Attachment 7 - Basic SOW Appendix B

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC) III for Hill Air Force Base, UT, newest first.
File Type Posted
Seed_Project_SOW_10_Dec_2015.pdf PDF
FA8201-15-R-00019_Amenment_0003.pdf PDF
Attachment_10_-_Seed_Project_SOW_8_Dec_2015.pdf PDF
Response_to_Questions_9_Dec_2015.pdf PDF
Appendix_1_R1_BASE_FACILITY_DESIGN_STANDARD.pdf PDF
Attachment_1_TBLOCK.dwg DWG drawing
Attachment_7_Water_Flow_Data.pdf PDF
Seed_Project_SOW_25_Nov_2015.pdf PDF
Attachment_3_G002.dwg DWG drawing
Attachment_8_Canopy_Photo.jpg JPG image
Section_L_25_Nov_2015.pdf PDF
Attachment_2_G001.dwg DWG drawing
Attachment_02_R1_-_Section_J_-_Attachment_2__Pricing_Matrix.xlsx XLSX spreadsheet
Section_M_25_Nov_2015.pdf PDF
Addendum_2 _R1_Concept_Drawings.pdf PDF
Responses_to_Questions_25_Nov_2015.pdf PDF
MACC_III_Photos.pdf PDF
MACC_III_-_Bldg_270_Site_Visit_Attendee_List.pdf PDF
ppi_tool.accdb —
Attachment_35_-_Site_Visit_Attendees.xlsx XLSX spreadsheet
Attachment_01_-_Section_L_15_Oct_2015.pdf PDF
Attachment_27_-_Appendix_11_INSTALLATION_CODES.pdf PDF
Attachment_23_-_Appendix_7_TAB_K.pdf PDF
Attachment_02_-_Section_J_-_Attachment_2__Pricing_Matrix.xlsx XLSX spreadsheet
Attachment_13_-_Addendum_3 _01_00_00_General_Requirements.pdf PDF
Attachment_33_-_Attachment_6_B270_Survey_LBP.pdf PDF
Attachment_20_-_Appendix_4_ACM_LBP.pdf PDF
Attachment_06_-_Appendix_A.pdf PDF
Attachment_15_-_Addendum_5 _01_35_26_Government_Safety_Requirements.pdf PDF
Attachment_29_-_Attachment_2_G001.pdf PDF
Attachment_39_-_Wage_Determination_UT110_6-5-2015.pdf PDF
Attachment_16_-_Addendum_6 _01_57_20_Environmental_Protection.pdf PDF
Attachment_32_-_Attachment_5_B270_Survey_Data.pdf PDF
Attachment_18_-_Appendix_2_Structural_Loads.pdf PDF
Attachment_17_-_Appendix_1_BASE_FACILITY_DESIGN_STANDARD.pdf PDF
Attachment_09_-_Appendix_D.pdf PDF
FA8201-15-R-0019.pdf PDF
Attachment_05_-_Basic_SOW_1_Sept_2015.pdf PDF
Attachment_12_-_Addendum_2 _Concept_Drawings.pdf PDF
Attachment_21_-_Appendix_5_ACM_and_LBP_Qualification_Requirements.pdf PDF
Attachment_31_-_Attachment_4_B270_Survey_ACM.pdf PDF
Attachment_04_-_Section_M_15_Oct_2015.pdf PDF
Attachment_40_-_Wage_Determination_WY15_9-18-2015.pdf PDF
Attachment_22_-_Appendix_6_Utility_Drawings.pdf PDF
Attachment_37_-_Wage_Determination_UT100_6-5-2015.pdf PDF
Attachment_19_-_Appendix_3_Waste_Diversion_Report.pdf PDF
Attachment_38_-_Wage_Determination_UT102_6-5-2015.pdf PDF
Attachment_08_-_APPENDIX_C_MASTER_ON_or_OFF_BASE_UPDATED_July__2015.pdf PDF
Attachment_03_-_Section_L_SF330-13a.pdf PDF
Attachment_28_-_Attachment_1_TBLOCK.pdf PDF
Show all 50

Multiple Award Construction Contract (MACC) III for Hill Air Force Base, UT has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A. When working within the Explosives Clear Zone (MAMS I, MAMS II, Little Mountain, UTTR (OASIS) as well as any of the Airfield areas described in Section 12 (Safety Requirements), specifically Sections 12.4 -

12.4.5 the following rules will be adhered to:

1. Smoke only in posted “Designated Smoking Areas”, vehicles are not Designated Smoking Areas.

2. “Hot Work” (welding, cutting, brazing, open flames, spark producing equipment, high heat appliances, tools, etc.) requires an AF Form 592 (Hot Work Permit) issued by the HAFB Fire department before work commences.

3. A maximum speed limit of 25 mph shall be enforced unless posted otherwise.

4. Park vehicles 100 feet from any explosives facility on surfaces free of combustible materials. If the vehicle is not required as part of the work effort, it shall be parked in established parking areas or lots.

5. The use of Modern Mobile Emitters (ex. cell phones, pagers, radios & laptop computers) shall not be used within 10 feet of any explosives loaded vehicle or facility.

6. Explosive laden vehicles have the right of way at all times.

7. Roads posted “Explosives Operation in Progress” shall not be used.

8. If a construction trailer is located in the free zone, the windows will be boarded up from the inside. This is to protect personnel from flying glass in the event of a mishap. Each work site shall have a minimum of two serviceable Type 2A:10ABC fire extinguishers present.

9. Work on facilities, or in areas with explosives requires prior approval of the facility supervisor and 75 ABW/SEW. Exception: Facilities with the explosives content removed.

10. In the event explosive safety requirements are not specified in a contract, apply the provisions of DoD 4145.26-M.

B. When working in the explosive areas, use only the minimum number of workers to accomplish the job.

Remain in the explosive areas for the minimum amount of time to complete the job. Leave the explosive areas for breaks and lunches. The cardinal rule for the explosive areas: Limit exposure to a minimum number of persons, for a minimum amount of time, to the minimum amount of ammunition and explosives consistent with safe and efficient operations. When lightning is within 30 Minutes of 5 nautical miles (5.75 land Miles) of HAFB, ALL personnel shall evacuate the Explosive Clear Zone, which is determined as the gated areas of these zones.

C. Emergency procedures in the event of accident, fire, and/or electrical storm:

1. Maintain a capability to communicate with 75 ABW emergency services (telephone 911, radio with frequency authorized by the Project Manager or other suitable means).

2. Maintain a capability to be contacted by emergency services or the Project Manager.

D. Only tasks consistent with the contract shall be accomplished in explosive areas.

E. Contact shall be made with the 75 ABW Weapons Safety Manager to determine if contractor employees require a weapons safety briefing before being granted access to explosives areas or beginning work.

I have read and completely understand the above minimum safety requirements and shall comply as they apply with this contract.

PRINTED NAME: SIGNATURE: DATE:

APPENDIX B

Explosives Safety Awareness

28 Aug 2014