MACC_III_Photos.pdf

PDF 3 MB Posted

Attached to
Multiple Award Construction Contract (MACC) III for Hill Air Force Base, UT
Solicitation number
FA8201-15-R-0019
Issued by

About this file

Photos requested for seed project are provided in this document.

View the file

Other files

File Type Posted
Seed_Project_SOW_10_Dec_2015.pdf PDF
FA8201-15-R-00019_Amenment_0003.pdf PDF
Attachment_10_-_Seed_Project_SOW_8_Dec_2015.pdf PDF
FA8201-15-R-00019_Amenment_0002_Released.pdf PDF
Response_to_Questions_9_Dec_2015.pdf PDF
Attachment_1_TBLOCK.dwg DWG drawing
Seed_Project_SOW_25_Nov_2015.pdf PDF
Attachment_3_G002.dwg DWG drawing
Attachment_8_Canopy_Photo.jpg JPG image
Section_L_25_Nov_2015.pdf PDF
Attachment_2_G001.dwg DWG drawing
Appendix_1_R1_BASE_FACILITY_DESIGN_STANDARD.pdf PDF
Attachment_02_R1_-_Section_J_-_Attachment_2__Pricing_Matrix.xlsx XLSX spreadsheet
Section_M_25_Nov_2015.pdf PDF
FA8201-15-R-00019_Amenment_0001_Released.pdf PDF
Addendum_2 _R1_Concept_Drawings.pdf PDF
Attachment_7_Water_Flow_Data.pdf PDF
Responses_to_Questions_25_Nov_2015.pdf PDF
MACC_III_-_Bldg_270_Site_Visit_Attendee_List.pdf PDF
ppi_tool.accdb —
Attachment_15_-_Addendum_5 _01_35_26_Government_Safety_Requirements.pdf PDF
Attachment_06_-_Appendix_A.pdf PDF
Attachment_39_-_Wage_Determination_UT110_6-5-2015.pdf PDF
Attachment_29_-_Attachment_2_G001.pdf PDF
Attachment_24_-_Appendix_8_Enclosure_3.pdf PDF
Attachment_10_-_Seed_Project_SOW_1_Sept_2015.pdf PDF
Attachment_20_-_Appendix_4_ACM_LBP.pdf PDF
Attachment_31_-_Attachment_4_B270_Survey_ACM.pdf PDF
Attachment_03_-_Section_L_SF330-13a.pdf PDF
Attachment_28_-_Attachment_1_TBLOCK.pdf PDF
Attachment_04_-_Section_M_15_Oct_2015.pdf PDF
Attachment_40_-_Wage_Determination_WY15_9-18-2015.pdf PDF
Attachment_30_-_Attachment_3_G002.pdf PDF
Attachment_11_-_Addendum_1 _AFCEC_Interim_Guidance.pdf PDF
Attachment_35_-_Site_Visit_Attendees.xlsx XLSX spreadsheet
Attachment_36_-_Wage_Determination_UT104_1-16-2015.pdf PDF
Attachment_37_-_Wage_Determination_UT100_6-5-2015.pdf PDF
Attachment_22_-_Appendix_6_Utility_Drawings.pdf PDF
Attachment_19_-_Appendix_3_Waste_Diversion_Report.pdf PDF
Attachment_38_-_Wage_Determination_UT102_6-5-2015.pdf PDF
Attachment_01_-_Section_L_15_Oct_2015.pdf PDF
Attachment_08_-_APPENDIX_C_MASTER_ON_or_OFF_BASE_UPDATED_July__2015.pdf PDF
Attachment_34_-_Site_Visit.pdf PDF
Attachment_27_-_Appendix_11_INSTALLATION_CODES.pdf PDF
Attachment_02_-_Section_J_-_Attachment_2__Pricing_Matrix.xlsx XLSX spreadsheet
Attachment_23_-_Appendix_7_TAB_K.pdf PDF
Attachment_13_-_Addendum_3 _01_00_00_General_Requirements.pdf PDF
Attachment_25_-_Appendix_9_1354_Example.pdf PDF
Attachment_33_-_Attachment_6_B270_Survey_LBP.pdf PDF
Attachment_26_-_Appendix_10_CATCODE_2010.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lockers, 32 Each

Comm Room, South Side

Sanding Booth

Electrical Switch

Tank and Mech Room

Comm Room, North Side

Vestibule

Janitor and Comm Room, Left and Right

Fire Panel for Building

Paint Booth 1 Panel

Men’s Locker Room

2nd Store Office

Booth 1 Fire Protection

2nd Story office

South End Office

Women’s Restroom

Men’s Locker Room

Fire Panel for Building

North Wall

Weather Stripping 3

Fire Riser

Trench Drains, North Side-Looking South

Weather Stripping 1

South Wall

Weather Stripping 2

Exhaust Stack, Low Roof

Bottom of Stack, Low Roof

South Mezz

North Mezz

Exhaust Stack, High Roof

File details come from the government source that posted it. Updated .