Attachment 2 - Comm Data Drops, Camera Tv Locations, and Rack Elecations

View the file

Other files

File Type Posted
ATTACHMENT_4_REV.1.pdf PDF
FA568219RA0020004.pdf PDF
FA568219RA002_RFIs_Q_&_A_(5).pdf PDF
FA568219RA19RA002_RFIs_Q_&_A_(4).pdf PDF
FA568219RA19RA002_RFIs_Q_&_A_(2)_REV.1.pdf PDF
FA568219RA19RA002_RFIs_Q_&_A_(1).pdf PDF
FA568219RA19RA002_RFIs_Q_&_A_(3).pdf PDF
ASHE12~3.PDF PDF
ASHE12~2.PDF PDF
ASHE12~1.PDF PDF
F6B57A99.PDF PDF
SOVRIN~4.PDF PDF
SOVRIN~3.PDF PDF
SOVRIN~1.PDF PDF
ASHE12~2.PDF PDF
SOVRIN~2.PDF PDF
ASHE12~4.PDF PDF
7E8D02FB.PDF PDF
ASHE12~3.PDF PDF
E02E9BD8.PDF PDF
ASHE12~4.PDF PDF
ASHE12~1.PDF PDF
ASHE12~1.PDF PDF
ASHE12~2.PDF PDF
FA568219RA0020003.pdf PDF
ASHE_12-1039_SEP-2018_Tech_Specs_Rev.2.pdf PDF
REV_1-_Drawings_Pack_1.zip ZIP file
REV_1-Drawings_Pack_3.zip ZIP file
REV_1-Drawings_Pack_2.zip ZIP file
ASHE_12-1039_CCEB_Rev.01.xls XLS spreadsheet
Solicitation_Amendment_FA568219RA0020002_SF_30.pdf PDF
Solicitation_Amendment_FA568219RA0020001_SF_30_-1.pdf PDF
Solicitation_-_FA568219RA002_Final.pdf PDF
AUTORI~1.PDF PDF
ASHE_12-1039_CCEB_SEP-2018.xls XLS spreadsheet
ASHE_12-1039_ATTACHMENT_1.pdf PDF
ASHE_12-1039_SEP-2018_DWG.pdf PDF
Comment_Matrix_for_new_Comm_Requirements_ATTACHMENT_3.docx DOCX document
Design_Comments_ATTACHMENT_4.doc DOC document
ASHE_12-1039_SEP-2018_Tech_Specs_Rev.1.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Comm Data Drops, Camera & TV locations, and Rack Elevations for B1469

Renovation

*Drawings not to scale

Ground Level - Left = CCTV Rack = CCTV Camera= 2 LAN Cables

= 4 LAN Cables

= Wall Addition

= Wall Deletion

= Plywood Backboard

= Comm Rack

= AFN Rack

= Television

Ground level - Right = CCTV Rack = CCTV Camera= 2 LAN Cables

= Wall Addition

= Wall Deletion = Plywood Backboard

= Comm Rack = AFN Rack

= 75mm Conduit

Ground level – Ballroom = CCTV Rack = CCTV Camera= 2 LAN Cables

= Wall Addition

= Wall Deletion

= 2 x 75mm Conduit

= Comm Rack

= AFN Rack

= Television

= A/V Rack= 100mm Conduit

Sliding Doors

*Ensure there are sound-rated doors in the three wall openings

*All conduits must have a pull box every 10m.

Stage

Stage

StairsT ec h R o o m

/S ta g e

S ta g e

C o n tr o l

E m er g en cy C o rr id o r

Stairs

Stairs

First Level - Left

Relocate this Cable Tray system

To where the rack will be located.

Will be used for backbone fiber and ground wire only

= 2 LAN Cables

= 4 LAN Cables

= Wall Addition

= Wall Deletion

= Plywood Backboard

= Comm Rack

= AFN Rack

= Television

= CCTV Rack = CCTV Camera= 2 LAN

= 4 LAN Cables

= Wall Addition

= Wall Deletion

= Plywood Backboard

= Comm Rack

First Level – Right

= Wall Addition

= Wall Deletion

= Plywood Backboard

= Comm Rack

= AFN Rack

= Television

= CCTV Rack = CCTV Camera= 2 LAN Cables

= 4 LAN Cables

= Wall Addition

= Wall Deletion

= Plywood Backboard

= Comm Rack

Second Level - Left = CCTV Rack = CCTV Camera= 2 LAN Cables

= Wall Addition

= Wall Deletion

= Plywood Backboard

= Comm Rack

= AFN Rack

= Television

Relocate this Cable Tray system

To where the rack will be located.

Will be used for backbone fiber and ground wire only

Second Level - Right = CCTV Rack = CCTV Camera= 2 LAN Cables

= Wall Addition

= Wall Deletion

= Plywood Backboard

= Comm Rack

= AFN Rack

New double door

Third Level = CCTV Rack = CCTV Camera= 2 LAN Cables

= Wall Addition

= Wall Deletion

= Plywood Backboard

= Comm Rack

Rack Elevations GL & FL

First Level

12-st FOC MM ISP FODP (1RU)

UPS (2RU)

48-port CAT6 Patch Panel (2RU)

Cable Management (1RU)

48-port CAT6 Patch Panel (2RU)

48-port CAT6 Patch Panel (2RU)

Cable Management (1RU)

Cable Management (1RU)

Cable Management (1RU)

Ground Level

24 port CAT6 Patch Panel for CCTV (1RU)

UPS (2RU)

CCTV System (Includes server, recording system, power supply, switches, etc… based on

FSS Tech solution (RUs unspecified)

Cable Management (1RU)

Cable Management (1RU)

This Rack is reserved and should coordinated by the customer and AFN on technical solutions.

Ensure AFN customers are contacted to generate requirements. Solution should include AFN over fiber solutions. Fiber Optic Cabling will be provided by SRM project.

UPS (2RU)

24-st FOC SM OSP FODP (1RU)

UPS (2RU)

1st Lvl 12-st FOC MM ISP FODP (1RU)

3rd Lvl 12-st FOC MM ISP FODP (1RU)

2nd Lvl 12-st FOC MM ISP FODP (1RU)

12-port Fiber Dist. Switch (1RU)

Cable Management (1RU)

Cable Management (1RU)

Cable Management (1RU)

Cable Management (1RU)

48-port CAT6 Patch Panel (2RU)

48-port CAT6 Patch Panel (2RU)

48-port CAT6 Patch Panel (2RU)

48-port CAT6 Patch Panel (2RU)

Cable Management (1RU)

48-port CAT6 Patch Panel (2RU)

Cable Management (1RU)

Cable Management (1RU)

48-port NIPR CAT6 Access Switch (1RU)

Cable Management (1RU)

Rack Elevations SL & TL

Second Level

12-st FOC MM ISP FODP (1RU)

UPS (2RU)

48-port CAT6 Patch Panel (2RU)

Cable Management (1RU)

48-port CAT6 Patch Panel (2RU)

48-port CAT6 Patch Panel (2RU)

Cable Management (1RU)

Cable Management (1RU)

Cable Management (1RU)

48-port NIPR CAT6 Access Switch (1RU)

Cable Management (1RU)

Cable Management (1RU)

Third Level

48-port CAT6 Patch Panel (2RU)

Cable Management (1RU)

UPS (2RU)

12-st FOC MM ISP FODP (1RU)

Cable Management (1RU)

48-port CAT6 Patch Panel (2RU)

Cable Management (1RU)

Example of Wall-mounted quarter server rack.

All Racks except for the quarter rack on the third level shall be

Full-sized with exhaust fans located at the top. Each rack must

Be bolted down to the floor to prevent accidental movement.

Server racks are a must due to the size of UPS and airflow

Required for cooling down network equipment. Use the picture

On the right as an example of a full-sized server rack. Placement

Of all racks must have a clearance of 36” in the front or back

And a 24” clearance on at least one side. If it is wall-mounted, The rack must be able to pivot open to expose the back so access

Is provided for maintenance/new installs. Thus, the front will

Maintain a 36” clearance and both sides must have 24” clearance.

The height of the wall-mounted rack will be 2m and will have on

It reflective warning tape for safety.

All NIPR and Fiber switches and UPS are to be government-furnished

Equipment (GFE). All other hardware are to be supplied and

Installed by the contractor. Customer will create CIPS WO to

Purchase necessary switches and UPS.

Rack Requirements and Equipment

Grounding Requirements

= Telecommunications Main Grounding Busbar (TMGB)

= Telecommunications Room Busbar

= Rack Busbar)

= Two-hole Compression-type Grounding Lug

*All surfaces must be brushed clean/polished

And coated with non-oxidizing compound prior

To termination or mating.