Attachment_21_-_Appendix_5_ACM_and_LBP_Qualification_Requirements.pdf

PDF 23 KB Posted

Attached to
Multiple Award Construction Contract (MACC) III for Hill Air Force Base, UT Federal contract opportunity
Solicitation number
FA8201-15-R-0019
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Attachment 21 - Seed SOW Appendix 5 ACM and LBP Qualification Requirements

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC) III for Hill Air Force Base, UT, newest first.
File Type Posted
Seed_Project_SOW_10_Dec_2015.pdf PDF
FA8201-15-R-00019_Amenment_0002_Released.pdf PDF
Attachment_10_-_Seed_Project_SOW_8_Dec_2015.pdf PDF
Response_to_Questions_9_Dec_2015.pdf PDF
FA8201-15-R-00019_Amenment_0001_Released.pdf PDF
Attachment_3_G002.dwg DWG drawing
Attachment_8_Canopy_Photo.jpg JPG image
Section_L_25_Nov_2015.pdf PDF
Attachment_2_G001.dwg DWG drawing
Attachment_02_R1_-_Section_J_-_Attachment_2__Pricing_Matrix.xlsx XLSX spreadsheet
Section_M_25_Nov_2015.pdf PDF
Addendum_2 _R1_Concept_Drawings.pdf PDF
Appendix_1_R1_BASE_FACILITY_DESIGN_STANDARD.pdf PDF
Attachment_1_TBLOCK.dwg DWG drawing
MACC_III_Photos.pdf PDF
MACC_III_-_Bldg_270_Site_Visit_Attendee_List.pdf PDF
ppi_tool.accdb —
Attachment_03_-_Section_L_SF330-13a.pdf PDF
Attachment_28_-_Attachment_1_TBLOCK.pdf PDF
Attachment_30_-_Attachment_3_G002.pdf PDF
Attachment_11_-_Addendum_1 _AFCEC_Interim_Guidance.pdf PDF
Attachment_36_-_Wage_Determination_UT104_1-16-2015.pdf PDF
Attachment_34_-_Site_Visit.pdf PDF
Attachment_25_-_Appendix_9_1354_Example.pdf PDF
Attachment_14_-_Addendum_4 _01_32_00_Project_Schedule.pdf PDF
Attachment_26_-_Appendix_10_CATCODE_2010.pdf PDF
Attachment_24_-_Appendix_8_Enclosure_3.pdf PDF
Attachment_10_-_Seed_Project_SOW_1_Sept_2015.pdf PDF
Attachment_40_-_Wage_Determination_WY15_9-18-2015.pdf PDF
Attachment_22_-_Appendix_6_Utility_Drawings.pdf PDF
Attachment_37_-_Wage_Determination_UT100_6-5-2015.pdf PDF
Attachment_19_-_Appendix_3_Waste_Diversion_Report.pdf PDF
Attachment_38_-_Wage_Determination_UT102_6-5-2015.pdf PDF
Attachment_08_-_APPENDIX_C_MASTER_ON_or_OFF_BASE_UPDATED_July__2015.pdf PDF
Attachment_35_-_Site_Visit_Attendees.xlsx XLSX spreadsheet
Attachment_01_-_Section_L_15_Oct_2015.pdf PDF
Attachment_27_-_Appendix_11_INSTALLATION_CODES.pdf PDF
Attachment_23_-_Appendix_7_TAB_K.pdf PDF
Attachment_02_-_Section_J_-_Attachment_2__Pricing_Matrix.xlsx XLSX spreadsheet
Attachment_13_-_Addendum_3 _01_00_00_General_Requirements.pdf PDF
Attachment_33_-_Attachment_6_B270_Survey_LBP.pdf PDF
Attachment_20_-_Appendix_4_ACM_LBP.pdf PDF
Attachment_06_-_Appendix_A.pdf PDF
Attachment_15_-_Addendum_5 _01_35_26_Government_Safety_Requirements.pdf PDF
Attachment_29_-_Attachment_2_G001.pdf PDF
Attachment_39_-_Wage_Determination_UT110_6-5-2015.pdf PDF
Attachment_16_-_Addendum_6 _01_57_20_Environmental_Protection.pdf PDF
Attachment_32_-_Attachment_5_B270_Survey_Data.pdf PDF
Attachment_18_-_Appendix_2_Structural_Loads.pdf PDF
Attachment_17_-_Appendix_1_BASE_FACILITY_DESIGN_STANDARD.pdf PDF
Show all 50

Multiple Award Construction Contract (MACC) III for Hill Air Force Base, UT has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS/LEAD BASED PAINT (LBP) ABATEMENT

CONTRACTOR QUALIFICATION

REQUIREMENTS

PART 1: REGULATORY COMPLIANCE

The contractor must comply with all applicable provisions of the following:

A. 40 Code of Federal Regulations (CFR) 61 Subpart M (All notifications will be made to the Utah Division of Air Quality

[UDAQ].)

B. 29 CFR 1910.1001 (Asbestos) 29 CFR 1910.1025 (Lead) C. Air Force Occupational Safety and Health (AFOSH) Standard 48-8 D. 29 CFR 1926.1101 (Asbestos) 29 CFR 1926.62 (Lead) E. Utah Asbestos Rule R307-801

PART 2: SUBMITTAL REQUIREMENTS

The following information must be submitted for prequalification in sequential order:

2.1 List of employees by date of last exams, who are medically qualified to work with asbestos (29 CFR 1926.1101) and Lead (29 CFR 1926.62).

Include examiner's name, signature, medical qualifications and place of employment. At least 50% of the employees must be current at time of submittal. 100% of employees must show current medical qualification documents at the beginning of each abatement job.

2.2 Contractor's respiratory protection program (29 CFR 1926.1101, 29

CFR 1926.62, EPA Publication 560/5-85-024).

2.3 Air sampling protocol used to support sampling requirements found in

29 CFR 1926.1101, 29 CFR 1926.62.

2.4 List of equipment to be used for asbestos/LBP work under this contract. Examples of equipment include negative air machines (with maintenance logs/ High Efficiency Particulate Air [HEPA] filter documentation), scaffolding, decontamination facilities, disposable clothing, air pressure differential measuring devices (with proof of annual calibration), HEPA vacuums, etc. Copy of manufacturers' certification of HEPA filter for vacuum. (EPA Publication560/5-85-024).

2.5 List of National Institute for Occupational Safety and Health

(NIOSH)-approved respirators to be used on site by employees.

Include NIOSH approval numbers and proof of approval (29 CFR 1926.1101, 29 CFR 1926.62, EPA Publication 560/5-85-024).

2.6 Qualifications of the Independent Third Party Industrial Hygienist (IH) who will oversee the project to include certification date, college degrees, years of experience, and any other qualifications to perform this work. It is recommended the IH overseeing the project be an American Board of Industrial Hygiene-Certified Industrial Hygienist or college graduate with at least eight years of work related experience.

The third party on site monitor must have current UDAQ Contractor/Supervisor Certification. If more than one IH consultant is used, list those who may oversee the asbestos/LBP work.

2.7 List of employees fit tested for respirator use in accordance with 29

CFR 1926.1101, 29 CFR 1926.62. List these employees by date and respirator. Include proof of employee fit testing and the name and qualifications of the fit tester. At least 50% of the employees must be current (i.e., WITHIN SIX MONTHS) at the time of submittal. 100% of employees must show current fit test documents at the beginning of each abatement job.

2.8 Asbestos - Proof of at least one year minimum work experience in Utah as a UDAQ certified asbestos abatement company. Provide a current list of employees who have received training in accordance with 29 CFR 1926.1101 and EPA Publication 560/5-85-024. Proof of UDAQ certification is required for all asbestos work categories. Include proof of training (i.e., written certification of completion) from a nationally recognized EPA asbestos training course for each employee.

At least 100% of the employees must be currently certified at the time of submittal. All workers, contractor/supervisors, project designers must show current UDAQ certification documents before the beginning of each abatement job.

2.9 Lead – Proof of at least one year minimum work experience in Utah as a UDAQ certified lead abatement company. Provide proof of employee training (i.e., written certification of completion) from an EPA approved course for each employee. All workers, contractor/supervisors must show current UDAQ certification documents before the beginning of each abatement job.

2.10 Copies of air monitoring data taken during and after abatement from previous projects completed by contractor (not to exceed five projects).

(29 CFR 1926.1101, EPA Publication 560/5-85-024).

2.11 List of prior asbestos abatement contracts performed during the past two years. Include the names, addresses, telephone numbers and dates the projects were performed. (EPA Publication 560/5-85-024).

2.12 Additional information to adequately show compliance with applicable laws and regulations in the following areas:

A. Medical certification B. NIOSH Analytical Lab Certification (independent lab) C. Disposal of waste D. Department of Transportation transport of asbestos waste E. Cleanup procedures

2.13 List of any asbestos/LBP abatement projects including those of any corporation, limited liability company, partnership, or sole proprietorship of which any director, officer, or agent of the contractor now making application was a director, officer, partner, or agent, to have been prematurely terminated. Include the circumstances surrounding the termination. (EPA Publication 560/5-85-024).

2.14 List of any contractual penalties within the past two years including those of any corporation, limited liability company, partnership, or sole proprietorship of which any director, officer, or agent of the contractor now making application was a director, officer, partner, or agent, whom the contractor has paid for breach or noncompliance with contract specifications. (EPA Publication 560/5-024).

2.15 List any enforcement action levied by any Federal, State or local government agencies against the contractor for violations related to asbestos/LBP within the past two years including those of any corporation, Limited Liability Company, partnership, or sole proprietorship of which any director, officer, or agent of the contractor now making application was a director, officer, partner, or agent. .

The citations will be identified by contractor including the name and location of the project, the date(s) and how the allegations were resolved. (EPA Publication 560/5-85-024).

2.16 Description of all legal proceedings, lawsuits or claims which have been filed or levied against the contractor or any of his past or present employees for asbestos/LBP related activities within the past two years including those of any corporation, limited liability company, partnership, or sole proprietorship of which any director, officer, or agent of the contractor now making application was a director, officer, partner, or agent.. (EPA Publication 560/5-85-024).

PART 3: INSURANCE

3.1 The contractor will provide proof of insurance to handle

asbestos-containing materials/LBP.

ALL INFORMATION SUBMITTED IS SUBJECT TO CONFIRMATION BY

GOVERNMENT. ANY INFORMATION FOUND TO BE FALSE, WILL BE

GROUNDS FOR IMMEDIATE DISQUALIFICATION OF CONTRACTOR.

UPDATE/ REQUALIFICATION OF ALL QUALIFIED CONTRACTORS IS

REQUIRED EVERY TWO YEARS, WITH THE EXCEPTION OF IDIQ

CONTRACTORS WHICH SHALL BE QUALIFIED FOR THE DURATION

OF THE CONTRACT. (The update will require that all qualified contractors show proof of compliance with the sections listed above.)

THE GOVERNMENT RESERVES THE RIGHT TO DISQUALIFY ANY

ABATEMENT CONTRACTOR FOR INTENTIONALLY REMOVING

ASBESTOS/LBP MATERIALS IN VIOLATION OF APPLICABLE

REGULATIONS.

ABATEMENT CONTRACTORS ARE REQUIRED TO COORDINATE ALL

ABATEMENT WORK/PROJECT DOCUMENTATION THROUGH THE 75

CES/CEHOA ASBESTOS/LBP SHOP.

(Issue date: 12 June 1997/updated 8 October 2013)

PLEASE MAIL PREQUALIFICATION PACKAGE TO:

DEPARTMENT OF THE AIR FORCE

75 CES/CEOHA

5643 Lahm Ln.

HILL AIR FORCE BASE, UT 84056-5300

ATTN: Nickolas King Telephone# 801-586-7094

PART 1: REGULATORY COMPLIANCE
PART 2: SUBMITTAL REQUIREMENTS
PART 3: INSURANCE