About this file
From the source
PPI Tool - IMPORTANT The line spacing font size (etc.) restrictions stated in Section L do not apply to the pages that are generated by the PPI tool.
Other files for this federal contract opportunity
Other files attached to Multiple Award Construction Contract (MACC) III for Hill Air Force Base, UT, newest first.
| File |
Type |
Posted |
| FA8201-15-R-00019_Amenment_0003.pdf |
PDF |
|
| Seed_Project_SOW_10_Dec_2015.pdf |
PDF |
|
| FA8201-15-R-00019_Amenment_0002_Released.pdf |
PDF |
|
| Attachment_10_-_Seed_Project_SOW_8_Dec_2015.pdf |
PDF |
|
| Response_to_Questions_9_Dec_2015.pdf |
PDF |
|
| FA8201-15-R-00019_Amenment_0001_Released.pdf |
PDF |
|
| Attachment_7_Water_Flow_Data.pdf |
PDF |
|
| Seed_Project_SOW_25_Nov_2015.pdf |
PDF |
|
| Appendix_1_R1_BASE_FACILITY_DESIGN_STANDARD.pdf |
PDF |
|
| Attachment_1_TBLOCK.dwg |
DWG drawing |
|
| Attachment_3_G002.dwg |
DWG drawing |
|
| Responses_to_Questions_25_Nov_2015.pdf |
PDF |
|
| MACC_III_Photos.pdf |
PDF |
|
| MACC_III_-_Bldg_270_Site_Visit_Attendee_List.pdf |
PDF |
|
| Attachment_03_-_Section_L_SF330-13a.pdf |
PDF |
|
| Attachment_28_-_Attachment_1_TBLOCK.pdf |
PDF |
|
| Attachment_30_-_Attachment_3_G002.pdf |
PDF |
|
| Attachment_11_-_Addendum_1 _AFCEC_Interim_Guidance.pdf |
PDF |
|
| Attachment_36_-_Wage_Determination_UT104_1-16-2015.pdf |
PDF |
|
| Attachment_34_-_Site_Visit.pdf |
PDF |
|
| Attachment_25_-_Appendix_9_1354_Example.pdf |
PDF |
|
| Attachment_14_-_Addendum_4 _01_32_00_Project_Schedule.pdf |
PDF |
|
| Attachment_26_-_Appendix_10_CATCODE_2010.pdf |
PDF |
|
| Attachment_24_-_Appendix_8_Enclosure_3.pdf |
PDF |
|
| Attachment_10_-_Seed_Project_SOW_1_Sept_2015.pdf |
PDF |
|
| Attachment_16_-_Addendum_6 _01_57_20_Environmental_Protection.pdf |
PDF |
|
| Attachment_32_-_Attachment_5_B270_Survey_Data.pdf |
PDF |
|
| Attachment_18_-_Appendix_2_Structural_Loads.pdf |
PDF |
|
| Attachment_17_-_Appendix_1_BASE_FACILITY_DESIGN_STANDARD.pdf |
PDF |
|
| Attachment_09_-_Appendix_D.pdf |
PDF |
|
| FA8201-15-R-0019.pdf |
PDF |
|
| Attachment_07_-_Appendix_B.pdf |
PDF |
|
| Attachment_05_-_Basic_SOW_1_Sept_2015.pdf |
PDF |
|
| Attachment_12_-_Addendum_2 _Concept_Drawings.pdf |
PDF |
|
| Attachment_21_-_Appendix_5_ACM_and_LBP_Qualification_Requirements.pdf |
PDF |
|
| Attachment_31_-_Attachment_4_B270_Survey_ACM.pdf |
PDF |
|
| Attachment_04_-_Section_M_15_Oct_2015.pdf |
PDF |
|
| Attachment_35_-_Site_Visit_Attendees.xlsx |
XLSX spreadsheet |
|
| Attachment_01_-_Section_L_15_Oct_2015.pdf |
PDF |
|
| Attachment_27_-_Appendix_11_INSTALLATION_CODES.pdf |
PDF |
|
| Attachment_23_-_Appendix_7_TAB_K.pdf |
PDF |
|
| Attachment_02_-_Section_J_-_Attachment_2__Pricing_Matrix.xlsx |
XLSX spreadsheet |
|
| Attachment_13_-_Addendum_3 _01_00_00_General_Requirements.pdf |
PDF |
|
| Attachment_33_-_Attachment_6_B270_Survey_LBP.pdf |
PDF |
|
| Attachment_20_-_Appendix_4_ACM_LBP.pdf |
PDF |
|
| Attachment_06_-_Appendix_A.pdf |
PDF |
|
| Attachment_15_-_Addendum_5 _01_35_26_Government_Safety_Requirements.pdf |
PDF |
|
| Attachment_29_-_Attachment_2_G001.pdf |
PDF |
|
| Attachment_39_-_Wage_Determination_UT110_6-5-2015.pdf |
PDF |
|
| Attachment_40_-_Wage_Determination_WY15_9-18-2015.pdf |
PDF |
|
Show all 50
Multiple Award Construction Contract (MACC) III for Hill Air Force Base, UT has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated .