joints because bearing seals might be damaged and lubricating nipples broken off.
Prior to disassembly, measures must be taken to ensure that the original positioning of the articulated shafts can be duplicated during reassembly.
When painting the shaft, care must be taken so that the shaft areas on which the seal l i p slides remain free from paint, as in
Fig. 10/X.
F i g . 10
6-6
Attention:
When assembling a r t i c u l a t e d shafts without length or spline adjustment, one connecting part must be of movable con f i g u r a t i o n i n order that the a r t i c u l a t e d shaft can be slipped over the centering adapter.
Changes in length caused by thermal expansion must be
V .absorbed by adequate connecting bearings.
Caution:
Adequate safety measures are to be taken by the user where men and material might be endangered by r o t a t i n g a r t i c u l a t e d shafts. , V
A l l accident prevention regulations are to be complied with.
2.2 FLANGE UNIONS >
To ensure perfect operation of the a r t i c u l a t e d shafts, exact alignment of the counterflanges i s necessary.
Only b o l t s of strength class DIN 10.9 or SAE grade 8 may be used as connecting bolts for a r t i c u l a t e d shaft attach ments. For mounting purposes, the bolts are to be o i l e d s l i g h t l y ; lubricants containing MoSg additives (such as
Molykote) are to be avoided.
Tighten bolts with torque wrench uniformly using cross pattern; see chart on page 10 for torque values.
3. MAINTENANCE '
The a r t i c u l a t e d shafts used in SCHOTTEL propulsion systems are normally f i t t e d with three DIN 71412 grease nipples, one of which i s located at either universal j o i n t while the
; t h i r d serves fo r r e l u b r i c a t i n g the splined section.
Only class 2 l i t h i u m base greases, having a penetration number of 265/295 and a drop point of approx. 453 K (180°C), or the greases indicated in the
6-7
Chart of Recommended Lubricants on Page 11 are to be used for r e l u b r i c a t i o n .
We recommend to relubricate the a r t i c u l a t e d shafts a f t e r every
250 OPERATING HOURS, BUT AT LEAST EVERY THREE ' •
MONTHS,
and to carry out the checks as to Section 3.2.
3.1 LUBRICATING THE ARTICULATED SHAFTS
Prior to r e l u b r i c a t i o n , the nipples must be cleaned. We recommend l u b r i c a t i n g the articulaed shafts at service temperature in order to keep the resistance of the old grease in the a r t i c u l a t e d shaft as low as possible.
Attention:
THE LUBRICATING PRESSURE IS TO BE LIMITED TO MAX. 15 bars
(15 • 10^ Pa)(220 lbs. i n ̂ ) .
Grease universal j o i n t s u n t i l the used grease comes out at the seals.
When r e l u b r i c a t i n g the splined sections of the s l i d i n g parts, take p a r t i c u l a r care to position a v e r t i c a l l y ad justable SRP beforehand in such a way that the a r t i c u l a t e d shaft to be greased i s i n a horizontal position and/or i s at i t s shortest length.
I f no grease emerges when r e l u b r i c a t i n g the splined sec t i o n , the cap must be removed and the f e l t gasket either cleaned or replaced.
CHECKS
3.2 The following checks should be carried out p r i o r to re l u b r i c a t i n g the a r t i c u l a t e d shafts:
- Check universal j o i n t s for wear (checking the play).
- Check splined section for wear (visual check and check '* 4 1 . " ' T \
^ ^ . ' of p l a y ) .
6-8
- Check connecting bolts (flange unions) for tightness; % retighten them i f necessary.
For tightening torques see page 10. '
In operation, a r t i c u l a t e d shafts should be constantly checked for anomalous noise; whenever there are deviations from the normal running noise, the cause must be ascer tained and eliminated immediately.
•4-
6-9
,,v T i g h t e n i n g Torques f o r Fastening B o l t s of
, A: A r t i c u l a t e d Propelling Shafts
* - B; A r t i c u l a t e d Steering Shafts
Type of SRP Flange Dia m m
Size of Thre ad
Opening of Wrench rrrr
Tightening Torque
Nm (rr̂ kp)
10 ... 12 30/15 30/31 50/50 50/51
A 120 M 10 17 69 (7) 10 ... 12 30/15 30/31 50/50 50/51 B 90 M 8 13 35 (3,6)
76/75 76/76 100/100 100/103
A 150 M 12 19 120 (12,3) 76/75 76/76 100/100 100/103
B 90 M 8 13 35 (3,6)
76/75 76/76 100/100 100/103
B 100 M 8 13 35 (3,6)
150/152 A 180 M 14 22 190 (19,4)
150/152
B 120 M 8 13 35 (3,6)
224/226 225/226 300/300
A 225 M 16 24 295 (30) 224/226 225/226 300/300
B 150 M 10 17 69 (7)
502/502 502/503 503/505 505/505
A 285 M 20 30 580 (59) 502/502
502/503 503/505 505/505
A
315 M 22 32 780 (80)
1100/1100 A 390 M 24 36 1000 (102) c — in
RECOMMENDED LUBRICANTS ' f - ' , B r a n d L u b r i c a t i n g Grease ,,t •
Grease HLP 2
E n e r g r e a s e LS 2 0 ' f •
Poly-urea EP 2 ,•
( ^so) Beacon 2 fsC";..'-;-. , ^ . ;„i: :, Marson E P L 2 r »i
M©bll Mobilux 2 . '^ ' " •
• S h e l l
A l v a n i a E P 2 , *
I ] M u l t i f a k EP 2
. ;• -v", 6-11
SCHOTTEL o r A M E R I C A . I N C . "
International SCHOTTEL GROUP Companies *.
Schottel Group companies specialize in providing technical assistance for all types of Schottel Tunnel Thrusters. Facilities and trained mechanics are available at these locations to handle service from routine maintenance to complete overhauls. - • '^^^^^^^A'
The following companies also maintain inventories of
Schottel parts and specialized tooling and are part of the Schottel worldwide service network: ' '
Schottel Werft, 5401 Spay/Rhein, West Germany; Tlx: 0862867
Schottel Nederland, The Hague, Netherlands; Tlx: 31166
Schottel of America, Inc., Miami, FL; Tlx: 51-9196
Schottel England, London; Tlx: 887179 t ' *, : • •% Schottel Far East, Singapore; Tlx: 24715
Schottel SudAmericana, Buenos Aires; Tlx: 21500
Schottel Do Brazil, Puerto Allegrei Tlx: 2123782
... . •• " • -r.- -V.̂,' . , 6 - 12