ATTACHMENT_4_REV.1.pdf

PDF 625 KB Posted

Attached to
ASHE 12-1039 Renovate Bldg 1469 for Community Center, Area F, Aviano AB, Italy
Solicitation number
FA568219RA002
Issued by

About this file

ATTACHMENT 4 REV.1

View the file

Other files

File Type Posted
FA568219RA0020004.pdf PDF
FA568219RA002_RFIs_Q_&_A_(5).pdf PDF
FA568219RA19RA002_RFIs_Q_&_A_(4).pdf PDF
FA568219RA19RA002_RFIs_Q_&_A_(2)_REV.1.pdf PDF
FA568219RA19RA002_RFIs_Q_&_A_(1).pdf PDF
FA568219RA19RA002_RFIs_Q_&_A_(3).pdf PDF
ASHE12~3.PDF PDF
ASHE12~2.PDF PDF
ASHE12~1.PDF PDF
F6B57A99.PDF PDF
SOVRIN~4.PDF PDF
SOVRIN~3.PDF PDF
SOVRIN~1.PDF PDF
ASHE12~2.PDF PDF
SOVRIN~2.PDF PDF
ASHE12~4.PDF PDF
7E8D02FB.PDF PDF
ASHE12~3.PDF PDF
E02E9BD8.PDF PDF
ASHE12~4.PDF PDF
ASHE12~1.PDF PDF
ASHE12~1.PDF PDF
ASHE12~2.PDF PDF
FA568219RA0020003.pdf PDF
ASHE_12-1039_SEP-2018_Tech_Specs_Rev.2.pdf PDF
REV_1-_Drawings_Pack_1.zip ZIP file
REV_1-Drawings_Pack_3.zip ZIP file
REV_1-Drawings_Pack_2.zip ZIP file
ASHE_12-1039_CCEB_Rev.01.xls XLS spreadsheet
Solicitation_Amendment_FA568219RA0020002_SF_30.pdf PDF
Solicitation_Amendment_FA568219RA0020001_SF_30_-1.pdf PDF
Solicitation_-_FA568219RA002_Final.pdf PDF
AUTORI~1.PDF PDF
COMMDA~1.PDF PDF
ASHE_12-1039_CCEB_SEP-2018.xls XLS spreadsheet
ASHE_12-1039_ATTACHMENT_1.pdf PDF
ASHE_12-1039_SEP-2018_DWG.pdf PDF
Comment_Matrix_for_new_Comm_Requirements_ATTACHMENT_3.docx DOCX document
Design_Comments_ATTACHMENT_4.doc DOC document
ASHE_12-1039_SEP-2018_Tech_Specs_Rev.1.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGN COORDINATION AND REVIEW COMMENTS JOB ORDER NO.

ASHE 12-1039

COMMENTS BY CODE PHONE DATE

Andrew Haas, Cheryl Duggan, Andelo Zanot, Riccardo Antonini

March 2017

PROJECT TITLE AND LOCATION TYPE OF REVIEW

RENOVATE BLDG 1469 FOR COMMUNITY CENTER Final Design Review

NO. DWG. NO. OR

PARA. NO.

COMMENTS

(MAKE GENERAL COMMENTS AFTER SPECIFIC COMMENTS)

ACTION TAKEN

(& REASONS WHERE

SIGNIFICANT)

1 Layout End User requests layout changes to allow for improved functionality of the building. See attached floor plans 2 General Provide stage in each of the new ballrooms, including stairs and parapets 3 General Both ball rooms need electrical / Audio visual in both ceilings and floors and one electrical outlet box in each room with (380x1 + 220x2). Exact location needs to be coordinate with end users

4 General CATV conduit on all floors at the stair / elevator lobby - Location to be determined

5 General Computer data drops for VOIP and DATA in computer lab – need to coordinate number of drops

6 General Conduit back to reception desk for camera system - Camera system by others, Location of cameras and monitor to be determined

7 Not Used.

8 General For all classrooms and studios on 2nd floor to have STC 60 partition walls 9 General Existing circle opening at stairwell to remain 10 General R-22 not allowed as well.

11 General Provide electrostatic filters as per UNI 11254:07 with extractable aluminum plates.

12 General Electrical motors have to be IE3 efficiency class.

13 General For VVF application VSM motors with proper electrical insulation must be provided.

14 General Energy efficiency must be included on the nameplate.

15 General LED fixture to be used instead of Fluorescent.

In case of Fluorescent must be used T5 (G5 cap)

- 14W and 28W

No correspondences with PART IV – ELECT WORK pt.49 (pag

255) and Drawings (E1, E14 to E22)

16 General Ballast/Driver must be in accordance to the Fluorescent light type or LED

17 General HID lamps: No correspondences with PART IV – ELECT WORK pt.49 (pg. 255) and Drawings (E1, E14 to E22)

18 General No references about HVAC controls.

HVAC controls should be design in accordance with USACE / NAVFAC / AFCEC / NASA UFGS-23 09 23.13 20 (November 2015).

19 General Include electrostatic filters as per UNI 11254:07 with extractable aluminum plates.

ATTACHMENT #4 Rev. 1

20 General Supply and install one water meter at each of two water feeding lines of the building, therefore one will be inside the boiler room for sanitary and boiler room supply and the other one will be for the Fire system supply.

Meters must be connected to the HVAC Control system as per

USACE / NAVFAC / AFCEC / NASA UFGS-23 09 23.13 20

(November 2015).

21 General Supply and install inside the gas counter box the gas meter with digital output and bring the data cable inside the boiler room.

22 General Delay set to 15min. Settings (delay and light level) can be modified if required. All rooms where usage of projector is foreseen, need to be equipped also with manual override.

23 General Fixtures as reference are not produced anymore. As product reference can be used either DISANO 842 led Panel 35W (for entire fixture) 4300 Lumen with UGR<19 or DISANO 841 Minicomfort 33W 5200 Lumen with UGR<19. So total qty will be 313. Qty and position of lights must be analyzed based on the application of each room.

24 Not Used.

25 General Documentation about Summer Cooling loss and Winter

Heating loss are missing.

26 General Preferred as reference product for exterior lights DISANO LED

Ministelvio 3276 39W or IGuzzini LED Quid 35W.

27 General Electrical meter is highly preferred Schneider PM810 series as it is installed in every Electrical Substation at Aviano AB.

28 General Wrong indication for minimum receptacle section 2.5sqmm for receptacle (instead of 1.5sqmm) 29 General Avoid red color for LV phase L3 (use grey). Red color is usually reserved for MV cables and fire alarm cables.

30 General Wrong indication N07V-K cable to be corrected with LSOH cable N07G9-K as indicated at page 252 and following.

The use of Low smoke halogen LSOH cables is strongly suggested for cables installations different from embedded conduits and metallic conduits in accordance to CEI 64-8 “luoghi maggior rischio in caso di incendio” (places with high risk of fire) where exist highly crowd areas risk.

31 General Wrong indication for fire alarm cable. Fire alarm cables to be 30minutes fire rated cables in accordance to EN50200.

-For rated voltage up to 100V the standard CEI 20-105 should be considered (with minimum section 0.5sqmm).

-For rated voltage upper than 100V the standard CEI 20-45 should be followed for cables with rated voltage 0.6/1kV (with minimum section 1.5sqmm as indicated at page 259 indicating FTG10M1 cables)

32 General Indicated protection degree IP40 do not protect against water falling. IP41 should be the least requirement. IP level to be defined according installation conditions.

IP44 to be used at least in the HVAC & water rooms.

IP55 to be used for external installations.

33 General Indicate the connections of conditioning units (path/conduits/cables to be used).

34 General Building 1465 is not identified. To be verified availability of circuit breaker and power in Building 14001 (substation F39) power center. Building number has changed since design was issued.

35 General Close out documentation (as built layout diagrams, O&M manuals) and warranty plan documentation to be required. 5 hardcopies and 2DVDs with PDFs and DWGs

36 General As required for new layout design 37 General Building design and specifications should be updated to meet current code / UFC technical requirements and base design requirements.

38 General Provide 60 month mechanical system warranty to include annual maintenance.

39 General Cables to comply with New July 2017 Construction Product Regulations

40 General All lighting to be replaceable type LED lights

DESIGN COORDINATION AND REVIEW COMMENTS
PROJECT TITLE AND LOCATION
TYPE OF REVIEW
Final Design Review