072719 plastic sheet air barriers.doc

DOC document 31 KB Posted

Attached to
Construct Addition/Fire Suppression B104
Solicitation number
FA6656-09-R-0005
Issued by

About this file

Specification Section 07 27 19 Plastic Sheet Air Barriers

View the file

Other files

File Type Posted
Q Aas of 28 August 2009 B104.doc DOC document
Attendes Site VisitB104.xls XLS spreadsheet
scan166.pdf PDF
Q Aas of20 August 2009 B104.doc DOC document
FA665609R0005Amendment1B104.doc DOC document
scan165.pdf PDF
scan168.pdf PDF
scan169.pdf PDF
scan164.pdf PDF
scan167.pdf PDF
WDupdateB104.doc DOC document
Q Aas of 19 August 2009 B104.doc DOC document
SiteVisitMinutesB104.docx DOCX document
Attendes Site VisitB104.xls XLS spreadsheet
SolDocB104.doc DOC document
230713 - ductwork insulation.doc DOC document
260529 - hangers and supports for electrical systems.doc DOC document
095113 - acoustical panel ceilings.doc DOC document
312300 excavation and fill.doc DOC document
072216 roof board insulation.doc DOC document
081113 hollow-metal doors and frame.doc DOC document
329213 hydro-mulching.doc DOC document
081416 flush wood doors.doc DOC document
a_01.pdf PDF
220529 - pipe hangers supports for plumbing piping.doc DOC document
s_01.pdf PDF
s_06.pdf PDF
122100 window blinds.doc DOC document
FA665609R0005Atch4ResQues.doc DOC document
e_02.pdf PDF
013280 removal of asbestos.doc DOC document
083100 access doors and panels.doc DOC document
262726 - wiring devices.doc DOC document
238126 - duct-free split system air conditioners.doc DOC document
054000_cold formed metal framing.doc DOC document
f_01.pdf PDF
220719 - plumbing piping insulation.doc DOC document
260101 - electrical demolition.doc DOC document
s_03.pdf PDF
USAFR Asbestos Areas1.pdf PDF
052100_steel joist framingf.doc DOC document
024119.13 selective building demolition.doc DOC document
p_02.pdf PDF
p_03.pdf PDF
223000 - plumbing equipment.doc DOC document
260526 - grounding and bonding for electrical systems.doc DOC document
AF Form 3065.pdf PDF
335100 - natural-gas distribution.doc DOC document
a_03.pdf PDF
000110 table of contents.doc DOC document
Show 40 more

Latest 50 of 145 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEction 07 27 19

PLASTIC SHEET AIR BARRIERS

Part 1 – GENERAL

1.01 Related Documents

A.

Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.02

SUMMARY

A.

Section includes furnishing and installing weather‑resistive barriers on exterior side of insulation in exterior walls as indicated on the Drawings.

B.

Related Sections:

1.

Section 07212 – Foam Board Insulation.

1.03 References

A.

American Association of Textile Chemists and Colorists (AATCC): Water Resistance: Hydrostatic Pressure Test (AATCC 127‑1998).

ASTM International:

Standard Test Methods for Water Vapor Transmission of Materials (ASTM E‑96‑00).

2.

Standard Specification for an Air Retarder (AR) Material or System for Low‑Rise Framed Building Walls (ASTM E‑1677‑95 (Reapproved 2000)).

1.04 System Description

A.

Performance Requirements:

Air Leakage: Less than 0.6 CFM per square foot at 25 MPH wind pressure per ASTM D‑1677, Type I.

Water Vapor Permeance (WVP): Greater than 20 perms per ASTM E‑96, Method B.

3.

Water Penetration Resistance: Greater than 200 cm of hydrostatic head per AATCC 127.

1.05 Submittals

A.

Product Data: Provide Manufacturers Product Data.

B.

Test Reports: Submit copies of test results showing performance characteristics equaling or exceeding those specified above.

C.

Manufacturer's Instructions.

1.09 Sequencing and Scheduling

A.

Install air barrier after sheathing is installed – but before windows are installed.

B.

Coordinate installation with the Trade that installs flashing over window openings so that air barrier from above laps in front of topmost edge of flashing.

C.

Install finish material within 120 days of installation of air barrier.

Part 2 – Products

2.01 Manufactured Units

A.

Air Barrier: Non‑woven, non‑perforated, recyclable, 100‑percent flash spun‑bonded high‑density polyethylene (HDPE) fibers bonded together by heat and pressure, without binders or fillers, into a tough, durable sheet structure.

2.02 Accessories

A.

Sealing Tape: White 3‑inch wide oriented polypropylene film coated with the Air Barrier Manufacturer's specially formulated, high‑tack, permanent acrylic adhesive. Use of duct tape will be grounds for rejection of the installation.

Fasteners: One of the following.

Rust‑resistant screws with washers.

Nails with large heads or plastic washer heads.

Part 3 – Execution

3.01 Installation

Install air barrier over insulation in exterior walls per the Air Barrier Manufacturer's instructions and the following requirements. Where requirements conflict, the most restrictive shall prevail.

Unwrap roll beginning at corner. Line up printed stud marks with first stud. Maintain roll plumb.

Secure to sheathing on vertical stud lines at between 12‑ and 18‑inches on center.

3.

Unroll directly over window openings.

4.

At vertical seams, lap edges between 6‑ and 12‑inches.

5.

Lap upper rolls over lower rolls by a minimum of 6 inches.

B.

Prior to installation of finish material, seal perimeters, seams, and penetrations through air barrier with specified tape and fasteners per the Air Barrier Manufacturer's instructions.

C.

At window openings, make a modified “I” cut in the air barrier, fold flaps into opening, and secure edges, all per the Air Barrier Manufacturer's instructions.

3.02 Protection

After installation, continuously monitor condition of air barrier.

If air barrier exhibits tears, breaks, or holes – or is otherwise compromised, allow sheathing to dry and then install patch of new material over compromised area and seal with specified tape.

Do not allow air barrier to be contaminated with chemicals that increase its wettability (for example, surfactants). Such contamination will adversely affect resistance of air barrier to bulk water. Remove contaminated material and replace with new material immediately.

Air barrier shall be air tight and free from tears – before, during, and after installation of finish material.

End of Section 07 27 19

THIS PAGE IS INTENTIONALLY BLANK.

07 27 19-4

PLASTIC SHEET AIR BARRIERS

12910-330

Revised 3/2/09

12910-330

PLASTIC SHEET AIR BARRIERS

07 27 19-3

Revised 3/2/09

File details come from the government source that posted it. Updated .