NOAA Gangway Test.docx

DOCX document 16 KB Posted

Attached to
FY27 NOAA Ship Gordon Gunter Drydock REFERENCES
Solicitation number
1305M226Q0144REF
Issued by

About this file

This is a draft load test procedure document for the gangway system on the NOAA Ship Gordon Gunter. The procedure specifies comprehensive testing requirements to validate the gangway's structural integrity and operational functionality prior to returning it to service during the vessel's FY27 drydock. The test must be conducted in the presence of the Contracting Officer's Representative (COR), a Crane Inspector, and an American Bureau of Shipping (ABS) representative, with the gangway loaded to the weight currently identified on its load test placard.

The testing methodology requires the gangway to be positioned on end supports in a level configuration, with deflection measurements recorded at minimum six locations away from the ends. The load is to be applied evenly using sandbags, waterbags, or COR-approved methods and held for 15 minutes, after which the gangway must be inspected for damage or excessive deformation. If tack welds fail during testing, they must be repaired and the full weight test re-performed. Upon successful completion, the procedure requires demonstration that side frames show no distortion, decking is adequately secured, rollers move freely, and removable components (stations, handrails, guides, and rigid joint fittings) function properly and can be stowed when dismantled. The final deliverable is a comprehensive test report documenting all test details, results, instrumentation data, and calibration information. The procedure references ISO 7061 standard requirements of 5000N/m² load specifications.

View the file

Other files

File Type Posted
Copy of 1-QUADRANS-UserManual_MU-QUADRANS-AN-003-G.pdf PDF
NIX-D03066A_NETANSN1_UM_compressed.pdf PDF
Copy of 110-6233550.pdf PDF
AMC-505-1B Valve Overhaul and Test 4 pages.pdf PDF
Copy of 524-6233983.pdf PDF
AMC-631-2Dx.pdf PDF
Gauge Calibration List.xlsx XLSX spreadsheet
SCOTT AirPak_595118-01-Ex.pdf PDF
AMC-240-1 Propulsion Shafts _ Propellers.pdf PDF
150-6233566_RevJ_Sht1 THRU 6_N_A_MODULE NO. 9C STRL ASSY.pdf PDF
Copy of GU_514_TA-514-6629787_RevNO REVISION_Sht1 THRU 3_N_A_CHILLED WATER SYSTEM DIAGRAM.pdf PDF
GU_NONE_150-6233569_RevP_Sht1 THRU 9_N_A_MODULE NO. 10A STRUCTURAL ASSEMBLY.pdf PDF
Copy of GU_NONE_150-6233604_RevL_Sht1 THRU 5_N_A_MODULE NO. 15 STRUCTURAL ASSEMBLY.pdf PDF
20-KT-055A - Gordon Gunter Reefer Equipment Original.pdf PDF
Copy of 110-6233549.pdf PDF
000-1H General-Requirements-Ship-Ship-Repair-Contracts.pdf PDF
T9555-BA-MMO-010_0_0x.PDF PDF
GG Extinguisher List 5-28-25.xlsx XLSX spreadsheet
TECHNICAL MANUAL INDEX TMI.xlsx XLSX spreadsheet
Copy of 5100332-01_Salwico Cargo Addressable_User Guide_M_EN_2021_ADx.pdf PDF
Copy of TAGO_NONE_150-6233575_RevN_Sht1 THRU 13_N_A_MODULE NO. 10C STRUCTURAL ASSEMBLY.pdf PDF
Copy of m-202-instruction-manual-ocenco-inc.pdf PDF
Copy of 5100334-01_Salwico Cargo Addressable_Service Maintenance Manual_M_EN_2021_V.pdf PDF
Copy of GU_NONE_150-6233572_RevK_Sht1 THRU 7_N_A_MODULE NO. 10B STRUCTURAL ASSEMBLY.pdf PDF
GG SCBA Layout.pptx PPTX presentation
Copy of 512-6233801.pdf PDF
Copy of GU_342_342-6233836_RevF_Sht1 THRU 2_N_A_MAIN ENGINE SEAWATER COOLING SYSTEM ARRANGEMENT.pdf PDF
TAGO_NONE_150-6233566_RevJ_Sht1 THRU 6_N_A_MODULE NO. 9C STRL ASSY.pdf PDF
NOAA DOCKING REPORT.pdf PDF
T9568-AC-MMO-010_0_0.PDF PDF
Copy of EX-GU_524_524-6233839_RevG_Sht1 THRU 11_N_A_AUXILIARY SEA WATER COOLING SYSTEM ARRANGEMENT.pdf PDF
Copy of GU-300-102_ELEC Installations.pdf PDF
T9555-BC-MMO-010_0_0.PDF PDF
s0700-3 Dry Dock Certification-1.pdf PDF
Copy of 5100195_Control-Repeater Panel M 4.3_M_EN_2018_H.pdf PDF
SE_85_085-6233567_RevH_Sht2 OF 2_N_A_GENERAL ARRANGEMENT FORECASTLE DECK AND ABOVE SHT 2.pdf PDF
8KatoGenerator.pdf PDF
TAGO_NONE_150-6233562_RevK_Sht1 THRU 9_N_A_MODULE NO. 9A STRL ASSY.pdf PDF
GU_NONE_NONE_RevNONE_Sht1THRU2_N_A_GENERALARRANGEMENTMAINDECK_BELOW.pdf PDF
TECHNICAL PUBLICATIONS INDEX - SM638027 - 2203874.pdf PDF
620-6233557.pdf PDF
E100 Rev -1 Gunter.pdf PDF
SE_NONE_NONE_RevNONE_Sht1 OF 1_N_A_OS-342-6233813-1.pdf PDF
543-6233930.pdf PDF
243-6233870 (1).pdf PDF
NOAA SETTE - NOAA GUNTER ALARM INPUTS 09November2020 Revision 0_122452722.pdf PDF
Gunter Valve List.xlsx XLSX spreadsheet
1005-01 - NOAA Ship Health Plan (public).docx DOCX document
NOAA Ships General Arrangement with camera locations (1).pdf PDF
Zodiac Hurricane H638 SOLAS Manual MB10247 Rev 11-8-2016.pdf PDF
Show 40 more

Latest 50 of 134 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(DRAFT) NOAA Gangway Load Test Procedure for Gordon Gunter

1. In conjunction with weight test of other equipment, perform weight test of ship's gangway in the presence of the COR, Crane Inspector, and ABS to weight currently identified on load test placard.

a. Remove gangway and place upon end supports to allow loading of gangway and measurement of deflection. Gangway Must be level.

b. Mark locations for, and measure distances from gangway to level surface on the gorund, and record for each location. Minimum six (6) locations, away from end to be measured.

c. Using sandbags, waterbags, or other method approved by COR, distribute test load evenly across length of gangway. Load must be applied gently, and evenly.

d. Measure deflection of gangway.

e. Hold full load for 15 minutes.

f. Remove load, and Inspect for damage or excess deformation.

g. Upon completion of “e” and/or any subsequent repairs from “e,” re-perform weight test.

h. Upon completion of steps “e-f” above, make weld repairs to the tack welds which failed during this testing.

i. Replace Weight Test placard with placard indicating same loads as existing, but updated test date.

j. Demonstrate that:

a. There is no distortion of the side frames

b. The decking is adequately secured

c. The rollers move freely

d. The stations, handrail, and guides can be easily removed and erected

e. The removable fittings for rigid joints can be properly stowed when the gangway is dismantled

k. Provide report with test details and results, as well as all instrumentation and calibration.

Return gangway to service installation.

Note: ISO 7061 requires a load of 5000N/m^2 or 0.725 lbf/ft^2

File details come from the government source that posted it. Updated .