This is a draft load test procedure document for the gangway system on the NOAA Ship Gordon Gunter. The procedure specifies comprehensive testing requirements to validate the gangway's structural integrity and operational functionality prior to returning it to service during the vessel's FY27 drydock. The test must be conducted in the presence of the Contracting Officer's Representative (COR), a Crane Inspector, and an American Bureau of Shipping (ABS) representative, with the gangway loaded to the weight currently identified on its load test placard.

The testing methodology requires the gangway to be positioned on end supports in a level configuration, with deflection measurements recorded at minimum six locations away from the ends. The load is to be applied evenly using sandbags, waterbags, or COR-approved methods and held for 15 minutes, after which the gangway must be inspected for damage or excessive deformation. If tack welds fail during testing, they must be repaired and the full weight test re-performed. Upon successful completion, the procedure requires demonstration that side frames show no distortion, decking is adequately secured, rollers move freely, and removable components (stations, handrails, guides, and rigid joint fittings) function properly and can be stowed when dismantled. The final deliverable is a comprehensive test report documenting all test details, results, instrumentation data, and calibration information. The procedure references ISO 7061 standard requirements of 5000N/m² load specifications.

View the file

Other files for this federal contract opportunity

Other files attached to FY27 NOAA Ship Gordon Gunter Drydock REFERENCES, newest first.
File Type Posted
SE_85_085-6233567_RevH_Sht2 OF 2_N_A_GENERAL ARRANGEMENT FORECASTLE DECK AND ABOVE SHT 2.pdf PDF
TAGO_NONE_150-6233562_RevK_Sht1 THRU 9_N_A_MODULE NO. 9A STRL ASSY.pdf PDF
T9555-BC-MMO-010_0_0.PDF PDF
Copy of 5100195_Control-Repeater Panel M 4.3_M_EN_2018_H.pdf PDF
GU_NONE_NONE_RevNONE_Sht1THRU2_N_A_GENERALARRANGEMENTMAINDECK_BELOW.pdf PDF
Copy of 110-6233550.pdf PDF
AMC-505-1B Valve Overhaul and Test 4 pages.pdf PDF
s0700-3 Dry Dock Certification-1.pdf PDF
8KatoGenerator.pdf PDF
SE_NONE_NONE_RevNONE_Sht1 OF 1_N_A_OS-342-6233813-1.pdf PDF
GU_NONE_GU-KA-568-01_RevNONE_Sht1 THRU 76_N_A_GU-KA-568-01 TUNNEL THRUSTER MODEL S-300-L SERIAL NOS. 86.000.435 AND 86.000.436.pdf PDF
Profile References Modules and Erection Sequence.docx DOCX document
90RMC050-D-610_REV- Carrier Operation and Maintenance Manual.pdf PDF
mk-line-2nd-1-26.pdf PDF
524-6233814 (1).pdf PDF
528-6233824.pdf PDF
6233762_G (1).PDF PDF
620-6233548.pdf PDF
GU_NONE_NONE_RevNONE_Sht1 THRU 2_N_A_GENERAL ARRANGEMENT MAIN DECK _ BELOW.pdf PDF
529-001 Revision A (1).pdf PDF
EconoAir General Arrangement Drawing.pdf PDF
E100 Rev -1 Gunter.pdf PDF
DD GU Reference 1 MOC-300-3_General_Requirements_for_Electrical_Electronic_Items_SEP_2000.pdf PDF
AMC-573-1C Weight Handling Gear Testing.pdf PDF
AMC-583-1B General Requirements for Liferaft Inspections.pdf PDF
GU-436-015 37442.03.01 - Connection drawings.pdf PDF
NOAA Standard Specification 0002.0.docx.pdf PDF
NOAA_Weight_Reporting_Spreadsheet.xlsx XLSX spreadsheet
NOAA Standard Specification 0863.0.docx.pdf PDF
SSPC-SP-1-Solvent-Wipe.pdf PDF
233-3 Main Engine Overhaul.pdf PDF
Steyr Motor Marine Engines SE SERIES 4 Cylinders 6 Cylinders Operation Maintenance and Warranty Manual P_N 707245 1st Edition February 2021..pdf PDF
Zodiac Hurricane H638 SOLAS Manual MB10247 Rev 11-8-2016.pdf PDF
GU-436-011Rev - Fire Detection Install_123880286.pdf PDF
529-6233819.pdf PDF
620-6233557.pdf PDF
NOAA Ships General Arrangement with camera locations (1).pdf PDF
GU_NONE_T0965-LP-109-1010_Rev1_Sht1 THRU 158_N_A_GU-KA-437-04 TANK LEVEL INDICATING TLI SYSTEM TYPE NO. 36000.pdf PDF
GU-555-001_-.pdf PDF
SFLC-Std-Spec-6310-(2020) - Requirements for Preservations of Ships Structures.pdf PDF
593-6233812.pdf PDF
1005-01 - NOAA Ship Health Plan (public).docx DOCX document
111-001.pdf PDF
NOAA Standard Specification 0000.1.docx.pdf PDF
437-6233672.pdf PDF
Drager Aerotest Navy Drager Tubes Pamphlet 9046651.pdf PDF
Gordon Gunter FY21 Cable Testing.xlsx XLSX spreadsheet
NOAA Ship Gordon Gunter Drawing Index List.xlsx XLSX spreadsheet
SSPC-SP-11-Power-Tool-To-Bare-Metal.pdf PDF
2 Bottle Vertical Inline Rack - UN_ISO Cylinders.pdf PDF
Show all 50

FY27 NOAA Ship Gordon Gunter Drydock REFERENCES has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(DRAFT) NOAA Gangway Load Test Procedure for Gordon Gunter

1. In conjunction with weight test of other equipment, perform weight test of ship's gangway in the presence of the COR, Crane Inspector, and ABS to weight currently identified on load test placard.

a. Remove gangway and place upon end supports to allow loading of gangway and measurement of deflection. Gangway Must be level.

b. Mark locations for, and measure distances from gangway to level surface on the gorund, and record for each location. Minimum six (6) locations, away from end to be measured.

c. Using sandbags, waterbags, or other method approved by COR, distribute test load evenly across length of gangway. Load must be applied gently, and evenly.

d. Measure deflection of gangway.

e. Hold full load for 15 minutes.

f. Remove load, and Inspect for damage or excess deformation.

g. Upon completion of “e” and/or any subsequent repairs from “e,” re-perform weight test.

h. Upon completion of steps “e-f” above, make weld repairs to the tack welds which failed during this testing.

i. Replace Weight Test placard with placard indicating same loads as existing, but updated test date.

j. Demonstrate that:

a. There is no distortion of the side frames

b. The decking is adequately secured

c. The rollers move freely

d. The stations, handrail, and guides can be easily removed and erected

e. The removable fittings for rigid joints can be properly stowed when the gangway is dismantled

k. Provide report with test details and results, as well as all instrumentation and calibration.

Return gangway to service installation.

Note: ISO 7061 requires a load of 5000N/m^2 or 0.725 lbf/ft^2