About this file

This document contains a price schedule and statement of work for a federal construction contract. Fairchild Air Force Base is soliciting bids to convert an existing aircraft maintenance dock into a fuel cell maintenance hangar at Building 1007. The contractor will be responsible for all associated architectural, structural, mechanical and electrical work. This includes installing an epoxy floor coating, partitioning support spaces, LED lighting, fire suppression and detection systems, ventilation, overhead rails, emergency equipment, heating and cooling systems, insulated hangar doors, roof repairs, thermal insulation, and necessary utility infrastructure upgrades. Bidders should provide a lump sum price for the entire scope of work as outlined in the statement of work and price schedule.

The related federal contract opportunity is a solicitation for a Multiple Award Construction Contract at Fairchild AFB in Washington. The Air Force will award an indefinite delivery/indefinite quantity contract with a potential value of $95 million over five years to six small businesses. Contractors must be registered in Washington, Oregon or Idaho with single bonding of $10 million and aggregate bonding of $20 million. The contract will include maintenance, repair, construction and facility upgrade projects across various construction disciplines valued between $500,000 to $10,000,000. The period of performance is one base year with four optional one-year extensions.

View the file

Other files for this federal contract opportunity

Other files attached to Amendment 0009, newest first.
File Type Posted
Attch 1.3 SOW 5 May 2020.pdf PDF
TAB K- HVAC Chiller System Justification and Approval 7 Aug 19.pdf PDF
TAB N - Foundation Plan B1003 B1005 and B1007 As Builts.pdf PDF
TAB M - B1003 and B1019 Tail Door Drawings.pdf PDF
TAB L - B1007 Prelim Hydraulic Analysis.pdf PDF
Solicitation Amendment FA462020R00020009 SF 30.pdf PDF
Solicitation Amendment FA462020R00020008 SF 30 (1).pdf PDF
TAB I-PICTURES_B1007_RM.pdf PDF
Solicitation Amendment FA462020R00020007 SF 30.pdf PDF
Attch 1.3 SOW dated 1 May 2020.pdf PDF
TAB H-B1007 Comm Connection-1.PNG PNG image
Solicitation Amendment FA462020R00020006 SF 30.pdf PDF
SOW 27 April 2020.pdf PDF
Solicitation Amendment FA462020R00020005 SF 30.pdf PDF
Attch 1.3 SOW dated 22 April 2020.pdf PDF
Solicitation Amendment FA462020R00020004 SF 30.pdf PDF
Solicitation Amendment FA462020R00020003 SF 30.pdf PDF
Attachment 1 MACC Seed Project FOPR Letter as of 17 April 2020.pdf PDF
Attch 1.3 SOW 17 April 2020.pdf PDF
TAB G B1001 B1003 B1005 and B1007 As Built Drawings.pdf PDF
Solicitation Amendment FA462020R00020002 SF 30 (1).pdf PDF
Solicitation Amendment FA462020R00020001 SF 30.pdf PDF
Attachment 12 2020 MACC Virtual Preproposal Site VisitConference - FA462020R0002.pdf PDF
TAB A2 - Site Plan Map.pdf PDF
TAB A1 - Course of Action Option 3A Floor Plan.pdf PDF
Attachment 2 Past Performance Information.pdf PDF
Attachment 1 MACC Seed Project FOPR Letter.pdf PDF
Attachment 4 Subcontractor - Teaming Arrangement Release.pdf PDF
Attachment 10C WD WA20200001 - Highway - Statewide.pdf PDF
TAB A5 - As-Built Drawing Submittal.pdf PDF
Tab A - Planning Charette Report.pdf PDF
Attachment 10B WD WA20200076 Heavy Spokane County.pdf PDF
TAB A4 - Utility Plan.pdf PDF
Attachment 3 Past Perf cover letter and Questionnaire.pdf PDF
TAB B - Type A Pad Mount Oil-Insulated Switchgear Reference.pdf PDF
Attachment 6 MACC Specifications 7 January 2020.pdf PDF
TAB C - Base Switchgear Map.pdf PDF
Attachment 5 MACC Orientation Seminar Task Order 0001 SOW dated 16 January 2020.pdf PDF
TAB A3 - Elevation Model.pdf PDF
Attachment 8 - Fairchild AFB IFS 2019.pdf PDF
TAB E - Hazardous Materials Inspection Report.pdf PDF
Attachment 11 - Task Order Procedures.pdf PDF
Solicitation FA462020R0002 pdf.pdf PDF
Attachment 9 FAFB Operational Climactic Data.pdf PDF
TAB F - Standard Restroom Fixtures Cut Specification Reference.pdf PDF
Attachment 10A WD WA202000017 Building - Spokane County.pdf PDF
Attch 1.3 SOW.pdf PDF
Attachment 7 Fairchild AFB 2018 Base Design Standards.PDF PDF
TAB D - Corrosion Control_Fuel Cell Mx Hangar Facility Standard Designs.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

PRICE SCHEDULE

CAP1027134, Convert Aircraft Maintenance Dock to Fuel System Maintenance Dock Building 1007

Fairchild Air Force Base, Washington

CLIN DESCRIPTION QTY UNIT UNIT

PRICE

PRICE

0001 BASIC REQUIREMENT:

All labor, materials and equipment necessary to Convert existing Aircraft Maintenance Dock into Fuel Cell Maintenance Hangar, Provide epoxy coating applied to existing flooring, partitioning of support spaces, LED light fixtures, automatic fire sprinkler and foam suppression systems with booster pump, fire detection and mass notification systems with quantitative voice intelligibility, fire protection equipment room, fire alarm system control panel, draft curtains and fire separation walls, major exhaust fans and ventilation systems, overhead rails for supporting fall protection system, emergency eye-wash stations and showers, heating and cooling systems, conversion of existing manual hangar doors into an electric powered system; replacement of existing roll-up tug and tail clearance door with insulated roll-up doors;

suspended hangar door tracks heating system, structural frame reinforcement, roof and exterior wall panels repairs and replacement, thermal insulation of roof, exterior wall, and horizontal rolling hangar doors; and associated power and utility infrastructures, complete, including but not limited to the design effort, geotechnical survey, hazardous material surveys, material submittal process, hazardous material abatement, demolition, construction, and closeout associated with the project to include, but not limited to, all work identified in the Statement of Work, including all General Requirements associated with the above listed work.

0001AA PROJECT CAP1027134:

All labor, materials and equipment necessary to convert Building 1007 and provide new architectural, structural, mechanical and electrical construction as described in CLIN 0001 above, complete.

1 JOB N/A $

TOTAL OF ALL CLINs TOTAL $

CAP1027134

Attach. 2 Price Schedule

BASIC REQUIREMENT:
TOTAL OF ALL CLINs
TOTAL