230593 - testing adjusting and balancing.doc

DOC document 39 KB Posted

Attached to
Construct Addition/Fire Suppression B104
Solicitation number
FA6656-09-R-0005
Issued by

About this file

Specification Section 23 05 93 Testing Adjusting and Balancing

View the file

Other files

File Type Posted
Q Aas of 28 August 2009 B104.doc DOC document
Attendes Site VisitB104.xls XLS spreadsheet
scan166.pdf PDF
Q Aas of20 August 2009 B104.doc DOC document
FA665609R0005Amendment1B104.doc DOC document
scan165.pdf PDF
scan168.pdf PDF
scan169.pdf PDF
scan164.pdf PDF
scan167.pdf PDF
WDupdateB104.doc DOC document
Q Aas of 19 August 2009 B104.doc DOC document
SiteVisitMinutesB104.docx DOCX document
Attendes Site VisitB104.xls XLS spreadsheet
SolDocB104.doc DOC document
230713 - ductwork insulation.doc DOC document
260529 - hangers and supports for electrical systems.doc DOC document
095113 - acoustical panel ceilings.doc DOC document
312300 excavation and fill.doc DOC document
072216 roof board insulation.doc DOC document
081113 hollow-metal doors and frame.doc DOC document
329213 hydro-mulching.doc DOC document
081416 flush wood doors.doc DOC document
a_01.pdf PDF
220529 - pipe hangers supports for plumbing piping.doc DOC document
s_01.pdf PDF
s_06.pdf PDF
122100 window blinds.doc DOC document
FA665609R0005Atch4ResQues.doc DOC document
e_02.pdf PDF
013280 removal of asbestos.doc DOC document
083100 access doors and panels.doc DOC document
262726 - wiring devices.doc DOC document
238126 - duct-free split system air conditioners.doc DOC document
054000_cold formed metal framing.doc DOC document
f_01.pdf PDF
220719 - plumbing piping insulation.doc DOC document
260101 - electrical demolition.doc DOC document
s_03.pdf PDF
072719 plastic sheet air barriers.doc DOC document
USAFR Asbestos Areas1.pdf PDF
052100_steel joist framingf.doc DOC document
024119.13 selective building demolition.doc DOC document
p_02.pdf PDF
p_03.pdf PDF
223000 - plumbing equipment.doc DOC document
260526 - grounding and bonding for electrical systems.doc DOC document
AF Form 3065.pdf PDF
335100 - natural-gas distribution.doc DOC document
a_03.pdf PDF
Show 40 more

Latest 50 of 145 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 23 05 93

TESTING, ADJUSTING, AND BALANCING

PART 1 - GENERAL

1.01 Related Documents:

A.

Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.02

SECTION INCLUDES:

A.

Testing, adjustment, and balancing of air systems.

B.

Measurement of final operating condition of HVAC systems.

1.03

RELATED SECTIONS:

A.

Section 23 01 00 - General HVAC Requirements

B.

Section 23 81 20 - Packaged Roof Top Air Conditioning Units

C.

Section 23 73 13 - Air Handling Units

D.

Section 23 34 23 - Power Ventilators

E.

Section 23 31 13 - Ductwork and Accessories

F.

Section 23 37 00 - Air Distribution Devices

1.04

SUBMITTALS:

A.

Submit name of Testing and Balancing Agency for approval within 30 days after award of Contract.

B.

Submit test reports in accordance with Section 230100.

C.

Submit draft copies of report for review prior to final acceptance of project. Provide final copies for Architect/Engineer and for inclusion in Maintenance Manuals.

D.

Provide reports in soft cover, letter size, 3-ring binder manuals, complete with index page and indexing tabs, with cover identification at front and side.

1.05

REPORT FORMS:

A.

Submit reports on AABC National Standards for Total System Balance or NEBB forms.

B.

Forms shall include the following information:

1.

Title Page:

a.

Company name b.

Company address c.

Company telephone number d.

Project name e.

Project location f.

Project Architect/Engineer g.

Project Contractor

2.

Instrument List:

Instrument

Manufacturer

Model

Serial number

Range

Calibration date

3.

Air Handling Unit Data:

Location

Company address

Air flow, specified and actual

Return air flow, specified and actual

Outside air flow, specified and actual h.

Total static pressure (total external), specified and actual

4.

Exhaust Fan Data:

Location

Air flow, specified and actual

Total static pressure (total external), specified and actual

Inlet pressure

Discharge pressure

Fan RPM

5.

Duct Traverse:

System zone/branch

Duct size

Area

Design velocity

Design air flow

Test velocity

Test air flow

Duct static pressure i.

Air temperature

6.

Air Distribution Test Sheet:

Air terminal number

Room number/location

Terminal type

Terminal size

Area factor

Design velocity

Design air flow

Test (final) velocity i.

Test (final) air flow j.

Percent of design air flow

1.06

QUALITY ASSURANCE:

A.

Agency shall be company specializing in the adjusting and balancing of systems specified in this Section with minimum of five (5) years documented experience. Perform Work under supervision of AABC Certified Test and Balance Engineer or NEBB Certified Testing, Balancing and Adjusting Supervisor.

B.

Total system balance shall be performed in accordance with AAAB national Standards for Field Measurements and Instrumentation, Total System Balance or NEBB Procedural Standards for Testing, Balancing and Adjusting of Environmental Systems.

1.07

SEQUENCING AND SCHEDULING:

A.

Sequence work to commence after completion of systems and schedule completion of work before Substantial Completion of Project.

PART 2 - PRODUCTS

2.01

AGENCY:

A.

Agency shall be a member of AABC or NEBB.

PART 3 - EXECUTION

3.01

EXAMINATION:

A.

Before commencing work, verify that systems are complete and operable. Ensure the following:

1.

Equipment is operable and in a safe and normal condition.

2.

Temperature control systems are installed complete and operable.

3.

Proper thermal overload protection is in place for electrical equipment.

4.

Final filters are clean and in place. If required, install temporary media in addition to final filter.

5.

Duct systems are clean of debris.

6.

Correct fan rotation.

7.

Fire and volume dampers are in place and open.

8.

Coil fins have been cleaned and combed.

9.

Access doors are closed and duct end caps are in place.

10.

Air outlets are installed and connected.

11. Duct system leakage has been minimized.

B.

Report any defects or deficiencies noted during performance of services to Contracting Officer.

C.

Promptly report abnormal conditions in mechanical systems or conditions which prevent system balance.

D.

If, for design reasons, system cannot be properly balanced, report as soon as observed.

E.

Beginning of work means acceptance of existing conditions.

3.02

PREPARATION:

A.

Provide all instruments required for testing, adjusting, and balancing operations.

B.

Coordinate balancing work with Temperature Control Contractor as required regarding auto dampers, valves, etc.

3.03

INSTALLATION TOLERANCES:

A.

Adjust air handling systems to plus or minus 5% for supply systems and plus or minus 10% for return and exhaust systems from figures indicated.

3.04

ADJUSTING:

A.

Recorded data shall represent actually measured, or observed condition.

B.

Permanently mark settings of valves, dampers, and other adjustment devices allowing settings to be restored. Set and lock memory stops.

C.

After adjustment, take measurements to verify balance has not been disrupted or that such disruption has been rectified.

D.

Leave system in proper working order, replacing belt guards, closing access doors, closing doors to electrical switch boxes, and restoring thermostats to specified settings.

3.05

AIR SYSTEM PROCEDURE:

A.

Adjust air handling and distribution systems to provide required or design supply, return, and exhaust air quantities.

B.

Make air quantity measurements in ducts by Pitot tube traverse of entire cross sectional area of duct.

C.

Measure air quantities at all air distribution devices.

D.

Adjust distribution system to obtain uniform space temperatures free from objectionable drafts and noise.

E.

Use volume control devices to regulate air quantities only to extent that adjustments do not create objectionable air motion or sound levels. Effect volume control by duct internal devices such as dampers and splitters.

F.

Vary total system air quantities by adjustment of fan speeds. Provide drive changes required. Vary branch air quantities by damper regulation.

G.

Measure static air pressure conditions on air supply units, including filter and coil pressure drops, and total pressure across the fan. Make allowances for 50 percent loading of filters.

H.

Adjust outside air automatic dampers, outside air, return air, and exhaust dampers for design conditions.

I.

Measure temperature conditions across outside air, return air, and exhaust dampers to check leakage.

J.

Where modulating dampers are provided, take measurements and balance at extreme conditions.

END OF SECTION 23 05 93

23 05 93-6

TESTING, ADJUSTING, AND BALANCING

12910-330

Revised 3/2/09

12910-330

TESTING, ADJUSTING, AND BALANCING

23 05 93-5

Revised 3/2/09