EGWW_Workshop_Project History.pdf

PDF 4 MB Posted

Attached to
Recovery: Edith Green/Wendell Wyatt Federal Building Modernization
Solicitation number
GS-10P-09-LT-C-0052
Issued by

About this file

Presentation Part 1 High Performance Building Workshop (Document is FYI only)

View the file

Other files

File Type Posted
Award_GS-10P-09-LT-C-0052.pdf PDF
Pavement_Markings_-_FedBizOpps_Form.pdf PDF
ER__14.01_-_Kitchen_Equipment.pdf PDF
Signage Bid Package.pdf PDF
ER 10.01 - Earthwork and Utilities.pdf PDF
ER 11.01 - Exterior Building Cleaning.pdf PDF
ER 9 - Roller Shades and Final Cleaning.pdf PDF
ER 8.01 - Cistern Waterproofing - FedBizOpps Form.pdf PDF
Affirmative Action Fact Sheet 1 Final 11-30-11.pdf PDF
EGWW FS Small Business 12-1-11 V4 CONSOLIDATED.pdf PDF
EGWW SBA calendar Oct 11 Update for FedBizOps.pdf PDF
Consolidated Directory October Update.pdf PDF
ER 7.01 - Plaza Level Waterproofing - FedBizOpps Form.pdf PDF
ER 6.01 - Arch Wood Casework - FedBizOpps Form.pdf PDF
Community Construction Training Fund RFP - FedBizOpps Form.docx DOCX document
Community Outreach Meeting 1.pdf PDF
Bid Phase 3 - Sub Fail FedBizOpps.pdf PDF
ER 4 - Early Release Packages - 10 05 10.pdf PDF
Bid Phase 2 - Sub Fair FedBizOpps rev 3 07.28.10.pdf PDF
Strategy for Outreach.pdf PDF
ER 002 - FedBizOpps Form.docx DOCX document
EGWW PS02 PLA Executed.pdf PDF
EGWW Final Executed PLA4.28.10.pdf PDF
BP 001 - Well Drilling.docx DOCX document
Amendment 009.pdf PDF
Amendment 008.pdf PDF
Amendment 007.pdf PDF
Amendment 6 Attachment GMP Pricing Assumptions.pdf PDF
Amendment 6.pdf PDF
Amendment 005.pdf PDF
Tech Docs for CMc Pricing.docx DOCX document
Attachment to Amendment 005 Block 14 10-2-09 V4.doc DOC document
Staffing and Summary Worksheet 10-1-09 V2.xls XLS spreadsheet
06-09 Scope Changes and Cost Summary 10-01-09 V1.xlsx XLSX spreadsheet
PIB 09-02.pdf PDF
Amendment 004.pdf PDF
Sections 100 600 700 Updated 8-17-09.doc DOC document
Amendment 003.pdf PDF
Pre-Proposal Conference Minutes 7-29-09.pdf PDF
Attachment 2 Technical Documents.pdf PDF
Amendment 002.pdf PDF
Amendment 001.pdf PDF
06 RFP —
Past Performance Evaluation - Owner V3 7-9-09.xls XLS spreadsheet
Market Research Summary 6-25-09 V2 FINAL.doc DOC document
Contractor POCs EGWW 6-27-09 V4.xls XLS spreadsheet
V3 PDF Format.pdf PDF
Transmittal E-Mail.doc DOC document
EMC Decision Flow Chart.pdf PDF
09_05_29_Synthesis HPBW.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HIGH PERFORMANCE BUILDINGS

WORKSHOP

SERA ARCHITECTS, INC. ©20091

INTRODUCTIONSINTRODUCTIONSINTRODUCTIONSINTRODUCTIONS

HIGH PERFORMANCE BUILDINGS WORKSHOP

SERA ARCHITECTS, INC. ©20092

Introductions

Workshop Purpose & Goals

HIGH PERFORMANCE BUILDINGS

WORKSHOP

PART 1 AGENDA

SERA ARCHITECTS, INC. ©20093

Workshop Purpose & Goals

Project History

2006 Design

Lunch Break

WORK SHOP PURPOSEWORK SHOP PURPOSEWORK SHOP PURPOSEWORK SHOP PURPOSE

HIGH PERFORMANCE BUILDINGS

IDENTIFY WAYS TO ENHANCE THE PROJECT IDENTIFY WAYS TO ENHANCE THE PROJECT IDENTIFY WAYS TO ENHANCE THE PROJECT IDENTIFY WAYS TO ENHANCE THE PROJECT

TO MEET EISA (TO MEET EISA (TO MEET EISA (TO MEET EISA (ENERGY INDEPENDENCE & SECURITY ACT) GOALS) GOALS) GOALS) GOALS

• Reduce energy, water & materials resource use

• Improve indoor air quality

• Improve occupant health & productivity

SERA ARCHITECTS, INC. ©20094

• Improve occupant health & productivity

• Increase the use of recyclable, non-toxic & bio-based materials

• Reduce building & material life-cycle impacts

• Use an integrated design process

• Reduce negative impacts on the environment

WORKSHOP GOALSWORKSHOP GOALSWORKSHOP GOALSWORKSHOP GOALS

no preconceptionsno preconceptionsno preconceptionsno preconceptions problem seekingproblem seekingproblem seekingproblem seeking

30,000 foot view30,000 foot view30,000 foot view30,000 foot view

SERA ARCHITECTS, INC. ©20095

PROJECT HISTORYPROJECT HISTORYPROJECT HISTORYPROJECT HISTORY

EDITH GREEN WENDELL WYATT MODERNIZATION

1974 SKIDMORE, OWINGS & MERRILL SKIDMORE, OWINGS & MERRILL SKIDMORE, OWINGS & MERRILL SKIDMORE, OWINGS & MERRILL

BUILDING OCCUPIED

1996 BUILDING ENGINEERING REPORT BUILDING ENGINEERING REPORT BUILDING ENGINEERING REPORT BUILDING ENGINEERING REPORT

INTEGRUS

SERA ARCHITECTS, INC. ©20096

INTEGRUS

2002 PROSPECTUS DEVELOPMENT PROSPECTUS DEVELOPMENT PROSPECTUS DEVELOPMENT PROSPECTUS DEVELOPMENT

STUDY STUDY STUDY STUDY SERA

2004 CONCEPT DESIGN CONCEPT DESIGN CONCEPT DESIGN CONCEPT DESIGN CAA + SERA

2006 50% DESIGN 50% DESIGN 50% DESIGN 50% DESIGN CAA + SERA

WEST ELEVATION

PROJECT STANDARDSPROJECT STANDARDSPROJECT STANDARDSPROJECT STANDARDS

2006 DESIGN

2006 DESIGN WAS BASED ON STANDARDS

SET IN PLACE IN THE 2003 CONTRACT

CODESCODESCODESCODES

ICC Family of codes

NFPA 101 Chapter 7

SERA ARCHITECTS, INC. ©20097

NFPA 101 Chapter 7

Uniform Federal Accessibility Standards (UFAS)(UFAS)(UFAS)(UFAS)

Americans with Disabilities Act Accessibility Guidelines (ADAAG) (ADAAG) (ADAAG) (ADAAG)

GSA STANDARDSGSA STANDARDSGSA STANDARDSGSA STANDARDS

PBS P-100 2003 Facilities Standards

PBS Business Assignment Guide

GSA BIM Guide (draft)

WorkPlace 2020

Design Notebook for Federal Building Lobby Security

Design Excellence and the Arts Program

2006 DESIGN2006 DESIGN2006 DESIGN2006 DESIGN

PROJECT SUMMARY

2006 BUDGET2006 BUDGET2006 BUDGET2006 BUDGET

Authorized Prospectus budget $86,200,000

Estimated construction cost $86,204,083

Estimated cost less alternatesEstimated cost less alternatesEstimated cost less alternatesEstimated cost less alternates $80,664,358$80,664,358$80,664,358$80,664,358

2006 DESIGN LEED Scorecard 2006 DESIGN LEED Scorecard 2006 DESIGN LEED Scorecard 2006 DESIGN LEED Scorecard TRACKING LEED GOLDTRACKING LEED GOLDTRACKING LEED GOLDTRACKING LEED GOLD

SERA ARCHITECTS, INC. ©20098

2006 DESIGN LEED Scorecard 2006 DESIGN LEED Scorecard 2006 DESIGN LEED Scorecard 2006 DESIGN LEED Scorecard TRACKING LEED GOLDTRACKING LEED GOLDTRACKING LEED GOLDTRACKING LEED GOLD

48 POINTS 48 POINTS 48 POINTS 48 POINTS

(33(33(33(33----38 points)38 points)38 points)38 points) SilverSilverSilverSilver 38 points certain38 points certain38 points certain38 points certain

(39(39(39(39----51 points)51 points)51 points)51 points) GoldGoldGoldGold 10 points probable10 points probable10 points probable10 points probable

(52+ points)(52+ points)(52+ points)(52+ points) PlatinumPlatinumPlatinumPlatinum 21 points unlikely/no21 points unlikely/no21 points unlikely/no21 points unlikely/no

AVAILABLE INCENTIVESAVAILABLE INCENTIVESAVAILABLE INCENTIVESAVAILABLE INCENTIVES

State of Oregon Business Energy Tax Credits (BETC) $365,000

Energy Trust of Oregon (ETO) cash rebates $202,000

July 3, 2006

2006 DESIGN2006 DESIGN2006 DESIGN2006 DESIGN

PROJECT SUMMARY

ENERGY PERFORMANCEENERGY PERFORMANCEENERGY PERFORMANCEENERGY PERFORMANCE

EUI (ENERGY USE INTENSITY)

SERA ARCHITECTS, INC. ©20099

EUI (ENERGY USE INTENSITY)

Energy Goal 60,056 BTU/sf/year

Design 42,450 BTU/sf/year

29% BELOW ENERGY GOAL29% BELOW ENERGY GOAL29% BELOW ENERGY GOAL29% BELOW ENERGY GOAL

EXCEEDS ASHRAE 90.1 STANDARDS FOR BUILDING EFFICIENCY

BLAST DESIGNBLAST DESIGNBLAST DESIGNBLAST DESIGN

EXTERIOR ENVELOPE REPLACEMENT , INCLUDING THE WINDOWS

AND CURTAIN WALL, DESIGNED TO MEET THE MEDIUM PROTECTION

SERA ARCHITECTS, INC. ©200910

AND CURTAIN WALL, DESIGNED TO MEET THE MEDIUM PROTECTION

LEVEL OF THE ISC SECURITY CRITERIA [MAY 28, 2001]

Analysis & recommendations derived from the response of buildings to explosion effects as described in the military manual TM5-1300, the text on structural dynamics from Biggs, and ConWep.

• Exterior glazing is designed for dynamic air-blast loads of 4 psi & 28 psi-msec

• Mullions, frames & anchorage are designed to resist the maximum capacity of the glass

• Balanced design : weakest element (the glass) fails

BLAST DESIGNBLAST DESIGNBLAST DESIGNBLAST DESIGN

2006 DESIGN

SERA ARCHITECTS, INC. ©200911

• Balanced design : weakest element (the glass) fails first and creates a controlled instead of catastrophic failure of the system

• No ballistic or forced entry threats are to be considered for the windows of this facility

3B HIGH

Glazing cracks. Fragments enter space & land on floor no further than 10 ft. from the window

ELECTRICAL & DATAELECTRICAL & DATAELECTRICAL & DATAELECTRICAL & DATA

ELECTRICAL DEFICIENCIES:ELECTRICAL DEFICIENCIES:ELECTRICAL DEFICIENCIES:ELECTRICAL DEFICIENCIES:

System at Capacity; Dirty Power

Inadequate Primary Power Supply

Obsolete Components

Abandoned Systems In-Place

Inadequate Emergency Power Supply Obsolete Lighting & Controls

SERA ARCHITECTS, INC. ©200912

Obsolete Lighting & Controls

DATA ITEMS:DATA ITEMS:DATA ITEMS:DATA ITEMS:

Combined Electrical / Data Closets

Outdated Systems and Equipment

Abandoned Systems In-Place

ALARM SYSTEMS:ALARM SYSTEMS:ALARM SYSTEMS:ALARM SYSTEMS:

Outdated Proprietary System Does Not Meet NFPA 72 Code Requirements Does Not Meet ADAAG Requirements

VICINITY MAPVICINITY MAPVICINITY MAPVICINITY MAP

I-5

SERA ARCHITECTS, INC. ©200913

N

PORTLAND, OR

SITE AERIALSITE AERIALSITE AERIALSITE AERIAL

SERA ARCHITECTS, INC. ©200914

DESIGN PROCESSDESIGN PROCESSDESIGN PROCESSDESIGN PROCESS

SERA ARCHITECTS, INC. ©200915

INTEGRATING NATURAL SYSTEMS

SERA ARCHITECTS, INC. ©200916

EXPLORATIONS

SERA ARCHITECTS, INC. ©200917

SERA ARCHITECTS, INC. ©200918

SERA ARCHITECTS, INC. ©200919

SERA ARCHITECTS, INC. ©200920

v v

SERA ARCHITECTS, INC. ©200921

SERA ARCHITECTS, INC. ©200922

VIEW FROM SECURITY PAVILION TO ELEVATOR CORE

DETAIL SITE PLANDETAIL SITE PLANDETAIL SITE PLANDETAIL SITE PLAN

SERA ARCHITECTS, INC. ©200923

FIRST FLOOR PLANFIRST FLOOR PLANFIRST FLOOR PLANFIRST FLOOR PLAN

SERA ARCHITECTS, INC. ©200924

ENTRY PLAZA & PAVILIONENTRY PLAZA & PAVILIONENTRY PLAZA & PAVILIONENTRY PLAZA & PAVILION

SERA ARCHITECTS, INC. ©200925

EAST WEST SECTION THROUGH ENTRY PAVILION, FIRST

FLOOR LOBBY & GROUND FLOOR PARKING ENTRY

GROUND FLOORGROUND FLOORGROUND FLOORGROUND FLOOR

SERA ARCHITECTS, INC. ©200926

TYPICAL OFFICE FLOORTYPICAL OFFICE FLOORTYPICAL OFFICE FLOORTYPICAL OFFICE FLOOR

SERA ARCHITECTS, INC. ©200927

BUILDING SECTIONSBUILDING SECTIONSBUILDING SECTIONSBUILDING SECTIONS

SERA ARCHITECTS, INC. ©200928

EAST - WESTNORTH - SOUTH

ENVELOPE ENVELOPE ENVELOPE ENVELOPE

DEMOLITION

TOP DOWN

EXISTING EAST SECTIONEXISTING

SERA ARCHITECTS, INC. ©200929

TOP DOWN

CONSTRUCTION

ENVELOPEENVELOPEENVELOPEENVELOPE

CLIMATE RESPONSIVE DESIGN

HIGH PERFORMANCE CURTAIN WALL

• Primary Envelope Upgrade

• Improved thermal performance

SERA ARCHITECTS, INC. ©200930

• Improved thermal performance

• Improved light transmittance

• Improved solar control

• Installation & weatherization complete before installation of vegetated wall & double curtain wall

DETAIL SECTION THROUGH

NORTH FAÇADE

EXISTING CEILING HEIGHT

SOLAR STUDYSOLAR STUDYSOLAR STUDYSOLAR STUDY

SERA ARCHITECTS, INC. ©200931

SOUTHWEST SOLAR ANALYSIS

OBJECTIVE TO DETERMINE:

• Dynamic façade U-values & shading coefficients

• Airflow rates in façade

DOUBLE FACADEDOUBLE FACADEDOUBLE FACADEDOUBLE FACADE

CLIMATE RESPONSIVE DESIGN

SERA ARCHITECTS, INC. ©200932

• Airflow rates in façade

• Heat gain for potential reuse

VARIABLES EVALUATED

• Automated shading strategy

• Glass type on internal façade

• Glass type on external façade

• Dynamic shading control in summer to reduce solar gain

• Thermal chimney to vent heat from envelope in summer

• Insulating “blanket” in winter (better U-value)

DOUBLE FACADEDOUBLE FACADEDOUBLE FACADEDOUBLE FACADE

CLIMATE RESPONSIVE DESIGN

SERA ARCHITECTS, INC. ©200933

(better U-value)

• Increased ceiling height

• Higher amount of outside air to improve IAQ with no penalty in winter

VEGETATED WALLVEGETATED WALLVEGETATED WALLVEGETATED WALL

CLIMATE RESPONSIVE DESIGN

SERA ARCHITECTS, INC. ©200934

PRECEDENT

• Reduced solar gain during summer

• Provides connection for occupants to outdoors

VEGETATED WALLVEGETATED WALLVEGETATED WALLVEGETATED WALL

CLIMATE RESPONSIVE DESIGN

SERA ARCHITECTS, INC. ©200935

occupants to outdoors

• Visual statement (e.g., fall color spectacle)

• Permits additional light in winter after leaves fall

CONSTRUCTION PHASINGCONSTRUCTION PHASINGCONSTRUCTION PHASINGCONSTRUCTION PHASING

SERA ARCHITECTS, INC. ©200936

• Building remains occupied

• 3 Swing Floors

• Top Down Construction

SERA ARCHITECTS, INC. ©200937

STAGING SITE PLAN

SERA ARCHITECTS, INC. ©200938

TENANT IMPACT

SERA ARCHITECTS, INC. ©200939

SERA ARCHITECTS, INC. ©200940