This statement of work outlines the scope for converting Building 1007 at Fairchild Air Force Base, Washington into a fully functioning fuel cell maintenance facility. The project includes hazardous material abatement, architectural construction such as partitions and walls, installation of fire suppression sprinklers and foam systems, a new fire alarm and mass notification system with sufficient voice intelligibility, HVAC, electrical and lighting systems, and associated site work. The contractor shall provide design plans, material submissions, and construction services. Work must be completed within the performance periods outlined in the solicitation and adhere to all applicable Air Force, DOD and federal standards and specifications.

View the file

Other files for this federal contract opportunity

Other files attached to Amendment 0009, newest first.
File Type Posted
TAB M - B1003 and B1019 Tail Door Drawings.pdf PDF
TAB L - B1007 Prelim Hydraulic Analysis.pdf PDF
Solicitation Amendment FA462020R00020009 SF 30.pdf PDF
Attch 1.3 SOW 5 May 2020.pdf PDF
TAB K- HVAC Chiller System Justification and Approval 7 Aug 19.pdf PDF
TAB N - Foundation Plan B1003 B1005 and B1007 As Builts.pdf PDF
Solicitation Amendment FA462020R00020008 SF 30 (1).pdf PDF
TAB I-PICTURES_B1007_RM.pdf PDF
Solicitation Amendment FA462020R00020007 SF 30.pdf PDF
TAB H-B1007 Comm Connection-1.PNG PNG image
Solicitation Amendment FA462020R00020006 SF 30.pdf PDF
SOW 27 April 2020.pdf PDF
Solicitation Amendment FA462020R00020005 SF 30.pdf PDF
Solicitation Amendment FA462020R00020004 SF 30.pdf PDF
Attch 1.3 SOW dated 22 April 2020.pdf PDF
TAB G B1001 B1003 B1005 and B1007 As Built Drawings.pdf PDF
Solicitation Amendment FA462020R00020003 SF 30.pdf PDF
Attachment 1 MACC Seed Project FOPR Letter as of 17 April 2020.pdf PDF
Attch 1.3 SOW 17 April 2020.pdf PDF
Solicitation Amendment FA462020R00020002 SF 30 (1).pdf PDF
Solicitation Amendment FA462020R00020001 SF 30.pdf PDF
Attachment 12 2020 MACC Virtual Preproposal Site VisitConference - FA462020R0002.pdf PDF
Attachment 9 FAFB Operational Climactic Data.pdf PDF
TAB F - Standard Restroom Fixtures Cut Specification Reference.pdf PDF
Attachment 10A WD WA202000017 Building - Spokane County.pdf PDF
Attch 1.3 SOW.pdf PDF
Attachment 7 Fairchild AFB 2018 Base Design Standards.PDF PDF
TAB D - Corrosion Control_Fuel Cell Mx Hangar Facility Standard Designs.pdf PDF
TAB A2 - Site Plan Map.pdf PDF
TAB A1 - Course of Action Option 3A Floor Plan.pdf PDF
Attachment 2 Past Performance Information.pdf PDF
Attachment 1 MACC Seed Project FOPR Letter.pdf PDF
Attachment 4 Subcontractor - Teaming Arrangement Release.pdf PDF
Attch 1.2 Price Schedule.pdf PDF
Attachment 10C WD WA20200001 - Highway - Statewide.pdf PDF
TAB A5 - As-Built Drawing Submittal.pdf PDF
Tab A - Planning Charette Report.pdf PDF
Attachment 10B WD WA20200076 Heavy Spokane County.pdf PDF
TAB A4 - Utility Plan.pdf PDF
Attachment 3 Past Perf cover letter and Questionnaire.pdf PDF
TAB B - Type A Pad Mount Oil-Insulated Switchgear Reference.pdf PDF
Attachment 6 MACC Specifications 7 January 2020.pdf PDF
TAB C - Base Switchgear Map.pdf PDF
Attachment 5 MACC Orientation Seminar Task Order 0001 SOW dated 16 January 2020.pdf PDF
TAB A3 - Elevation Model.pdf PDF
Attachment 8 - Fairchild AFB IFS 2019.pdf PDF
TAB E - Hazardous Materials Inspection Report.pdf PDF
Attachment 11 - Task Order Procedures.pdf PDF
Solicitation FA462020R0002 pdf.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No.: CAP 10-27134 1 May 2020

STATEMENT OF WORK

FOR

BUILDING 1007

AT

FAIRCHILD AIR FORCE BASE, WASHINGTON

Project: CAP 10-27134

1.0 PROPOSAL

This Task Order is directed by Work Element No. 2 (Design-Build Required with Provided Partial Design) as specified in the MACC Statement of Work, General Contract Provisions, Section 01000.

A. MACC contractors shall provide a price proposal. Price proposal shall consist of a complete Price Schedule.

B. Relevant project information are provided as Attachments A-G, including the Planning Charrette Report (Attachment A), Course of Action Option 3A Floor Plan (Attachment A.1), Site Plan Map (Attachment A.2), Elevation Model (Attachment A.3), Utility Plan (Attachment A.4), As-Built Drawing Submittal (Attachment A.5), Type A Pad Mount Oil-Insulated Switchgear Reference (Attachment B), Base Switchgear Map (Attachment C), Corrosion Control/Fuel Cell Maintenance Hangar Facility Standard Designs (Attachment D), Hazardous Materials Inspection Report (Attachment E), Standard Restroom Fixtures Cut Specification Reference (Attachment F), and AFMAN 31-1084, Facility Requirements Standards (Attachment G).

C. During the pre-proposal site visit, MACC contractors shall visit the site and become familiar with the project requirements. Government-furnished information is not guaranteed to represent actual conditions and shall therefore be field verified prior to incorporation into the design. It is the responsibility of the Contractor to ensure designed elements, layouts, etc. are compatible with existing site conditions. MACC Contractors responding to this solicitation of subject project shall be solely responsible for any and all field measurements, and verification of work elements. Questions arising at the site visit shall be submitted to the Contracting Officer in writing. The Contracting Officer will respond to all questions in writing to all Offerors within a reasonable time period after the site visit.

D. All means, methods, and proposal submission requirements shall conform to specifications set forth in this statement of work, and shall be designed and constructed to, a level acceptable by, or surpassing that of quality and performance industry standards. All construction and contractor provided products shall conform to the most current Air Force and Base Design Standards, UFC, NEC, NFPA, and other local, state, and federal regulations at the time of the proposal.

2.0 HAZARDOUS MATERIALS

The Hazardous Materials Inspection Report (Attachment E) in support of this project has been performed on April 2018 by Fulcrum Environmental Consulting, Spokane WA, with the scope of work limited to Asbestos Containing Materials and Lead Containing Materials. The Contractor shall provide all Hazardous Materials abatement necessary to all areas that will be affected by the conversion work, and shall only reference Attachment E for information only when providing the proposal for this task order. As a requirement of this contract, the successful Contractor shall provide additional hazardous material testing and reports to incorporate all areas that will be affected by the conversion work during the Phase I performance period to support their construction efforts. Should the successful Contractor encounter additional hazardous materials that were not identified in the provided hazardous material survey, they shall immediately bring the issue to the Contracting Officer’s attention for resolution. Suspected Hazardous Materials not identified in the Phase I performance period will be considered as differing site conditions.

A. All waste streams that contain building materials with surface coatings shall have a Toxicity Characteristic Leaching Procedure (TCLP) accomplished.

1. Results of the TCLP will be submitted to the Government for review and acceptance.

2. TCLP results shall be submitted for review prior to any waste streams containing building materials with surface coatings leaving the worksite for disposal.

3. TCLP reports shall be accomplished during Phase I of this contract.

B. Conduct Clean-Air Testing as required to meet all Fairchild Air Force Base, OSHA, EPA, and other Federal, State and Local codes and standards.

C. Waste Water: any waste water generated during this project is subject to FAFB EPA MS4

Storm Water Permit. To comply with the permit, all contaminated wastewater produced by this project must be collected, processed, characterized, and disposed of into the FAFB sanitary sewer system or another authorized disposal method. FAFB sanitary sewer discharge requires a FAFB Sanitary Sewer Discharge Permit which is used by DPW Waste Water Treatment Plant. Prior to discharge a laboratory analysis of the waste water may be required for review and approval by wastewater plant personnel. Process water is not authorized to discharge to the ground or FAFB storm sewer. The environmental protection plan for the project should identify any potential wastewater generation and the process to which that water will be properly disposed.

3.0 SCOPE

This Statement of Work (SOW) defines the scope for this task order including construction actions at the proposed project site to convert Building 1007 into a fully-functioning fuel cell maintenance dock and to bring into compliance with fire protection and life safety codes in as far as practicable. A Planning Charrette Report (PCR) was completed in support of this project, and determines the overall scope, and definable features of work required to be accomplished under this contract. The following is a brief summary of the project and is provided solely for the purpose of revealing the general nature of the work involved. The place of performance shall be at Fairchild Air Force Base (FAFB), Washington (WA).

A. Project Management Plan: The Government will reference the basic MACC contract proposals for information relating to quality control, teaming, personnel qualifications, etc.

1. Comply with Unified Facilities Guide Specification 01 45 00.00 10/20 (revisions Nov

2016/Nov 2011), Contractor Quality Control.

B. Material gathering shall be accomplished after the submittals have been reviewed and approved by the Government Project Manager and the Contracting Officer. Material gathering shall be accomplished in both Phase I and Phase II of the project.

C. The performance period shall not exceed the number of calendar days shown in the Fair

Opportunity Proposal Request (FOPR) issued by the Contracting Officer. The performance period shall be broken down into three phases: Phase I – quantitative voice intelligibility modeling study, hazardous materials survey, fire protection and life safety analysis, hydraulic analysis, work plan, 100% design drawings, and material submittals; Phase II – Physical works; and Phase III – Closeout. A Notice to Proceed (NTP) will be issued for each performance period. Material submittals process must be complete and prior to issuance of NTP and start of Phase II.

D. MACC contractor shall submit work plans, material submittals, and design drawings, complete with comprehensive engineering analysis using performance requirements and fire-hydrant flow test records, etc. per General Contract Requirements Section 01000.7.

E. NTP for Phase II (Physical Construction phase) shall be issued upon completion and government acceptance of Phase I.

1. Planned disruptions to gas, electric or other utilities must be coordinated with the

Construction Manager a minimum of 5 days in advance of work.

2. The Government will make a determination prior to the end of Phase II, after a joint contractor / Government inspection of the contractor’s punch list items and all systems testing and acceptance, whether Phase II is substantially complete.

F. NTP for Phase III (Closeout Phase) shall be issued upon acceptance of Phase II. Per the contract specifications, the requirements for Closeout Procedures shall be managed by the contractor throughout the total contract performance period. The NTP to Phase III shall identify the due date for the completion of all close-out requirements, government review, and the delivery of Contracting Officer approval of the receivables.

4.0 GENERAL WORK DESCRIPTION

The contractor shall perform all design, demolition and construction activities required to provide hazardous material survey and abatement, epoxy coating applied to existing flooring, CMU walls separating the support space from the hangar, partitioning of support spaces to include cell room, tool room, computer room, offices and training room, break room and toilet rooms; LED light fixtures for new support spaces, automatic fire sprinkler and foam suppression systems with adequate water supply and pressure, fire detection and mass notification systems with sufficient quantitative voice intelligibility, booster pump, fire protection equipment room, fire alarm system control panel, draft curtains and fire separation walls, major exhaust fans and ventilation systems, overhead rails for supporting fall protection system, emergency eye-wash stations and showers, heating and cooling systems, conversion of existing hangar doors from manual operations into an electric powered operating system; replacement of existing roll-up tug and tail clearance door with insulated roll-up doors; suspended hangar door tracks heating system, structural frame reinforcement, roof and exterior wall panels repairs and replacement, thermal insulation of roof, exterior wall, and horizontal rolling hangar doors; new concrete pavement and curbs for tug-flightline access, pedestrian movement and ATFP standoff; interior and exterior daylighting fixtures; staging or preparation work for the installation of physical access control systems; utility meters; and associated power and utility infrastructures to support these systems. Work includes associated architectural, structural, mechanical, electrical and pavement construction. Activities specific to this project shall include but are not limited to:

4.1 DESIGN SUBMITTALS

A. Preparation of the technical portion of the Design Documents of the project, to include

Quantitative Voice Intelligibility Modeling Study, Fire Protection/Life Safety/Hydraulic Analysis, and a full, complete design (35%, 65%, 95%, and 100%). Refer to MACC Specifications General Contract Provisions Section 01300 for Design Requirements as applicable to the scope of this task order. As-built drawings are required for project close-out.

1. All map data shall use a Coordinate System of NAD83 (2011) State Plane WA North feet; all GPS coordinates shall be first order accuracy (1:25,000).

2. Any and all features demolished under this task order shall be deleted from the map and associated geodatabase electronic file.

3. Any and all errors, changes, or modifications to existing site features shall be reflected on the map and associated geodatabase. This includes changing electrical lines from “in-use” to “abandoned.”

4. Surveyed GPS coordinates (horizontal and vertical control) shall be provided for any cut or capped utilities and the boundaries of any features modified under this task order.

B. Schedule the design work with the following considerations:

1. Contractor shall furnish 35%, 65%, 95%, and 100% Design submittals for Government review. Allow 45 calendar days for Government review and comments of each design submittal.

2. Contractor shall schedule 35%, 65%, 95%, and 100% Design Review Conferences at Fairchild AFB after Government comments have been furnished to the contractor.

Allow 30 calendar days to complete each design update, resubmit and obtain Government approval.

3. The 35%, 65%, 95%, and 100% Designs shall be submitted and approved within the Phase I performance period.

4.2 TEMPORARY FACILITIES

Provide temporary facilities in accordance with Fairchild Air Force Base Design Standards. The Contractor shall have approval from the Contracting Officer and the Building Manager prior to initiating any temporary facilities. Building Manager’s contact information will be provided upon award of Contract. Provide, maintain and remove guard rails, barricades, warning signs and other warning devices at appropriate locations to protect and safeguard base personnel, property and operations during the construction process.

4.3 FIRE SUPRESSION SYSTEMS

A. Install a single interlock, addressable pre-action fire sprinkler system in Building 1007, including hangar and support spaces per Attachment A. The fire suppression system design shall be performed by an A-E of Record. The designer shall be, at minimum, a licensed Professional fire Protection Engineer (FPE). Items include, but not limited to:

Addition of two (2) new fire hydrants Fire Suppression booster pump with backflow prevention Automatic Fire Sprinkler System

Other specifics are as follows:

1. Currently, Building 1007 has no connections to water or sewage service. An existing

16” water main that runs parallel along the west face of B1007 shall be the point of connection for new water service to the hangar.

2. The connection between Building 1007 and the 16” water main shall include a new PIV Feed, excavation backfill site restoration, valves and fitting as required for a complete and fully functional installation to supply required water flow to new Fire Suppression System.

3. The contractor shall conduct the hydrant flow test at existing fire hydrant locations as indicated in Attachment A.4.

B. Provide design and construction for a Low-Level, High-Expansion Foam Fire Suppression System per Attachment A, including but not limited to, the following components:

Piping; provide types as required by UFC and ETL Foam Concentrate, booster pumps, storage tanks and control valves High Expansion Foam Generators Foam System Control Panel (FSCP) Fire Protection Room

1. Ensure expansion foam suppression system pumps maintain an independent electrical connection and/or compliance with NFPA 13.

C. Provide draft curtains in accordance with the comparative analysis of Attachment A.

A. The curtain depth will be a minimum of one eighth of the distance from roof to floor.

NOTE: All fire suppression systems will have seismic protection per Attachment A.

4.4 FIRE DETECTION AND NOTIFICATION SYSTEMS

Provide design and construction of a new addressable fire alarm and mass notification system with sufficient quantitative voice intelligibility, panels, fire detection system components and devices for the entire Building 1007 to include, but not limited to, wiring, raceways, pull boxes, terminal cabinets, outlets and mounting boxes, control equipment, alarm, and supervisory signal initiating devises, alarm notification appliances, supervising station fire alarm system transmitter, and other accessories and miscellaneous items required for a complete operating system in an aircraft maintenance hangar in accordance with UFC 3-600-01, Fire Protection Engineering for Facilities, and UFC 4-021-01, Design And O&M: Mass Notification Systems A. In conjunction with the installation of a mass notification system, Contractor will provide testing/modeling, design and implementation of quantitative voice intelligibility within the fuel cell maintenance facility to meet the specifications and requirements of UFC 3-600-01 and UFC 4-021-01.

1. Quantitative Voice Intelligibility Modeling Study will be completed prior to the initial

35% design submittal.

2. Facilities are required to verify intelligibility by measurement after installation.

4.5 ARCHITECTURAL AND STRUCTURAL WORKS

A. Design and construct CMU wall separation and non-CMU partitions for interior support space as indicated in COA Option 3A Floor Plan Layout and Comparative Analysis of Attachment A, to include but not limited to, the following components:

Independent structural CMU walls supporting a steel and concrete deck framed mezzanine for excess Plumbing, HVAC, electrical, communications, fire suppression equipment.

Associated steel handrails and stairs

B. Design and Construct 1-hour fire resistant rated and fully insulated, temperature-controlled

Fire Protection Equipment Room with direct exterior access containing the fire pumps, fire pump controllers, overhead fire sprinkler system risers, the foam system equipment and FSCP, and the fire alarm system control panel per Attachment A. Provide and install HVAC units as required to provide adequate heating and cooling. Proposed location is indicated on Attachment A.1.

C. Design and Construct two new Toilet Rooms as indicated in COA Option 3A Floor Plan Layout of Attachment A. For standard toilet fixture specifications, Refer to Attachment F.

D. Repair existing exterior CMU low walls extended up to the eave line in accordance with comparative analysis of Attachment A.

1. For bidding purposes, assume 100 LF of CMU Wall requires repair.

E. Upgrade existing northern and western wall near Building 2036 to 2-hour rated separation in accordance with comparative analysis of Attachment A.

F. Repair existing punctured or damaged roof panels in accordance with comparative analysis of Attachment A.

1. Repair opened joints between panels.

2. Individual panels with more than 10 small punctures damaged shall be replaced and painted.

3. Roof panels shall be repaired/replaced prior to insulation installation.

4. For bidding purposes, assume 600 small holes/punctures cross the hangar were observed.

5. For bidding purposes, assume no more than 25, 10' x 12' panels require replacement.

G. Convert existing manually operating hangar doors into an electric powered operating system with independent circuits for power source, heated tracks and portable generator connection per comparative analysis of Attachment A.

H. Provide weather-stripping to hangar doors in accordance with User and Facility Requirements of Attachment A.

I. Refurbish existing rollers, guides, tracks, and rails of hangar doors in accordance with Attachment A.

1. For bidding purposes, assume all 20 rollers (2 roller per door section) require refurbishment.

J. Replace existing roll-up tug and tail clearance door with insulated roll-up door in accordance with comparative analysis of Attachment A.

K. Provide and install structural frame reinforcement and/or purlins to support and transfer additional loads from roof thermal insulation, automatic fire sprinkler system, foam suppression system, draft curtains, fall protection rails and heating elements in accordance with comparative analysis of Attachment A.

4.6 FLOORING

A. Provide noncombustible epoxy coating finish for the existing concrete floor with slope in order to accommodate and withstand aircraft and equipment movements in accordance with Comparative Analysis of Attachment A.

1. For bidding purposes, assume 3200 SF of existing concrete flooring requires repair of surfaces.

2. For bidding purposes, assume 150 LF of existing concrete flooring requires repair/replacement of expansion joints

4.7 INSULATION

Provide and install thermal Insulations with serviceable finished surfaces to the roof, exterior walls and to the horizontal rolling hangar doors per Attachment A.

4.8 HVAC, EXHAUST FANS & VENTILATION SYSTEMS

A. Provide all new HVAC infrastructure, to include exhaust fans and ventilation systems, ductwork, DDC controls, and accessories for complete and usable HVAC systems for the entire Fuel Cell facility, including the offices, restrooms and all support areas in accordance with UFC 3-410-01 and Scope Analysis of Attachment A. Other specifics are as follows:

1. Controls for the new HVAC, exhaust fan and ventilation systems are to be connected to the base wide EMCS system. All graphics are be updated to reflect the current floor plan throughout the building.

B. Provide and installed interior-suspended heating system for de-icing the horizontal rolling hangar door tracks/rails per the Comparative Analysis of Attachment A.

1. Heating devices with a flame or glowing element open to the atmosphere are not permitted in the aircraft servicing area or fuel cell rooms.

2. Radiant tube heating systems may be used in the aircraft repair area if the flame is contained in a sealed chamber with combustion air taken from outside the repair area, and the combustion products are exhausted outside the repair area.

3. For additional direction regarding heating, and the types of heating systems allowed in aircraft maintenance hangars, refer to UFC 4-211-01.

4.9 ELECTRICAL SYSTEMS

A. Provide and install new electrical power systems in order to accommodate the new fuel cell facility’s requirements and its support functions. All systems shall be complete and usable and shall comply with UFC, NEC, NFPA, USAF and Fairchild AFB Base Design Standards. Other specifics are as follows:

1. Provide and install all necessary electrical infrastructure to include, but not limited to, electrical wiring, conduit, receptacles, controls, alarms, and systems as defined by Attachment A.

2. All circuit breakers shall be non-adjustable and shall be bolt-on type. All new panel(s) shall have at least (2) spare circuit breaker spaces.

3. Provide Surge Protection Device (SPD) to protect all power supply circuits to FACP and FSCP panels, including any subpanels (e.g. Mass Notification Panels, Amplifier Panels, and NAC Booster Panels). Provide SPD to protect all fire alarm circuits leaving or entering the building. Devices mounted on an exterior wall do not require an SPD when lighting protection is provided on the building (e.g. wall mounted exterior speaker.)

SPDs will be in accordance with UFC 3-520-01 and will be mounted in a separate enclosure, unless listed and installed by the factory (e.g. Installing the SPD in the FACP or FSCP is not permitted).

B. Replace existing electrical switchgear along the electrical distribution feeder lines with a

Type A Pad-Mounted Grid Switchgear per Attachment A. Other specifics are as follows:

1. The bases of design for base switchgears is by Cooper Industries as referenced in

Attachment B. Other manufacturer’s equivalent products shall be allowed if documentation is provided that indicates equal or superior performance.

2. Existing equipment pad shall be enlarged to an adequate size to host new switchgear and to meet UFC and NEC regulatory requirements.

3. At the concrete pads, the grounding ring shall have individual concentric neutrals extending to the grounding ring. Neutrals may NOT be connected together, nor doubled up on a lug. The neutrals shall be evenly spaced along the grounding ring. Verify the layout with Government prior to the installation.

4. Ensure that existing pad-mounted distribution transformers (480Y/277 volts and 208Y/120 volts, respectively) located on the northwest corner of B1007, as indicated in the Attachment A.4, are adequately sized and sufficient for the scope of this conversion project. If the existing transformers indeed require upgrading, Contractor shall be coordinated with the Government and the Base Electrical Shop during Phase I Design.

5. For bidding purposes, the Contractor shall provide a temporary generator, in order to supply power to the building while the switchgear is de-energized. The Contractor shall assume that a 500KW capacity is required for each generator.

4.10 LIGHTING SYSTEMS

Provide and install new LED Light Fixtures in the newly partitioned interior support space layout including all components and infrastructure for a complete and functional installation as indicated in Attachment A.

4.11 DATA & COMMUNICATION SYSTEMS

Provide and install data and communication system connection points throughout the fuel cell facility to support a fully functioning telephone and data network system per UFC 3-580-01, Telecommunications Interior Infrastructure Planning And Design. Required items include, but not limited to:

Data receptacles in each office Multiple data receptacles in break room Telephone connections in all office/training areas

4.12 PLUMBING

Provide and install all plumbing, sewer and drainage utilities and fixtures required to support the new facility program per Attachment A. Other specifics are as follows:

1. Currently, Building 1007 has no connections to water or sewage service. Water supply connection shall occur at the 16” main located along the west face of B1007 in accordance with procedures outlined in both UFC 3-230-02 and Principles and Practices of Water Supply Operations Series: Water Transmission and Distribution.

2. The contractor shall field verify the location and coordinate the tap location with the Government prior to the start of Phase II construction. For approximate location, refer to Attachment A.4.

3. In order to prevent possible discharges of the High Expansion Foam Suppression System from causing sewer pump failure, floor drains are prohibited on bay floor.

4.13 OCCUPATIONAL SAFETY

A. Provide Overhead Rails for Fall Protection System in support of personnel working on top of the aircraft wings and fuselage and major ventilation systems per Attachment A.

B. Provide and install multiple locations of emergency eye-wash and shower stations to accommodate fuel cell maintenance operations per Attachment A.

4.14 PAVEMENT

A. Provide new pavement route for dedicated tug access from existing tug roll-up door opening to flightline per Attachment A.2, proposed Site Plan Map. New pavement shall comply with the current UFC and Fairchild AFB Base Design Standards.

B. Provide new concrete walkways adjacent to new tug route pavement and to connect with existing walkways, parking lots and aprons for pedestrian movement per Attachment A.2, proposed Site Plan Map. New pavement shall comply with the current UFC and Fairchild AFB Base Design Standards.

C. Provide new 2-foot wide concrete barrier curbs for preventing unauthorized vehicles from entering the building’s 39-foot ATFP standoff zone per Attachment A and A.2, proposed Site Plan Map. New pavement shall comply with the current UFC and Fairchild AFB Base Design Standards.

4.15 DAYLIGHTING

A. Provide adequate daylighting throughout the building by installing translucent wall panels on the upper exterior portions of the hangar’s south, east and western walls per Attachment A and A.3 Elevation Model. Glazing requirements for minimizing hazardous fragments and possible blast resistance shall comply with the current UFC and ATFP standards.

B. Install appropriate interior and exterior windows for the inhabited support portions of the hangar in compliance with the current UFC, BDS, and ATFP standards. Recommended locations are indicated on Attachment A.1. Glazing requirements for minimizing hazardous fragments and possible blast resistance shall comply with the current UFC and ATFP standards.

4.16 PHYSICAL ACCESS CONTROL

Provide staging or preparation work for the installation of physical access control system with card reader at entrance/exit leading to the exterior, non-flightline area of the building. Systems shall be able to connect or integrate with existing base-wide system. Preparation work shall comply with the current UFC and ATFP standards.

4.17 UTILITY MEASUREMENT

Install utility meters with interval and remote reading capabilities for electrical and natural gas usage of the building. Meters shall be able to connect or integrate with existing base EMCS.

Meters shall comply with the current UFC, AFMAN and Fairchild AFB Base Design Standards.

5.0 TECHNICAL REFERENCES

The documents listed in Section 01300 of the basic contract are incorporated here by reference.

Requirements for implementing the Fairchild AFB Green Procurement Plan and use of Recovered Materials are referenced in the BASE DESIGN STANDARDS as "92 CES, Green

Procurement Program Plan, 2006". The following products have been identified as EPA-designated items of Recovered Materials required for this project: 1. Cement and Concrete containing Fly Ash or Ground Granulated Blast Furnace Slag. 2. Carpet. 3. Latex Paint. 4.

Floor Tiles. 5. Restroom dividers/partitions. 6. Gypsum Wall Board. 7. Acoustical Ceiling Tiles.

This list, however, may not be complete.

6.0 SUBMMITAL QUANTITIES

SUBMITTAL DESCRIPTION NUMBER OF COPIES

HAZARDOUS MATERIALS SURVEY

Hard Copy 2 Electronic Copy 1

QUANTITATIVE VOICE INTELLIGIBILITY

MODELING STUDY

Hard Copy 2 Electronic Copy 1

35%, 95%, & 100% DESIGNS (Respectively) Drawings full size 1 Drawings 1/2 size 2 AutoCAD and PDF Drawings on CD 1 Design Analysis and Technical Specifications (paper and PDF on CD)

AS-BUILTS

Drawings full size (paper) 1 AutoCAD and PDF Drawings on CD 2 ArcMap MXD and File Geo Database on CD 1

7.0 SOW ATTACHMENTS

1. Planning Charrette Report (Attachment A)

2. Course of Action Option 3A Floor Plan (Attachment A.1)

3. Site Plan Map (Attachment A.2)

4. Elevation Model (Attachment A.3)

5. Utility Plan (Attachment A.4)

6. As-Built Drawing Submittal (Attachment A.5)

7. Type A Pad Mount Oil-Insulated Switchgear Reference (Attachment B)

8. Base Switchgear Map (Attachment C)

9. Corrosion Control/Fuel Cell Maintenance Hangar Facility Standard Designs (Attachment D)

10. Hazardous Materials Inspection Report (Attachment E)

11. Standard Restroom Fixtures Cut Specification Reference (Attachment F)

12. AFMAN 31-1084, Facility Requirements Standards (Attachment G)

13. B1007 Comm Connection-1 (Attachment H)

14. PICTURES_B1007_RM (Attachment I)

15. B1001, B1003, B1005 and B1007 As Built Drawings(Attachment J)