Attachment_19_-_Appendix_3_Waste_Diversion_Report.pdf

PDF 15 KB Posted

Attached to
Multiple Award Construction Contract (MACC) III for Hill Air Force Base, UT Federal contract opportunity
Solicitation number
FA8201-15-R-0019
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Attachment 19 - Seed SOW Appendix 3 Water Diversion Report

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC) III for Hill Air Force Base, UT, newest first.
File Type Posted
FA8201-15-R-00019_Amenment_0003.pdf PDF
Seed_Project_SOW_10_Dec_2015.pdf PDF
FA8201-15-R-00019_Amenment_0002_Released.pdf PDF
Attachment_10_-_Seed_Project_SOW_8_Dec_2015.pdf PDF
Response_to_Questions_9_Dec_2015.pdf PDF
FA8201-15-R-00019_Amenment_0001_Released.pdf PDF
Attachment_7_Water_Flow_Data.pdf PDF
Seed_Project_SOW_25_Nov_2015.pdf PDF
Appendix_1_R1_BASE_FACILITY_DESIGN_STANDARD.pdf PDF
Attachment_1_TBLOCK.dwg DWG drawing
Responses_to_Questions_25_Nov_2015.pdf PDF
MACC_III_Photos.pdf PDF
MACC_III_-_Bldg_270_Site_Visit_Attendee_List.pdf PDF
ppi_tool.accdb —
Attachment_03_-_Section_L_SF330-13a.pdf PDF
Attachment_28_-_Attachment_1_TBLOCK.pdf PDF
Attachment_30_-_Attachment_3_G002.pdf PDF
Attachment_11_-_Addendum_1 _AFCEC_Interim_Guidance.pdf PDF
Attachment_36_-_Wage_Determination_UT104_1-16-2015.pdf PDF
Attachment_34_-_Site_Visit.pdf PDF
Attachment_25_-_Appendix_9_1354_Example.pdf PDF
Attachment_14_-_Addendum_4 _01_32_00_Project_Schedule.pdf PDF
Attachment_26_-_Appendix_10_CATCODE_2010.pdf PDF
Attachment_24_-_Appendix_8_Enclosure_3.pdf PDF
Attachment_10_-_Seed_Project_SOW_1_Sept_2015.pdf PDF
Attachment_16_-_Addendum_6 _01_57_20_Environmental_Protection.pdf PDF
Attachment_32_-_Attachment_5_B270_Survey_Data.pdf PDF
Attachment_18_-_Appendix_2_Structural_Loads.pdf PDF
Attachment_17_-_Appendix_1_BASE_FACILITY_DESIGN_STANDARD.pdf PDF
Attachment_09_-_Appendix_D.pdf PDF
FA8201-15-R-0019.pdf PDF
Attachment_07_-_Appendix_B.pdf PDF
Attachment_05_-_Basic_SOW_1_Sept_2015.pdf PDF
Attachment_12_-_Addendum_2 _Concept_Drawings.pdf PDF
Attachment_21_-_Appendix_5_ACM_and_LBP_Qualification_Requirements.pdf PDF
Attachment_31_-_Attachment_4_B270_Survey_ACM.pdf PDF
Attachment_04_-_Section_M_15_Oct_2015.pdf PDF
Attachment_35_-_Site_Visit_Attendees.xlsx XLSX spreadsheet
Attachment_01_-_Section_L_15_Oct_2015.pdf PDF
Attachment_27_-_Appendix_11_INSTALLATION_CODES.pdf PDF
Attachment_23_-_Appendix_7_TAB_K.pdf PDF
Attachment_02_-_Section_J_-_Attachment_2__Pricing_Matrix.xlsx XLSX spreadsheet
Attachment_13_-_Addendum_3 _01_00_00_General_Requirements.pdf PDF
Attachment_33_-_Attachment_6_B270_Survey_LBP.pdf PDF
Attachment_20_-_Appendix_4_ACM_LBP.pdf PDF
Attachment_06_-_Appendix_A.pdf PDF
Attachment_15_-_Addendum_5 _01_35_26_Government_Safety_Requirements.pdf PDF
Attachment_29_-_Attachment_2_G001.pdf PDF
Attachment_39_-_Wage_Determination_UT110_6-5-2015.pdf PDF
Attachment_40_-_Wage_Determination_WY15_9-18-2015.pdf PDF
Show all 50

Multiple Award Construction Contract (MACC) III for Hill Air Force Base, UT has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hill AFB Construction and Demolition Waste Diversion Report

Project Title: _____________________________ Contract No.: ____________________________ Project No.: KRSM________________________ Project Manager__________________________ Contractor: _____________________________

MATERIAL Reused (tons)

Recycled (tons)

Disposed (tons) Recycling Service Provider Used

Asphalt

Cardboard

Concrete

Dry Wall

Green Waste

Lumber/Wood

Metal(s)

Rock/Stone

Soil:

Other:

A. Total amount of material recycled or reused: _______________________ (tons); attach copy of weigh tickets

B. Total amount of material disposed of: _____________________________ (tons); attach copy of weigh tickets

C. Total amount of solid waste generated (A + B): ______________________ (tons)

D. Percent recycled or reused [(A/C )x100]: _________% ; Attach justification if recyclable material is disposed of instead reused/recycled

Contractor Superintendant Signature Date