This document contains an amendment to a solicitation for a Multiple Award Construction Contract at Fairchild Air Force Base in Washington. The solicitation seeks proposals for indefinite delivery, indefinite quantity construction efforts including facility upgrades, utility work, airfield pavement, roads, roofs and other repair and maintenance projects. The construction work includes trades such as carpentry, asbestos abatement, demolition, mechanical, electrical, plumbing, concrete, masonry, welding and paving. The contract term is one base year with four one-year options. Task order values may range from $500 to $10,000,000 with most between $1,000,000 to $5,000,000. The total program value including six contracts and subsequent task orders is not to exceed $95,000,000 over five years. This acquisition is set aside for small businesses in Washington, Oregon or Idaho with single bonding of $10,000,000 and aggregate bonding of $20,000,000. Proposals were due on April 27, 2020 by 2:00 PM PST to the Air Force at Fairchild Air Force Base in Washington.

View the file

Other files for this federal contract opportunity

Other files attached to Amendment 0009, newest first.
File Type Posted
Attch 1.3 SOW 5 May 2020.pdf PDF
TAB K- HVAC Chiller System Justification and Approval 7 Aug 19.pdf PDF
TAB N - Foundation Plan B1003 B1005 and B1007 As Builts.pdf PDF
TAB M - B1003 and B1019 Tail Door Drawings.pdf PDF
TAB L - B1007 Prelim Hydraulic Analysis.pdf PDF
Solicitation Amendment FA462020R00020009 SF 30.pdf PDF
Solicitation Amendment FA462020R00020008 SF 30 (1).pdf PDF
Solicitation Amendment FA462020R00020007 SF 30.pdf PDF
TAB I-PICTURES_B1007_RM.pdf PDF
Attch 1.3 SOW dated 1 May 2020.pdf PDF
TAB H-B1007 Comm Connection-1.PNG PNG image
Solicitation Amendment FA462020R00020006 SF 30.pdf PDF
SOW 27 April 2020.pdf PDF
Solicitation Amendment FA462020R00020005 SF 30.pdf PDF
Attch 1.3 SOW dated 22 April 2020.pdf PDF
Solicitation Amendment FA462020R00020004 SF 30.pdf PDF
Solicitation Amendment FA462020R00020003 SF 30.pdf PDF
Attachment 1 MACC Seed Project FOPR Letter as of 17 April 2020.pdf PDF
Attch 1.3 SOW 17 April 2020.pdf PDF
TAB G B1001 B1003 B1005 and B1007 As Built Drawings.pdf PDF
Solicitation Amendment FA462020R00020001 SF 30.pdf PDF
Attachment 12 2020 MACC Virtual Preproposal Site VisitConference - FA462020R0002.pdf PDF
TAB A5 - As-Built Drawing Submittal.pdf PDF
Tab A - Planning Charette Report.pdf PDF
Attachment 10B WD WA20200076 Heavy Spokane County.pdf PDF
TAB A4 - Utility Plan.pdf PDF
Attachment 3 Past Perf cover letter and Questionnaire.pdf PDF
TAB B - Type A Pad Mount Oil-Insulated Switchgear Reference.pdf PDF
Attachment 6 MACC Specifications 7 January 2020.pdf PDF
TAB C - Base Switchgear Map.pdf PDF
TAB A2 - Site Plan Map.pdf PDF
TAB A1 - Course of Action Option 3A Floor Plan.pdf PDF
Attachment 2 Past Performance Information.pdf PDF
Attachment 1 MACC Seed Project FOPR Letter.pdf PDF
Attachment 4 Subcontractor - Teaming Arrangement Release.pdf PDF
Attch 1.2 Price Schedule.pdf PDF
Attachment 10C WD WA20200001 - Highway - Statewide.pdf PDF
Attachment 5 MACC Orientation Seminar Task Order 0001 SOW dated 16 January 2020.pdf PDF
TAB A3 - Elevation Model.pdf PDF
Attachment 8 - Fairchild AFB IFS 2019.pdf PDF
TAB E - Hazardous Materials Inspection Report.pdf PDF
Attachment 11 - Task Order Procedures.pdf PDF
Solicitation FA462020R0002 pdf.pdf PDF
Attachment 9 FAFB Operational Climactic Data.pdf PDF
TAB F - Standard Restroom Fixtures Cut Specification Reference.pdf PDF
Attachment 10A WD WA202000017 Building - Spokane County.pdf PDF
Attch 1.3 SOW.pdf PDF
Attachment 7 Fairchild AFB 2018 Base Design Standards.PDF PDF
TAB D - Corrosion Control_Fuel Cell Mx Hangar Facility Standard Designs.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

1 5

0002 4/14/2020 A004848 FA462020R0002

FA4620

FA4620 92 CONS LGC

110 W ENT ST STE 200

ADMINISTRATIVE ONLY NO REQUISITIONS

FAIRCHILD AFB, WA 99011-5320

United States HEATHER ROGERS, Email: heather.rogers.9@us.af.mil Telephone: 657-4871

FA462020R0002

3/26/2020

See Section G

The purpose of this amendment is to answer additional solicitation questions from vendors.

Contracting Officer Email: richard.hedrick.2@us.af.mil Telephone: (509)247-4867

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section C - Specification/SOW/SOO/ORD

The Requirements text has been modified to:

Solicitation Questions as of 14 April SUBJECT: Teaming Partners and Past Performance Questionnaires:

Attachment 4, Subcontractor/Teaming Partner First full paragraph READS IN PART: In an effort to assist the Government evaluation in assessing your past and present performance relevancy and confidence, we request that the following consent form be completed by major subcontractors/teaming partners identified in your proposal. The completed consent forms should be submitted as part of your past performance Volume 1.

Question #12: We need to clarify the definition of teaming partner as used in the RFP. Are Architectural and Engineering firms who agree to be part of a Prime Contractors submittal to the RFP and agree through a consent form/teaming agreement to be subconsultants providing design support ONLY considered by the government to be major subcontractors/teaming partners as described above and therefore need to supply the outlined Past Performance Criteria with 1 to 5 projects each? AE firms are NOT full teaming partners (contractually speaking) as they do not share the overall project risk/liability as does the prime General Contractor or any general contractor with whom they for a Joint Venture (JV) or teaming agreement per FAR regulations. We feel strongly that the use of the term Teaming Partner is leading to confusion by teams that are preparing a submittal. PLEASE CLARIFY.

Answer 12: The intent of Attachment 4 is to permit the Government to discuss with major sub-contractors/ teaming past performance and present past performance information with the prime contractor during the source selection process. Please see Federal Acquisition Regulation Subpart 9.6 - Contractor Team Arrangements for clarification.

Question #13: Given that the Governments instructions (per Amendment 01 QA) are to include Teaming Agreement(s) in Volume I, can we assume that Teaming Agreements will not be included in the page limit?

Answer #13: No, the teaming arrangement is part of Volume I per Section L paragraph 2.1.5. This must be accomplished within the 30 page constraint in Section M, paragraph 1.5.

Question #14: There is a requirement to submit our cost proposal in CD format. There is a reference for the final cost portion to be emailed in. This was changed by response to question #2, which now requires the cost proposal to be included in the CD submission to be delivered to the address in Block 8 of the 1442. Major suppliers will hold off on providing the major equipment pricing to our primary subs (Mechanical, Electrical, and Fire Suppression) until hours prior to the proposal submission time. In the past, the AF has allowed offerors to submit all other content, except the final pricing and allowed it to be submitted via email and then followed up with amended CD to include final pricing with 48 hours. Would the government in its best interest to obtain competitive pricing, consider this?

Answer #14: Proposals are due on 4/27/2020 by 2:00 PM PST, IAW block 13 of the SF 1442 unless revised via amendment. Proposals shall be delivered to the address indicated in Block 8 of the 1442.

Question #15: Due to the COVID19 impacts to the industry forcing fragmentation our team collaboration efforts and impacting our abilities due to the states Stay Home and non-essential travel. Complied with the inability to properly assess existing condition for bidding purpose. Would the government consider an extension to the proposal submission date?

Answer #15: There will be no extensions to the proposal submission date at this time.

Question #16 : Since this is a virtual site visit instead of the normal approach, will the government provide a list of attendees for participating companies?

Answer #16: The Government will provide upon request, a list of companies/individuals requesting access to the site visit video. Please send your requests to heather.rogers.9@us.af.mil and/or brian.fernandez.2@us.af.

mil.

Question #17: Statement of Work Attachment 1.3 Paragraph 1.0.B makes many assertions and obligates the

FA462020R00020002

Contractor to fully ensure the elements and layouts of the RFP DURING a physical Pre-Proposal site visit. Now that the physical site visit was not possible and the Government has relied on a virtual site tour how does the Government plan on the relief required to address the fact that no team nor individual can verify anything on site and therefore as a result make no such assertions and/or field verify anything? This seems to leave the project open to innumerable change orders based upon assumptions that may or may not be articulated in an RFP response as currently outlined.

Answer #17: The Government has provided a virtual site visit, specifications and drawings, a concept design, and other associated documents (Base Design Standards, etc.) to assist companies in preparing proposals for this requirement. In addition, the Government has provided an opportunity for questions from vendors in an effort to provide as much information as possible to all prospective vendors. The Government believes this provides ample information for vendors to evaluate risk and prepare proposals accordingly. This requirement will be awarded as a Firm Fixed Price contract.

Question #18: Section L, Item 2.0 Specific Proposal Preparation Instruction, sub-item 2.1.4 requires Past Performance Questionnaires (PPQs). We have tried to reach out to past clients in various DOD organizations, however, we are getting of a number of Automatic Replies Out of Office messages. Additionally telephone voicemails are going unreturned. While we can demonstrate via sent email reports, that we have requested PPQs, we cannot guarantee anyone will reply in a timely fashion given current circumstances. As a result of a number of COVID-19 Shelter-In-Place orders (USA wide) and related consequences, such as virus-target demographics choosing to stay home, would the Government accept previously completed PPQs using other DOD formats that have been previously acceptable to other DOD organizations, in lieu of the specific forms required by this solicitation? In addition, will the Government reconsider accepting completed CCASS, CPARS, or ACCAS reports?

Answer #18: Per Section L 1.1, the objective of the Past Performance evaluation is to convey to the Government that the offeror is capable, possesses technical expertise and experience, possesses sufficient resources, and is able to plan, organize, and use those resources to deliver timely and quality construction projects. The Government will evaluate past performance information as described in Section M.

Question #19: Currently due to the COVID19 issues facing our state and local community most of our employees and those of our subcontractors are either temporarily laid off or are sheltering at/working from home to protect against the spread of the virus. (Governor Inslee just extended his stay at home order through April). Due to this, it is not realistically possible to bid such a large seed project. We have the following suggestions/recommendations: Would the Government Extend the proposal submission date a minimum of 60 days to allow interested parties the chance to get back to work and bid the project....and/or Change the seed project to something smaller in size that has already been designed ..and/or modify the solicitation to require a Phase 1 Tech Proposal and then a Phase 2 Seed Project for primes that meet Phase 1 requirements?

Answer #19: The Government will not be extending the proposal due date/time at this time. However, upon review of the Q and A for the Seed Project that may be readdressed. The Government will not change the seed project. The Government will not modify the solicitation to require a Phase I Tech Proposal.

Question #20: In reviewing amendment 1, I see there are some sections of the RFP with modified text as provided. How are the changed sections to be addressed in the proposal submission for volume II where a copy of the entire RFP is to be included?

Answer #20: Per FAR 52.215-1(b) Amendments to the solicitation. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s). Per Section 2.2.4 of Section L of the solicitation. The offeror must complete the following sections within the RFP, Part I, Section A (SF 1442, Blocks 19-20C). In addition, within the Amendment Form (SF30), Offerors must acknowledge receipt by the listed methods listed in Block 11 of the Amendment.

Question #21: Sections do not align with even page breaks in the amendment file or original document page breaks to swap out. Thus, we wanted to confirm if by acknowledging the amendment on the SF1442, it acknowledges changed text and we just keep the original RFP document in its entirety for the proposal or will a completed updated RFP file be provided to use in the proposal?

Answer #21: Acknowledging the Amendment on the 1442, blocks 19 through 20C is acceptable.

Question #22: On the Solicitation FA462020R0002 Section L 1.4 it states Joint Venture Offerors...The joint venture must be approved by the SBA prior to award... The SBA only reviews and approves JVAs submitted under section 8a set asides, they do not review and or approve JVAs for TSB set aside contracts. There is no reviewing or approving authority for TSB set aside contracts.

Answer #22: Any Joint Ventures shall meet all SBA approval requirements outlined in Section L 1.4 prior to submission of proposals. No corrections and/or changes are permitter after the time for submission of offers.

Question #23: Per the 1442 of the original solicitation, Block 13d, states that we are to guarantee our pricing for 250 CDs. Per Attachment -1, item 17, it states we are to hold our number until December 31, 2020. Which is correct?

Answer #23: The original solicitation, block 13d of the 1442 states proposals shall be good for 250 days. Per the current solicitation, there are 250 calendar days from the solicitation close date 26 April 2020 to 31 December 2020. Please ensure proposals are valid through 31 December 2020.

Question #24: During the Phase I, after acceptance of the 65% design, would the contractor start to mobilize and start preparatory work for the new work, provided the critical administrative submittals have been approved?

Answer #24: Please see Attachment 1 MACC Seed Project FOPR Letter, paragraph 3 Performance Period and Paragraph 4 Notice to Proceed. The Notice to Proceed for Phase II would not be issued until Phase I has been accepted by the Government.

Question #25: Per Attachment -1, item 17, it states, In addition, the contractors shall provide a Schedule of Values (SoV) along with their price proposal. The SoV shall be broken down per the current MasterSpec format: by Division, and subsequently, by Section. Does the schedule of values have to be fully burdened with all indirect work, G and A, profit, fees, and bonds?

Answer #25: Yes, the schedule of values should be fully burdened. The SoV is for informational use only and will not be used for evaluation purposes.

Question #26: Can this request be provided post submission of the proposal, as this will require extended effort to structure it as defined?

Answer #26: No, this cannot be provided post submission. IAW Attachment 1, #17,In addition, the contractors shall provide a Schedule of Values (SoV) along with their price proposal.

Question #27: Reference Section L para 1.5: This states that if the offer is based on a teaming/partnering relationship, the offeror shall provide all required solicitation information for all parties. If we are teaming /partnering with consultants/subcontractors, are we required to include their information on the SF 1442?

Answer #27: Teaming/partnering information will be provided as instructed in Section L.

Question #28: Attachment 1 MACC Seed Project FOPR Letter, page 1 identifies 650 calendar days project duration. However, the Solicitation states that the duration is 365 calendar days. Please clarify.

Answer #28: The period of performance for the seed project and the base/option year periods are two different time frames. Per the FOPR letter, the period of performance for the Seed Project is 650 Days from award of the Seed Project. The MACC contract includes a base year plus 4 year Option Periods, each with a period of performance of 365 days.

Question #29: The Solicitation and the Amendment 1 Section 1 Contract Clauses state that this is a NAFI administrated contract. Please confirm.

Answer #29: There are several funding sources for requirements of a base-wide Multiple-Award Construction Contract (MACC). Some requirements may be funded by Non-Appropriated Funds (NAF). In instances, task orders are funded with NAF funds. A Non-appropriated Fund Instrumentality (NAFI), as an instrumentality of the U.S. Government, enjoys the same immunities and privileges as the U.S. Government in the absence of specific Federal statute. It is not incorporated under the law of any State, but has the legal status of an instrumentality of the United States. References to United States, the Government, and other related references will generally be implied to mean the NAFI throughout this contract. See Section I, NAF General Provisions, paragraph f the solicitation for more information.

Question #30: Section L para 2.1.2 indicates that relevant contracts shall have been performed during the past three years from the date of issuance of this solicitation. Can that be relaxed to the last six years from the date of this solicitation for submitted design-build projects?

Answer #30: Per Section L 2.1.3, The Government will not consider performance on an effort that concluded more than three years prior to the issuance date of the solicitation.

Question #31: Current proposal due date is on a Monday, which creates risk for mailing proposals over the weekend. Can this be changed to any other weekday than a Monday?

Answer #31: At this time the proposal due date/time identified on the 1442 block 13 will remain unchanged.

Question #32: Due to the COVID-19 pandemic a lot of folks are working from home, which is making it more difficult to coordinate and secure all of the quotes needed. Would the Government consider extending the proposal due date by a week or two to allow us more time?

Answer #32: Please see Answer #31 above.

Question #33: Due to current volatile market conditions, and the fact that we have to provide 250 calendar days for Government acceptance of the proposal, we request that the Government add FAR clause 52.216-4 Economic Price Adjustment - Labor and Material to the solicitation.

Answer #33: The current solicitation includes Defense Acquisition Federal Regulation (DFARS) clause 252.243-7002 Requests for Equitable Adjustments (DEC 2012) which provides the contractor a platform to request adjustments to previously agreed upon pricing in certain, approved circumstances.

Question #34: We would like to submit, as a supplement to our design-build projects, a couple design-bid-build projects under performance. Will design-bid-build projects submitted under Past Performance be considered, or do all projects submitted have to be design-build?

Answer #34: Please see Answer #9 in Amendment 0001.