Attachment_02_R1_-_Section_J_-_Attachment_2__Pricing_Matrix.xlsx
XLSX spreadsheet 46 KB Posted
- Attached to
- Multiple Award Construction Contract (MACC) III for Hill Air Force Base, UT Federal contract opportunity
- Solicitation number
- FA8201-15-R-0019
About this file
Section J - Attachment 2R1
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract (MACC) III for Hill Air Force Base, UT has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rate Worksheet
BINDING NOT TO EXCEED (NTE) HOURLY LABOR RATE MATRIX
FOR
PROFESSIONAL LABOR CATEGORY RATE REQUIREMENTS - NOT SUBJECT TO THE CONSTRUCTION WAGE RATE REQUIREMENTS STATUTE - FORMERLY DAVIS-BACON ACT (DBA)
REQUIRED BY THE STATEMENT OF WORK (SOW)
| = Complete Cells shaded blue like at the right, do not otherwise alter spreadsheet | ||||||
| Ordering Period | Rates for ordering period 1 are valid from date of basic contract award thru 12 months. Each subsequent ordering period is valid 12 months thereafter. Exact dates will be determined upon basic contract award. | |||||
| Labor Category | Basic SOW ref. | NTE Hourly Rates for Ordering Period 1 | NTE Hourly Rates for Ordering Period 2 | NTE Hourly Rates for Ordering Period 3 | NTE Hourly Rates for Ordering Period 4 | NTE Hourly Rates for Ordering Period 5 |
| Contract Manager (CM) | 1.3.1.5 | |||||
| Project Manager (PM) | 1.3.1.1 | |||||
| Project Superintendent | 1.3.1.2 | |||||
| Quality Control Inspector | 3.1 |
FA8201-15-R-0019
Multiple Award Construction Contract (MACC)
Attachment 2 For Evaluation and Award Purposes Binding NTE Non-DBA Labor Rate Matrix
Seed Project Rollup Costs WS
MACC TASK ORDER PRICING WORKSHEET
FOR SEED PROJECT
| = Complete Cells shaded blue like at the right, do not otherwise alter spreadsheet | ||||
| PROJECT NUMBER | KRSM 152032 | |||
| MAGNITUDE OF CONSTRUCTION (Per FAR 36.204) | $1M - $5M | |||
| PROJECT TITLE/DESCRIPTION | Building 270 (B270) is the new location for the F-35 Paint and Coatings Center of Excellence. The facility was built in the 1940’s. This MACC III Seed Project will convert the building to a new fueled aircraft paint booth facility for the F-35 program. This renovation will bring the facility up to current standards. The project consists of two phases and the schedule is critical. | |||
| FACILITY NUMBER | Building 270 | |||
| PERIOD OF PERFORMANCE | 365 | Calendar Days After Notice To Proceed | ||
| SECTION I | ||||
| Description | Qty | U/I | Unit Price | Total |
| All costs and prices associated with the performance of this project other than those listed below (i.e. Labor, Material, Subcontractor, Equipment Rental, etc) as set forth in the "Seed Project Division Detail Worksheet". | 1 | Project | $ - 0 | $ - 0 |
| SECTION II | ||||
| Professional Labor Rate Requirement applicable to this project (Fully-Burdened) | ||||
| Description | Qty | U/I | Unit Price | Total |
| Contract Manager (CM) | Hour | $ - 0 | $ - 0 | |
| Project Manager (PM) | Hour | $ - 0 | $ - 0 | |
| Project Superintendent | Hour | $ - 0 | $ - 0 | |
| Quality Control Inspector | Hour | $ - 0 | $ - 0 | |
| Section II Total | $ - 0 | |||
| Task Order Total (Sum Sections I, II) | $ - 0 |
Contractor Certification: By submission of this proposal, I hereby certify that the fully-burdened hourly rates for the professional labor categories cited above do not exceed the rates proposed and incorporated into the basic contract.
Signature: __________________________________________
Title: ______________________________________________
Date:_______________________________________________
FA8201-15-R-0019
Multiple Award Construction Contract (MACC)
| Attachment 2 | For Evaluation & Award of |
| Seed Project Purposes | Task Order Pricing for Seed Project |
Seed Project Division Detail WS Instructions:
1. All prices shall be burdened and shall include direct, indirect costs, profit and construction labor. Professional labor rates shall be detailed separately on the 'Seed Project Rollup Costs WS' Worksheet.
2. Input all prices as whole dollars.
3. The offeror shall complete all priced cells with either the appropriate amount or "N/A" if not applicable.
4. The sum of Divisions below shall equal the sum of the "Prime Contractor Total" and "Subcontractor Total".
5. The offeror shall input Bond information below in the appropriate fields.
6. The "Grand Total" below shall be a sum of Prime and Subcontractor Totals plus "BOND AMT" and will auto populate into the' Seed Project Rollup Costs WS' Worksheet Direct Costs Cell (D10)
8. The offeror shall only complete fields and not alter the spreadsheet in any way.
9. If additional information is required the offeror may be required to submit additional breakout of divisions.
| = Complete Cells shaded blue like at the right, do not otherwise alter spreadsheet | |||||||
| PRICE ESTIMATE | BLDG NO. | 270 | W.O. NO. | Project No. | KRSM 152032 | Contract No. | TBD |
| PROJECT TITLE / SUBTITLE | CONTRACTOR | DATE | |||||
| Repair Building 270 | TBD |
| BASE TOTALS | TOTAL PRICE |
| Prime Contractor Total | $0 |
| Subcontractor Total | $0 |
| DIVISION BREAKOUT | PRICE |
| Division 1 - General Requirements | |
| Division 2 - Existing Conditions | |
| Division 3 - Concrete | |
| Division 4 - Masonry | |
| Division 5 - Metals | |
| Division 6 - Wood, Plastics & Composites | |
| Division 7 - Thermal and Moisture Protection | |
| Division 8 - Openings | |
| Division 9 - Finishes | |
| Division 10 - Specialties | |
| Division 11 - Equipment | |
| Division 12 - Furnishings | |
| Division 13 - Special Construction | |
| Division 14 - Conveying Systems | |
| Division 21 - Fire Suppression | |
| Division 22 - Plumbing | |
| Division 23 - HVAC | |
| Division 26 - Electrical | |
| Division 27 - Communications | |
| Division 28 - Electronic Safety & Security | |
| Division 31 - Earthwork | |
| Division 32 - Exterior Improvements | |
| Division 33 - Utilities | |
| Division 34 - Transportation | |
| Division 35 - Waterway & Marine Const. | |
| Division 41 - Material Handling & Processing | |
| Division 44 - Pollution Control Equipment | |
| Miscellaneous - Provide explanation and itemized list of Prices |
BOND PERCENT BOND AMT. $0 GRAND TOTAL $0
| OFFEROR'S SIGNATURE BLOCK | DATE | |
| OFFEROR'S SIGNATURE | ||
| Project Manager | ||
| OFFEROR'S TITLE | FIRM'S NAME |
* * * For Official Use Only * * *
AF Form 3052 - &A * * * For Official Use Only * * * Page &P of &N
Notional Amount Application WS Notional Amount Application Worksheet All rates will auto-populate into this spreadsheet. All notional hours will be determined by the government prior to Offeror evaluation and will be applied to all Offerors equally. Notional hours and totals will be populated by the Government and will not be disclosed to the Offerors. All NTE Hourly Rates shall be fully-burdened labor rates.
| Ordering Period 1 | Ordering Period 2 | Ordering Period 3 | Ordering Period 4 | Ordering Period 5 | ||||||||||||
| Labor Category | Basic SOW ref. | NTE Hourly Rates | Notional Hours | Notional Total | NTE Hourly Rates | Notional Hours | Notional Total | NTE Hourly Rates | Notional Hours | Notional Total | NTE Hourly Rates | Notional Hours | Notional Total | NTE Hourly Rates | Notional Hours | Notional Total |
| Contract Manager (CM) | 1.3.1.5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Project Manager (PM) | 1.3.1.1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Project Superintendent | 1.3.1.2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Quality Control Inspector | 3.1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Subtotal Professional Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Labor $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Grand Total $ - 0
FA8601-15-R-0019
Multiple Award Construction Contract (MACC)
Attachment 2 For Evaluation and Award Purposes Binding NTE Non-DBA Labor Rate Matrix
Total Evaluated Price Calc
TOTAL EVALUATED PRICE (TEP) CALCULATION FOR THE
MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC)
| Product or Service Description | Total Price Element |
| Seed Project | $ - 0 |
| Notional Amount Application | $ - 0 |
| Total Evaluated Price: | $ - 0 |
FA8601-15-R-0019
Multiple Award Construction Contract (MACC)
Attachment 2 For Evaluation and Award Purposes Total Price Evaluation (TEP) Calculation
File details come from the government source that posted it. Updated .