Attachment 32 - Seed SOW Attachment 5 B270 Survey Data

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC) III for Hill Air Force Base, UT, newest first.
File Type Posted
Seed_Project_SOW_10_Dec_2015.pdf PDF
FA8201-15-R-00019_Amenment_0003.pdf PDF
Attachment_10_-_Seed_Project_SOW_8_Dec_2015.pdf PDF
Response_to_Questions_9_Dec_2015.pdf PDF
Attachment_3_G002.dwg DWG drawing
Attachment_8_Canopy_Photo.jpg JPG image
Section_L_25_Nov_2015.pdf PDF
Attachment_2_G001.dwg DWG drawing
Attachment_02_R1_-_Section_J_-_Attachment_2__Pricing_Matrix.xlsx XLSX spreadsheet
Section_M_25_Nov_2015.pdf PDF
Addendum_2 _R1_Concept_Drawings.pdf PDF
Appendix_1_R1_BASE_FACILITY_DESIGN_STANDARD.pdf PDF
Attachment_1_TBLOCK.dwg DWG drawing
Attachment_7_Water_Flow_Data.pdf PDF
Seed_Project_SOW_25_Nov_2015.pdf PDF
Responses_to_Questions_25_Nov_2015.pdf PDF
MACC_III_Photos.pdf PDF
MACC_III_-_Bldg_270_Site_Visit_Attendee_List.pdf PDF
ppi_tool.accdb —
Attachment_40_-_Wage_Determination_WY15_9-18-2015.pdf PDF
Attachment_22_-_Appendix_6_Utility_Drawings.pdf PDF
Attachment_37_-_Wage_Determination_UT100_6-5-2015.pdf PDF
Attachment_19_-_Appendix_3_Waste_Diversion_Report.pdf PDF
Attachment_38_-_Wage_Determination_UT102_6-5-2015.pdf PDF
Attachment_08_-_APPENDIX_C_MASTER_ON_or_OFF_BASE_UPDATED_July__2015.pdf PDF
Attachment_35_-_Site_Visit_Attendees.xlsx XLSX spreadsheet
Attachment_01_-_Section_L_15_Oct_2015.pdf PDF
Attachment_27_-_Appendix_11_INSTALLATION_CODES.pdf PDF
Attachment_23_-_Appendix_7_TAB_K.pdf PDF
Attachment_02_-_Section_J_-_Attachment_2__Pricing_Matrix.xlsx XLSX spreadsheet
Attachment_13_-_Addendum_3 _01_00_00_General_Requirements.pdf PDF
Attachment_33_-_Attachment_6_B270_Survey_LBP.pdf PDF
Attachment_20_-_Appendix_4_ACM_LBP.pdf PDF
Attachment_06_-_Appendix_A.pdf PDF
Attachment_15_-_Addendum_5 _01_35_26_Government_Safety_Requirements.pdf PDF
Attachment_29_-_Attachment_2_G001.pdf PDF
Attachment_39_-_Wage_Determination_UT110_6-5-2015.pdf PDF
Attachment_16_-_Addendum_6 _01_57_20_Environmental_Protection.pdf PDF
Attachment_18_-_Appendix_2_Structural_Loads.pdf PDF
Attachment_17_-_Appendix_1_BASE_FACILITY_DESIGN_STANDARD.pdf PDF
Attachment_09_-_Appendix_D.pdf PDF
FA8201-15-R-0019.pdf PDF
Attachment_07_-_Appendix_B.pdf PDF
Attachment_05_-_Basic_SOW_1_Sept_2015.pdf PDF
Attachment_12_-_Addendum_2 _Concept_Drawings.pdf PDF
Attachment_21_-_Appendix_5_ACM_and_LBP_Qualification_Requirements.pdf PDF
Attachment_31_-_Attachment_4_B270_Survey_ACM.pdf PDF
Attachment_04_-_Section_M_15_Oct_2015.pdf PDF
Attachment_03_-_Section_L_SF330-13a.pdf PDF
Attachment_28_-_Attachment_1_TBLOCK.pdf PDF
Show all 50

Multiple Award Construction Contract (MACC) III for Hill Air Force Base, UT has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Inspector:

PB # :

PbL (+/-) Serial # Cal. Standard

1221 1.10 1222 1.00 1223 1.10 Average: 1.07

Side Condition West Good West Good West Good West Good West Good West Good West Good West Good West Good North Good Center Good West Good West Good South Good South Good West Good West Good South Good South Good South Good South Good South Good West Good

NEG

NEG

NEG

NEG

Paint Booth Structural Steel

0Drywall

PbL(mg/cm2)

0.00 0.00 0.00 0.90

0.00 0.00

NEG

Model# Niton XL3t 300 30660

PbL (+/-) Cal. Standard

Average:

Post Calibration

1.04 +/- 0.06

NEG

NEG

NEG

NEG

NEG

NEG

NEG

NEG

NEG

NEG

NEG

NEG

NEG

NEG

NEG/POS

POS

NEG

NEG

NEG

Building:

Date:

Time:

Work Order:

XL Number

0.01Metal 0.00Tan

Structural Steel Landing Floor Grate

Safety Landing Top Rail Steps

C-130 Paint Booth Interior Building

Paint Booth Structural Steel Ladder

Landing Frame Safety Rail

Interior Wall

C-130 Paint Booth C-130 Paint Booth

0.03

0.00

0.00 0.00 0.00 0.00

Metal Metal

Drywall Metal

Concrete Drywall 0.00

Metal Concrete

Metal Metal Metal

0.00

Red

Metal

Metal

Metal Metal Metal

Structure Safety Rail Man Lift

Man Lift Frame Man Lift Frame

Ladder

Paint Mixer Room

Door jamb Sprinkler Pipe

Exterior Frame Footing Exterior Wall

Fire Riser Wall Door

Interior Wall Paint Mixer Room Paint Mixer Room Paint Mixer Room Paint Mixer Room Paint Mixer Room

Metal

0.00 0.00

Grey White Silver Grey Grey

Yellow Grey

White White

Red Tan Tan

0.00 0.00

Metal

Blue Blue

Yellow 0.00

C-130 Paint Booth C-130 Paint Booth

C-130 Paint Booth C-130 Paint Booth C-130 Paint Booth

0.00 Red Grey Grey Grey

Metal

C-130 Paint Booth C-130 Paint Booth

Substrate

Metal Metal

Color Yellow

White

Pre Calibration

PbL(mg/cm2)

1.04 +/- 0.06

PbL(mg/cm2)

1.00 1.00 1.20 1.07

Paint Mixer Room Paint Mixer Room C-130 Paint Booth

C-130 Paint Booth Room

C-130 Paint Booth C-130 Paint Booth

21-August-2014

Neldon Anderson

PB1072

57659

PbL (+/-) Serial # Cal. Standard

1221 1.10 1222 1.00 1223 1.10 Average: 1.07

Side Condition North Good North Good North Good East Good West Good South Good South Good Center Good West Good East Good West Good North Good North Good West Good West Good East Good

South Good South Good South Good West Good East Good

North Good North Good

Building: 270 Neldon Anderson Date: 21-August-2014 PB1072

Time: 1300 Work Order: 57659

Pre Calibration

PbL(mg/cm2) Model#

Post Calibration PbL(mg/cm2) PbL (+/-)

Niton XL3t 300 30660 Cal. Standard

1.04 +/- 0.06

1304 1.00

1.04 +/- 0.06 1305 1.00 1306 1.20

Average: 1.07 XL Number Room Structure Substrate Color PbL(mg/cm2) NEG/POS

1272 Paint Mixer Vent hood Metal White 0.00 NEG 1273 Paint Mixer Door Metal Light Grey 0.00 NEG 1274 Paint Mixer Door Jamb Metal Dark Grey 0.00 NEG 1275 Paint Mixer Ceiling Drywall White 0.00 NEG 1276 Paint Mixer Floor Ramp Concrete Yellow 0.00 NEG 1277 Blast Booth Wall Metal White 0.00 NEG 1278 Blast Booth Structural Steel Metal White 0.00 NEG 1279 Blast Booth Floor Concrete Grey 0.00 NEG 1280 Blast Booth Floor Walk Concrete Yellow 0.02 NEG 1281 Blast Booth Floor Grounding Concrete Yellow 0.00 NEG 1282 Blast Booth Parking Pad Concrete Yellow 0.00 NEG 1283 Blast Booth Floor Access Door Metal Yellow 0.00 NEG 1284 Blast Booth Floor Access Jamb Metal Yellow 0.01 NEG 1285 Office Stair Hand Rail Metal Brown 0.00 NEG 1286 Office Stair Jack Metal Brown 0.00 NEG 1287 Office Stair Column Metal Brown 0.00 NEG 1288 Office Exterior Wall Drywall White 0.00 NEG 1289 Office Door Metal Brown 0.00 NEG 1290 Office Door Jamb Metal Brown 0.00 NEG 1291 Break Room Interior Wall Drywall White 0.00 NEG 1292 Break Room Window Sill Drywall White 0.00 NEG 1293 Break Room Exterior Wall Drywall White 0.00 NEG 1294 Break Room Window Trim Wood White 0 NEG

PbL (+/-) Serial # Cal. Standard

1221 1.10 1222 1.00 1223 1.10 Average: 1.07

Side Condition North Good South Good North Good North Good North Good West Good North Good North Good North Good

Building: 270 Neldon Anderson Date: 21-August-2014 PB1072

Time: 1300 Work Order: 57659

Pre Calibration

PbL(mg/cm2) Model#

Post Calibration PbL(mg/cm2) PbL (+/-)

Niton XL3t 300 30660 Cal. Standard

1.04 +/- 0.06

1304 1.00

1.04 +/- 0.06 1305 1.00 1306 1.20

Average: 1.07 XL Number Room Structure Substrate Color PbL(mg/cm2) NEG/POS

1295 Break Room Sprinkler Pipe Metal White 0.00 NEG 1296 A-10 Paint Booth Structural Steel Metal Red 0.00 NEG 1297 A-10 Paint Booth 2" Floor Line Concrete Dark Yellow 0.00 NEG 1298 A-10 Paint Booth Floor Walk Concrete Yellow 0.00 NEG 1299 A-10 Paint Booth Wall Metal White 0.00 NEG 1300 A-10 Paint Booth Tank Metal Red 0.05 NEG 1301 Interior Structural Steel Metal Silver 0.00 NEG 1302 Interior Structural Steel Metal Red 0.08 NEG 1303 Interior Structural Steel Metal Tan 0.06 NEG

Sheet1