Q Aas of20 August 2009 B104.doc

Optional Form Aug 2009 DOC document 31 KB Posted

Attached to
Construct Addition/Fire Suppression B104
Solicitation number
FA6656-09-R-0005
Issued by

About this file

Solicitation FA6656-09-R-0005 Additional Q As as of 20 August 2009

View the file

Other versions and copies of OF 20

Who attaches OF 20

Other files

File Type Posted
Q Aas of 28 August 2009 B104.doc DOC document
Attendes Site VisitB104.xls XLS spreadsheet
scan166.pdf PDF
FA665609R0005Amendment1B104.doc DOC document
scan165.pdf PDF
scan168.pdf PDF
scan169.pdf PDF
scan164.pdf PDF
scan167.pdf PDF
WDupdateB104.doc DOC document
Q Aas of 19 August 2009 B104.doc DOC document
SiteVisitMinutesB104.docx DOCX document
Attendes Site VisitB104.xls XLS spreadsheet
SolDocB104.doc DOC document
230713 - ductwork insulation.doc DOC document
260529 - hangers and supports for electrical systems.doc DOC document
095113 - acoustical panel ceilings.doc DOC document
312300 excavation and fill.doc DOC document
072216 roof board insulation.doc DOC document
081113 hollow-metal doors and frame.doc DOC document
329213 hydro-mulching.doc DOC document
081416 flush wood doors.doc DOC document
a_01.pdf PDF
220529 - pipe hangers supports for plumbing piping.doc DOC document
s_01.pdf PDF
s_06.pdf PDF
122100 window blinds.doc DOC document
FA665609R0005Atch4ResQues.doc DOC document
e_02.pdf PDF
013280 removal of asbestos.doc DOC document
083100 access doors and panels.doc DOC document
262726 - wiring devices.doc DOC document
238126 - duct-free split system air conditioners.doc DOC document
054000_cold formed metal framing.doc DOC document
f_01.pdf PDF
220719 - plumbing piping insulation.doc DOC document
260101 - electrical demolition.doc DOC document
s_03.pdf PDF
072719 plastic sheet air barriers.doc DOC document
USAFR Asbestos Areas1.pdf PDF
052100_steel joist framingf.doc DOC document
024119.13 selective building demolition.doc DOC document
p_02.pdf PDF
p_03.pdf PDF
223000 - plumbing equipment.doc DOC document
260526 - grounding and bonding for electrical systems.doc DOC document
AF Form 3065.pdf PDF
335100 - natural-gas distribution.doc DOC document
a_03.pdf PDF
000110 table of contents.doc DOC document
Show 40 more

Latest 50 of 145 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation #FA6656-09-R-0005 Construct Addition/Fire Suppression B104 Questions with Answers/Clarifications as of 20 August 2009:

15. Will storage on the base be available for the furniture and equipment.

Response: No storage is available on base.

16. Could we get existing roof framing plans & cross sections of bldg?

Response: Please see the attached scanned drawings entitled Scan 164, Scan 165, Scan 166, Scan 167, Scan 168, and Scan 169. We have chosen the available ones that we felt were pertinent.

17. Is the area above clg to be sprinklered? If yes, is a dry system required?

Response: Yes, and a dry is not required.

18. Who is responsible for protecting existing wood floors? Any special method?

Response: Contractor is responsible for any protection required to protect the floor from damage.

19. The ceiling spec calls standard tile to be Cortega by Armstrong - Room finish on print says Mars Clima Plus. Please clarify - Mars is much higher price than Cortega.

Response: If this is referring to Spec section 09 51 13-4 para. 2.02 B.1.c references are for pattern only, the requirements of B. 1 must also be met. Either would be acceptable as long as para. B. 1 is met.

20. What is design based on, nfpa 13 , ufc, or?? Design density & hose allowance on f01 dose not match nfpa 13 standards.

Response: As drawing F-01 states and specifications section 21 13 13; design is based on NFPA 13 with the exceptions listed in the notes on sheet F-01.

21. If sprinklers are required above new ceilings in existg wood roof area, is area subject to freezing & is a dry system required?

Response: Area is a return air plenum and not subject to freezing. At this point a dry system is not required.

22. Is there a place on fbo website to check so we would automatically receive any bulletins, memos, etc?

Response: Vendor can add opportunities to a “watch list” list (ala “favorites” list). This allows for ease in referencing targeted opportunities. Additionally, vendors receive updates about opportunities on their Watch List. (See the Vendor USER GUIDE for more detailed information on the FBO site)

File details come from the government source that posted it. Updated .