SiteVisitMinutesB104.docx

DOCX document 17 KB Posted

Attached to
Construct Addition/Fire Suppression B104
Solicitation number
FA6656-09-R-0005
Issued by

About this file

Solicitation FA6656-09-R-0005 Site Visit Minutes

View the file

Other files

File Type Posted
Q Aas of 28 August 2009 B104.doc DOC document
Attendes Site VisitB104.xls XLS spreadsheet
scan166.pdf PDF
Q Aas of20 August 2009 B104.doc DOC document
FA665609R0005Amendment1B104.doc DOC document
scan165.pdf PDF
scan168.pdf PDF
scan169.pdf PDF
scan164.pdf PDF
scan167.pdf PDF
WDupdateB104.doc DOC document
Q Aas of 19 August 2009 B104.doc DOC document
Attendes Site VisitB104.xls XLS spreadsheet
SolDocB104.doc DOC document
230713 - ductwork insulation.doc DOC document
260529 - hangers and supports for electrical systems.doc DOC document
095113 - acoustical panel ceilings.doc DOC document
312300 excavation and fill.doc DOC document
072216 roof board insulation.doc DOC document
081113 hollow-metal doors and frame.doc DOC document
329213 hydro-mulching.doc DOC document
081416 flush wood doors.doc DOC document
a_01.pdf PDF
220529 - pipe hangers supports for plumbing piping.doc DOC document
s_01.pdf PDF
s_06.pdf PDF
122100 window blinds.doc DOC document
FA665609R0005Atch4ResQues.doc DOC document
e_02.pdf PDF
013280 removal of asbestos.doc DOC document
083100 access doors and panels.doc DOC document
262726 - wiring devices.doc DOC document
238126 - duct-free split system air conditioners.doc DOC document
054000_cold formed metal framing.doc DOC document
f_01.pdf PDF
220719 - plumbing piping insulation.doc DOC document
260101 - electrical demolition.doc DOC document
s_03.pdf PDF
072719 plastic sheet air barriers.doc DOC document
USAFR Asbestos Areas1.pdf PDF
052100_steel joist framingf.doc DOC document
024119.13 selective building demolition.doc DOC document
p_02.pdf PDF
p_03.pdf PDF
223000 - plumbing equipment.doc DOC document
260526 - grounding and bonding for electrical systems.doc DOC document
AF Form 3065.pdf PDF
335100 - natural-gas distribution.doc DOC document
a_03.pdf PDF
000110 table of contents.doc DOC document
Show 40 more

Latest 50 of 145 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Memorandum for Record 19 August 2009 Subject: Solicitation #FA6656-09-R-0005 Site Visit – 13 August 2009 0900 hours Construct Addition/Fire Suppression B104

1. A pre-proposal site visit was held for subject solicitation on 13 August 2009 at 0900 in building 104. See attached list for attendees.

2. Following is a summary of comments made by the Contract Specialist during the administrative portion of the site visit:

a. The project consists of, but is not limited to, the contractor providing all labor, materials, tools, equipment, permits, and transportation necessary required to complete the addition and install a fire suppression system and alarm system as required by fire codes. The work involves, but is not limited to, providing updated men’s and women’s locker rooms and toilet facilities, sauna rooms, racquetball court, and reconfiguring and renovating office spaces and receiving area. The addition consists of approximately 2,600 square feet to include locker rooms, mechanical room, fitness equipment area, and storage area. Requirements are further detailed in the Drawings and in the General Requirements found at Specification Section 01 00 00, Paragraph 1.02.C.

b. Attendees were advised the project is a Total HUB Zone Business Set Aside. Offers are only being solicited from HUB Zone Small Businesses that appear on the List of Qualified HUB Zone Small Business Concerns maintained by the Small Business Administration. Contract Clause 52.219-3 Notice of Total HUB Zone Set-aside is included in the solicitation at Section I page 5. By submitting an offer, Contractors agree that in the performance of a general construction contract at least 15% of the cost of contract performance incurred for personnel will be spent on the concern’s employees or the employees of other HUB Zone business concerns.

c. Proposals are due on 31 August 2009 at 2:00 p.m. Local Time. Hand carried bids shall be delivered to the Contracting Officer at Bldg 504, Room 114, not later than that time. Proposal package is to include required bonds and the Financial Institution Reference Sheet (Atch 4 of the solicitation).

d. Contractors were reminded that in order to receive an award as a prime contractor, they must be registered in the Central Contractor Register (CCR) database at website http://ccr.gov as well as have completed the annual representations and certifications electronically via Online Representation and Certification Application (ORCA) at website http://orca.bpn.gov.

e. The proposal is to be based on the specifications/drawings. General contractors are urged to closely review the drawing notes as well. No changes are to be made unless received in writing from the Contracting Officer in the form of an amendment. It is the contractor’s responsibility to check the FBO website for updates and amendments.

f. Contractors are to direct all questions to the Contracting Officer in writing. Questions can be e-mailed or faxed to the attention of Phyllis Delgros at FAX: 330-609-1042, or Email phyllis.delgros@youngstown.af.mil. Emails are preferred. It is imperative all communications are identified with the full solicitation number, not project number, in the subject line. Any/all questions received, along with the responses, will be posted to the FBO website as soon as possible after the conclusion of the site visit.

g. Contractor is reminded that the Buy American Act pertains per the terms of the contract. The contractor shall use only domestic construction material in performing this contract. (Reference Section I - Contract Clause 52.225-9.) Consideration should also be given to biobased products. This clause can be found in Section K.

3. At the conclusion of the administrative comments, the attendees were escorted throughout building 104 to examine the interior and exterior project site areas by Bob Woods, CE, and Kevin Hyman, Building Manager.

4. At the conclusion of the walkthrough, the site visit was adjourned.

//signed// Phyllis J. Delgros Contract Specialist

File details come from the government source that posted it. Updated .