Site_Visit_Presentation.pptx

PPTX presentation 2 MB Posted

Attached to
Paint and Protective Coatings IDIQ Federal contract opportunity
Solicitation number
FA4419-14-R-0102
Issued by
Department of the Air Force Air Education and Training Command

About this file

Brief presentation from the Site Visit. Please note Written questions must be submitted to Kelsey Brightbill at kelsey.brightbill us.af.mil by Wednesday 7 May 2014. A Questions and Answers document will be posted at a later date.

View the file

Other files for this federal contract opportunity

Other files attached to Paint and Protective Coatings IDIQ, newest first.
File Type Posted
Questions_and_Answers.xlsx XLSX spreadsheet
Attachment_22_-_Section_09_97_13.00_40_Steel_Coatings.pdf PDF
Attachment_23_-_Section_09_97_13.16_Interior_Coating_of_Welded_Steel_Water_Tanks.pdf PDF
Attachment_4_-_Section_01_30_00_Administrative_Requirements.pdf PDF
FA4419-14-R-0102_Paint_and_Protective_Coatings_IDIQ.doc DOC document
Attachment_13_-_Section_01_55_00_Temporary_Environmental_Controls.pdf PDF
Attachment_7_-_Section_01_35_00_Quality_Control.pdf PDF
Attachment_34_-_Paint_Coefficient_(FINAL).xlsx XLSX spreadsheet
Attachment_14_-_Section_01_75_00_Starting_and_Adjusting.pdf PDF
Attachment_9_-_Section_01_35_40.00_20_Environmental_Management.pdf PDF
Attachment_17_-_Section_03_01_30.71_Concrete_Rehabilitation.pdf PDF
Attachment_6_-_Section_01_33_00_Submittal_Procedures.pdf PDF
Attachment_30_-_Wage_Determination-Highway.pdf PDF
Attachment_10_-_Section_01_37_00_Construction_Schedule.pdf PDF
Attachment_2_-_Section_01_11_00_Summary_of_Work.pdf PDF
Attachment_28_-_Section_32_17_24.00_10_Pavement_Markings.pdf PDF
Attachment_8_-_Section_01_35_26_Government_Safety_Requirements.pdf PDF
Attachment_20_-_Section_09_64_66_Athletic_Wood_Flooring.pdf PDF
Attachment_29_-_Wage_Determination-Building.pdf PDF
Attachment_27_-_Section_32_17_23.00_20_Pavement_Markings.pdf PDF
Attachment_33_-_EMS_Training_Statement.pdf PDF
Attachment_3_-_Section_01_15_00_Work_Restrictions.pdf PDF
Attachment_16_-_Section_02_81_00_Transportation_and_Disposal_of_Hazardous_Materials.pdf PDF
Attachment_25_-_Section_09_97_13.27_Exterior_Coating_of_Steel_Structures.pdf PDF
Attachment_1_-_Statement_of_Work.pdf PDF
Attachment_15_-_Section_01_78_00_Project_Closeout.pdf PDF
Attachment_21_-_Section_09_90_00_Paints_and_Coatings.pdf PDF
Attachment_26_-_Section_32_01_11.51_Rubber_and_Paint_Removal_from_Airfield_Pavements.pdf PDF
Attachment_18_-_Section_09_23_00_Gypsum_Plastering.pdf PDF
Attachment_32_-_Form_66_Submittal_Register.xls XLS spreadsheet
Attachment_11_-_Section_01_40_00_Safety.pdf PDF
Attachment_24_-_Section_09_97_13.17_Three-Coat_Epoxy_Interior_Coating_of_Welded_Steel_Petroleum_Fuel_Tanks.pdf PDF
Attachment_12_-_Section_01_50_00_Temporary_Construction_Facilities_and_Controls.pdf PDF
Attachment_35_-_Past_Performance_Questionnaire.pdf PDF
Attachment_19_-_Section_09_29_00_Gypsum_Board.pdf PDF
Attachment_31_-_NAF_Provisions_Clauses.pdf PDF
Attachment_5_-_Section_01_30_60_Background_Checks_for_Contractor_Personnel.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAINT AND PROTECTIVE COATINGS IDIQ

SITE VISIT

Ms. Kelsey Brightbill

97 CONS/LGCC

2 May 2014

“Forging Combat Mobility Forces . . . Deploying Airman Warriors!”

The Hour Has Come

Purpose Contract Type – Firm-fixed price / Indefinite Delivery Indefinite Quantity

Length – One year basic period with four 12-month option periods.

Full and Open to Small Business

6.302-5 -- Authorized or Required by Statute.

(b) Application. This authority may be used when statutes, such as the following, expressly authorize or require that acquisition be made from a specified source or through another agency:

(4) Sole source awards under the 8(a) Program (15 U.S.C. 637), but see 6.303 for requirements for justification and approval of sole-source 8(a) awards over $20 million. (See Subpart 19.8.)

19.805 -- Competitive 8(a).

19.805-1 -- General.

(b) Where an acquisition exceeds the competitive threshold, the SBA may accept the requirement for a sole source 8(a) award if --

(2) SBA accepts the requirement on behalf of a concern owned by an Indian tribe or an Alaska Native Corporation.

Requirement Overview Painting services will be primarily for execution of sustainment, restoration and modernization (SRM) type projects. The Contractor will furnish all materials, labor, plant, tools, equipment, transportation, services and incidentals necessary to complete the requirements of each Task Order. Projects will vary by type, scope and complexity, requiring the use of various building trades for related finishes and minor construction.

Period of Performance One-year basic period with four 12-month option periods.

Task Order period of performance to be determined for each individual task order.

Brief Description of Requirement (Including delivery schedule, any problems/risk) Services will be primarily for execution of sustainment, restoration and modernization (SRM) type projects. Contractor will, however, have the capability to construct whole new building projects not to exceed $750K. The Contractor will furnish all materials, labor, plant, tools, equipment, transportation, services and incidentals necessary to complete the requirements of each Task Order. Projects will vary by type, scope and complexity, requiring the use of various and multiple building trades and related technical services. The Work of each project will be executed using experienced installers, workers, established trade practices, industry standards, and manufacturer recommendations/instructions to provide fully functional facilities, systems, equipment and assemblies suitable for their intended use and in strict compliance with the Government Design and approved supplemental design (where required). Technical and performance issues may arise due to the location of Altus AFB and the past difficulty acquiring a fully qualified contractor as well as contractor personnel. There is a risk that the selected contractor will have difficulty locating qualified sub-contracting personnel. History has shown the last two SABER contractors have run into this issue many time during their contract tenure. Risk of delay of project if experienced subcontractors are not found and possible issues with a delay in getting subcontracts awarded.

Solicitation Section L Proposal Preparation Instructions

Section M Evaluation Factors

Specifications

Base Pictures

Base Pictures

Questions Please submit written questions to Ms. Kelsey Brightbill at kelsey.brightbill@us.af.mil by 4:30pm Central on Wednesday, 7 May 2014.

Questions will be answered and posted to FBO.gov

Air Education and Training Command “The First Command” image6.jpeg image7.jpeg image8.png image9.png image10.jpg image11.png image12.png image13.png image3.jpeg image4.jpeg image5.jpeg image1.jpeg image2.jpeg

File details come from the government source that posted it. Updated .