Design Review Comments

View the file

Other files

File Type Posted
ATTACHMENT_4_REV.1.pdf PDF
FA568219RA0020004.pdf PDF
FA568219RA002_RFIs_Q_&_A_(5).pdf PDF
FA568219RA19RA002_RFIs_Q_&_A_(4).pdf PDF
FA568219RA19RA002_RFIs_Q_&_A_(2)_REV.1.pdf PDF
FA568219RA19RA002_RFIs_Q_&_A_(1).pdf PDF
FA568219RA19RA002_RFIs_Q_&_A_(3).pdf PDF
ASHE12~3.PDF PDF
ASHE12~2.PDF PDF
ASHE12~1.PDF PDF
F6B57A99.PDF PDF
SOVRIN~4.PDF PDF
SOVRIN~3.PDF PDF
SOVRIN~1.PDF PDF
ASHE12~2.PDF PDF
SOVRIN~2.PDF PDF
ASHE12~4.PDF PDF
7E8D02FB.PDF PDF
ASHE12~3.PDF PDF
E02E9BD8.PDF PDF
ASHE12~4.PDF PDF
ASHE12~1.PDF PDF
ASHE12~1.PDF PDF
ASHE12~2.PDF PDF
FA568219RA0020003.pdf PDF
ASHE_12-1039_SEP-2018_Tech_Specs_Rev.2.pdf PDF
REV_1-_Drawings_Pack_1.zip ZIP file
REV_1-Drawings_Pack_3.zip ZIP file
REV_1-Drawings_Pack_2.zip ZIP file
ASHE_12-1039_CCEB_Rev.01.xls XLS spreadsheet
Solicitation_Amendment_FA568219RA0020002_SF_30.pdf PDF
Solicitation_Amendment_FA568219RA0020001_SF_30_-1.pdf PDF
Solicitation_-_FA568219RA002_Final.pdf PDF
AUTORI~1.PDF PDF
COMMDA~1.PDF PDF
ASHE_12-1039_CCEB_SEP-2018.xls XLS spreadsheet
ASHE_12-1039_ATTACHMENT_1.pdf PDF
ASHE_12-1039_SEP-2018_DWG.pdf PDF
Comment_Matrix_for_new_Comm_Requirements_ATTACHMENT_3.docx DOCX document
ASHE_12-1039_SEP-2018_Tech_Specs_Rev.1.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGN COORDINATION AND REVIEW COMMENTS

JOB ORDER NO.

ASHE 12-1039

COMMENTS BY
CODE
PHONE
DATE

Andrew Haas, Cheryl Duggan, Andelo Zanot, Riccardo Antonini

March 2017

PROJECT TITLE AND LOCATION
TYPE OF REVIEW
RENOVATE BLDG 1469 FOR COMMUNITY CENTER
Final Design Review
NO.
DWG. NO. OR PARA. NO.
COMMENTS

(MAKE GENERAL COMMENTS AFTER SPECIFIC COMMENTS)

ACTION TAKEN

(& REASONS WHERE SIGNIFICANT)

Layout
End User requests layout changes to allow for improved functionality of the building. See attached floor plans
2
General
Provide stage in each of the new ballrooms, including stairs and parapets
3
General
Both ball rooms need electrical / Audio visual in both ceilings and floors and one electrical outlet box in each room with (380x1 + 220x2). Exact location needs to be coordinate with end users
4
General
CATV conduit on all floors at the stair / elevator lobby - Location to be determined
5
General
Computer data drops for VOIP and DATA in computer lab – need to coordinate number of drops
6
General
Conduit back to reception desk for camera system - Camera system by others, Location of cameras and monitor to be determined

Not Used.

8
General
For all classrooms and studios on 2nd floor to have STC 60 partition walls
9
General
Existing circle opening at stairwell to remain
10
General
R-22 not allowed as well.
11
General
Provide electrostatic filters as per UNI 11254:07 with extractable aluminum plates.
12
General
Electrical motors have to be IE3 efficiency class.
13
General
For VVF application VSM motors with proper electrical insulation must be provided.
14
General
Energy efficiency must be included on the nameplate.
15
General
LED fixture to be used instead of Fluorescent.

In case of Fluorescent must be used T5 (G5 cap)

· 14W and 28W

No correspondences with PART IV – ELECT WORK pt.49 (pag 255) and Drawings (E1, E14 to E22)

16
General
Ballast/Driver must be in accordance to the Fluorescent light type or LED
17
General
HID lamps: No correspondences with PART IV – ELECT WORK pt.49 (pg. 255) and Drawings (E1, E14 to E22)
18
General
No references about HVAC controls.

HVAC controls should be design in accordance with USACE / NAVFAC / AFCEC / NASA UFGS-23 09 23.13 20 (November 2015).

19
General
Include electrostatic filters as per UNI 11254:07 with extractable aluminum plates.
20
General
Supply and install one water meter at each of two water feeding lines of the building, therefore one will be inside the boiler room for sanitary and boiler room supply and the other one will be for the Fire system supply.

Meters must be connected to the HVAC Control system as per USACE / NAVFAC / AFCEC / NASA UFGS-23 09 23.13 20 (November 2015).

21
General
Supply and install inside the gas counter box the gas meter with digital output and bring the data cable inside the boiler room.
22
General
Delay set to 15min. Settings (delay and light level) can be modified if required. All rooms where usage of projector is foreseen, need to be equipped also with manual override.
23
General
Fixtures as reference are not produced anymore. As product reference can be used either DISANO 842 led Panel 35W (for entire fixture) 4300 Lumen with UGR<19 or DISANO 841 Minicomfort 33W 5200 Lumen with UGR<19. So total qty will be 313. Qty and position of lights must be analyzed based on the application of each room.

Not Used.

25
General
Documentation about Summer Cooling loss and Winter Heating loss are missing.
26
General
Preferred as reference product for exterior lights DISANO LED Ministelvio 3276 39W or IGuzzini LED Quid 35W.
27
General
Electrical meter is highly preferred Schneider PM810 series as it is installed in every Electrical Substation at Aviano AB.
28
General
Wrong indication for minimum receptacle section 2.5sqmm for receptacle (instead of 1.5sqmm)
29
General
Avoid red color for LV phase L3 (use grey). Red color is usually reserved for MV cables and fire alarm cables.
30
General
Wrong indication N07V-K cable to be corrected with LSOH cable N07G9-K as indicated at page 252 and following.

The use of Low smoke halogen LSOH cables is strongly suggested for cables installations different from embedded conduits and metallic conduits in accordance to CEI 64-8 “luoghi maggior rischio in caso di incendio” (places with high risk of fire) where exist highly crowd areas risk.

31
General
Wrong indication for fire alarm cable. Fire alarm cables to be 30minutes fire rated cables in accordance to EN50200.

-For rated voltage up to 100V the standard CEI 20-105 should be considered (with minimum section 0.5sqmm).

-For rated voltage upper than 100V the standard CEI 20-45 should be followed for cables with rated voltage 0.6/1kV (with minimum section 1.5sqmm as indicated at page 259 indicating FTG10M1 cables)

32
General
Indicated protection degree IP40 do not protect against water falling. IP41 should be the least requirement. IP level to be defined according installation conditions.

IP44 to be used at least in the HVAC & water rooms.

IP55 to be used for external installations.

33
General
Indicate the connections of conditioning units (path/conduits/cables to be used).
34
General
Building 1465 is not identified. To be verified availability of circuit breaker and power in Building 14001 (substation F39) power center. Building number has changed since design was issued.
35
General
Close out documentation (as built layout diagrams, O&M manuals) and warranty plan documentation to be required. 5 hardcopies and 2DVDs with PDFs and DWGs
36
General
As required for new layout design
37
General
Building design and specifications should be updated to meet current code / UFC technical requirements and base design requirements.
38
General
Provide 60 month mechanical system warranty to include annual maintenance.
39
General
Cables to comply with New July 2017 Construction Product Regulations
40
General
All lighting to be replaceable type LED lights