Attachment_8_-_Section_01_35_26_Government_Safety_Requirements.pdf
PDF 117 KB Posted
- Attached to
- Paint and Protective Coatings IDIQ Federal contract opportunity
- Solicitation number
- FA4419-14-R-0102
About this file
Attachment 8 - Section 01 35 26 Government Safety Requirements
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4419-14-R-0102
Attachment 8
SECTION 01 35 26
GOVERNMENTAL SAFETY REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)
ASSE/SAFE A10.32 (2004) Fall Protection
ASSE/SAFE A10.34 (2001; R 2005) Protection of the Public on or Adjacent to Construction Sites
ASSE/SAFE Z359.1 (2007) Safety Requirements for Personal Fall Arrest
Systems, Subsystems and Components
ASME INTERNATIONAL (ASME)
ASME B30.22 (2010) Articulating Boom Cranes
ASME B30.3 (2009) Tower Cranes
ASME B30.5 (2011) Mobile and Locomotive Cranes
ASME B30.8 (2010) Floating Cranes and Floating Derricks
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 10 (2010; Errata 2012) Standard for Portable Fire
Extinguishers
NFPA 51B (2009; TIA 09-1) Standard for Fire Prevention during
Welding, Cutting, and Other Hot Work
NFPA 70E (2012; Errata 1) Standard for Electrical Safety in the
Workplace
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2008; Errata 1-2010; Changes 1-3 2010; Changes 4-6
2011) Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
10 CFR 20 Standards for Protection against Radiation
29 CFR 1910 Occupational Safety and Health Standards
29 CFR 1910.146 Permit-required Confined Spaces
29 CFR 1926 Safety and Health Regulations for Construction
29 CFR 1926.1400 Cranes & Derricks in Construction
29 CFR 1926.16 Rules of Construction
29 CFR 1926.500 Fall Protection
CPL 2.100 (1995) Application of the Permit-Required Confined
Spaces (PRCS) Standards, 29 CFR 1910.146
1.2 DEFINITIONS
a. High Visibility Accident. Any mishap which may generate publicity or high visibility.
b. Medical Treatment. Treatment administered by a physician or by registered professional personnel under the standing orders of a physician. Medical treatment does not include first aid treatment even through provided by a physician or registered personnel.
c. Recordable Injuries or Illnesses. Any work-related injury or illness that results in:
(1) Death, regardless of the time between the injury and death, or the length of the illness;
(2) Days away from work (any time lost after day of injury/illness onset);
(3) Restricted work;
(4) Transfer to another job;
(5) Medical treatment beyond first aid;
(6) Loss of consciousness; or
(7) A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in (1) through (6) above.
d. "USACE" property and equipment specified in USACE EM 385-1-1 should be interpreted as Government property and equipment.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
Government acceptance, as defined in EM 385-1-1, is required for submittals with a "G, A" designation.
SD-01 Preconstruction Submittals
Accident Prevention Plan (APP)[G,A]
Activity Hazard Analysis (AHA) [G,A]
Crane Critical Lift Plan [G,A]
Proof of qualification for Crane Operators [G,A]
SD-06 Test Reports
Notifications and Reports
Submit reports as their incidence occurs, in accordance with the requirements of the paragraph, "Notifications and Reports."
Accident Reports
Crane Reports
SD-07 Certificates
Confined Space Entry Permit
Hot work permit
License Certificates
1.4 REGULATORY REQUIREMENTS
In addition to the detailed requirements included in the provisions of this contract, comply with the most recent addition of USACE EM 385-1-1, and all federal, state, and local laws, ordinances, criteria, rules and regulations. Submit matters of interpretation of standards to the file://52aggn-as-sps02/eda/JOBS/PAINT/pulldata/01%2033%2000.sec appropriate administrative agency for resolution before starting work. Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements govern.
1.5 SITE QUALIFICATIONS, DUTIES AND MEETINGS
1.5.1 Personnel Qualifications
1.5.1.1 Safety Officer:
The Safety Officer must meet the requirements of EM 385-1-1 section 1 and ensure that the requirements of 29 CFR 1926.16 are met for the project. Provide a
Safety oversight team that includes a minimum of one (1) person at each project site to function as the Site Safety representative. This person or an equally-qualified alternate shall be at the work site at all times to implement and administer the Contractor's safety program and government-accepted Accident
Prevention Plan. The Safety Officer's training, experience, and qualifications shall be as required by EM 385-1-1 paragraph 01.A.17, entitled SITE SAFETY
AND HEALTH OFFICER (SSHO), and all associated sub-paragraphs.
A Competent Person shall be provided for all of the hazards identified in the
Contractor's Safety and Health Program in accordance with the accepted Accident
Prevention Plan, and shall be on-site at all times when the work that presents the hazards associated with their professional expertise is being performed. Provide the credentials of the Competent Persons(s) to the Contracting Officer for acceptance in consultation with the Safety Office.
1.5.1.1.1 Contractor Quality Control (QC) Person:
The Contractor Quality Control Person can be the Safety Officer on this project.
1.5.1.2 Crane Operators:
Meet the crane operators’ requirements in USACE EM 385-1-1, Section 16 and
Appendix I. In addition, for mobile cranes with Original Equipment
Manufacturer (OEM) rated capacitates of 50,000 pounds or greater, designate crane operators as qualified by a source that qualifies crane operators (i.e., union, a government agency, or an organization that tests and qualifies crane operators).
Provide proof of current qualification.
1.5.2 Personnel Duties
1.5.2.1 The Safety Officer shall:
a. Conduct daily safety and health inspections and maintain a written log which includes area/operation inspected, date of inspection, identified hazards, recommended corrective actions, estimated and actual dates of corrections. Attach safety inspection logs to the Contractors' daily report.
b. Conduct mishap investigations and complete required reports.
c. Maintain applicable safety reference material on the job site.
d. Attend the pre-construction conference, pre-work meetings including preparatory inspection meeting, and periodic in-progress meetings.
e. Maintain a safety and health deficiency tracking system that monitors outstanding deficiencies until resolution. Post a list of unresolved safety and health deficiencies on the safety bulletin board.
f. Ensure sub-contractor compliance with safety and health requirements.
g. Maintain a list of hazardous chemicals on site and their material safety data sheets.
1.5.3 Meetings
1.5.3.1 Preconstruction Conference:
a. Contractor representatives who have a responsibility or significant role in accident prevention on the project shall attend the preconstruction conference. This includes the project superintendent, safety officer, quality control supervisor, or any other assigned safety and health professionals who participated in the development of the Safety and QC plans.
b. Discuss the details of the submitted Safety and QC plans.
c. Deficiencies in the submitted APP will be brought to the attention of the Contractor at the preconstruction conference, and the Contractor shall revise the plan to correct deficiencies and re-submit it for acceptance. Do not begin work until there is an accepted APP.
1.6 ACCIDENT PREVENTION PLAN (APP)
Use a qualified person to prepare the written Safety and QC plans.
Submit the Plans to the Contracting Officer 15 calendar days prior to the date of the preconstruction conference for acceptance. Work cannot proceed without accepted plans.
1.7 DISPLAY OF SAFETY INFORMATION
Within one calendar day(s) after commencement of work, erect a safety bulletin board at the job site. Where size, duration, or logistics of project do not facilitate a bulletin board, an alternative method, acceptable to the Contracting Officer, that is accessible and includes all mandatory information for employee and visitor review, shall be deemed as meeting the requirement for a bulletin board. Include and maintain information on safety bulletin board as required by EM 385-1-1, section 01.A.06. Additional items required to be posted include:
a. Confined space entry permit.
b. Hot work permit.
1.8 SITE SAFETY REFERENCE MATERIALS
Maintain safety-related references applicable to the project, including those listed in the article
"References." Maintain applicable equipment manufacturer's manuals.
1.9 EMERGENCY MEDICAL TREATMENT
For emergency treatment of injured personnel, the contractor must be aware that Emergency 911 calls may be routed to the Base Fire Department rather than Altus, OK. Contractor is advised to be aware that the local Altus Emergency numbers are called for 911 rather than the Base number.
1.10 NOT USED
1.11 NOTIFICATIONS AND REPORTS
1.11.1 Accident Notification:
Notify the Contracting Officer as soon as practical, but no more than four hours after any accident meeting the definition of Recordable Injuries or Illnesses or High Visibility
Accidents, property damage equal to or greater than $2,000, or any weight handling equipment accident. Within notification include contractor name; contract title; type of contract; name of activity, installation or location where accident occurred; date and time of accident; names of personnel injured; extent of property damage, if any; extent of injury, if known, and brief description of accident (to include type of construction equipment used, PPE used, etc.). Preserve the conditions and evidence on the accident site until the
Government investigation team arrives on-site and Government investigation is conducted.
1.11.2 Accident Reports:
a. Conduct an accident investigation for recordable injuries and illnesses, for Medical
Treatment defined in paragraph DEFINITIONS, property damage accidents resulting in at least $20,000 in damages, and near misses as defined in EM 385-1-1, to establish the root cause(s) of the accident. Complete the applicable The Contracting Officer will provide copies of any required or special forms.
b. Conduct an accident investigation for any weight handling equipment accident
(including rigging gear accidents) to establish the root cause(s) of the accident, complete the WHE Accident Report (Crane and Rigging Gear) form and provide the report to the Contracting Officer within 30 calendar days of the accident. Do not proceed with crane operations until cause is determined and corrective actions have been implemented to the satisfaction of the contracting officer. The Contracting
Officer will provide a blank copy of the accident report form.
1.12 HOT WORK
Welding, Cutting and Brazing: Inspection of all welding, cutting and brazing operations shall be completed by Fire Protection prior to any operation. The Contractor shall provide the appropriate operable fire extinguisher. Fire extinguishers shall comply with NFPA 10.
Contractor shall comply with OSHA STD 29 CFR 1910.252 Welding, Cutting and Brazing
(General Requirements) and AFOSH 91-5 Welding, Cutting and Brazing, which may be viewed at the following website: http://afpubs.hq.af.mil/pugs/publist.asp?pborg=AF&series=91 . AF
Form 592 USAF Welding, Cutting and Brazing permit will be issued prior to any operation and shall be kept on site until completion of operation or permit expires. Contact 97 CE Fire
Protection for issuance of permit.
1.13 RADIATION SAFETY REQUIREMENTS
License Certificates for radiation materials and equipment shall be submitted to the
Contracting Officer and Radiation Safety Office (RSO) for all specialized and licensed material and equipment that could cause fatal harm to construction personnel or to the construction project.
Workers shall be protected from radiation exposure in accordance with 10 CFR 20. Standards for Protection Against Radiation
Loss of radioactive material shall be reported immediately to the Contracting Officer.
Actual exposure of the radiographic film or unshielding the source shall not be initiated until after 5 p.m. on weekdays.
In instances where radiography is scheduled near or adjacent to buildings or areas having limited access or one-way doors, no assumptions shall be made as to building occupancy.
Where necessary, the Contracting Officer will direct the Contractor to conduct an actual building entry, search, and alert. Where removal of personnel from such a building cannot be accomplished and it is otherwise safe to proceed with the radiography, a fully instructed employee shall be positioned inside such building or area to prevent exiting while external radiographic operations are in process. Transportation of Regulated Amounts of Radioactive
Material will comply with 49 CFR, Subchapter C, Hazardous Material Regulations. Local
Fire authorities and the site Radiation Safety officer (RSO) shall be notified of any
Radioactive Material use.
Transmitter Requirements: The base policy concerning the use of transmitters such as radios, cell phones, etc., must be adhered to by all contractor personnel. They must also obey
Emissions control (EMCON) restrictions.
1.14 FACILITY OCCUPANCY CLOSURE
Streets, walks, and other facilities occupied and used by the Government shall not be closed or obstructed without written permission from the Contracting Officer.
1.15 SEVERE STORM PLAN
In the event of a severe storm warning, the Contractor must:
a. Secure outside equipment and materials and place materials that could be damaged in protected areas.
b. Check surrounding area, including roof, for loose material, equipment, debris, and other objects that could be blown away or against existing facilities.
c. Ensure that temporary erosion controls are adequate.
1.16 CONFINED SPACE ENTRY REQUIREMENTS.
Contractors entering and working in confined spaces while performing general industry work are required to follow the requirements of OSHA 29 CFR 1926 and comply with the requirements in Section 34 of EM 385-1-1, OSHA 29 CFR 1910, and OSHA 29 CFR
1910.146.
PART 2 PRODUCTSS
NOT USED
PART 3 EXECUTION
3.1 CONSTRUCTION AND OTHER WORK
3.1.1 Hazardous Material Exclusions
Notwithstanding any other hazardous material used in this contract, radioactive materials or instruments capable of producing ionizing/non-ionizing radiation (with the exception of radioactive material and devices used in accordance with USACE EM 385-1-1 such as nuclear density meters for compaction testing and laboratory equipment with radioactive sources) as well as materials which contain asbestos, mercury or polychlorinated biphenyls, di-isocynates, lead-based paint are prohibited. The Contracting Officer, upon written request by the Contractor, may consider exceptions to the use of any of the above excluded materials. Low mercury lamps used within fluorescent lighting fixtures are allowed as an exception without further Contracting Officer approval. Notify the
Radiation Safety Officer (RSO) prior to excepted items of radioactive material and devices being brought on base.
3.1.2 Unforeseen Hazardous Material
The design should have identified materials such as PCB, lead paint, and friable and non-friable asbestos and other OSHA regulated chemicals (i.e. 29 CFR Part 1910.1000). If additional material, not indicated, that may be hazardous to human health upon disturbance during construction operations is encountered, stop that portion of work and notify the Contracting Officer immediately. Within 14 calendar days the Government will determine if the material is hazardous. If material is not hazardous or poses no danger, the Government will direct the Contractor to proceed without change. If material is hazardous and handling of the material is necessary to accomplish the work, the
Government will issue a modification pursuant to "FAR 52.243-4, Changes" and "FAR
52.236-2, Differing Site Conditions."
3.2 PRE-OUTAGE COORDINATION MEETING
Apply for utility outages at least 14 days in advance. As a minimum, the request should include the location of the outage, utilities being affected, duration of outage and any necessary sketches. Special requirements for electrical outage requests are contained elsewhere in this specification section. Once approved, and prior to beginning work on the utility system requiring shut down, attend a pre-outage coordination meeting with the
Contracting Officer to review the scope of work and the lock-out/tag-out procedures for worker protection. No work will be performed on energized electrical circuits unless proof is provided that no other means exist.
3.3 CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)
Ensure that each employee is familiar with and complies with these procedures and USACE
EM 385-1-1, Section 12, Control of Hazardous Energy.
3.4 FALL HAZARD PROTECTION AND PREVENTION PROGRAM
Establish a fall protection and prevention program, for the protection of all employees exposed to fall hazards. Within the program include company policy, identify responsibilities, education and training requirements, fall hazard identification, prevention and control measures, inspection, storage, care and maintenance of fall protection equipment and rescue and evacuation procedures. Fall protection and prevention programs and training will only be required if work is ever required for accomplishment at significant heights above ground to merit special training. In all other instances, OSHA requirements for worker protection shall always be adhered to.
3.5 NOT USED
3.6 NOT USED
3.7 ELECTRICAL
3.7.1 PORTABLE EXTENSION CORDS
Size portable extension cords in accordance with manufacturer ratings for the tool to be powered and protected from damage. Immediately removed from service all damaged extension cords. Portable extension cords shall meet the requirements of EM 385-1-1, NFPA 70E, and OSHA electrical standards.
3.8 WORK IN CONFINED SPACES
Comply with the requirements in Section 34 of USACE EM 385-1-1, OSHA 29 CFR 1910, OSHA 29 CFR 1910.146, OSHA Directive CPL 2.100 and OSHA 29 CFR 1926. Any potential for a hazard in the confined space requires a permit system to be used.
a. Entry Procedures. Prohibit entry into a confined space by personnel for any purpose, including hot work, until the qualified person has conducted appropriate tests to ensure the confined or enclosed space is safe for the work intended and that all potential hazards are controlled or eliminated and documented. (See Section 34 of USACE EM 385-1-1 for entry procedures.) All hazards pertaining to the space shall be reviewed with each employee during review of the AHA.
b. Forced air ventilation is required for all confined space entry operations and the minimum air exchange requirements must be maintained to ensure exposure to any hazardous atmosphere is kept below its' action level.
c. Sewer wet wells require continuous atmosphere monitoring with audible alarm for toxic gas detection.
-- End of Section --