Attachment 31 - Seed SOW Attachment 4 B270 Survey ACM

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC) III for Hill Air Force Base, UT, newest first.
File Type Posted
Seed_Project_SOW_10_Dec_2015.pdf PDF
Attachment_10_-_Seed_Project_SOW_8_Dec_2015.pdf PDF
FA8201-15-R-00019_Amenment_0002_Released.pdf PDF
Response_to_Questions_9_Dec_2015.pdf PDF
Attachment_3_G002.dwg DWG drawing
Attachment_8_Canopy_Photo.jpg JPG image
Section_L_25_Nov_2015.pdf PDF
Attachment_2_G001.dwg DWG drawing
Attachment_02_R1_-_Section_J_-_Attachment_2__Pricing_Matrix.xlsx XLSX spreadsheet
Section_M_25_Nov_2015.pdf PDF
Addendum_2 _R1_Concept_Drawings.pdf PDF
Appendix_1_R1_BASE_FACILITY_DESIGN_STANDARD.pdf PDF
Attachment_1_TBLOCK.dwg DWG drawing
FA8201-15-R-00019_Amenment_0001_Released.pdf PDF
MACC_III_Photos.pdf PDF
MACC_III_-_Bldg_270_Site_Visit_Attendee_List.pdf PDF
ppi_tool.accdb —
Attachment_40_-_Wage_Determination_WY15_9-18-2015.pdf PDF
Attachment_22_-_Appendix_6_Utility_Drawings.pdf PDF
Attachment_37_-_Wage_Determination_UT100_6-5-2015.pdf PDF
Attachment_19_-_Appendix_3_Waste_Diversion_Report.pdf PDF
Attachment_38_-_Wage_Determination_UT102_6-5-2015.pdf PDF
Attachment_08_-_APPENDIX_C_MASTER_ON_or_OFF_BASE_UPDATED_July__2015.pdf PDF
Attachment_35_-_Site_Visit_Attendees.xlsx XLSX spreadsheet
Attachment_01_-_Section_L_15_Oct_2015.pdf PDF
Attachment_27_-_Appendix_11_INSTALLATION_CODES.pdf PDF
Attachment_23_-_Appendix_7_TAB_K.pdf PDF
Attachment_02_-_Section_J_-_Attachment_2__Pricing_Matrix.xlsx XLSX spreadsheet
Attachment_13_-_Addendum_3 _01_00_00_General_Requirements.pdf PDF
Attachment_33_-_Attachment_6_B270_Survey_LBP.pdf PDF
Attachment_20_-_Appendix_4_ACM_LBP.pdf PDF
Attachment_06_-_Appendix_A.pdf PDF
Attachment_15_-_Addendum_5 _01_35_26_Government_Safety_Requirements.pdf PDF
Attachment_29_-_Attachment_2_G001.pdf PDF
Attachment_39_-_Wage_Determination_UT110_6-5-2015.pdf PDF
Attachment_03_-_Section_L_SF330-13a.pdf PDF
Attachment_28_-_Attachment_1_TBLOCK.pdf PDF
Attachment_30_-_Attachment_3_G002.pdf PDF
Attachment_11_-_Addendum_1 _AFCEC_Interim_Guidance.pdf PDF
Attachment_36_-_Wage_Determination_UT104_1-16-2015.pdf PDF
Attachment_34_-_Site_Visit.pdf PDF
Attachment_25_-_Appendix_9_1354_Example.pdf PDF
Attachment_14_-_Addendum_4 _01_32_00_Project_Schedule.pdf PDF
Attachment_26_-_Appendix_10_CATCODE_2010.pdf PDF
Attachment_24_-_Appendix_8_Enclosure_3.pdf PDF
Attachment_10_-_Seed_Project_SOW_1_Sept_2015.pdf PDF
Attachment_16_-_Addendum_6 _01_57_20_Environmental_Protection.pdf PDF
Attachment_32_-_Attachment_5_B270_Survey_Data.pdf PDF
Attachment_18_-_Appendix_2_Structural_Loads.pdf PDF
Attachment_17_-_Appendix_1_BASE_FACILITY_DESIGN_STANDARD.pdf PDF
Show all 50

Multiple Award Construction Contract (MACC) III for Hill Air Force Base, UT has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

75TH CIVIL ENGINEERING (CEOHA)

HILL AIR FORCE BASE, UTAH

ASBESTOS INSPECTION REPORT FOR BUILDING 270

INSTALL THREE LO PAINT BOOTHS

During June 2014, Mr. Bart Priest, with 309 MXSS requested an asbestos inspection of Building 270 to install three new LO paint booths. The scope of this project is as follows:

Work Location: Building 270 Work Order: #57659

Statement of Work:

• Install three new LO paint booths.

• This inspection report is project specific and is not a valid report for any other project(s) associated with Building 270.

The information provided for this inspection report is based on samples collected by Neldon Anderson (Utah Certified Asbestos Inspector ASB-#0054). Samples for this survey were collected on 21 August 2014. The Science and Engineering laboratory, utilizing EPA Method 600R-93-116, analyzed all samples, which is PLM similar to NIOSH Manual of Analytical Methods 9002. Civil Engineering personnel also reviewed all available asbestos inspection reports databases of suspect asbestos containing building materials (ACM) that could potentially be encountered in this area. The information gathered from all current and previous inspections is shown below by homogenous area.

Footages are based upon the scope of work provided by the requestor.

Drywall/Joint compound wall system (3,200 sq’) was sampled from the exterior northwest corner of the paint mixing room, the exterior north side of the west entry to the break room, the northeast corner of the break room, the southeast corner of the 2nd floor office, and the east side of the south door to the paint mixing room. These samples were analyzed as non-asbestos containing material (GM143121, GM143122, GM143123, GM143124, and GM143125).

Drywall/Joint compound ceiling system (1,400 sq’) was sampled from the center east side of the northwest corner of the paint mixing room, the center west side of the northwest paint mixing room, and the southwest side of the paint mixing room. These samples were analyzed as non-asbestos containing material (GM143126, GM143127, and GM143128).

Ceiling tile 2’x2’ white pockmarks/pinholes pattern (1,600 sq’) was sampled from the northwest corner of the break room, the southeast corner of the break room, the southwest corner of the break room, the southeast corner of the 2nd floor office, and the northwest corner of the 2nd floor office. These samples were analyzed as non-asbestos containing material (GM143129, GM143130, GM143131, GM143132, and GM143133).

Bldg. 270 Install paint booths

WO # 57659

19 October 2015 13:42 Hours

Pipe fitting insulation white over yellow (1,500 ln’) was sampled from the southeast corner of the break room, the southwest corner of the C-130 paint booth, and the west side of the A-10 paint booth. These samples were analyzed as non-asbestos containing material (GM143134, GM143135, and GM143136).

Pipe fitting insulation white over yellow (50 ea.) was sampled from the northwest side of the building, the southeast corner of the building, the exterior northwest corner of C-130 paint booth, the north side of the A-10 paint booth, and the southeast corner of the break room. These samples were analyzed as non-asbestos containing material (GM143137, GM143138, GM143139, GM143140, and GM143141).

Ceiling bat insulation white over grey over yellow (1,000 sq’) was sampled from the southeast corner of the break room, the southeast corner of the 2nd floor office, and the northwest corner of the break room. These samples were analyzed as non-asbestos containing material (GM143142, GM143143, and GM143144).

Wall bat insulation white over green1,000 sq’) was sampled from the northwest corner of the building, the northwest corner of the building, the northeast corner building, the northeast corner of the hangar, the northwest corner of the hangar, and the southeast corner of the hangar. These samples were analyzed as non-asbestos containing material (GM143145, GM143146, GM143147, GM143148, GM143149, and GM143150).

Duct insulation foil over white (70 ln’) was sampled from the center west side of the break room, the southeast corner of the break room, and the northwest corner of the break room. These samples were analyzed as non-asbestos containing material (GM143151, GM143152, and

GM143153).

Floor tile white with blue over yellow adhesive (1,600 sq’) was sampled from the northwest corner of the break room, the southeast corner of the break room, and the northeast corner of the break room. These samples were analyzed as non-asbestos containing material (GM143154, GM143145, and GM143156).

Duct stack expansion collar, black (120 ln’) was sampled from the center stack #7790 C0130 paint booth, the north stack #7791 C-130 paint booth, and the south stack #7789 C-130 paint booth. These samples were analyzed as non-asbestos containing material (GM143157, GM143158, and GM143159).

9” Floor tile and associated black mastic/adhesive is assumed to be an asbestos containing material. Do not disturb this material.

All hard Thermal System Insulation encountered above ceilings, behind walls, in wall chases, in attic spaces, and in mechanical rooms is assumed to be asbestos. This includes all insulation on pipe runs, pipe saddles, tanks, and pipe fittings.

Bldg. 270 Install paint booths

WO # 57659

19 October 2015 13:42 Hours

All suspect ACM not identified in the body of this report must be sampled to determine asbestos content. If materials are encountered which have not been previously identified/sampled, stop work and contact Nickolas King at 586-7094.

Remember that the locations of these building materials (homogenous areas) indicate where these materials were found, but do not necessarily mean that these are the only locations where these materials may be encountered during the project. When any new suspect ACM is encountered, stop work immediately and contact 75 CES/CEOHA to identify any new suspect building materials. As per state and federal regulations, if the scope of work or the work location changes, a new asbestos inspection and asbestos inspection report will be required.

DO NOT DISTURB ANY BUILDING MATERIALS THAT ARE SUSPECTED ACM.

CONTACT NICKOLAS KING AT 586-7094 TO ARRANGE REMOVAL OF THESE

MATERIALS IF THERE IS ANY POTENTIAL FOR THEM TO BE DISTURBED

DURING THIS PROJECT.

The project manager must post a copy of this inspection report at the project before this project begins, and must remain posted until the project is completed. Please contact Nickolas King at 586-7094 with any questions regarding this inspection report.

Neldon Anderson 75th CES/CEOHA Certified Asbestos Inspector

UDAQ #ASB-0054

File details come from the government source that posted it. Updated .