FA568219RA0020003.pdf

PDF 159 KB Posted

Attached to
ASHE 12-1039 Renovate Bldg 1469 for Community Center, Area F, Aviano AB, Italy
Solicitation number
FA568219RA002
Issued by

About this file

AMENDMENT 0003

View the file

Other files

File Type Posted
ATTACHMENT_4_REV.1.pdf PDF
FA568219RA0020004.pdf PDF
FA568219RA002_RFIs_Q_&_A_(5).pdf PDF
FA568219RA19RA002_RFIs_Q_&_A_(4).pdf PDF
FA568219RA19RA002_RFIs_Q_&_A_(2)_REV.1.pdf PDF
FA568219RA19RA002_RFIs_Q_&_A_(1).pdf PDF
FA568219RA19RA002_RFIs_Q_&_A_(3).pdf PDF
ASHE12~3.PDF PDF
ASHE12~2.PDF PDF
ASHE12~1.PDF PDF
F6B57A99.PDF PDF
SOVRIN~4.PDF PDF
SOVRIN~3.PDF PDF
SOVRIN~1.PDF PDF
ASHE12~2.PDF PDF
SOVRIN~2.PDF PDF
ASHE12~4.PDF PDF
7E8D02FB.PDF PDF
ASHE12~3.PDF PDF
E02E9BD8.PDF PDF
ASHE12~4.PDF PDF
ASHE12~1.PDF PDF
ASHE12~1.PDF PDF
ASHE12~2.PDF PDF
ASHE_12-1039_SEP-2018_Tech_Specs_Rev.2.pdf PDF
REV_1-_Drawings_Pack_1.zip ZIP file
REV_1-Drawings_Pack_3.zip ZIP file
REV_1-Drawings_Pack_2.zip ZIP file
ASHE_12-1039_CCEB_Rev.01.xls XLS spreadsheet
Solicitation_Amendment_FA568219RA0020002_SF_30.pdf PDF
Solicitation_Amendment_FA568219RA0020001_SF_30_-1.pdf PDF
Solicitation_-_FA568219RA002_Final.pdf PDF
AUTORI~1.PDF PDF
COMMDA~1.PDF PDF
ASHE_12-1039_CCEB_SEP-2018.xls XLS spreadsheet
ASHE_12-1039_ATTACHMENT_1.pdf PDF
ASHE_12-1039_SEP-2018_DWG.pdf PDF
Comment_Matrix_for_new_Comm_Requirements_ATTACHMENT_3.docx DOCX document
Design_Comments_ATTACHMENT_4.doc DOC document
ASHE_12-1039_SEP-2018_Tech_Specs_Rev.1.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

1 16

0003 7/12/2019 F1F3A28324AW01 ASHE 12-1039

FA5682

FA5682 31 CONS DA LGC

UNIT 6102 BOX 140

APO AE 09604-6102

APO, AE 09604-6102

United States Anna Maria Valeri, Email: anna_maria.valeri.it@us.af.mil Telephone: 632-7354

FA568219RA002

5/17/2019

See Section G

The purpose of this amendment is to make changes as indicated below and in the following page(s):

a. replace the technical specifications and 17 drawings and

b. change clause 52.228-15.

Severino Mion Email: severino_francesco.mion.it@us.af.mil Telephone: 632-8553

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section A - Solicitation/Contract Form

The following changes have been made:

INFORMATION FROM TO

Contract Description \nNotice to Offeror(s)/Supplier(s):

Funds are not presently available for this effort. No award will be made under this solicitation until funds become available.

The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.\n\n- ALL

QUANTITIES INDICATED IN

THE PROJECT DOCUMENTS

FURNISHED BY THE

GOVERNMENT, INCLUDING

THE CONSTRUCTION

COST BREAKDOWN, ARE

ESTIMATES AND THE

GOVERNMENT SHALL NOT

BE HELD RESPONSIBLE FOR

THE ACCURACY OF THE

ESTIMATED QUANTITIES. THE

CONTRACT SHALL REQUIRE

A COMPLETED PROJECT ON

A LUMP SUM BASIS. IT IS THE

RESPONSIBILITY OF THE

OFFEROR TO CALCULATE,

FORESEE AND PERFORM

ALL QUANTITIES OF WORK

MANIFESTLY NECESSARY

TO DELIVER A COMPLETE

PROJECT BASED ON ITS

OVERALL SCOPE.\n- THE

CONTRACTOR SHALL BE IN

POSSESSION OF A CURRENT

SOA THROUGHOUT THE

ENTIRE PERFORMANCE

OF THE CONTRACT.\n\nThe Government intends to award one contract for the performance

\nNotice to Offeror(s)/Supplier(s):

Funds are not presently available for this effort. No award will be made under this solicitation until funds become available.

The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.\n\n- ALL

QUANTITIES INDICATED IN

THE PROJECT DOCUMENTS

FURNISHED BY THE

GOVERNMENT, INCLUDING

THE CONSTRUCTION

COST BREAKDOWN, ARE

ESTIMATES AND THE

GOVERNMENT SHALL NOT

BE HELD RESPONSIBLE FOR

THE ACCURACY OF THE

ESTIMATED QUANTITIES. THE

CONTRACT SHALL REQUIRE

A COMPLETED PROJECT ON

A LUMP SUM BASIS. IT IS THE

RESPONSIBILITY OF THE

OFFEROR TO CALCULATE,

FORESEE AND PERFORM

ALL QUANTITIES OF WORK

MANIFESTLY NECESSARY

TO DELIVER A COMPLETE

PROJECT BASED ON ITS

OVERALL SCOPE.\n- THE

CONTRACTOR SHALL BE IN

POSSESSION OF A CURRENT

SOA THROUGHOUT THE

ENTIRE PERFORMANCE

OF THE CONTRACT.\n\nThe Government intends to award one contract for the performance

FA568219RA0020003

of Project ASHE 12-1039 Renovate Building 1469 for Community Center Area F, Aviano AB, Italy.\nResulting award will be Firm-Fixed- Price contract. Magnitude is between $1,000,000 and $5,000,000.\nNAICS:

238990\nAttachments:\n1.

Master Technical Specifications for Construction Projects Aviano Air Base, Aviano, Italy, dated November 2005\n2. Technical Specifications Project ASHE 12-1039 Renovate FAC. 1469 for Community Center Area F, Aviano AB, Italy Revision Sep 2018. - 278 written pages with cover page and\nattachments #1,2,3,4,5.\n3. Drawings - 115 sheets including cover page of Project ASHE 12-1039 Renovate Building 1469 for Community Center Area F, Aviano AB, Italy.\nResulting award will be Firm-Fixed-Price contract. Magnitude is between $1,000,000 and $5,000,000.

\nNAICS: 238990\nAttachments:

as indicated in Section J.

Section B - Supplies or Services & Prices or Costs

The following CLIN(s) / SLIN(s) were modified:

0001 - PART A - REPAIR WORKS

THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS,

TRANSPORTATION, SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH

THE PROJECT HEREIN LISTED AT THE PRICE STATED BELOW AND STRICTLY IN

ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS CONTRACT INCLUDING THE

FOLLOWING ATTACHED DOCUMENTS LISTED IN SECTION J HEREIN:

PROJECT ASHE 12-1039 RENOVATE BLDG. 1469 FOR COMMUNITY CENTER, AREA F, AVIANO

AB, ITALY, TECHNICAL SPECIFICATIONS REVISION JUN 2019 - REV2

INFORMATION FROM TO

Description PART A - REPAIR WORKS

THE CONTRACTOR SHALL

FURNISH ALL LABOR,

EQUIPMENT, MATERIALS,

TRANSPORTATION,

SUPERVISION AND ANY

OTHER NECESSARY WORK

TO ACCOMPLISH THE

PROJECT HEREIN LISTED

AT THE PRICE STATED

BELOW AND STRICTLY IN

ACCORDANCE WITH THE

TERMS AND CONDITIONS OF

THIS CONTRACT INCLUDING

THE FOLLOWING ATTACHED

PART A - REPAIR WORKS

THE CONTRACTOR SHALL

FURNISH ALL LABOR,

EQUIPMENT, MATERIALS,

TRANSPORTATION,

SUPERVISION AND ANY

OTHER NECESSARY WORK

TO ACCOMPLISH THE

PROJECT HEREIN LISTED

AT THE PRICE STATED

BELOW AND STRICTLY IN

ACCORDANCE WITH THE

TERMS AND CONDITIONS OF

THIS CONTRACT INCLUDING

THE FOLLOWING ATTACHED

DOCUMENTS LISTED IN

SECTION J HEREIN:

PROJECT ASHE 12-1039

RENOVATE BLDG. 1469

FOR COMMUNITY CENTER,

AREA F, AVIANO AB, ITALY,

TECHNICAL SPECIFICATIONS

DATED SEPTEMBER 2018 AND

MARKED ASHE 12-1039

DOCUMENTS LISTED IN

SECTION J HEREIN:

PROJECT ASHE 12-1039

RENOVATE BLDG. 1469

FOR COMMUNITY CENTER,

AREA F, AVIANO AB, ITALY,

TECHNICAL SPECIFICATIONS

REVISION JUN 2019 - REV2

0002 - PART B - NEW CONSTRUCTION WORKS

THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS,

TRANSPORTATION, SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH

THE PROJECT HEREIN LISTED AT THE PRICE STATED BELOW AND STRICTLY IN

ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS CONTRACT INCLUDING THE

FOLLOWING ATTACHED DOCUMENTS LISTED IN SECTION J HEREIN:

PROJECT ASHE 12-1039 RENOVATE BLDG. 1469 FOR COMMUNITY CENTER, AREA F, AVIANO

AB, ITALY, TECHNICAL SPECIFICATIONS DATED REVISION JUN 2019 - REV2.

FOR THE PURPOSES OF PROVISION 252.236-7006 OF SECTION L, THE CONSTRUCTION

WORK UNDER THIS ITEM IS SUBJECT TO THE STATUTORY COST LIMITATION OF $1,000,000

FOR UNSPECIFIED MINOR MILITARY CONSTRUCTION (10 USC 2805)

INFORMATION FROM TO

Description PART B - NEW

CONSTRUCTION WORKS

THE CONTRACTOR SHALL

FURNISH ALL LABOR,

EQUIPMENT, MATERIALS,

TRANSPORTATION,

SUPERVISION AND ANY

OTHER NECESSARY WORK

TO ACCOMPLISH THE

PROJECT HEREIN LISTED

AT THE PRICE STATED

BELOW AND STRICTLY IN

ACCORDANCE WITH THE

TERMS AND CONDITIONS OF

THIS CONTRACT INCLUDING

THE FOLLOWING ATTACHED

DOCUMENTS LISTED IN

SECTION J HEREIN:

PROJECT ASHE 12-1039

RENOVATE BLDG. 1469

FOR COMMUNITY CENTER,

AREA F, AVIANO AB, ITALY,

TECHNICAL SPECIFICATIONS

DATED SEPTEMBER 2018 AND

MARKED ASHE 12-1039

FOR THE PURPOSES OF

PROVISION 252.236-7006

OF SECTION L, THE

CONSTRUCTION WORK

UNDER THIS ITEM

PART B - NEW

CONSTRUCTION WORKS

THE CONTRACTOR SHALL

FURNISH ALL LABOR,

EQUIPMENT, MATERIALS,

TRANSPORTATION,

SUPERVISION AND ANY

OTHER NECESSARY WORK

TO ACCOMPLISH THE

PROJECT HEREIN LISTED

AT THE PRICE STATED

BELOW AND STRICTLY IN

ACCORDANCE WITH THE

TERMS AND CONDITIONS OF

THIS CONTRACT INCLUDING

THE FOLLOWING ATTACHED

DOCUMENTS LISTED IN

SECTION J HEREIN:

PROJECT ASHE 12-1039

RENOVATE BLDG. 1469

FOR COMMUNITY CENTER,

AREA F, AVIANO AB, ITALY,

TECHNICAL SPECIFICATIONS

DATED REVISION JUN 2019 -

REV2.

FOR THE PURPOSES OF

PROVISION 252.236-7006

OF SECTION L, THE

CONSTRUCTION WORK

UNDER THIS ITEM

IS SUBJECT TO THE

STATUTORY COST

LIMITATION OF $1,000,000

FOR UNSPECIFIED MINOR

MILITARY CONSTRUCTION (10

USC 2805)

IS SUBJECT TO THE

STATUTORY COST

LIMITATION OF $1,000,000

FOR UNSPECIFIED MINOR

MILITARY CONSTRUCTION (10

USC 2805)

Section H - Special Contract Requirements

Miscellaneous text in this section has been modified to:

NON WORK DAYS

1. Unless otherwise approved by the Contracting Officer, work shall not be performed at the on base site of work on the following U.S. or Italian holidays (including other base closure days).

2. Regular working days as used herein mean Monday through Friday, from 0800 to 1700 hrs, of each week with exception of established Italian or American holidays or any other day proclaimed an official holiday by either Government.

Italian Holidays:

1 January New Year's Day 6 January Epiphany Easter Monday Monday following Easter 12 April Aviano Patron's Day 25 April Liberation Day 1 May Labor Day 2 June Republic Day 15 August Assumption Day 1 November All Saints' Day 8 December Immaculate Conception 25 December Christmas Day 26 December St. Stephen's Day U.S. Holidays:

1 January * New Year's Day 3rd Monday in January Martin Luther King's Birthday 3rd Monday in February Washington's Birthday Last Monday in May Memorial Day 4th of July* Independence Day 1st Monday in September Labor Day 2nd Monday in October Columbus Day 11 November * Veteran's Day 4th Thursday in November Thanksgiving Day 25 December* Christmas Day *When the holiday is on a Saturday, the preceding Friday will be the U.S. holiday. When the holiday is on a Sunday, the following Monday will be a U.S. holiday. If delivery is scheduled for a proclaimed holiday, delivery will be made on the next normal workday.

EFT PAYMENT INFORMATION:

Information will be indicated when processing each invoice in WAWF

OBSERVANCE OF HOST COUNTRY SOCIAL CONTRIBUTION LABOR LAW

(a) The Contractor throughout the life of this contract shall scrupulously observe the requirements of Italian Law regarding the payment of social contributions for Italian national employees as well as the similar laws/directives for all legally employed workers. The contractor shall require subcontractors at all tiers to also comply with the payment requirements of this law and those of the

European Community member nations. The Contractor shall on a yearly basis, provide copies of the certifications (DURC) issued by the appropriate host nation authority attesting compliance with regular payment requirements of this law and/or corresponding documentation issued for employees that are citizens of other European Community member countries. The certifications shall be provided any time a new employee or subcontractor performs work under this contract or upon expiration of any previously provided certifications. Failure of the Contractor to strictly observe this special contract requirement shall be sufficient reason for the U.S. Government to terminate this contract for Cause.

(b) The contractor shall be responsible for complying with any and all Italian labor laws, relations and standards in effect or which shall come into effect during the term of this contract. Such compliance shall pertain to: hours of work, wages, salaries, working conditions, labor relations (including collective bargaining, union agreements etc.), particular workmen's compensation, social security contributions for all categories of dependents and professionals.

The Contractor and all subcontractors are required to adhere with all safety laws in effect (I.L. 626, Legislative Decree 9 April 2008, n. 81) and that may come into effect of the Italian Government. The Contracting Officer reserves the right to suspend work until such time as adherence to the laws is assured and to remove from the work site any worker found to ignore required safety practices. Such suspensions of work or removal of employees shall be at no cost to the Government. Failure by the contractor to correct deficiencies in reasonable time shall be cause for Termination for Default.

(c) Furthermore the contractor shall safeguard his firm with additional insurance against the risks of monetary recovery by Italian authorities and workers for accidents, injuries or deaths which are imputable to the contractor for failure to observe required safety practices and/or any requirement of paragraph a. above.

(d) The contractor shall be totally responsible and shall save harmless the U.S. Government from any and all disputes, claims, or grievance initiated by employees or third parties because of failure to comply with this special contract requirement.

(e) Construction contractors shall be responsible for written notification to the local labor benefits office of site work initiation under this contract and shall produce copy of such notice to the Contracting Officer.

(f) With each base pass request the Contractor shall furnish the health insurance and labor benefits employee number.

(g) With signature of the offer the contractor warrants that the proposed price(s) include all costs in effect or which shall come into effect during the term of the contract for compliance with this contract requirement and also for all responsibilities and risks as indicated herein.

INSURANCE AMOUNTS

Pursuant to contract clause 52.228-5, Insurance-Work on a Government Installation, the following are the kinds and minimum amounts of insurance that are required for performance of this contract.

Employee and third party bodily injury (in addition to the mandatory contractor's country social insurance).

(i) Per Person: EURO 1,000,000.00 Per Occurrence: EURO 5,000,000.00

(ii) Third Party Property Damages, Per Occurrence: EURO 1,500,000.00 Vehicle Liability Insurance in accordance with the mandatory requirements of the contractor's country and those of the European Common Market for work outside of the contractor's country. Insurance policies may be denominated in other than currency of the contractor's country provided the amount is equivalent to those stated above and the insurance policies are valid in the country where work is to be performed.

PREPARATION OF MATERIAL APPROVAL SUBMITTALS

The submittals contemplated by the clause entitled "Material and Workmanship" shall be accomplished on and in accordance with the instructions pertaining to AF Form 3000, Material Approval Submittal.

PREPARATION OF PROGRESS SCHEDULES AND REPORTS

The reports contemplated by the clause herein entitled: "Schedules for Construction Contracts" shall be accomplished on and in accordance with the instructions pertaining to AF Form 3064, Contract Progress Schedule, and AF Form 3065, Contract Progress Report.

USE OF DRAWINGS, MAPS, SITE PLANS AND OTHER DOCUMENTS

(Applicable to Section K of the Solicitation)

a. For purposes of this certification drawings, maps, site plans and other documents shall be referred to as the "documents".

b. The Offeror certifies that he understands and shall observe the following instructions concerning the "documents" furnished by the government including those developed by him if required by the scope of the eventual contract:

The "documents" shall not be:

(1) reproduced in whole or in part without the written consent of the Contracting Officer prior to award of the contract.

(2) released to third party personnel or subcontractors without the written consent of the Contracting Officer. For purposes of obtaining written consent, the Contractor shall provide the Contracting Officer the name of the firms who require the "documents" and the contents to be released.

(3) reproduced in whole or in part after contract award, without the written consent of the Contracting Officer. The request for approval shall contain a list of "documents" that require reproduction, the number of copies and to whom they will be distributed.

(4) retained by the Contractor after contract completion without the approval of the Contracting Officer.

NAME OF OFFEROR: _________________________________________________________

SIGNATURE: ________________________________________________________________

NAME AND TITLE OF SIGNER: _________________________________________________

NON APPLICABILITY OF ITALIAN CIVIL CODE

(Applicable to Section K of the Solicitation) The undersigned contractor, having seen and completely knowledgeable of the contents of the solicitation and eventual contract, in all of its parts, hereby renounces to any and all rights afforded to him by article 1341 of the Italian Civil Code with respect to the provisions and clauses of this contract and Italian Civil Code articles 1664, 1467 and 1673. The renouncement is made on his own free will without having received influence of any kind, from any third parties, including the contracting officer.

The contractual price includes adequate monetary compensation for this renouncement.

I hereby certify to have read and understood all terms, conditions and clauses of this contract and hereby approve them in their entirety.

NAME OF CONTRACTOR: _______________________________________________________

POSITION OF AGENT: __________________________________________________________

SIGNATURE OF AGENT: ________________________________________________________

GOVERNMENT FILL-INS:

52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER

THAN CERTIFIED COST OR PRICING DATA -- MODIFICATIONS (OCT 2010)--ALTERNATE IV

(OCT 2010)

Para (b) Insert: "Construction Cost Estimate Breakdown or other forms/documents provided by the Contracting Officer"

52.236-4 PHYSICAL DATA (APR 1984)

Para (b) Insert: "Average record for Aviano Air Base only, records for other work sites are not available.

% of Hr. Temp. is Average Min. Extreme Min. Below 1C from Average Relative Month Temp. (C) Temp. (C) 0600 to 1700 hrs. Humidity (%)

JAN -2 -13 19 74

FEB 0 -11 10 71

MAR 3 -12 5 66

APR 7 - 3 * 66

MAY 12 1 0 70

JUN 15 6 0 70

JUL 17 4 0 65

AUG 17 8 0 68

SEP 14 3 0 73

OCT 8 - 2 * 74

NOV 4 -10 3 77

DEC -1 -12 19 71

% of Hr.

Humidity is Over 70% from Average Number Average Number Average Number 1200 to 1400 of Days With of Days With of Days With Month Hrs. Precipitation Snow Thunderstorms

JAN 38 9 2 *

FEB 31 10 2 *

MAR 22 13 2 1

APR 17 16 * 5

MAY 16 18 0 11

JUN 15 18 0 13

JUL 6 15 0 12

AUG 10 15 0 10

SEP 21 12 0 6

OCT 19 10 0 3

NOV 39 13 * 2

DEC 27 10 2 *

* = Occurs less than 1 day or 1%.

Para (c) Insert: No Government transportation vehicles or facilities are available for contractor use.

Para (d) Insert: Items identified as Government Furnished Property will be turned over to the Contractor, whenever he requests such items, at a warehouse located within the limits of Aviano Air Base.

52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994)

Change all references to 1 year to read 2 years.

252.229-7003 TAX EXEMPTIONS (ITALY) (JAN 2002)

Para (iii) Insert: 91000190933

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

Para (e) Insert: SEE SECTION J HEREIN

52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994)

Change all references to 1 year to read 2 years.

OFFEROR FILL-INS

52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (JAN 1997)

Para (b) Material Insert: _______________________ Identification No. Insert:

252.223-7001 HAZARD WARNING LABELS (DEC 1991)

Para (c) Material Insert: _______________________ ACT Insert:

252.229-7001 TAX RELIEF (SEP 2014)

Para (a) Name of Tax Insert: ___________________ Rate Insert: __________________________

Section I - Contract Clauses

Miscellaneous text in this section has been modified to:

CLAUSES INCORPORATED BY REFERENCE

52.253-1 Computer Generated Forms. JAN 1991

CLAUSES INCORPORATED BY FULL TEXT

52.204-8 -- Annual Representations and Certifications (Oct 2018) (a)

(1) The North American Industry classification System (NAICS) code for this acquisition is ____________ [insert NAICS code].

(2) The small business size standard is ____________ [insert size standard].

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)

(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:

[_] (i) Paragraph (d) applies.

[_] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)

(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless--

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that--

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations--Representation.

(vii) 52.209-5; Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(viii) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.

(ix) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(x) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(xi) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(xii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xiii) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xiv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xv) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xvi) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xvii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.

(xviii) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals-- Representation. This provision applies to solicitations that include the clause at 52.204-7.

(xix) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xx) 52.225-4, Buy American--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225- 3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $80,317, the provision with its Alternate II applies.

(D) If the acquisition value is $80,317 or more but is less than $100,000, the provision with its Alternate III applies.

(xxi) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xxii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification.

This provision applies to all solicitations.

(xxiii) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran--Representation and Certification. This provision applies to all solicitations.

(xxiv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.

(2) The following representations or certifications are applicable as indicated by the Contracting Officer:

[Contracting Officer check as appropriate.] ___ (i) 52.204-17, Ownership or Control of Offeror.

___ (ii) 52.204-20, Predecessor of Offeror.

___ (iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

___ (iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Certification.

___ (v) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Certification.

___ (vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA- Designated Products (Alternate I only).

___ (vii) 52.227-6, Royalty Information.

___ (A) Basic.

___ (B) Alternate I.

___ (viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The Offeror has completed the annual representations and certifications electronically in SAM accessed through https://www.sam.gov. After reviewing the SAM information, the Offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date].

These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR Clause Title Date Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.

(End of Provision) 52.246-21 -- Warranty of Construction (Mar 1994)

(a) In addition to any other warranties in this contract, the Contractor warrants, except as provided in paragraph (i) of this clause, that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier.

(b) This warranty shall continue for a period of 1 year from the date of final acceptance of the work. If the Government takes possession of any part of the work before final acceptance, this warranty shall continue for a period of 2 year from the date the Government takes possession.

(c) The Contractor shall remedy at the Contractor's expense any failure to conform, or any defect. In addition, the Contractor shall remedy at the Contractor's expense any damage to Government-owned or controlled real or personal property, when that damage is the result of --

(1) The Contractor's failure to conform to contract requirements; or

(2) Any defect of equipment, material, workmanship, or design furnished.

(d) The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause.

The Contractor's warranty with respect to work repaired or replaced will run for 2 year from the date of repair or replacement.

(e) The Contracting Officer shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage.

(f) If the Contractor fails to remedy any failure, defect, or damage within a reasonable time after receipt of notice, the Government shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the Contractor's expense.

(g) With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract, the Contractor shall --

(1) Obtain all warranties that would be given in normal commercial practice;

(2) Require all warranties to be executed, in writing, for the benefit of the Government, if directed by the Contracting Officer; and

(3) Enforce all warranties for the benefit of the Government, if directed by the Contracting Officer.

(h) In the event the Contractor's warranty under paragraph (b) of this clause has expired, the Government may bring suit at its expense to enforce a subcontractor's, manufacturer's, or supplier's warranty.

(i) Unless a defect is caused by the negligence of the Contractor or subcontractor or supplier at any tier, the Contractor shall not be liable for the repair of any defects of material or design furnished by the Government nor for the repair of any damage that results from any defect in Government-furnished material or design.

(j) This warranty shall not limit the Government's rights under the Inspection and Acceptance clause of this contract with respect to latent defects, gross mistakes, or fraud.

(End of Clause)

252.204-7007 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2018)

Substitute the following paragraphs (d) and (e) for paragraph (d) of the provision at FAR 52.204-8:

(d)(1) The following representations or certifications in the System for Award Management (SAM) database are applicable to this solicitation as indicated:

(i) 252.209-7003, Reserve Officer Training Corps and Military Recruiting on Campus--Representation.

Applies to all solicitations with institutions of higher education.

(ii) 252.216-7008, Economic Price Adjustment--Wage Rates or Material Prices Controlled by a Foreign Government. Applies to solicitations for fixed-price supply and service contracts when the contract is to be performed wholly or in part in a foreign country, and a foreign government controls wage rates or material prices and may during contract performance impose a mandatory change in wages or prices of materials.

(iii) 252.222-7007, Representation Regarding Combating Trafficking in Persons, as prescribed in

222.1771. Applies to solicitations with a value expected to exceed the simplified acquisition threshold.

(iv) 252.225-7042, Authorization to Perform. Applies to all solicitations when performance will be wholly or in part in a foreign country.

(v) 252.225-7049, Prohibition on Acquisition of Certain Foreign Commercial Satellite Services--Representations. Applies to solicitations for the acquisition of commercial satellite services.

(vi) 252.225-7050, Disclosure of Ownership or Control by the Government of a Country that is a State Sponsor of Terrorism. Applies to all solicitations expected to result in contracts of $150,000 or more.

(vii) 252.229-7012, Tax Exemptions (Italy)--Representation. Applies to solicitations and contracts when contract performance will be in Italy.

(viii) 252.229-7013, Tax Exemptions (Spain)--Representation. Applies to solicitations and contracts when contract performance will be in Spain.

(ix) 252.247-7022, Representation of Extent of Transportation by Sea. Applies to all solicitations except those for direct purchase of ocean transportation services or those with an anticipated value at or below the simplified acquisition threshold.

(2) The following representations or certifications in SAM are applicable to this solicitation as indicated by the Contracting Officer: [Contracting Officer check as appropriate.] ___ (i) 252.209-7002, Disclosure of Ownership or Control by a Foreign Government.

___ (ii) 252.225-7000, Buy American--Balance of Payments Program Certificate.

___ (iii) 252.225-7020, Trade Agreements Certificate.

___ Use with Alternate I.

___ (iv) 252.225-7031, Secondary Arab Boycott of Israel.

___ (v) 252.225-7035, Buy American--Free Trade Agreements--Balance of Payments Program Certificate.

___ Use with Alternate I.

___ Use with Alternate II.

___ Use with Alternate III.

___Use with Alternate IV.

___ Use with Alternate V.

(e) The offeror has completed the annual representations and certifications electronically via the SAM website at https://www.acquisition.gov/. After reviewing the SAM database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in FAR 52.204-8(c) and paragraph (d) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer, and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by provision number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR/DFARS Provision # Title Date Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications located in the SAM database.

(End of provision) 52.228-15 -- Performance and Payment Bonds -- Construction

As prescribed in 28.102-3(a), insert a clause substantially as follows:

Performance and Payment Bonds -- Construction (Oct 2010)

(a) Definitions. As used in this clause -- "Original contract price" means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.

(b) Amount of required bonds. Unless the resulting contract price is $150,000 or less, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:

(1) Performance Bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 10 percent of the original contract price.

(2) Payment Bonds (Standard Form 25-A). The penal amount of payment bonds at the time of contract award shall be 10 percent of the original contract price.

(3) Additional bond protection.

(i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 10 percent of the increase in contract price.

(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.

(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.

(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the:

U.S. Department of Treasury Financial Management Service Surety Bond Branch 3700 East West Highway, Room 6F01 Hyattsville, MD 20782 Or via the internet at http://www.fms.treas.gov/c570/ .

(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.

(End of Clause) Disregard the following clauses (inserted by error due to contract writing software):

52.232-8 52.243-1 Alt. I 252.225-7001 252.225-7002

Section J - List of Attachments

Miscellaneous text in this section has been modified to:

a. Attachment 1:

Master Technical Specifications for Construction Projects Aviano Air Base, Aviano, Italy, dated November 2005

b. Attachment 2:

Technical Specifications Project ASHE 12-1039 Renovate FAC. 1469 for Community Center Area F, Aviano AB, Italy Revision Jun 2019 - Rev2.

- 278 written pages including cover pages Attachments #s1,2,3,4,5.

c. Attachment 3:

Drawings

- 115 sheets 17 sheets marked Rev. 1: A-11, A-12, A-13, A-14, A-16, A-17, A-18, A-20, A-21, AX-3, AX-4, E-02, E-40, S-9, S-10, S-11, S-12

Section L - Instructions, Conditions, & Notices to Offerors or Quoters

Miscellaneous text in this section has been modified to:

Section L - Instructions, Conditions, and Notices to Offerors

L-01. PROPOSAL PREPARATION INSTRUCTIONS

A. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors. Failure to meet a requirement may result in an offer being ineligible for award. In order to be determined responsive, an offeror must submit all documentation to demonstrate the following:

1. Acknowledgement of compliance with all solicitation terms and conditions.

2. Acknowledgement of all solicitation amendments.

3. Active registration status in SAM on submittal of proposal as required by provision 52.204-7.

4. Offeror's current Societa' Organismi di Attestazione (SOA) certification for category OG1 and classification adequate to cover offeror's proposed amount for project performance and current SOA certification for category OS2-A for the firm tasked to perform the restoration work.

5. Offeror's current Documento Unico di Regolarita' Contributiva (DURC) certifying the payment of host social security benefits. This document must not be older than 120 days from the closing date of the solicitation.

B. In addition to the requirements outlined above required to determine responsiveness of prospective offerors, the proposal shall consist of two additional separate parts:

Part I - Price Part II - Technical C. The contracting officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the contracting officer will review this determination and if, in the contracting officer's opinion adequate price competition exists, no additional data will be requested and certification under FAR 15.406-2 will not be required.

However, if at any time during this competition the contracting officer determines that adequate price competition no longer exists, offerors may be required to submit cost data to the extent necessary for the contracting officer to determine the reasonableness of the price.

D. Specific Instructions:

1. Part I - Price Proposal The offeror shall provide a price breakdown for the project in accordance with the Construction Cost Estimate Breakdown Rev.1 form sample provided. Proposed amounts shall be limited to 2 digits after the decimal. All prices shall be submitted in EURO currency. Offers not submitted in EURO currency will not be considered for award. Offers shall be complete, accurate, and sufficiently detailed to demonstrate a clear understanding of the requirement, and be consistent with the offeror's technical proposal. The burden of proof for credibility of proposed pricing rests with the offeror.

(i) Complete blocks 14, 15, 16, 19 (only if amendments are issued) and 20A through 20C of the RFP Section A, SF1442. In doing so, the offeror accedes to the contract terms and conditions as written in the RFP Sections A through K. These sections constitute the model contract.

(ii) Insert proposed unit and extended prices in Section B for each Contract Line Item Number (CLIN) using the amounts resulting from the completion of the Construction Cost Estimate breakdown form.

(iii) Complete the necessary fill-ins and certifications in Sections H through K.

(iv) The entire solicitation Sections A through M as well as the form Construction Cost Estimate breakdown Rev.1 shall be returned in their entirety.

2. Part II - Technical Proposal - Limited to no more than 12 pages (excluding Government released documents which are not subject to any page limitation). Submit original only. Note: references to documentation validity is to be construed as "from the closing date of the solicitation".

(i) Subfactor 1 - Experience: Submit offeror's experience with the same work/trades, complexity and magnitude foreseen by the project requirements and experience of the firm tasked with the restoration work as follows:

(1) evidence of at least two (2) projects successfully completed within the last five (5) years where the offeror was solely responsible for the entire performance of the projects and

(2) evidence of at least two (2) projects successfully completed within the last five (5) years by the firm tasked with the restoration work.

(ii) Subfactor 2 - Quality Management Plan (QMP): Submit a detailed QMP to include, as a minimum, the following components to cover all activities, both onsite and offsite and work by subcontractors:

(1) Complete QC organizational chart with a supporting narrative identifying precise lines of authority and responsibilities, including names, qualifications and duties of each person assigned to a QC function.

(2) Procedures for scheduling, reviewing, certifying and managing submittals.

(3) Control, verification and acceptance testing procedures for each specific test to include the test name, specification paragraph requiring test, feature of work to be tested, test frequency and person responsible for each test.

(4) Procedures for tracking deficiencies from identification through acceptable corrective action to include verification procedures that identified deficiencies have been corrected.

(5) Reporting procedures, including proposed reporting formats.

(iii) Subfactor 3 - Construction Performance Schedule: Submit a schedule indicating the principal work elements, their performance in chronological sequence, the impact on performance schedule of items such as material submittals, design work and material/equipment lead time.

E. Documents submitted in response to this RFP must be fully responsive to and consistent with the following:

(i) Requirements of the RFP (CLINs & Technical Specifications) and Government standards and regulations pertaining to the Technical Specifications.

(ii) Evaluation Factors for Award in Section M of this RFP.

(iii) Any limitation on the number of proposal pages. Pages exceeding the page limitations set forth in this Section L will not be read or evaluated, and will be removed from the proposal.

(iv) Format for proposal Parts I and II shall be as follows:

(1) The proposals will be no bigger than A4 size paper except for fold-outs used for charts, tables, or diagrams, which may not exceed A3 size paper.

(2) A page is defined as one face of a sheet of paper containing information.

(3) Typing shall not be less than 12 pitch.

(4) Elaborate formats, bindings or color presentations are not desired or required.

L-02. CURRENCY

A. All prices in response to this solicitation will be in EURO currency.

B. Contracting Officer has determined that submission of offers in U.S. currency is not required for this solicitation to be entered into and performed outside of the United States. Therefore the requirement for U.S. currency at provision 52.215-1(c)(5) is not applicable to this solicitation.

L-03. PROPOSAL DOCUMENTATION

All proposal documentation in response to this solicitation must be submitted in the English language.

Summary translations of documents in the Italian language (to include SOA, DURC, etc.) must be provided.

L-04. PROPOSAL SUBMISSION INSTRUCTIONS

Proposals in response to this solicitation shall be submitted to reach the issuing office indicated at page 1 of the solicitation, Standard Form 1442 block 7, by the date and time specified in block 13A of the Standard Form 1442.

Submissions of offers must follow the guidance in the table below:

Submission Method Instructions

PAPER COPY/CD/DVD

CD/DVD Submit the proposal to Building 600, Area E, Via Pordenone 89, 33081 Aviano, Italy in a sealed envelope or package showing the time and date specified for receipt, solicitation number, and the name and address of the offeror.

- one (1) original paper copy;

- one (1) redacted paper copy of the Technical Proposal indicated in Section L, provision L-01. A redacted copy removes all direct references that can identify an offeror by name or other easily recognizable characteristic. The redacted copy will be used during source selection procedures as detailed in Section M of the solicitation.

Electronic copies:

- one (1) original copy; and

- one (1) redacted copy of the Technical Proposal indicated in Section L, provision L-01.

Electronic copies must be submitted on CD or DVD.

Electronic copies may be submitted on the same disk if sufficient capacity is available.

Flash drives will not be accepted.

Note: Offerors are cautioned that Aviano AB has visitor control procedures requiring individuals not affiliated with the installation to obtain a visitor pass prior to entrance.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.