Attachment 1 MACC Seed Project FOPR Letter.pdf

PDF 241 KB Posted

Attached to
Amendment 0009 Federal contract opportunity
Solicitation number
FA462020R0002
Issued by
Department of the Air Force Air Mobility Command

About this file

This document is a Request for Proposal (RFP) for a construction project at Fairchild Air Force Base in Washington. The project involves converting an aircraft maintenance dock to a fuel system maintenance dock, including epoxy flooring, partitioning, lighting, fire suppression systems, ventilation, overhead rails, emergency equipment, and associated infrastructure upgrades. The project magnitude is between $5-10 million. The performance period is 650 calendar days broken into design, physical work, and closeout phases. Liquidated damages apply for delays. A pre-proposal site visit will be held virtually on April 3rd. Proposals are due by April 27th. The selection will be made in accordance with FAR 15.3 based on technical evaluation factors and price. The attached documents provide additional details on the statement of work, drawings, specifications, and hazardous materials inspection report.

View the file

Other files for this federal contract opportunity

Other files attached to Amendment 0009, newest first.
File Type Posted
Attch 1.3 SOW 5 May 2020.pdf PDF
TAB K- HVAC Chiller System Justification and Approval 7 Aug 19.pdf PDF
TAB N - Foundation Plan B1003 B1005 and B1007 As Builts.pdf PDF
TAB M - B1003 and B1019 Tail Door Drawings.pdf PDF
TAB L - B1007 Prelim Hydraulic Analysis.pdf PDF
Solicitation Amendment FA462020R00020009 SF 30.pdf PDF
Solicitation Amendment FA462020R00020008 SF 30 (1).pdf PDF
TAB I-PICTURES_B1007_RM.pdf PDF
Solicitation Amendment FA462020R00020007 SF 30.pdf PDF
Attch 1.3 SOW dated 1 May 2020.pdf PDF
TAB H-B1007 Comm Connection-1.PNG PNG image
Solicitation Amendment FA462020R00020006 SF 30.pdf PDF
SOW 27 April 2020.pdf PDF
Solicitation Amendment FA462020R00020005 SF 30.pdf PDF
Attch 1.3 SOW dated 22 April 2020.pdf PDF
Solicitation Amendment FA462020R00020004 SF 30.pdf PDF
Solicitation Amendment FA462020R00020003 SF 30.pdf PDF
Attachment 1 MACC Seed Project FOPR Letter as of 17 April 2020.pdf PDF
Attch 1.3 SOW 17 April 2020.pdf PDF
TAB G B1001 B1003 B1005 and B1007 As Built Drawings.pdf PDF
Solicitation Amendment FA462020R00020002 SF 30 (1).pdf PDF
Solicitation Amendment FA462020R00020001 SF 30.pdf PDF
Attachment 12 2020 MACC Virtual Preproposal Site VisitConference - FA462020R0002.pdf PDF
TAB A2 - Site Plan Map.pdf PDF
TAB A1 - Course of Action Option 3A Floor Plan.pdf PDF
Attachment 2 Past Performance Information.pdf PDF
Attachment 4 Subcontractor - Teaming Arrangement Release.pdf PDF
Attch 1.2 Price Schedule.pdf PDF
Attachment 10C WD WA20200001 - Highway - Statewide.pdf PDF
TAB A5 - As-Built Drawing Submittal.pdf PDF
Tab A - Planning Charette Report.pdf PDF
Attachment 10B WD WA20200076 Heavy Spokane County.pdf PDF
TAB A4 - Utility Plan.pdf PDF
Attachment 3 Past Perf cover letter and Questionnaire.pdf PDF
TAB B - Type A Pad Mount Oil-Insulated Switchgear Reference.pdf PDF
Attachment 6 MACC Specifications 7 January 2020.pdf PDF
TAB C - Base Switchgear Map.pdf PDF
Attachment 5 MACC Orientation Seminar Task Order 0001 SOW dated 16 January 2020.pdf PDF
TAB A3 - Elevation Model.pdf PDF
Attachment 8 - Fairchild AFB IFS 2019.pdf PDF
TAB E - Hazardous Materials Inspection Report.pdf PDF
Attachment 11 - Task Order Procedures.pdf PDF
Solicitation FA462020R0002 pdf.pdf PDF
Attachment 9 FAFB Operational Climactic Data.pdf PDF
TAB F - Standard Restroom Fixtures Cut Specification Reference.pdf PDF
Attachment 10A WD WA202000017 Building - Spokane County.pdf PDF
Attch 1.3 SOW.pdf PDF
Attachment 7 Fairchild AFB 2018 Base Design Standards.PDF PDF
TAB D - Corrosion Control_Fuel Cell Mx Hangar Facility Standard Designs.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS 92D AIR REFUELING WING (AMC)

FAIRCHILD AIR FORCE BASE WASHINGTON

26 March 2020

MEMORANDUM FOR: MACC CONTRACTORS

FROM: 92 CONS/PKB

110 W. Ent Street Fairchild AFB, WA 99011-8568

SUBJECT: Request for Proposal under the MACC solicitation; FA4620-20-R-0002: Project CAP1027134, Replace (RM) Alternate Fuel Cell, B1007, Fairchild AFB, WA

1. This is a Request for Proposal for the FY20 MACC seed project, CAP1027134, Replace (RM) Alternate Fuel Cell B1007, Fairchild AFB, WA. The award will be pursuant to Federal Acquisition Regulation (FAR) 15.3, all supplemental regulations, and per Section L and M of the solicitation.

TASK ORDER DESCRIPTION: Fairchild AFB invites you to submit a proposal for Project CAP1027134, Convert (R&M) Aircraft Maintenance Dock to Fuel System Maintenance Dock, B1007, Fairchild AFB, WA. This is a Design-Build project defined as a specific Work Element No. 1.2 proposed task order and as specified in the basic MACC specifications, Section 01000, Paragraph 1.2.

Work includes, but is not limited to: provide epoxy coating applied to existing flooring, partitioning of support spaces, LED light fixtures, automatic fire sprinkler and foam suppression systems with booster pump, fire detection and mass notification systems with quantitative voice intelligibility, fire protection equipment room, fire alarm system control panel, draft curtains and fire separation walls, major exhaust fans and ventilation systems, overhead rails for supporting fall protection system, emergency eye-wash stations and showers, heating and cooling systems, conversion of existing manual hangar doors into an electric powered system; replacement of existing roll-up tug and tail clearance door with insulated roll-up doors; suspended hangar door tracks heating system, structural frame reinforcement, roof and exterior wall panels repairs and replacement, thermal insulation of roof, exterior wall, and horizontal rolling hangar doors; and associated power and utility infrastructures to meet the requirements of the attached Statement of Work.

2. PROJECT MAGNITUDE: The project magnitude is between $5,000,000.00 and $10,000,000.00.

3. PERFORMANCE PERIOD: The total Performance Period for this task order is 650 calendar days, broken into three distinct phases:

Phase I -Phase I is identified as the Design, Material Gathering/Submittal Phase, and has a duration of 285 calendar days to design, prepare, submit, and receive approval on all submittals, other than those required for closeout.

Phase II -Phase II is identified as the Physical Work Phase and has a duration of 305 calendar days to occupy the work site and to physically accomplish the work.

Phase III -Phase III is identified as the Closeout Phase and has a duration of 60 calendar days for completion of all closeout requirements specified.

4. NOTICE TO PROCEED: A Notice to Proceed (NTP) shall be issued for each phase of work. A NTP for Phase I will be issued within 15 calendar days after award of the task order, receipt of bonds and approval of the Contractor’s Interim Quality Control Plan. The NTP for Phase II/III will be issued upon substantial completion of Phase I/II work, respectively. No NTP shall be issued until the previous phase has been formally accepted and/or recommended for issuance by CENM.

5. LIQUIDATED DAMAGES: Liquidated damages (LDs) shall apply for all phases- Design: Material

Gathering/Submittal; Physical Work; and Closeout. Breakdowns for each phase are as follows:

LDs for Phase I will be assessed in the amount of $182.00 per day.

LDs for Phase II will be assessed in the amount of $205.00 per day.

6. WORKING HOURS: Working hours are weekdays, 7:30 AM to 4:30 PM, excluding federal holidays.

7. CONTROLLED/RESTRICTED AREA: The work on B1007 IS located in a controlled area. An Entry Authorization List (EAL) WILL be required for work in this area.

8. SUPERINTENDENT/ QC SUPERINTENDENT: The Superintendent/QC responsibilities MAY

NOT be combined. QC requirements of the basic MACC Specifications shall be met; Contractor Quality Control shall also conform to the Fairchild Air Force Base Design Standards, Section 014516, and UFGS, Guide Specification 01 45 00.00 10 (revisions Nov 2016). For the period between the award of the task order and the issuance of the Phase I NTP, the Contractor’s Quality Control Plan may be an Interim Quality Control Plan per the provisions of the UFGS Guide Specifications, Section 3.2.

9. QUALITY CONTROL PLAN: Within 15 days after the award of the task order, the Contractor shall submit an Interim Quality Control Plan per the provisions of the UFGS Guide Specifications, Section 3.2.

10. WAGE DETERMINATION: The most current “building” wage determination for Spokane County referenced in the basic MACC solicitation is applicable to this project.

11. BONDS: The successful offeror will be required to submit a performance and payment bond in the amount of 100% of the task order price within fifteen (15) calendar days after task order award. A bid bond is required in accordance with the solicitation, Section L, 2.3.2.

12. RECOVERED MATERIALS: Recovered Materials Determination and Green Procurement are applicable for the project. Anticipated recovered materials for project use include: ground granulated blast furnace slag, consolidated and reprocessed latex paint and non-pressure pipe.

13. NOTICE TO OFFERORS: Funds are not presently available for this effort. No award will be made under this solicitation until funds become available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.”

14. CONFLICT OF INTEREST: Identify any conflict of interest or appearance issues which may be a potential Organizational Conflict of Interest (OCI) in accordance with FAR 9.5, as supplemented, and any basic solicitation clause(s) that govern the IDIQ. OCI mitigation plans or a statement that no OCI exists should accompany your proposal. Contractors are responsible for immediately notifying the Contracting Officer should any potential conflict of interest arise at any time prior to and/or after contract award.

15. PRE-PROPOSAL VIRTUAL SITE VISIT: A pre-proposal site visit will be held virtually. In addition to the Seed Project documents listed in Section J, Attachment 3, we will provide a video of the jobsite on or about 3 April 2020 via AMRDEC SAFE. All interested contractors should contact Ms. Heather Rogers, (509) 247-4871, heather.rogers.9@us.af.mil , SrA Brian Fernandez, (509) 247-3859, brian.fernandez.2@us.af.mil.

16. OFFERS DUE: Proposals shall be submitted to this office no later than a 27 April 2020 at 2:00 p.m.

Pacific, unless changed by Amendment. Proposals submitted after the established submission time will be “late” in accordance with FAR 52.215-1(c)(3). Submit proposals via email to brian.fernandez.2@us.af.mil AND heather.rogers.9@us.af.mil or by fax to (509) 247-8685.

17. PRICE SCHEDULE: Price proposal shall consist of completing the Government provided price schedule (Attachment 2). Proposals shall indicate that offers are valid until 31 December 2020 for Government acceptance, as well as acknowledgements of all amendments issued to the FOPR. In addition, the contractors shall provide a Schedule of Values (SoV) along with their price proposal. The SoV shall be broken down per the current MasterSpec format: by Division, and subsequently, by Section. Each Section Item shall include the Section Number, Section Title, and Scheduled Value. The Design effort shall be a separate line item of its own. The SoV is for informational use only and will not be used for evaluation purposes.

18. QUESTIONS AND ANSWERS: Any questions, whether technical or contractual in nature, shall be submitted in writing. Questions and Answers may be submitted in writing to the Contract Specialist (CS) at brian.fernandez.2@us.af.mil AND CO at heather.rogers.9@us.af.mil. Questions will be consolidated and responses will be forwarded to all Contractors.

19. AWARD SELECTION: The selection methodology for award of this task order will be made in accordance with FAR 15.3 and all supplemental regulations. See Section L and M of the solicitation for details.

20. If you have any questions, please contact SrA Brian Fernandez at (509) 247-3859, brian.fernandez.2@us.af.mil, heather.rogers.9@us.af.mil, or the undersigned at (509) 247-4867.

RICHARD HEDRICK, GS-13, DAF

Contracting Officer

Attachments:

1.2 Price Schedule

1.3 Statement of Work

A. TAB A - Planning Charette Report

TAB A.1 - Course of Action Option 3A Floor Plan TAB A.2 - Site Plan Map TAB A.3 - Elevation Model TAB A.4 - Utility Plan TAB A.5 - As-Built Drawing Submittal

B. TAB B - Type A Pad Mount Oil-Insulated Switchgear Reference C. TAB C - Base Switchgear Map D. TAB D - Corrosion Control_Fuel Cell Mx Hangar Facility Standard Designs E. TAB E - Hazardous Materials Inspection Report F. TAB F - Standard Restroom Fixtures Cut Specification Reference

2020-03-26T13:10:40-0700
HEDRICK.RICHARD.A.1082372500

File details come from the government source that posted it. Updated .