FA8201-15-R-00019_Amenment_0003.pdf

PDF 49 KB Posted

Attached to
Multiple Award Construction Contract (MACC) III for Hill Air Force Base, UT Federal contract opportunity
Solicitation number
FA8201-15-R-0019
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Amendment 0003

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC) III for Hill Air Force Base, UT, newest first.
File Type Posted
Seed_Project_SOW_10_Dec_2015.pdf PDF
Attachment_10_-_Seed_Project_SOW_8_Dec_2015.pdf PDF
Response_to_Questions_9_Dec_2015.pdf PDF
Attachment_3_G002.dwg DWG drawing
Attachment_8_Canopy_Photo.jpg JPG image
Section_L_25_Nov_2015.pdf PDF
Attachment_2_G001.dwg DWG drawing
Attachment_02_R1_-_Section_J_-_Attachment_2__Pricing_Matrix.xlsx XLSX spreadsheet
Section_M_25_Nov_2015.pdf PDF
Addendum_2 _R1_Concept_Drawings.pdf PDF
Appendix_1_R1_BASE_FACILITY_DESIGN_STANDARD.pdf PDF
Attachment_1_TBLOCK.dwg DWG drawing
Attachment_7_Water_Flow_Data.pdf PDF
Seed_Project_SOW_25_Nov_2015.pdf PDF
Responses_to_Questions_25_Nov_2015.pdf PDF
MACC_III_Photos.pdf PDF
MACC_III_-_Bldg_270_Site_Visit_Attendee_List.pdf PDF
ppi_tool.accdb —
Attachment_40_-_Wage_Determination_WY15_9-18-2015.pdf PDF
Attachment_22_-_Appendix_6_Utility_Drawings.pdf PDF
Attachment_37_-_Wage_Determination_UT100_6-5-2015.pdf PDF
Attachment_19_-_Appendix_3_Waste_Diversion_Report.pdf PDF
Attachment_38_-_Wage_Determination_UT102_6-5-2015.pdf PDF
Attachment_08_-_APPENDIX_C_MASTER_ON_or_OFF_BASE_UPDATED_July__2015.pdf PDF
Attachment_35_-_Site_Visit_Attendees.xlsx XLSX spreadsheet
Attachment_01_-_Section_L_15_Oct_2015.pdf PDF
Attachment_27_-_Appendix_11_INSTALLATION_CODES.pdf PDF
Attachment_23_-_Appendix_7_TAB_K.pdf PDF
Attachment_02_-_Section_J_-_Attachment_2__Pricing_Matrix.xlsx XLSX spreadsheet
Attachment_13_-_Addendum_3 _01_00_00_General_Requirements.pdf PDF
Attachment_33_-_Attachment_6_B270_Survey_LBP.pdf PDF
Attachment_20_-_Appendix_4_ACM_LBP.pdf PDF
Attachment_06_-_Appendix_A.pdf PDF
Attachment_15_-_Addendum_5 _01_35_26_Government_Safety_Requirements.pdf PDF
Attachment_29_-_Attachment_2_G001.pdf PDF
Attachment_39_-_Wage_Determination_UT110_6-5-2015.pdf PDF
Attachment_16_-_Addendum_6 _01_57_20_Environmental_Protection.pdf PDF
Attachment_32_-_Attachment_5_B270_Survey_Data.pdf PDF
Attachment_18_-_Appendix_2_Structural_Loads.pdf PDF
Attachment_17_-_Appendix_1_BASE_FACILITY_DESIGN_STANDARD.pdf PDF
Attachment_09_-_Appendix_D.pdf PDF
FA8201-15-R-0019.pdf PDF
Attachment_07_-_Appendix_B.pdf PDF
Attachment_05_-_Basic_SOW_1_Sept_2015.pdf PDF
Attachment_12_-_Addendum_2 _Concept_Drawings.pdf PDF
Attachment_21_-_Appendix_5_ACM_and_LBP_Qualification_Requirements.pdf PDF
Attachment_31_-_Attachment_4_B270_Survey_ACM.pdf PDF
Attachment_04_-_Section_M_15_Oct_2015.pdf PDF
Attachment_03_-_Section_L_SF330-13a.pdf PDF
Attachment_28_-_Attachment_1_TBLOCK.pdf PDF
Show all 50

Multiple Award Construction Contract (MACC) III for Hill Air Force Base, UT has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose for this amendment is to:

1 - Replace Seed SOW dated 8 Dec 2015 w ith Seed SOW dated 10 Dec 2015.

All Basic SOW requriements are applicable to Task Order SOW requirements, including the Seed Project SOW, unless explicitly excluded.

The Offer due date is not being extended.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Dec-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA8201-15-R-0019

X 9B. DATED (SEE ITEM 11)

20-Oct-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Dec-2015

CODE

OL:H/PZIE

FA8222 KRISTIN STOKER

6038 ASPEN AVE B1289NE

HILL AFB UT 84056-5805

FA8224 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA8201-15-R-0019

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 01 Section L - Instruction to

Offerors (ITOs) R1

25-NOV-2015

Attachment 02 Section L Pricing Matrix R1

25-NOV-2015

Attachment 03 Section L - Standard Form (SF) 330-13a

14 01-MAR-2013

Attachment 04 Section M - Evaluation Factors for Award R1

25-NOV-2015

Attachment 05 Basic Statement of Work

(SOW)

12 01-SEP-2015

Attachment 06 Basic SOW Appendix A 9 01-SEP-2015 Attachment 07 Basic SOW Appendix B 1 28-AUG-2014 Attachment 08 Basic SOW Appendix C 15 23-JUL-2015 Attachment 09 Basic SOW Appendix D 4 02-JUN-2011 Attachment 10 Seed SOW 10-DEC-2015 Attachment 11 Seed SOW Addendum 1 -

AFCEC

Attachment 12 Seed SOW Addendum 2R1-Concept Drawings

25-NOV-2015

Attachment 13 Seed SOW Add. 3 - 01 00 00 Gen. Requirements

21 05-JUN-2015

Attachment 14 Seed SOW Add. 4 - 01 32 00 Project Schedule

Attachment 15 Seed SOW Add. 5 - 01 35 26 Government Safety Requirements

23 05-JUN-2015

Attachment 16 Seed SOW Add. 6 - 01 57 20 Environmental Protection

19 05-JUN-2015

Attachment 17 Seed SOW Appendix 1R1

- Base Facility Design

25-NOV-2015

Attachment 18 Seed SOW Appendix 2 - Structural Loads

Attachment 19 Seed SOW Appendix 3 - Waste Diversion Report

Attachment 20 Seed SOW Appendix 4 -

ACM LBP

Attachment 21 Seed SOW Appendix 5 -

ACM & LBP

Qualitification Requirement

Attachment 22 Seed SOW Appendix 6 - Utility Drawings

FA8201-15-R-0019

Attachment 23 Seed SOW Appendix 7 -

TAB K

15 01-AUG-2011

Attachment 24 Seed SOW Appendix 8 - Enclosure 3

122 19-MAR-2013

Attachment 25 Seed SOW Appendix 9 - 1354 Example

2 01-AUG-2013

Attachment 26 Seed SOW Appendix 10 -

CATCODE_2010

451 01-JAN-2010

Attachment 27 Seed SOW Appendix 11 - Installation_Codes

Attachment 28 Seed SOW Attachment 1

- TBLOCK

Attachment 29 Seed SOW Attachment 2

- G001

Attachment 30 Seed SOW Attachment 3

- G002

Attachment 31 Seed SOW Attachment 4

- B270 Survey ACM

Attachment 32 Seed SOW Attachment 5

- B270 Survey Data

Attachment 33 Seed SOW Attachment 6

- B270 Survey LBP

Attachment 34 Site Visit Information 1 01-SEP-2015 Attachment 35 Site Visit Attendees 1 06-OCT-2015 Attachment 36 Wage Determination

UT150104

5 16-JAN-2015

Attachment 37 Wage Determination

UT150100

4 05-JUN-2015

Attachment 38 Wage Determination

UT150102

5 05-JUN-2015

Attachment 39 Wage Determination

UT150110

5 05-JUN-2015

Attachment 40 Wage Determination

WY150015

5 18-SEP-2015

Attachment 41 Seed SOW Attachment 1a

- TBLOCK

25-NOV-2015

Attachment 42 Seed SOW Attachment 2a

- G001

25-NOV-2015

Attachment 43 Seed SOW Attachment 3a

- G002

25-NOV-2015

Attachment 44 Seed SOW Attachment 7

- Picutre

Attachment 45 Seed SOW Attachment 8

25-NOV-2015

(End of Summary of Changes)

File details come from the government source that posted it. Updated .