This is a Standard Specification for valve overhaul and test operations issued by the National Oceanic and Atmospheric Administration (NOAA) Atlantic Marine Center, effective August 1995, superseding the prior version from September 1990.
The specification establishes comprehensive requirements for overhauling and testing valves on NOAA ships and boats. Standard overhaul procedures require removal of most valves to a suitable machine shop, with tagging and complete disassembly of each valve. Contractors must thoroughly clean all components to bright metal, check and straighten valve stems to within 0.002 inch total indicator runout with a 32 RMS surface finish, and visually inspect all parts for deterioration. Critical contact fit requirements are specified using the bluing transfer method, with different standards for globe valves (360-degree continuous contact with bluing transfer line not exceeding 1/16-inch width), gate valves (360-degree contact with transfer line not exceeding 3/16-inch width), plug valves (minimum 80-percent contact evenly distributed), and swing-check valves (360-degree continuous contact). Contractors must renew all gaskets, fasteners, rubber seals, non-metallic seats, and valve stem packing, with specific packing conformance standards (MIL-P-24503 and DOD-P-24583 for feed water, condensate, and steam valves; MIL-P-24396 Type B for others).
Testing requirements mandate hydrostatic tests using clean water at 150 percent of maximum operating pressure (minimum 50 psig), with no leakage allowed when valve bodies are tested in open position for 10 minutes. Seat leakage limits vary by valve type and size, ranging from zero leakage for soft-seated valves to specified rates measured in cc/hour/inch diameter for check valves and metal-to-metal seated valves. Additional sea valve requirements include inspection and reporting of fastener materials, interior epoxy primer coating, removal and inspection of waster and spool pieces, and special handling procedures for transducer sea chest valves. Quality assurance requires contractors to perform preliminary inspections and tests meeting acceptance criteria before notifying the Contracting Officer's Technical Representative (COTR) to witness final bluing contact inspections and hydrostatic test acceptance. Any valve failing seat leakage tests must be renewed or re-overhauled and retested until acceptable performance is achieved. Upon test acceptance, valves are reinstalled using new flange gaskets.
View the file
Other files for this federal contract opportunity
Show all 50
FY27 NOAA Ship Gordon Gunter Drydock REFERENCES has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMC-505-1B
AUGUST 1995
SUPERSEDING
AMC-505-1A
SEPTEMBER 1990
NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)
ATLANTIC MARINE CENTER
STANDARD SPECIFICATION AMC-505-1B
VALVE OVERHAUL AND TEST
1. SCOPE. This specification contains the general requirements for overhaul and test of valves on and for NOAA ships and boats.
2. REFERENCES.
None
3. REQUIREMENTS.
3.1 Standard Overhaul. Overhaul all specified valves as
follows:
3.1.1 Except for valves which have welded ends preventing
removal without cutting the welds, or unless otherwise specified in the detail specification or other applicable procurement document, remove all specified valves from the ship or boat to a suitable machine shop for overhaul and tests. Specified valves which are not removed from the ship or boat shall be overhauled in place. See paragraph 3.2 for special requirements for sea valve removals.
3.1.2 Tag each valve prior to removing from the ship or
boat.
3.1.3 Completely disassemble each valve. Matchmark valve
parts. Thoroughly clean bonnets, stems, discs, gates, globes, seats, bodies, and other metal parts to bright metal.
3.1.4 Deleted.
3.1.5 Clean and chase all valve stem threads. Check stems
for straightness. Straighten stems to within 0.002 inch total indicator runout (TIR). Polish stems to a 32 Root-Mean-Square (RMS) finish in way of packing surface and remove all raised edges.
3.1.6 Visually inspect all parts, including all fasteners, for deterioration and other defects. Clean, dress, and true gasket mating surfaces.
3.1.7 Check the disc-to-seat, globe-to-seat, and plug-to-
bore contact fits using the bluing transfer method. Machine, grind, lap, spot-in, and recheck contact fits as necessary to obtain the following contacts:
a. Globe, globe angle, and globe stop-check valves shall have a 360-degree continuous globe-to-seat contact with a bluing transfer line not exceeding 1/16-inch width.
b. Gate valves shall have a 360-degree continuous gate-to-seat contact with a bluing transfer line which does not exceed 3/16-inch width. The transfer line shall appear within the lower 50-percent of the gate seating surface at the top and bottom of the gate.
c. Plug valves shall have a minimum 80-percent plug-to-bore surface contact, evenly distributed over 100-percent of the area.
d. Swing-check valves shall have a 360-degree continuous disc-to-seat contact.
3.1.8 If unable to obtain the above specified contact fits
by machining, grinding, and lapping, renew the globes, plugs, discs, gates, and renewable seats. Contractor may, at their option and at no additional cost to the Government, renew globes, plugs, discs, gates, and renewable seats after initial inspections and before machining, grinding, or lapping the existing parts to obtain the required contact fits.
3.1.9 (Modified and relocated to section 3.2)
3.1.10 Reassemble each valve. Insure that discs, gates, and plugs are in the half-open position during reassembly to avoid damaging seats or bending stems. Renew all gaskets, fasteners, rubber seals, and non-metallic seats. In butterfly valves, renew boots, o-rings, o-ring fasteners, and teflon bushings. Renew valve stem packing in feed water, condensate, and steam valves with packing conforming to MIL-P-24503 and DOD- P-24583. Renew valve stem packing in all other valves with packing conforming to MIL-P-24396, Type B.
3.1.11 Prior to disassembling and overhauling a valve, the
Contractor may, at their option and at no additional cost to the Government, renew the valve with an identical valve. If this option is exercised, the new valve must be tested and meet the same acceptance criteria as prescribed herein for overhauled valves. If a valve is determined after disassembly to be nonrepairable, the Government will negotiate an equitable cost adjustment, limited to the difference between the cost of the new valve and the costs which would have been incurred had the valve been overhauled. For valves of 3-inch IPS size and below, the cost adjustment will be limited to the costs incurred associated with disassembling the valves.
3.2 Additional Sea Valve Requirements.
3.2.1 Inspect all studs, bolts, and nuts in line and bonnet
flanges of non-ferrous sea valves to determine the material. If the fasteners are not nickel-copper (Monel), submit a Condition Report giving the actual material, condition, and recommendations.
3.2.2 Coat the interior of each steel valve, excluding
seating and polished surfaces, with the same epoxy primer used on the underwater body.
3.2.3 Remove all waster pieces and spool pieces installed
between the sea valves and the ship's hull. Thoroughly clean the waster and spool pieces, and inspect for deterioration or other defective conditions. Inspect all fasteners and submit a Condition Report same as specified above for sea valves.
3.2.4 Whenever a transducer sea chest valve is required to
be removed for overhaul, extreme care must be taken to prevent damaging the transducer assembly. Remove and reinstall the transducer assembly in accordance with the transducer manufacturer's technical manual, a copy of which will be provided by the COTR within 48 hours after requested.
3.3 Tests. After reassembling or renewing, conduct hydrostatic tests of each valve as follows:
3.3.1 All tests shall be performed using clean water as the
test medium. Unless otherwise specified, the test pressure shall be 150-percent of the maximum operating pressure of the system from which the valve was removed, but not less than 50 pounds-per-square-inch-gage (psig).
3.3.2 With the valve in the open position, test each valve
body for 10 minutes. No leakage is allowed.
3.3.3 Seat each plug and butterfly valve with hand force.
Seat all other valves using the torque values listed in the following table as the maximum allowable seating force applied to the handwheel.
Total Tangential Force Handwheel Diameter (pounds) on Rim of Handwheel
2 inches and below 90 3 inches 98 4 inches 106 5 inches 112 6 inches and greater 118 plus 3 pounds for each inch above 6, not to exceed 150 pounds.
3.3.4 Test each globe, angle globe, and globe stop-check
valve by applying test pressure in the direction tending to open the valve. Test each butterfly, gate, and plug valve by applying test pressure alternately on both sides of the disc, gate, or plug. Hold test pressure for a minimum of 3 minutes if there is no evidence of leakage. If there is evidence of leakage, hold the test pressure and measure the leakage rate.
3.3.5 Test each globe stop-check valve and swing-check
valve by applying test pressure in direction tending to close the valve (back pressure) for a minimum of 5 minutes. If leakage occurs, hold the test pressure and measure the leakage rate.
Globe stop-check valves shall be tested with stems in the open position. The test back pressure for valves having a pressure rating of 150 psig and below shall be 50 psig, and for valves having a pressure rating over 150 psig shall be 100 psig.
3.3.6 The seat leakage shall not exceed the following:
a. Check valve back pressure tests -- For valves up to and including 2 inches, the leakage rate shall not exceed 25 cc/hour/inch diameter. For valves 2-1/2 to 10 inches, the leakage rate shall not exceed 50 cc/hour/inch diameter. For valves over 10 inches, the leakage rate shall not exceed 100 cc/hour/inch diameter.
b. Soft-seated valves -- No leakage shall be permitted.
c. Metal-to-metal seated valves -- For valves less than 1 inch, the leakage rate shall not exceed 10 cc/hour. For larger valves, the leakage rate shall not exceed 10 cc/hour/inch of nominal pipe size.
3.3.7 Any valve which fails a seat leakage test shall be
renewed or overhauled and retested until an acceptable test is performed.
3.4 Reinstallation. After tests have been accepted by the COTR, reinstall each valve, using new flange gaskets.
4. QUALITY ASSURANCE.
4.1 Prior to requesting the COTR to witness the final bluing
contact inspection or the final acceptance hydrostatic tests of a valve, the Contractor shall perform preliminary inspections and tests which meet the acceptance criteria stated above.
4.2 After acceptable preliminary inspections and tests have been conducted, the Contractor shall notify the COTR and conduct final acceptance bluing contact inspection and final acceptance hydrostatic tests of each valve in the COTR's presence.
END OF SPECIFICATION