FA568219RA19RA002_RFIs_Q_&_A_(2)_REV.1.pdf

PDF 83 KB Posted

Attached to
ASHE 12-1039 Renovate Bldg 1469 for Community Center, Area F, Aviano AB, Italy
Solicitation number
FA568219RA002
Issued by

About this file

Q&A 2

View the file

Other files

File Type Posted
ATTACHMENT_4_REV.1.pdf PDF
FA568219RA0020004.pdf PDF
FA568219RA002_RFIs_Q_&_A_(5).pdf PDF
FA568219RA19RA002_RFIs_Q_&_A_(4).pdf PDF
FA568219RA19RA002_RFIs_Q_&_A_(1).pdf PDF
FA568219RA19RA002_RFIs_Q_&_A_(3).pdf PDF
ASHE12~3.PDF PDF
ASHE12~2.PDF PDF
ASHE12~1.PDF PDF
F6B57A99.PDF PDF
SOVRIN~4.PDF PDF
SOVRIN~3.PDF PDF
SOVRIN~1.PDF PDF
ASHE12~2.PDF PDF
SOVRIN~2.PDF PDF
ASHE12~4.PDF PDF
7E8D02FB.PDF PDF
ASHE12~3.PDF PDF
E02E9BD8.PDF PDF
ASHE12~4.PDF PDF
ASHE12~1.PDF PDF
ASHE12~1.PDF PDF
ASHE12~2.PDF PDF
FA568219RA0020003.pdf PDF
ASHE_12-1039_SEP-2018_Tech_Specs_Rev.2.pdf PDF
REV_1-_Drawings_Pack_1.zip ZIP file
REV_1-Drawings_Pack_3.zip ZIP file
REV_1-Drawings_Pack_2.zip ZIP file
ASHE_12-1039_CCEB_Rev.01.xls XLS spreadsheet
Solicitation_Amendment_FA568219RA0020002_SF_30.pdf PDF
Solicitation_Amendment_FA568219RA0020001_SF_30_-1.pdf PDF
Solicitation_-_FA568219RA002_Final.pdf PDF
AUTORI~1.PDF PDF
COMMDA~1.PDF PDF
ASHE_12-1039_CCEB_SEP-2018.xls XLS spreadsheet
ASHE_12-1039_ATTACHMENT_1.pdf PDF
ASHE_12-1039_SEP-2018_DWG.pdf PDF
Comment_Matrix_for_new_Comm_Requirements_ATTACHMENT_3.docx DOCX document
Design_Comments_ATTACHMENT_4.doc DOC document
ASHE_12-1039_SEP-2018_Tech_Specs_Rev.1.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS & ANSWERS (2)

GENERAL

Q: Please clarify if the Government will provide editable drawings (dwg) of the current design and in which phase.

A: CE will provide editable drawings to the winner Contractor before NTP issuance.

Q: Is the Basis of Design available?

A: Structural, Electrical and Mechanical Design Analysis (which will be provided in FBO) include Design Assumptions.

STRUCTURAL

Q: The structural design is dated before 2018, therefore it is necessary to update it to respect the Ministerial Decree 17.01.2018. Are the original structural calculations report available?

A: The project has been approved by The Construction Mix Commission during the “out of Cycle” Session on 17 Apr 17, 9 months before new D.M. 17 Jan 18.

In addition for the seismic upgrade of B.1469 the changes included in DM 17 Jan 18 are just marginal if compared with D.M. 14 Jan 2008 and such changes does not require a full structural re-design in accordance with 2018 norms. Finally The Gvt does not foresee any issue to have the facility tested by a certified engineer once the renovation is completed.

Q: Are the tests performed regarding the characterization of the materials (e.g. level of knowledge LC1, LC2 or LC3) available?

A: There is no test performed, just visual on-site survey. Level of knowledge is LC1 (Fc=1,35) as reported in the Structural Design Analysis.

ARCHITECTURAL

Q: Is the current Design in compliance with ABA requirements?

A: YES. The project is in compliance with D.L. 13/89 and following applicable revisions.

Q: As per contract drawings and specifications provided there are no indications about AT/FP requirement. Is the Building considered sensitive?

A: NO

Q: In reference to “Autorizzazione Palazzina N. 20 “attached to the Contract, it is indicated: “ Vista la documentazione descrittiva dei lavori di restauro della palazzina ex circolo sottufficiali da convertire in aule didattiche, […omissis…], questa Soprintendenza […omissis…] autorizza l’esecuzione dei lavori di restauro […omissis…] subordinatamente alla piena osservanza delle prescrizioni indicate […omissis…]”. Is the documentation submitted to the Soprintendenza available?

A: The documentation submitted to Historical Heritage Agency will be (which will be provided in FBO)

Q: No water fountains are indicated. Are they foreseen in the project?

A: Not required

LIFE SAFETY

Q: There is no reference in the drawing about life safety requirements. Is a new life safety analysis available?

A: NO

Q: Please clarify whether dance rooms need to be considered as training or public access.

A: Training

Q: Is the CPI required by the Gov?

A: Yes. Revised specs which will be provided in the forthcoming amendment will require the contractor to submit to PNFD documentation for project approval and final CPI obtainment including payment of fees (bollettini).

Q: Sprinkler system. In drawing E40 “typical fire alarm matrix” it is indicated the connection of tamper and flow switch of sprinkler system to the fire alarm panel. There is no other reference to the sprinkler system in the drawings or documentation, nor to the water flow test, which is fundamental to determine the minimum project specifications. Will the Govt. provide minimum requirements of main water line or the KTR has to conduct a water flow test?

A: Revised drawing E-40 will be provided in the forthcoming amendment

MECHANICAL SYSTEM

Q: As per Design Comments ATTACHMENT 4 item 25 “Documentation about Summer cooling loss and winter heating loss are missing”. Is it available?

A: Summer and Winter Mechanical Design Analysis will be provided in FBO

Q: In the mechanical project the HVAC system has no control system. Please clarify whether a full DDC system is required.

A: see Specs IIIa – HVAC Systems Item 16 and Item 17

Q: As per Aviano Design Guide 2017 chapter 14.4.2 and chapter 14.4.6 “all exposed mechanical equipments installed […omissis…] on roof shall be screened from view”. Please clarify why in the design there are no screens for the AHUs.

A: The project has been made in accordance with the Hystorical Heritage Agency, that Do not allow changing anything concerning external views.

ELECTRICAL SYSTEM

Q: The A/V rack (audio/video) identified in Attachment "COMMDA-1" on the ground floor, has no descriptive specifications. Are these Specifications available?

A: NO

Q: Please clarify who will supply the video projectors?

A: Projectors will be provided by the GVT

Q: What type of maintenance is foreseen and with what frequency is included in the requested 5 year guarantee?

A: Revised requirement will be provided in the forthcoming amendment