This solicitation is for a Multiple Award Construction Contract at Fairchild Air Force Base in Washington. The contract will provide indefinite delivery, indefinite quantity construction services including design-build, maintenance, repair, and minor construction projects. Work will involve various trades such as carpentry, demolition, mechanical, electrical, plumbing, concrete, and paving. The North American Industry Classification System codes covered are 236000 for construction of buildings. Each contract will have a one-year base period and four one-year options, with task order values ranging from $500 to $10 million and a program value not to exceed $95 million over five years. This acquisition is set aside for small businesses in Washington, Oregon, and Idaho with single bonding of $10 million and aggregate bonding of $20 million.

View the file

Other files for this federal contract opportunity

Other files attached to Amendment 0009, newest first.
File Type Posted
TAB M - B1003 and B1019 Tail Door Drawings.pdf PDF
TAB L - B1007 Prelim Hydraulic Analysis.pdf PDF
Solicitation Amendment FA462020R00020009 SF 30.pdf PDF
TAB N - Foundation Plan B1003 B1005 and B1007 As Builts.pdf PDF
Attch 1.3 SOW 5 May 2020.pdf PDF
TAB K- HVAC Chiller System Justification and Approval 7 Aug 19.pdf PDF
Solicitation Amendment FA462020R00020008 SF 30 (1).pdf PDF
TAB I-PICTURES_B1007_RM.pdf PDF
Attch 1.3 SOW dated 1 May 2020.pdf PDF
TAB H-B1007 Comm Connection-1.PNG PNG image
Solicitation Amendment FA462020R00020006 SF 30.pdf PDF
SOW 27 April 2020.pdf PDF
Solicitation Amendment FA462020R00020005 SF 30.pdf PDF
Solicitation Amendment FA462020R00020004 SF 30.pdf PDF
Attch 1.3 SOW dated 22 April 2020.pdf PDF
TAB G B1001 B1003 B1005 and B1007 As Built Drawings.pdf PDF
Solicitation Amendment FA462020R00020003 SF 30.pdf PDF
Attachment 1 MACC Seed Project FOPR Letter as of 17 April 2020.pdf PDF
Attch 1.3 SOW 17 April 2020.pdf PDF
Solicitation Amendment FA462020R00020002 SF 30 (1).pdf PDF
Solicitation Amendment FA462020R00020001 SF 30.pdf PDF
Attachment 12 2020 MACC Virtual Preproposal Site VisitConference - FA462020R0002.pdf PDF
Attachment 9 FAFB Operational Climactic Data.pdf PDF
TAB F - Standard Restroom Fixtures Cut Specification Reference.pdf PDF
Attachment 10A WD WA202000017 Building - Spokane County.pdf PDF
Attch 1.3 SOW.pdf PDF
Attachment 7 Fairchild AFB 2018 Base Design Standards.PDF PDF
TAB D - Corrosion Control_Fuel Cell Mx Hangar Facility Standard Designs.pdf PDF
TAB A2 - Site Plan Map.pdf PDF
TAB A1 - Course of Action Option 3A Floor Plan.pdf PDF
Attachment 2 Past Performance Information.pdf PDF
Attachment 1 MACC Seed Project FOPR Letter.pdf PDF
Attachment 4 Subcontractor - Teaming Arrangement Release.pdf PDF
Attch 1.2 Price Schedule.pdf PDF
Attachment 10C WD WA20200001 - Highway - Statewide.pdf PDF
Attachment 5 MACC Orientation Seminar Task Order 0001 SOW dated 16 January 2020.pdf PDF
TAB A3 - Elevation Model.pdf PDF
Attachment 8 - Fairchild AFB IFS 2019.pdf PDF
TAB E - Hazardous Materials Inspection Report.pdf PDF
Attachment 11 - Task Order Procedures.pdf PDF
Solicitation FA462020R0002 pdf.pdf PDF
TAB A5 - As-Built Drawing Submittal.pdf PDF
Tab A - Planning Charette Report.pdf PDF
Attachment 10B WD WA20200076 Heavy Spokane County.pdf PDF
TAB A4 - Utility Plan.pdf PDF
Attachment 3 Past Perf cover letter and Questionnaire.pdf PDF
TAB B - Type A Pad Mount Oil-Insulated Switchgear Reference.pdf PDF
Attachment 6 MACC Specifications 7 January 2020.pdf PDF
TAB C - Base Switchgear Map.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

1 10

0007 5/1/2020 A004848 FA462020R0002

FA4620

FA4620 92 CONS LGC

110 W ENT ST STE 200

ADMINISTRATIVE ONLY NO REQUISITIONS

FAIRCHILD AFB, WA 99011-5320

United States HEATHER ROGERS, Email: heather.rogers.9@us.af.mil Telephone: 657-4871

FA462020R0002

3/26/2020

See Section G

SEE CONTINUATION PAGE

Contracting Officer Email: richard.hedrick.2@us.af.mil Telephone: (509)247-4867

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The purpose of this amendment is to:The Purpose of This Amendment Is:

1.Answer solicitation and Seed Project questions from vendors.

2. Update Attch 1.3 SOW dated 27 April 2020 to Attch 1.3 SOW dated 1 May 2020.

3. Add TAB H- B1007 Comm Connection-1

4. Add TAB I- PICTURES_B1007_RM

5. Update and correct List of Attachments in Section J.

Section A - Solicitation/Contract Form

The following changes have been made:

INFORMATION FROM TO

Accept Within Days 250 234

Section C - Specification/SOW/SOO/ORD

The Requirements text has been modified to:

Question#75: Reference Attachment 7 Fairchild AFB 2018 Base Design Standards: Division 04 - Masonry, paragraph B. states, When developing specifications for this section, use the Fairchild Base Design Standards sectional information developed by the 92nd Civil Engineer Squadron Engineering Flight. (other sections state this as well). Please provide the Fairchild Base Design Standards sectional information developed by the 92nd Civil Engineer Squadron Engineering Flight.

Answer #75: The mentioned sectional information refers to the subsequent Section 042000 - Unit Masonry (page 180/409 of BDS) Question #82: BACKGROUND: TAB_1A_Course of Action Option 3A Floor Plan: Restrooms CLARIFICATION: For purposes of equal bidding what are the fixture counts for each restroom; lavatories, water closets and urinals?

Answer #82: This is a 100% D/B project Question #90: Attachment 03, the SOW part 1.0 B states that MACC Contractors responding to this solicitation of subject project shall be solely responsible for any and all field measurements, and verification of work elements. Being that this project had a virtual site walk, bidders were not able to verify the dimensions or existing conditions. Can you please allow bidders to rely on the dimensions given?

Answer #90: See Answer #17 Amendment 0002 Question #105: Is the building on Generator Power? The fire protection system with fire pump? Standby or portable?

Answer #105: This is a 100% D/B project; building is not on generator power and no generator power is required Question #115: The RFP provided utility plan did not show where the fiber/telecom lines are being fed from that service the building. Please provide manhole locations that provide telecommunications services to the hangar building.

Answer #115: Refer to additional Attch 14. B1007 Comm Connection-1 and Attch15. PICTURES_B1007_RM.

Question #116: The RFP Option 3A floor plan shows a new communications room located on the opposite side of the building from the existing wall mounted communications enclosure. It is our understanding that the existing fiber and comm lines will need to be replaced. Please provide the fiber and telecommunications cabling requirements for the building.

Answer #116: This is a 100% D/B project; must comply with UFC. Refer to TAB H B1007 Comm Connection- 1 and TAB I PICTURES_B1007_RM.

FA462020R00020007

Question #123: How many data drops and receptacles are desired in each room, are there any rooms with high occupancy or usage requirements?

Answer#123: Must comply with UFC 3-580-01, and Tab D. Standard Design for AF Corrosion Control/Fuel Cell Maintenance Hangar Facility.

Question #148: Although the Attch 1.3 SOW does not address translucent panels, the Tab A Planning Charette Report, (Page 41/59, Environmental) and the Tab A3 Elevation Model do show translucent panels. If translucent panels are required is there a base standard specification that is required (manufacturer, etc.)? The Attachment 7 Fairchild AFB 2018 Base Design Standards only addresses color?

Answer #148: See Amended SOW dated 1 May 2020, daylighting is part of the scope and required within aircraft maintenance bay area to improve overall lighting conditions for maintenance operations.

Implementation of daylighting in hangar should be done to include South, East and West walls of B1007 per Tab A3 Elevation Model/Notional Concept. #97. Current version of UFC 4-010-01 is from 12 Dec 2018; vendor should use latest version of UFC 4-010-01 in consideration of a) glazing requirement of window/daylighting panels, b) door openings and c) exterior hardening. This requirement is amended/added into SOW. See Revised

SOW 4.15

Question #151: SUBJECT: Exterior Windows

c. QUESTION/CLARIFICATION: For the purpose of equal bidding and estimating please prescribe the size and function of exterior windows at the following spaces OR identify for all bidders the document in the RFP that defines the sizes of windows in compliance with RFP design guides and references:

i. Breakroom

ii. Offices; both Section Chief Guard and Assistant

iii. Training Room

iv. Computer (COMP) Room Answer #151: This is a 100% D/B project; Please see Tab A and A1 as a reference of the notional concept.

Question #152: SUBJECT: Interior Widows

d. QUESTION /CLARIFICATION: For the purpose of equal bidding and estimating please prescribe the size and function of exterior windows at the following spaces OR identify for all bidders the document in the RFP that defines the sizes of windows in compliance with RFP design guides and references:

i. Breakroom Computer (COMP) Room Cell Room CTK Room Answer #152: See Answer #151 of Amendment 0007 Question #153: SUBJECT: Windows Interior and Exterior

e. QUESTION/CLARIFICATION: What window treatments are required in the following rooms AND are their procurement under the Building Construction Budget or a separate FF and E package/submittal?

i. Breakroom

ii. Computer Room

iii. Offices

iv. Training Room

v. Cell Room

vi. CTK Room Answer #153: This is a 100% D/B project; Please see Tab A and A1 as a reference of the notional concept.

Question #154: SUBJECT: Course of Action 3A Floor Plan

f. QUESTION/CLARIFICATION: Are adjustments/changes allowed on the RFP Option 3A Floor Plan? For example, based on our calculations and determinations, the Fire Pump and Equipment Room shown on the Floor Plan will need to be substantially bigger than what is shown on the RFP Option 3A Floor Plan. Please confirm if its the intention of the Government, that for bidding purposes, bidders shall adhere to the RFP Option 3A Floor Plan and any necessary changes shall be addressed with the Client after award and/or during design, etc.

Answer #154: This is a 100% D/B project; Please see Tab A and A1 as a reference of the notional concept.

Question #158: SUBJECT: Translucent Panels; Course of Action 3A Floor Plan

j. CLARIFY/CONFIRM: On the 3A Floor plan Under NOTES: IMPROVEMENTS Item number 7 READS:

Translucent Panels on the wall space above the hangar doors. Translucent panels at this southern exposure adds daylighting. CONFIRM: While we take no exception to the statement it does not appear to direct anyone to install panels. Please CONFIRM that it IS the intent of this RFP that an acceptable approach to this project MUST incorporate translucent panels on the Project and the quantity that is considered acceptable for bidding and award. Please include if translucent panels are required on the North, East and/or West walls as well.

Answer #158: See Answer #148 of Amendment 0007.

Question #169: Reference Response to Question #4 in Amendment 2: This response directs us to Answer #9 in Amendment 1, which does not really clarify whether design/bid/build projects will be accepted and reviewed.

As the offeror we have a design/build project to submit, but not five of them completed in the last three years.

We would like to supplement this design/build project with otherwise relevant design/bid/build projects, but if they will not be accepted we do not want to include them and take up pages in the 30-page limit (which would otherwise be used for team experience). Please clarify (yes or no) whether design/bid/build projects will be acceptable, and whether they would be rated less favorably than design/build projects.

Answer# 169: See Answer #18 in Amendment 0002.

Question #190: Please provide detailed drawings showing the dimensions of the rolling hangar doors. This needs to include interior dimensions. This information is critical to developing our proposal.

Answer #190: Please see Tab A and A1 as a reference of the notional concept.

Question #250:The Fire Pump and Equipment area indicated in Tab A1 Course of Action Option 3A - Floor Plan dated 29 August 2018 is approximately 7ft-0in x10ft-6in (as scaled in Bluebeam) within a plumbing room that is approximately 17ft-0in x22ft-0in (scaled in Bluebeam). Preliminary layouts of the fire protection equipment including fire pump, jockey pump, foam concentrate tank, etc. indicate a room closer to 24ft-0in x24ft-0in with outside access being required. Is it acceptable to enlarge the fire protection room to an adequate size, add a double door exit to building exterior for equipment replacement, and relocate the plumbing room to the South?

Answer#250: This is a 100% D/B project Question #251:BACKGROUND: Per UFC 4-211-01, Aircraft Maintenance Hangars, Para 3-7.7 Aircraft Power Systems, States, Aircraft have specific power requirements, including unique voltages, frequencies, and capacities. Review the requirements of the aircraft being maintained in the hangar bay to determine the appropriate special power systems required. Provide the appropriate aircraft power systems in voltage, frequency, and capacity to service the aircraft being maintained.

QUESTION:

a) What is the appropriate special power systems requirements for the KC 135?

b) Is there a specific receptacle requirement to be provided, to allow connectivity?

c) How many connection points are required in the hanger?

Answer #251: This is a 100% D/B project; voltage is determined by design based on required equipment (hangar door, fire suppression systems, etc.); refer to UFC, NFPA, Tab D Standard Design for AF Corrosion Control/Fuel Cell Maintenance Hangar Facility.

Question #254: Loads added to the structure because of added roof thermal insulation, automatic fire sprinkler system, foam suppression system, fall protection rails and heaters is anticipated to exceed original structural design loads. Structural as-builts and design calculations were not provided with the bid package, therefore the extent of structural modifications is unknown; how are we to quantify?

Answer #254: As-built drawings coupled with your structural engineers evaluation; fire suppression and insulation projects at similar hangars require no structural modification; see TAB G B1001 B1003 B1005 and B1007 As Built Drawings.

Question #269:Will perimeter cove base at wall/floor interface within the maintenance area be required?

Answer #269: This is a 100% D/B project.

Question #279: TAB A1, note 5, says to add windows to the existing exterior walls. SOW does not include this requirement. Please confirm.

Answer #279: See Amended SOW dated 1 May 2020, daylighting is part of the scope and required within aircraft maintenance bay area to improve overall lighting conditions for maintenance operations.

Implementation of daylighting in hangar should be done to include South, East and West walls of B1007 per Tab A3 Elevation Model/Notional Concept. #97. Current version of UFC 4-010-01 is from 12 Dec 2018; vendor should use latest version of UFC 4-010-01 in consideration of a) glazing requirement of window/daylighting panels, b) door openings and c) exterior hardening. This requirement is amended/added into SOW.

Question #280: TAB D, Room Criteria Sheets (Page 39). Will the base communications squadron be providing WAP mapping for placement called for in the Fuel Cell Maintenance Hangar Bay? We are assuming the government will provide these and other active communications electronic equipment.

Answer#280: Additional reference will be provided post-award Question #281: TAB D, Room Criteria Sheets. Security devices are called out on the sheets, but other documents such as the charrette documents do not address security. Are we to provide security system or rough-in only for card readers, motion detectors, glass break detectors, BMS and electric door strikes? Assuming electric strikes would have to be provided with door hardware.

Answer #281: See Amended SOW dated 1 May 2020. 5. Page 11, Section 4.16 PHYSICAL ACCESS CONTROL added. Assume rough-in for card swipe/reading system at all doors to exterior non-flightline area;

systems should tie into base-wide system Question # 282: The scope calls for providing thermal insulation to create a heated space. This affects the walls, roof, and hanger doors. With regard to insulation, this can be a code/expense mess unless clarification is offered.

Answer#282: Please thoroughly review Tab A PCR for clarification, mentioned within SOW or otherwise.

Question #283:Can the RFP state clearly what desired values of insulation are expected for the walls, door, and roof?

Answer #283: Refer to current UFC and Tab D for reference.

Question #284: Guidelines for existing structures stipulate minimum R-values, but also have stipulation for continuous insulation (CI) as part of the assembly.

Answer #284: See Answer #283 Amendment 0007 Question #292 SOW Section 4.8 bullet B indicates that heating devices with a flame or glowing elements open to the environment are not allowed in the aircraft servicing area or fuel cell rooms. If this is the case, will the purge systems and ventilation systems for these areas need to be spark and or explosion proof?

Answer #292: This is a 100% D/B project; must comply with the UFC and NFPA Question #316: Please confirm means of egress and number of exits from the facility must be upgraded to meet UFC 4-211-01 requirements. Note that this may require new outside stairs.

Answer #316: This is a 100% D/B project Question #317: Please confirm personnel doors are permitted in the hangar bay door, however they are not considered exits for egress.

Answer #317: This is a 100% D/B project Question #318: Please confirm support areas (and mezzanines) are not permitted to have their required egress through the hangar bay.

Answer #318: This is a 100% D/B project Question #319: TAB_A1 Floor Plan shows exit stairs discharging to the hangar bay and no outside stairs. Are these stairs existing to remain? Are these exits from occupiable spaces above or mezzanines? Either way, the exhibit describes non code compliant egress. Please advise.

Answer #319: No existing stairs; this is a 100% D/B project Question #320: Is there a preferred or required manufacturer for triple IR flame detectors and releasing control unit, e.g. Detronics?

Answer #320: Refer to current ETL Question #321: Please confirm at least two discharge tests will be required for commissioning of the new HEF system.

Answer #321: Must comply with current UFC, NFPA and ETL Question #322: Please clarify environmental requirements and controls associated with HEF system. Is containment required? Is there a location on base that will accept the fire suppression effluent, or is the contractor required to capture and dispose to a facility off base?

Answer #322: This is a 100% D/B project; must comply with the UFC and NFPA Question #325: The SOW requires a Quantitative Voice Intelligibility Modeling Study. Note that UFC 4-021-01 requires all occupiable rooms and exterior locations to be provided with speakers, and travel distance allowances where voice intelligibility cannot be achieved. To what benefit does the Quantitative Voice Intelligibility Modeling Study offer the government if there is no guidance (or money in the budget) on how to improve the acoustics of the existing facility?

Answer#325:Must comply with current UFC, NFPA and ETL.

Question#326:Please provide a list of the pre-recorded MNS messages required for this project.

Answer#326: Will be provided Post-award.

Question#327:UFC 4-021-01 requires interconnection and status monitoring with existing base-wide (giant voice) communication systems. Please clarify if Fairchild has the capacity for two-way communication with the new interior MNS. If so, is the existing system proprietary?

Answer#327: Refer to current NFPA and ETL Question#328:UFC 4-021-01 requires textural notification appliances at exits. Please confirm MNS text signs are required and clarify if they should be scrolling type or simply indicate announcement or evacuate depending on the FAMNS signal.

Answer#328: Refer to current NFPA and ETL Question#329:Please clarify if the MNS strobes are required to be amber or clear.

Answer#329: Refer to current NFPA and ETL Question#331: Please confirm all electrical equipment, including 400 Hz equipment located in the hangar bay and foam equipment room is required to be NEMA 250 Type 3R rated, and that all raceway shall have raintight connections.

Answer#331: Design accordingly to meet requirements.

Question#332: The SOW indicates to reuse existing lighting systems. Can the Government confirm the existing lighting in the hangar bay is NEMA 250 Type 3R rated?

Answer#332: This is a 100% D/B project; vendor must ensure and/or modify existing lighting fixtures to accommodate new fuel cell maintenance function; Refer to UFC, TAB G and Tab D Question#366: In TAB A, under Structural Requirements and under Roofing it says The existing roofing material (metal roofing panels) is to remain in place. Numerous holes occur in the metal panels and these are to be patched. A few joints, between panels, have opened-up and these are to be repaired. Panels damaged beyond repair shall be replaced and painted. -For bidding purposes, please provide the sf of Roof that need patching and the sf of Roof that need replacement.

Answer#366: See Answer #14 amendment 0003.

Question#367: In TAB A, under Finishes (exterior walls, interior walls, ceilings) It says The many holes in the metal panels as well as open joints between panels are to be repaired. Damaged panels are to be replaced and painted. -For bidding purposes, please provide the sf of Metal Walls that need patching and the sf of Metal Walls that need replacement.

Answer#367: See Answer #14 amendment 0003.

Question #382: The Charette report provided in the RFP does not indicate the structural load requirements that are the basis of the structural findings in the report. Please confirm that there are no additional structural loads other than what is specifically indicated in this SOW, UFC 3-301-01 and UFC 4-211-01.

Answer #382: Fire suppression and insulation projects at similar hangars require no structural modification; see TAB G B1001 B1003 B1005 and B1007 As Built Drawings Question # 406: Is the fence gate electrified or have a requirement for security conduit rough-in?

Answer #406: See Answer #281 Amendment 0007.

Question # 420: Confirm that the existing hangar bay doors have a key-operated or other access-controlled switch on the exterior of the facility to open the hangar bay door in the event of an emergency and meets the requirements of Paragraph 3-7.2 of UFC 4-211-01. If not, will compliance with Paragraph 3-7.2 of UFC 4-211- 01 be required?

Answer #420: Existing hangar bay doors are manually operated by users.

Question # 421: Confirm that the existing hangar is provided with a portable generator connection on the exterior of the building having a manual transfer switch for hangar bay doors and meets the requirements of Paragraph 3-7.2.1 of UFC 4-211-01. If not, will compliance with Paragraph 3-7.2.1 of UFC 4-211-01 be required?

Answer #421: Existing hangar bay doors are manually operated by users Question # 422: Is a card reader system required for access control?

Answer #422: See Answer #281 Amendment 0007.

Question # 423: If a card reader system is or may be required for access control: a. Will this tie into a base-wide system? b. If this will tie into a base-wide system, where is the tie-in point?

Answer #423: See Answer #281 Amendment 0007.

Question # 424: Where is the tie-in point for communications/data systems?

Answer #424: Assume data tie-in point is near/adjacent by existing pullbox outside the building; refer to additional file for B1007 lighting, fire detection, power and water main.

Question # 427: The following responses conflict with each other. Please clarify if the translucent panels on the south elevation is required Question #42: Attch 1.3 SOW does NOT mention the addition of windows or additional daylighting. The Tab A Planning Charrette Report, Page 41/59, Environmental - States that adding additional daylighting will enhance the working environment. In addition, the Tab A3 Elevation Model shows an elevation drawing with translucent wall panels on the hangar door side of the building. Since daylighting /translucent wall panels are NOT specifically noted on the Attch 1.3 SOW, please confirm if daylighting /translucent panels, etc. are part of the scope and confirm what the overall intent /requirements Answer#42: Natural daylighting should be used to at least the same level as that shown in the concept design in order to reduce lighting and heating requirement;

This is a 100% D/B project Question #97: Please confirm which edition of the UFC 4-010-01 Antiterrorism Force protection Standard is to be considered for use? The latest edition would be 12 December 2018. Is this the document to be utilized? a. Glazing requirement for windows and daylight translucent panels being considered.

b. Door openings at exterior wall would swing out c. No strengthening or hardening of shell. Answer #97: Yes, must comply with the latest UFC and NFPA. However, daylighting is not required within the aircraft maintenance bay area Answer #427: See Amended SOW dated 1 May 2020, daylighting is part of the scope and required within aircraft maintenance bay area to improve overall lighting conditions for maintenance operations.

Implementation of daylighting in hangar should be done to include South, East and West walls of B1007 per Tab A3 Elevation Model/Notional Concept. #97. Current version of UFC 4-010-01 is from 12 Dec 2018; vendor should use latest version of UFC 4-010-01 in consideration of a) glazing requirement of window/daylighting panels, b) door openings and c) exterior hardening. This requirement is amended/added into SOW.

Question #428: Page 50 of the Planning Charette indicates that the existing floor slab is sloped at 0.36%. The Planning Charette does not make it clear where this measurement was taken, and the plans only vaguely show slope arrows around the north end of the building (were not sure if these indicate new or existing floor slope).

With this information, and the fact that a physical site visit is not allowed, we dont have a way to accurately gauge the quantity of floor sloping materials required to meet the 0.5% slope requirements. If the Government can provide a drawing showing all existing floor sloping in the hangar, the following questions will be answered:

a. Where was the initial slope measurement high point measured from and in which direction(s)? b. Is the location noted High Point of Slab in TAB A1 the existing high point of slab? c. Assuming the existing high point of slab is the location shown on TAB A1, is the existing floor slab sloped at 0.36% on both sides (north and south) of this line? d. If the existing slope is not the same on either side of the line shown as High Point of Slab in TAB A1, please provide the existing slope north of this line. (note that the existing slope to the north of this line could impact the amount of sloping material well need on the south side of the line, as we may have to bring this high point up higher to achieve the required slope going both ways).

Answer #428: Slope arrows around north end of building indicate existing floor slope. A) From high point of slab toward hangar door; B) yes; C)assume yes; D) assume slab slope north of high point where aircraft nose is located DOES NOT require adjustment.

Question #428: Page 50 of the Planning Charette indicates that the existing floor slab is sloped at 0.36%. The Planning Charette does not make it clear where this measurement was taken, and the plans only vaguely show slope arrows around the north end of the building (were not sure if these indicate new or existing floor slope).

With this information, and the fact that a physical site visit is not allowed, we dont have a way to accurately gauge the quantity of floor sloping materials required to meet the 0.5% slope requirements. If the Government can provide a drawing showing all existing floor sloping in the hangar, the following questions will be answered:

a. Where was the initial slope measurement high point measured from and in which direction(s)? b. Is the location noted High Point of Slab in TAB A1 the existing high point of slab? c. Assuming the existing high point of slab is the location shown on TAB A1, is the existing floor slab sloped at 0.36% on both sides (north and south) of this line? d. If the existing slope is not the same on either side of the line shown as High Point of Slab in TAB A1, please provide the existing slope north of this line. (note that the existing slope to the north of this line could impact the amount of sloping material well need on the south side of the line, as we may have to bring this high point up higher to achieve the required slope going both ways).

Answer #428: Slope arrows around north end of building indicate existing floor slope. A) From high point of slab toward hangar door; B) yes; C)assume yes; D) assume slab slope north of high point where aircraft nose is located DOES NOT require adjustment.

Question #479: Per Amendment 0005, Answers #362 and #363 indicate that no exterior concrete or asphalt paving work is required. However, per the Tab A2 Site Plan Map, there is new asphalt paving noted (i.e. for the tug route, the relocated parking spaces, etc.). Please reconfirm what asphalt and/or exterior concrete work is required, if any.

Answer# 479: See Amended SOW date 1 May 2020_exterior concrete paving work is required for dedicated tug route to flightline, walkways, and barrier curbs. Requirements have been added in SOW as 4.14 A, B, C, respectively.

Question #429: In order to slope the floor to the required 0.5%, existing expansion joints will have to be replaced. Does the grid pattern shown on the slab in TAB A1 represent the existing expansion joints? If not, please provide the locations of all existing expansion joints.

Answer #429: Assume Slabs grid patterns shown Tab A1 represent existing expansion joints.

Question #430: Q and A numbering in Amendment 0003 skips a lot of numbers (ex. Question #177 is followed by Question #203). Same thing with Amendment 0004. Are the skipped question numbers questions that are yet to be addressed?

Answer#430: Yes, skipped numbers are questions that are still waiting to be addressed.

Question #431: On future amendments where the Government modifies miscellaneous items in an attachment or section of the solicitation, can the Government please highlight the changes?

Answer#431: The areas that have been changed have been identified in Block 14 of the Amendment and updated attachments have been provided with associated Amendments. For future Amendments the Government will specify the page, section, and/or paragraph when possible.

Question #435: Are we to provide harnesses for the fall protection system and if so how many sets?

Answer #435: No, you are not required to provide harnesses.

Question #437: Loads to the steel frames. The as-builts for the hangars that are being referenced as comparison show that the structures are not the same as B1007. It is very likely the loads added to the structure because of added roof thermal insulation, automatic fire sprinkler system, foam suppression system, fall protection rails and heaters is anticipated to exceed beyond the 2.2 psf reserve capacity they discuss in Tab A original structural design loads. Structural as-builts and design calculations were not provided with the bid package, therefore the extent of structural modifications is unknown; how are we to quantify?

Answer# 437 No additional existing structural as-builts and design calculations are available; installation of structural frame reinforcement and/or purline to support and transfer additional loads from roof thermal insulation, automatic fire sprinkler system, foam suppression system, draft curtains, fall protection rails and heating elements is stated SOW, para 4.5.

Question #438: The metal wall panels in the video are aluminum, are the roof panels the same? There may be a concern with being able to walk on the roof to make repairs if its thin old aluminum.

Answer# 438: Assume Roof and Wall panels material identical Question #439: In the revised SOW it calls out for 25 each 10ft X 12ft panels, we dont think the panels are 10ftX12ft. Is this a type-o?

Answer# 439: panel size stated in revised SOW dated 1 May 2020 is the max ref; not actual size Question #440: In regards to Amendment 03 response to question #63 which states: Question#63: Page 50 of TAB A Planning Charette states that 10 foot CMU walls are required at all exterior walls. Attachment 1.3 the SOW, states that exterior walls are to be repaired only. Please clarify. Answer#63:See Revised SOW 17 April 2020, Page 6, Section 4.5 Architectural and Structural Works, D.

Answer# 440: See Answer #14 Amendment 0003.

Question #441: Exterior CMU Wall Repairs a. Added 1. For bidding purposes, assume 100 LF of CMU Wall requires repair Answer# 441: See Answer #14 Amendment 0003.

Question #470: BACKGROUND: Virtual Site Visit; TAB A2 - Site Plan Map. In the site plan map it reflects a new gate to be installed on the south east corner. In the Virtual Site Visit video, it shows a light tower approx.

center between Bldg. 1007s hanger door pocket and the rails and track assemblies for Bldg. 1005.

QUESTION:

a) There appears to be a new trench repair leading to it. What is it and how deep is it?

b) Since its not reflected in the site plan, please provide exact location in relation to the building and the door pocket.

c) Are we to relocate the light pole since it sits within the dedicated path of the new tug route?

Answer# 470: A) Structural concrete pavement on the airfield is typically 16 to 17 inches in this area. Shoulder asphalt is typically about 3 inches. However, the asphalt could be thicker, up to 6 inches, where it is used for structural pavement (for heavy aircraft). There may be isolated spots where that occurs. B) Hangar door pockets are on either sides of the buildings southern facing corners. C) Yes Question #442: Solicitation documents state exterior walls we must comply with UFC 4-211-01 - 3-3.2.3 which states; 3-3.2.3 Exterior Walls Provide a masonry or concrete finish up to a minimum 10 ft. (3.0 m) minimum above the finished floor for the interior and exterior face of the entire perimeter of the Aircraft Maintenance Bay, except at hangar doors. This includes the side/end walls, as well as the back wall which typically separates the Aircraft Maintenance Bay from shops and parts repair rooms. Question: Please clarify response given to question #63 and subsequent revised SOW which states to assume 100LF of CMU wall repairs. Existing CMU low wall was not constructed to support the additional weight of the anticipated 10ft+ high perimeter wall required to meet UFC requirements. For bidding purposes are we to assume low wall is sufficient and only needs repairs to 100LF, or are we to follow UFC requirements and provide costs to remove low wall and construct new 10ft+ perimeter walls?

Answer# 442: See Answer #14 Amendment 0003.

Question #443: Question: Please clarify response given to question #63 and subsequent revised SOW which states to assume 100LF of CMU wall repairs. Existing CMU low wall was not constructed to support the additional weight of the anticipated 10ft+ high perimeter wall required to meet UFC requirements. For bidding purposes are we to assume low wall is sufficient and only needs repairs to 100LF, or are we to follow UFC requirements and provide costs to remove low wall and construct new 10ft+ perimeter walls?

Answer# 443: Clarification: Assume 100 LF of 54 1/2inches tall, exterior CMU wall require repairs; new, 10-ft interior CMU wall, which separates aircraft from support facilities and be adjacent to the exterior CMU wall, is to be constructed.

Section J - List of Attachments

Miscellaneous text in this section has been modified to:

1. MACC Seed Project FOPR Letter as of 17 April 2020

1.2 Price Schedule

1.3 MACC Seed Project SOW as of 1 May 2020

A. TAB A - Planning Charette Report TAB A.1 - Course of Action Option 3A Floor Plan TAB A.2 - Site Plan Map TAB A.3 - Elevation Model TAB A.4 - Utility Plan TAB A.5 - As-Built Drawing Submittal B. TAB B - Type A Pad Mount Oil-Insulated Switchgear Reference C. TAB C - Base Switchgear Map D. TAB D - Corrosion Control_Fuel Cell Mx Hangar Facility Standard Designs E. TAB E - Hazardous Materials Inspection Report F. TAB F - Standard Restroom Fixtures Cut Specification Reference G. TAB G -AFMAN 31-1084. Facility Requirements Standards H. TAB H-B1007 Comm Connection-1

I. TAB I- PICTURES_B1007_RM

J. TAB J-B1001, B1003, B1005 and B1007 As Built Drawings

2. Past Performance Information

3. Past Performance Cover Letter and Questionnaire

4. Subcontractor/Teaming Arrangement Release

5. MACC Orientation Seminar Task Order 0001 SOW, dated 16 January 2020

6. MACC Specifications, dated 7 January 2020

7. Fairchild AFB 2018 Base Design Standards

8. Fairchild AFB IFS 2019 G. TG. TAB G

9. Fairchild AFB Climate Weather Data

10. Wage Determinations:

A. WD WA20200017 Building - Spokane County B. WD WA20200076 Heavy (includes sewer & water) - Spokane County C. WD WA20200001 Highway - Statewide

11. Task Order Procedures

12. 2020 MACC Virtual Preproposal Site Visit/Conference - FA462020R0002