223000 - plumbing equipment.doc

DOC document 31 KB Posted

Attached to
Construct Addition/Fire Suppression B104
Solicitation number
FA6656-09-R-0005
Issued by

About this file

Specification Section 22 30 00 Plumbing Equipment

View the file

Other files

File Type Posted
Q Aas of 28 August 2009 B104.doc DOC document
Attendes Site VisitB104.xls XLS spreadsheet
scan166.pdf PDF
Q Aas of20 August 2009 B104.doc DOC document
FA665609R0005Amendment1B104.doc DOC document
scan165.pdf PDF
scan168.pdf PDF
scan169.pdf PDF
scan164.pdf PDF
scan167.pdf PDF
WDupdateB104.doc DOC document
Q Aas of 19 August 2009 B104.doc DOC document
SiteVisitMinutesB104.docx DOCX document
Attendes Site VisitB104.xls XLS spreadsheet
SolDocB104.doc DOC document
230713 - ductwork insulation.doc DOC document
260529 - hangers and supports for electrical systems.doc DOC document
095113 - acoustical panel ceilings.doc DOC document
312300 excavation and fill.doc DOC document
072216 roof board insulation.doc DOC document
081113 hollow-metal doors and frame.doc DOC document
329213 hydro-mulching.doc DOC document
081416 flush wood doors.doc DOC document
a_01.pdf PDF
220529 - pipe hangers supports for plumbing piping.doc DOC document
s_01.pdf PDF
s_06.pdf PDF
122100 window blinds.doc DOC document
FA665609R0005Atch4ResQues.doc DOC document
e_02.pdf PDF
013280 removal of asbestos.doc DOC document
083100 access doors and panels.doc DOC document
262726 - wiring devices.doc DOC document
238126 - duct-free split system air conditioners.doc DOC document
054000_cold formed metal framing.doc DOC document
f_01.pdf PDF
220719 - plumbing piping insulation.doc DOC document
260101 - electrical demolition.doc DOC document
s_03.pdf PDF
072719 plastic sheet air barriers.doc DOC document
USAFR Asbestos Areas1.pdf PDF
052100_steel joist framingf.doc DOC document
024119.13 selective building demolition.doc DOC document
p_02.pdf PDF
p_03.pdf PDF
260526 - grounding and bonding for electrical systems.doc DOC document
AF Form 3065.pdf PDF
335100 - natural-gas distribution.doc DOC document
a_03.pdf PDF
000110 table of contents.doc DOC document
Show 40 more

Latest 50 of 145 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 22 30 00

PLUMBING EQUIPMENT

PART 1 - GENERAL

1.01 Related Documents:

A.

Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.02

SECTION INCLUDES:

A.

Hot Water Storage Tank

B.

Electric water coolers

C.

Simplex Lift Station

1.03

RELATED SECTIONS:

A.

Section 03 00 01 - Concrete

B.

Section 22 01 00 - General Plumbing Requirements

C.

Section 22 10 00 - Plumbing Piping

1.04

SUBMITTALS:

A.

Submit shop drawings and product data in accordance with Section 22 01 00.

B.

Include dimension drawings of water heaters and coolers indicating components and connections to other equipment and piping.

C.

Submit manufacturer's installation instructions.

D.

Include operation, maintenance, and inspection data, replacement part numbers and availability to be included in maintenance manuals.

E.

Submit certified pump curves showing pump performance characteristics with pump and system operating point plotted. Include NPSH curve when applicable.

F.

Submit manufacturer's certificate that pumps meet or exceed specified requirements.

1.05

QUALITY ASSURANCE:

A.

Ensure products and installation of specified products are in conformance with recommendations and requirements of the following organizations:

1.

American Gas Association (AGA)

2.

National Sanitation Foundation (NSF)

3.

American Society of Mechanical Engineers (ASME)

4.

National Board of Boiler and Pressure Vessel Inspectors (NBBPVI)

5.

National Electrical Manufacturers' Association (NEMA)

6.

Underwriters Laboratories (UL)

7.

American Society of Heating, Refrigerating, and Air Conditioning Engineers (ASHRAE)

PART 2 - PRODUCTS

2.01

ACCEPTABLE MANUFACTURERS – HOT WATER STORAGE TANK:

A.

A. O. Smith

C.

Lochinvar

D.

Bradford White

2.02

HOT WATER STORAGE TANK:

A.

Storage tank shall be glass-lined storage tank with an alkaline borosilicate composition which has been fused to the steel by firing at a temperature of 1600°F. Glass coating shall be continuous over the entire inner surface of the tank. Outer jacket shall have a baked enamel finish. Foam insulation to exceed ASHRAE 90.1-2004 efficiency requirements. Cathodic protection shall be provided. Tank shall have a working pressure of 160 psi. Tank shall have a five year limited warranty as outlined in the written warranty.

2.03

ACCEPTABLE MANUFACTURERS - WATER COOLERS AND DRINKING FOUNTAINS:

A.

Halsey-Taylor

B.

Oasis

C.

Elkay

2.07

WATER COOLER EWC-1:

A.

Barrier-free bi-level type with self-closing push bars on front.

B.

Stainless steel receptors and panels. Apron color to be selected.

C.

Two stream bubblers.

D.

Hermetically sealed refrigeration system for 120/1/60 power with 5 year warranty.

E.

ARI certified capacity of 8.8 GPH from 80 degree F to 50 degree F.

F.

Coolers to be CFC and lead free.

G.

Halsey-Taylor Model HAC8FSBL-Q ADA.

2.08

ACCEPTABLE MANUFACTURERS – LIFT STATION:

A.

Weil

B.

Bell and Gossett

C.

Zoeller

2.09

SUMP PUMP (P-1):

A.

Simplex submersible sump pump of cast iron construction with stainless steel shaft and single mechanical seal.

B.

36 inch square sump cover plate with openings for discharge piping, vent, and level controls.

C.

Pump set to be furnished with three (3) single pole mercury float switch liquid level controls, each with PVC cable, NEMA 1 duplex control panel suitable for wall mounting and including the following: one (1) fusible disconnect switch with lockout handle through cover, two (2) across-the-line magnetic starters with O/L and L/V protection in all three phases, one (1) control circuit transformer, one (1) control circuit disconnect switch, one (1) high water alarm buzzer, and one (1) silencing switch to indicate high water alarm conditions.

D.

Capacity, voltage, and HP as shown on the drawings.

PART 3 - EXECUTION

3.01

INSTALLATION:

A.

Install all equipment in accordance with manufacturer's instructions and to AGA, NSF, and UL requirements.

B.

Coordinate with plumbing piping, gas venting and electrical work to achieve operating systems.

C.

Provide a gate valve and check valve on the discharge of each pump above the floor. Check valve shall be installed in a horizontal position or a maximum 45degree incline.

D.

Provide a 4" concrete housekeeping pad under hot water storage tank in accordance with Section 030001 - Concrete.

END OF SECTION 22 30 00

22 30 00-4

PLUMBING EQUIPMENT

12910-330

Revised 3/2/09

12910-330

PLUMBING EQUIPMENT

22 30 00-3

Revised 3/2/09

File details come from the government source that posted it. Updated .