HIGH PERFORMANCE BUILDINGS
WORKSHOP
SERA ARCHITECTS, INC. ©20091
INTRODUCTIONSINTRODUCTIONSINTRODUCTIONSINTRODUCTIONS
HIGH PERFORMANCE BUILDINGS WORKSHOP
SERA ARCHITECTS, INC. ©20092
Introductions
Workshop Purpose & Goals
HIGH PERFORMANCE BUILDINGS
WORKSHOP
PART 1 AGENDA
SERA ARCHITECTS, INC. ©20093
Workshop Purpose & Goals
Project History
2006 Design
Lunch Break
WORK SHOP PURPOSEWORK SHOP PURPOSEWORK SHOP PURPOSEWORK SHOP PURPOSE
HIGH PERFORMANCE BUILDINGS
IDENTIFY WAYS TO ENHANCE THE PROJECT IDENTIFY WAYS TO ENHANCE THE PROJECT IDENTIFY WAYS TO ENHANCE THE PROJECT IDENTIFY WAYS TO ENHANCE THE PROJECT
TO MEET EISA (TO MEET EISA (TO MEET EISA (TO MEET EISA (ENERGY INDEPENDENCE & SECURITY ACT) GOALS) GOALS) GOALS) GOALS
• Reduce energy, water & materials resource use
• Improve indoor air quality
• Improve occupant health & productivity
SERA ARCHITECTS, INC. ©20094
• Improve occupant health & productivity
• Increase the use of recyclable, non-toxic & bio-based materials
• Reduce building & material life-cycle impacts
• Use an integrated design process
• Reduce negative impacts on the environment
WORKSHOP GOALSWORKSHOP GOALSWORKSHOP GOALSWORKSHOP GOALS
no preconceptionsno preconceptionsno preconceptionsno preconceptions problem seekingproblem seekingproblem seekingproblem seeking
30,000 foot view30,000 foot view30,000 foot view30,000 foot view
SERA ARCHITECTS, INC. ©20095
PROJECT HISTORYPROJECT HISTORYPROJECT HISTORYPROJECT HISTORY
EDITH GREEN WENDELL WYATT MODERNIZATION
1974 SKIDMORE, OWINGS & MERRILL SKIDMORE, OWINGS & MERRILL SKIDMORE, OWINGS & MERRILL SKIDMORE, OWINGS & MERRILL
BUILDING OCCUPIED
1996 BUILDING ENGINEERING REPORT BUILDING ENGINEERING REPORT BUILDING ENGINEERING REPORT BUILDING ENGINEERING REPORT
INTEGRUS
SERA ARCHITECTS, INC. ©20096
INTEGRUS
2002 PROSPECTUS DEVELOPMENT PROSPECTUS DEVELOPMENT PROSPECTUS DEVELOPMENT PROSPECTUS DEVELOPMENT
STUDY STUDY STUDY STUDY SERA
2004 CONCEPT DESIGN CONCEPT DESIGN CONCEPT DESIGN CONCEPT DESIGN CAA + SERA
2006 50% DESIGN 50% DESIGN 50% DESIGN 50% DESIGN CAA + SERA
WEST ELEVATION
PROJECT STANDARDSPROJECT STANDARDSPROJECT STANDARDSPROJECT STANDARDS
2006 DESIGN
2006 DESIGN WAS BASED ON STANDARDS
SET IN PLACE IN THE 2003 CONTRACT
CODESCODESCODESCODES
ICC Family of codes
NFPA 101 Chapter 7
SERA ARCHITECTS, INC. ©20097
NFPA 101 Chapter 7
Uniform Federal Accessibility Standards (UFAS)(UFAS)(UFAS)(UFAS)
Americans with Disabilities Act Accessibility Guidelines (ADAAG) (ADAAG) (ADAAG) (ADAAG)
GSA STANDARDSGSA STANDARDSGSA STANDARDSGSA STANDARDS
PBS P-100 2003 Facilities Standards
PBS Business Assignment Guide
GSA BIM Guide (draft)
WorkPlace 2020
Design Notebook for Federal Building Lobby Security
Design Excellence and the Arts Program
2006 DESIGN2006 DESIGN2006 DESIGN2006 DESIGN
PROJECT SUMMARY
2006 BUDGET2006 BUDGET2006 BUDGET2006 BUDGET
Authorized Prospectus budget $86,200,000
Estimated construction cost $86,204,083
Estimated cost less alternatesEstimated cost less alternatesEstimated cost less alternatesEstimated cost less alternates $80,664,358$80,664,358$80,664,358$80,664,358
2006 DESIGN LEED Scorecard 2006 DESIGN LEED Scorecard 2006 DESIGN LEED Scorecard 2006 DESIGN LEED Scorecard TRACKING LEED GOLDTRACKING LEED GOLDTRACKING LEED GOLDTRACKING LEED GOLD
SERA ARCHITECTS, INC. ©20098
2006 DESIGN LEED Scorecard 2006 DESIGN LEED Scorecard 2006 DESIGN LEED Scorecard 2006 DESIGN LEED Scorecard TRACKING LEED GOLDTRACKING LEED GOLDTRACKING LEED GOLDTRACKING LEED GOLD
48 POINTS 48 POINTS 48 POINTS 48 POINTS
(33(33(33(33----38 points)38 points)38 points)38 points) SilverSilverSilverSilver 38 points certain38 points certain38 points certain38 points certain
(39(39(39(39----51 points)51 points)51 points)51 points) GoldGoldGoldGold 10 points probable10 points probable10 points probable10 points probable
(52+ points)(52+ points)(52+ points)(52+ points) PlatinumPlatinumPlatinumPlatinum 21 points unlikely/no21 points unlikely/no21 points unlikely/no21 points unlikely/no
AVAILABLE INCENTIVESAVAILABLE INCENTIVESAVAILABLE INCENTIVESAVAILABLE INCENTIVES
State of Oregon Business Energy Tax Credits (BETC) $365,000
Energy Trust of Oregon (ETO) cash rebates $202,000
July 3, 2006
2006 DESIGN2006 DESIGN2006 DESIGN2006 DESIGN
PROJECT SUMMARY
ENERGY PERFORMANCEENERGY PERFORMANCEENERGY PERFORMANCEENERGY PERFORMANCE
EUI (ENERGY USE INTENSITY)
SERA ARCHITECTS, INC. ©20099
EUI (ENERGY USE INTENSITY)
Energy Goal 60,056 BTU/sf/year
Design 42,450 BTU/sf/year
29% BELOW ENERGY GOAL29% BELOW ENERGY GOAL29% BELOW ENERGY GOAL29% BELOW ENERGY GOAL
EXCEEDS ASHRAE 90.1 STANDARDS FOR BUILDING EFFICIENCY
BLAST DESIGNBLAST DESIGNBLAST DESIGNBLAST DESIGN
EXTERIOR ENVELOPE REPLACEMENT , INCLUDING THE WINDOWS
AND CURTAIN WALL, DESIGNED TO MEET THE MEDIUM PROTECTION
SERA ARCHITECTS, INC. ©200910
AND CURTAIN WALL, DESIGNED TO MEET THE MEDIUM PROTECTION
LEVEL OF THE ISC SECURITY CRITERIA [MAY 28, 2001]
Analysis & recommendations derived from the response of buildings to explosion effects as described in the military manual TM5-1300, the text on structural dynamics from Biggs, and ConWep.
• Exterior glazing is designed for dynamic air-blast loads of 4 psi & 28 psi-msec
• Mullions, frames & anchorage are designed to resist the maximum capacity of the glass
• Balanced design : weakest element (the glass) fails
BLAST DESIGNBLAST DESIGNBLAST DESIGNBLAST DESIGN
2006 DESIGN
SERA ARCHITECTS, INC. ©200911
• Balanced design : weakest element (the glass) fails first and creates a controlled instead of catastrophic failure of the system
• No ballistic or forced entry threats are to be considered for the windows of this facility
3B HIGH
Glazing cracks. Fragments enter space & land on floor no further than 10 ft. from the window
ELECTRICAL & DATAELECTRICAL & DATAELECTRICAL & DATAELECTRICAL & DATA
ELECTRICAL DEFICIENCIES:ELECTRICAL DEFICIENCIES:ELECTRICAL DEFICIENCIES:ELECTRICAL DEFICIENCIES:
System at Capacity; Dirty Power
Inadequate Primary Power Supply
Obsolete Components
Abandoned Systems In-Place
Inadequate Emergency Power Supply Obsolete Lighting & Controls
SERA ARCHITECTS, INC. ©200912
Obsolete Lighting & Controls
DATA ITEMS:DATA ITEMS:DATA ITEMS:DATA ITEMS:
Combined Electrical / Data Closets
Outdated Systems and Equipment
Abandoned Systems In-Place
ALARM SYSTEMS:ALARM SYSTEMS:ALARM SYSTEMS:ALARM SYSTEMS:
Outdated Proprietary System Does Not Meet NFPA 72 Code Requirements Does Not Meet ADAAG Requirements
VICINITY MAPVICINITY MAPVICINITY MAPVICINITY MAP
I-5
SERA ARCHITECTS, INC. ©200913
N
PORTLAND, OR
SITE AERIALSITE AERIALSITE AERIALSITE AERIAL
SERA ARCHITECTS, INC. ©200914
DESIGN PROCESSDESIGN PROCESSDESIGN PROCESSDESIGN PROCESS
SERA ARCHITECTS, INC. ©200915
INTEGRATING NATURAL SYSTEMS
SERA ARCHITECTS, INC. ©200916
EXPLORATIONS
SERA ARCHITECTS, INC. ©200917
SERA ARCHITECTS, INC. ©200918
SERA ARCHITECTS, INC. ©200919
SERA ARCHITECTS, INC. ©200920
v v
SERA ARCHITECTS, INC. ©200921
SERA ARCHITECTS, INC. ©200922
VIEW FROM SECURITY PAVILION TO ELEVATOR CORE
DETAIL SITE PLANDETAIL SITE PLANDETAIL SITE PLANDETAIL SITE PLAN
SERA ARCHITECTS, INC. ©200923
FIRST FLOOR PLANFIRST FLOOR PLANFIRST FLOOR PLANFIRST FLOOR PLAN
SERA ARCHITECTS, INC. ©200924
ENTRY PLAZA & PAVILIONENTRY PLAZA & PAVILIONENTRY PLAZA & PAVILIONENTRY PLAZA & PAVILION
SERA ARCHITECTS, INC. ©200925
EAST WEST SECTION THROUGH ENTRY PAVILION, FIRST
FLOOR LOBBY & GROUND FLOOR PARKING ENTRY
GROUND FLOORGROUND FLOORGROUND FLOORGROUND FLOOR
SERA ARCHITECTS, INC. ©200926
TYPICAL OFFICE FLOORTYPICAL OFFICE FLOORTYPICAL OFFICE FLOORTYPICAL OFFICE FLOOR
SERA ARCHITECTS, INC. ©200927
BUILDING SECTIONSBUILDING SECTIONSBUILDING SECTIONSBUILDING SECTIONS
SERA ARCHITECTS, INC. ©200928
EAST - WESTNORTH - SOUTH
ENVELOPE ENVELOPE ENVELOPE ENVELOPE
DEMOLITION
TOP DOWN
EXISTING EAST SECTIONEXISTING
SERA ARCHITECTS, INC. ©200929
TOP DOWN
CONSTRUCTION
ENVELOPEENVELOPEENVELOPEENVELOPE
CLIMATE RESPONSIVE DESIGN
HIGH PERFORMANCE CURTAIN WALL
• Primary Envelope Upgrade
• Improved thermal performance
SERA ARCHITECTS, INC. ©200930
• Improved thermal performance
• Improved light transmittance
• Improved solar control
• Installation & weatherization complete before installation of vegetated wall & double curtain wall
DETAIL SECTION THROUGH
NORTH FAÇADE
EXISTING CEILING HEIGHT
SOLAR STUDYSOLAR STUDYSOLAR STUDYSOLAR STUDY
SERA ARCHITECTS, INC. ©200931
SOUTHWEST SOLAR ANALYSIS
OBJECTIVE TO DETERMINE:
• Dynamic façade U-values & shading coefficients
• Airflow rates in façade
DOUBLE FACADEDOUBLE FACADEDOUBLE FACADEDOUBLE FACADE
CLIMATE RESPONSIVE DESIGN
SERA ARCHITECTS, INC. ©200932
• Airflow rates in façade
• Heat gain for potential reuse
VARIABLES EVALUATED
• Automated shading strategy
• Glass type on internal façade
• Glass type on external façade
• Dynamic shading control in summer to reduce solar gain
• Thermal chimney to vent heat from envelope in summer
• Insulating “blanket” in winter (better U-value)
DOUBLE FACADEDOUBLE FACADEDOUBLE FACADEDOUBLE FACADE
CLIMATE RESPONSIVE DESIGN
SERA ARCHITECTS, INC. ©200933
(better U-value)
• Increased ceiling height
• Higher amount of outside air to improve IAQ with no penalty in winter
VEGETATED WALLVEGETATED WALLVEGETATED WALLVEGETATED WALL
CLIMATE RESPONSIVE DESIGN
SERA ARCHITECTS, INC. ©200934
PRECEDENT
• Reduced solar gain during summer
• Provides connection for occupants to outdoors
VEGETATED WALLVEGETATED WALLVEGETATED WALLVEGETATED WALL
CLIMATE RESPONSIVE DESIGN
SERA ARCHITECTS, INC. ©200935
occupants to outdoors
• Visual statement (e.g., fall color spectacle)
• Permits additional light in winter after leaves fall
CONSTRUCTION PHASINGCONSTRUCTION PHASINGCONSTRUCTION PHASINGCONSTRUCTION PHASING
SERA ARCHITECTS, INC. ©200936
• Building remains occupied
• 3 Swing Floors
• Top Down Construction
SERA ARCHITECTS, INC. ©200937
STAGING SITE PLAN
SERA ARCHITECTS, INC. ©200938
TENANT IMPACT
SERA ARCHITECTS, INC. ©200939
SERA ARCHITECTS, INC. ©200940