C130_PWS_UDLM_PDM_App_G_Acronym_List_dtd_21Oct19.pdf
PDF 2 MB Posted
- Attached to
- C-130 Contract Depot Maintenance (UDLM/PDM)
- Solicitation number
- FA850420R0001
About this file
This document provides details for an anticipated solicitation for C-130 contract depot maintenance and mid-cycle paint services. The Air Force Materiel Command Lifecycle Management Center at Robins Air Force Base plans to issue a request for proposal for unscheduled and programmed depot level maintenance that cannot be completed organically at Air Logistics Complexes due to capacity constraints. The contract will have a potential value of five years and utilize a mixture of fixed price, cost reimbursement, and time and material pricing arrangements. Services will include overflow C-130 unscheduled and programmed depot maintenance and mid-cycle paint. Foreign companies will be ineligible to compete. The solicitation is expected to utilize full and open competition procedures and result in a best value award of one contract for a provider within the continental United States.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACI Analytical Condition Inspection
AFLCMC Air Force Life Cycle Management Center
AFMC Air Force Materiel Command
AFI Air Force Instruction
AFTO Air Force Technical Order
AIRCAT Automated Inspection, Repair, Corrosion & Aircraft Tracking
ALC Air Logistics Complex
AMREP Aircraft Maintenance Report
APT Aviation Program Team
AWBS Automated Weight and Balance System
BOM Bill of Materials
BHEC Bolt Hole Eddy Current
BL Butt Line
CAD Cartridge Activated Device
CAFDEx/ WSS Centralized Access for Data Exchange/ Weapon System Sustainment
CAGE Commercial and Government Entity
CAMS Core Automated Maintenance System
CAP Contractor Acquired Property
CAV AF Commercial Asset Visibility Air Force
CC Corrosion Control
CDM Contract Depot Maintenance
CEU Central Electronics Unit
CEMS Comprehensive Engine Maintenance System
CFA Cognizant Field Activity
CFR Cognizant Field Representative
CFT Contract Field Team
PWS APPENDIX G - ACRONYM LIST
Appendix G: Acronyms not defined in this paragraph and used by this specification shall be defined IAW applicable technical manuals series, and interpreted in the context of the requirements of this specification.
CMRA
COMSEC
COR
CPG
CSI
DCMA
D-Level
DIFM
DFT
DLM
DNACI
ECO
ECP Engineering Change Proposal
ETIMS Enhanced Technical Information Management System
FCF Functional Check Flight
FMS Foreign Military Sales
FTI Fatigue Technologies Incorporated
GAR Government Acceptance Rate
GFE Government Furnished Equipment
GFM Government Furnished Material
GFP Government Furnished Property
DONE Government Industry Data Exchange Program
GQAR Government Quality Assurance Representative
HAZMAT Hazardous Material
HMS Heavy Maintenance Support
IAW In Accordance With
ICARR Inspection Corrosion and Repair Recording
IMDS Integrated Maintenance Data System
APPENDIX G
Contractor Manpower Reporting Application
Communications Security
Contracting Officer’s Representative
Comprehensive Procurement Guidelines
Critical Safety Item
Defense Contract Management Agency
Depot Level
Due In From Maintenance
Depot Field Team
Depot Level Maintenance
DoD National Agency Checks Plus Written Inquires
Engineering Change Orders
ICP Inventory Control Points iRAPT Invoicing, Receipt, Acceptance, and Property Transfer
IUID Item Unique Identification
JDRS Joint Deficiency Report System
JEDMICS Joint Engineering Data Management Information Control System
O/I-Level Organizational/Intermediate Level
LEL Lower Explosive Limit
L/H Left Hand
LOAPs List of Applicable Publications
LRU Line Replaceable Unit
MDD Maintenance Data Documentation
MDCR Maintenance Data Collection Record
MDS Mission Design Series
MFT Multi-Functional Team
MICAP Mission Capability
MRO Maintenance, Repair, and Overhaul
MTF Maintenance Test Flight
MWO Maintenance/Modification Work Order
NAS National Aerospace Standard
NBNC Noted But Not Corrected
NCR Non-Conformance Report
NDI Nondestructive Inspection
NFPA National Fire Protection Association
NISPOM National Industrial Security Program Operating Manual
NSN National Stock Number
OAWR Over and Above Work Request
OCF Operational Check Flights
O-Level Organizational Level
APPENDIX G
OSL Operational Service Life
PDM Programmed Depot Maintenance
PGI Procedures, Guidance, and Information
PME Precision Measuring Equipment
P/N Part Number
POL Petroleum, Oil, & Lubricants
PWS Performance Work statement
QAPP Quality Assurance Program Palm
QAR Quality Assessment Report
(P)QDR (Program) Quality Deficiency Report
QMS Quality Management System
RAPIDS Real Time Automated Personnel Identification Documentation System
REMIS Reliability and Maintainability Information System
RFI Ready for Issue
R/H Right Hand
ROM Rough Order of Magnitude
R/T Rectifier/Transformer
SCSTC Safety Critical Screw Threaded Component
SOF Safety of Flight
SOS Sources of Supply
SSEC Surface Scan Eddy Current
STA Station
TCTO Time Compliance Technical Order
TD Technical Directive
TM Technical Manual
TO Technical Order
TODO Technical Order Distribution Office
UDLM Un-Programmed Depot Level Maintenance
USG IS U.S. Government Information System
WAWF Wide Area Work Flow
WC Work Cards
WL Water Line
WRALC Warner Robins Air Logistics Complex
WS Work/paint Specifications
File details come from the government source that posted it. Updated .