Attachment_02_-_Section_J_-_Attachment_2__Pricing_Matrix.xlsx

XLSX spreadsheet 46 KB Posted

Attached to
Multiple Award Construction Contract (MACC) III for Hill Air Force Base, UT Federal contract opportunity
Solicitation number
FA8201-15-R-0019
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Attachment 2 - Section L - Pricing Matrix

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC) III for Hill Air Force Base, UT, newest first.
File Type Posted
FA8201-15-R-00019_Amenment_0003.pdf PDF
Seed_Project_SOW_10_Dec_2015.pdf PDF
FA8201-15-R-00019_Amenment_0002_Released.pdf PDF
FA8201-15-R-00019_Amenment_0001_Released.pdf PDF
Attachment_7_Water_Flow_Data.pdf PDF
Seed_Project_SOW_25_Nov_2015.pdf PDF
Attachment_3_G002.dwg DWG drawing
Attachment_8_Canopy_Photo.jpg JPG image
Section_L_25_Nov_2015.pdf PDF
Attachment_2_G001.dwg DWG drawing
Attachment_02_R1_-_Section_J_-_Attachment_2__Pricing_Matrix.xlsx XLSX spreadsheet
Section_M_25_Nov_2015.pdf PDF
Addendum_2 _R1_Concept_Drawings.pdf PDF
Responses_to_Questions_25_Nov_2015.pdf PDF
MACC_III_Photos.pdf PDF
MACC_III_-_Bldg_270_Site_Visit_Attendee_List.pdf PDF
ppi_tool.accdb —
Attachment_03_-_Section_L_SF330-13a.pdf PDF
Attachment_28_-_Attachment_1_TBLOCK.pdf PDF
Attachment_30_-_Attachment_3_G002.pdf PDF
Attachment_11_-_Addendum_1 _AFCEC_Interim_Guidance.pdf PDF
Attachment_36_-_Wage_Determination_UT104_1-16-2015.pdf PDF
Attachment_34_-_Site_Visit.pdf PDF
Attachment_25_-_Appendix_9_1354_Example.pdf PDF
Attachment_14_-_Addendum_4 _01_32_00_Project_Schedule.pdf PDF
Attachment_26_-_Appendix_10_CATCODE_2010.pdf PDF
Attachment_24_-_Appendix_8_Enclosure_3.pdf PDF
Attachment_10_-_Seed_Project_SOW_1_Sept_2015.pdf PDF
Attachment_16_-_Addendum_6 _01_57_20_Environmental_Protection.pdf PDF
Attachment_32_-_Attachment_5_B270_Survey_Data.pdf PDF
Attachment_18_-_Appendix_2_Structural_Loads.pdf PDF
Attachment_17_-_Appendix_1_BASE_FACILITY_DESIGN_STANDARD.pdf PDF
Attachment_09_-_Appendix_D.pdf PDF
FA8201-15-R-0019.pdf PDF
Attachment_07_-_Appendix_B.pdf PDF
Attachment_05_-_Basic_SOW_1_Sept_2015.pdf PDF
Attachment_12_-_Addendum_2 _Concept_Drawings.pdf PDF
Attachment_21_-_Appendix_5_ACM_and_LBP_Qualification_Requirements.pdf PDF
Attachment_31_-_Attachment_4_B270_Survey_ACM.pdf PDF
Attachment_04_-_Section_M_15_Oct_2015.pdf PDF
Attachment_40_-_Wage_Determination_WY15_9-18-2015.pdf PDF
Attachment_22_-_Appendix_6_Utility_Drawings.pdf PDF
Attachment_37_-_Wage_Determination_UT100_6-5-2015.pdf PDF
Attachment_19_-_Appendix_3_Waste_Diversion_Report.pdf PDF
Attachment_38_-_Wage_Determination_UT102_6-5-2015.pdf PDF
Attachment_08_-_APPENDIX_C_MASTER_ON_or_OFF_BASE_UPDATED_July__2015.pdf PDF
Attachment_35_-_Site_Visit_Attendees.xlsx XLSX spreadsheet
Attachment_01_-_Section_L_15_Oct_2015.pdf PDF
Attachment_27_-_Appendix_11_INSTALLATION_CODES.pdf PDF
Attachment_23_-_Appendix_7_TAB_K.pdf PDF
Show all 50

Multiple Award Construction Contract (MACC) III for Hill Air Force Base, UT has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rate Worksheet

BINDING NOT TO EXCEED (NTE) HOURLY LABOR RATE MATRIX

FOR

PROFESSIONAL LABOR CATEGORY RATE REQUIREMENTS - NOT SUBJECT TO THE CONSTRUCTION WAGE RATE REQUIREMENTS STATUTE - FORMERLY DAVIS-BACON ACT (DBA)

REQUIRED BY THE STATEMENT OF WORK (SOW)

= Complete Cells shaded blue like at the right, do not otherwise alter spreadsheet
Ordering PeriodRates for ordering period 1 are valid from date of basic contract award thru 12 months. Each subsequent ordering period is valid 12 months thereafter. Exact dates will be determined upon basic contract award.
Labor CategoryBasic SOW ref.NTE Hourly Rates for Ordering Period 1NTE Hourly Rates for Ordering Period 2NTE Hourly Rates for Ordering Period 3NTE Hourly Rates for Ordering Period 4NTE Hourly Rates for Ordering Period 5
Contract Manager (CM)1.3.1.5
Project Manager (PM)1.3.1.1
Project Superintendent1.3.1.2
Quality Control Inspector3.1

FA8201-15-R-0019

Multiple Award Construction Contract (MACC)

Attachment 2 For Evaluation and Award Purposes Binding NTE Non-DBA Labor Rate Matrix

Seed Project Rollup Costs WS

MACC TASK ORDER PRICING WORKSHEET

FOR SEED PROJECT

= Complete Cells shaded blue like at the right, do not otherwise alter spreadsheet
PROJECT NUMBERKRSM 152032
MAGNITUDE OF CONSTRUCTION (Per FAR 36.204)$1M - $5M
PROJECT TITLE/DESCRIPTIONBuilding 270 (B270) is the new location for the F-35 Paint and Coatings Center of Excellence. The facility was built in the 1940’s. This MACC III Seed Project will convert the building to a new fueled aircraft paint booth facility for the F-35 program. This renovation will bring the facility up to current standards. The project consists of two phases and the schedule is critical.
FACILITY NUMBERBuilding 270
PERIOD OF PERFORMANCE365Calendar Days After Notice To Proceed
SECTION I
DescriptionQtyU/IUnit PriceTotal
All costs and prices associated with the performance of this project other than those listed below (i.e. Labor, Material, Subcontractor, Equipment Rental, etc) as set forth in the "Seed Project Division Detail Worksheet".1Project$ - 0$ - 0
SECTION II
Professional Labor Rate Requirement applicable to this project
DescriptionQtyU/IUnit PriceTotal
Contract Manager (CM)Hour$ - 0$ - 0
Project Manager (PM)Hour$ - 0$ - 0
Project SuperintendentHour$ - 0$ - 0
Quality Control InspectorHour$ - 0$ - 0
Section II Total$ - 0
Task Order Total (Sum Sections I, II)$ - 0

Contractor Certification: By submission of this proposal, I hereby certify that the hourly rates for the professional labor categories cited above do not exceed the rates proposed and incorporated into the basic contract.

Signature: __________________________________________

Title: ______________________________________________

Date:_______________________________________________

FA8201-15-R-0019

Multiple Award Construction Contract (MACC)

Attachment 2For Evaluation & Award of
Seed Project PurposesTask Order Pricing for Seed Project

Seed Project Division Detail WS Instructions:

1. All prices shall be burdened and shall include direct, indirect costs, profit and construction labor. Professional labor rates shall be detailed separately on the 'Seed Project Rollup Costs WS' Worksheet.

2. Input all prices as whole dollars.

3. The offeror shall complete all priced cells with either the appropriate amount or "N/A" if not applicable.

4. The sum of Divisions below shall equal the sum of the "Prime Contractor Total" and "Subcontractor Total".

5. The offeror shall input Bond information below in the appropriate fields.

6. The "Grand Total" below shall be a sum of Prime and Subcontractor Totals plus "BOND AMT" and will auto populate into the' Seed Project Rollup Costs WS' Worksheet Direct Costs Cell (D10)

8. The offeror shall only complete fields and not alter the spreadsheet in any way.

9. If additional information is required the offeror may be required to submit additional breakout of divisions.

= Complete Cells shaded blue like at the right, do not otherwise alter spreadsheet
PRICE ESTIMATEBLDG NO.270W.O. NO.Project No.KRSM 152032Contract No.TBD
PROJECT TITLE / SUBTITLECONTRACTORDATE
Repair Building 270TBD
BASE TOTALSTOTAL PRICE
Prime Contractor Total$0
Subcontractor Total$0
DIVISION BREAKOUTPRICE
Division 1 - General Requirements
Division 2 - Existing Conditions
Division 3 - Concrete
Division 4 - Masonry
Division 5 - Metals
Division 6 - Wood, Plastics & Composites
Division 7 - Thermal and Moisture Protection
Division 8 - Openings
Division 9 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 13 - Special Construction
Division 14 - Conveying Systems
Division 21 - Fire Suppression
Division 22 - Plumbing
Division 23 - HVAC
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety & Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterway & Marine Const.
Division 41 - Material Handling & Processing
Division 44 - Pollution Control Equipment
Miscellaneous - Provide explanation and itemized list of Prices

BOND PERCENT BOND AMT. $0 GRAND TOTAL $0

OFFEROR'S SIGNATURE BLOCKDATE
OFFEROR'S SIGNATURE
Project Manager
OFFEROR'S TITLEFIRM'S NAME

* * * For Official Use Only * * *

AF Form 3052 - &A * * * For Official Use Only * * * Page &P of &N

Notional Amount Application WS Notional Amount Application Worksheet All rates will auto-populate into this spreadsheet. All notional hours will be determined by the government prior to Offeror evaluation and will be applied to all Offerors equally. Notional hours and totals will be populated by the Government and will not be disclosed to the Offerors.

Ordering Period 1Ordering Period 2Ordering Period 3Ordering Period 4Ordering Period 5
Labor CategoryBasic SOW ref.NTE Hourly RatesNotional HoursNotional TotalNTE Hourly RatesNotional HoursNotional TotalNTE Hourly RatesNotional HoursNotional TotalNTE Hourly RatesNotional HoursNotional TotalNTE Hourly RatesNotional HoursNotional Total
Contract Manager (CM)1.3.1.5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Project Manager (PM)1.3.1.1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Project Superintendent1.3.1.2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Quality Control Inspector3.1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal Professional Labor$ - 0$ - 0$ - 0$ - 0$ - 0

Total Labor $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Grand Total $ - 0

FA8601-15-R-0019

Multiple Award Construction Contract (MACC)

Attachment 2 For Evaluation and Award Purposes Binding NTE Non-DBA Labor Rate Matrix

Total Evaluated Price Calc

TOTAL EVALUATED PRICE (TEP) CALCULATION FOR THE

MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC)

Product or Service DescriptionTotal Price Element
Seed Project$ - 0
Notional Amount Application$ - 0
Total Evaluated Price:$ - 0

FA8601-15-R-0019

Multiple Award Construction Contract (MACC)

Attachment 2 For Evaluation and Award Purposes Total Price Evaluation (TEP) Calculation

File details come from the government source that posted it. Updated .