Attachment_14_-_Section_01_75_00_Starting_and_Adjusting.pdf
PDF 209 KB Posted
- Attached to
- Paint and Protective Coatings IDIQ Federal contract opportunity
- Solicitation number
- FA4419-14-R-0102
About this file
Attachment 14 - Section 01 75 00 Starting and Adjusting
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4419-14-R-0102
Attachment 14
SECTION 01 75 00
STARTING AND ADJUSTING
Part 1 General
1.1 Summary
This section covers requirements for system testing and acceptance. Requirements of this section may be amended based upon project specific criteria identified by separate Task Order.
1.2 Submittals
1.2.1 Certifications:
1.2.1.1Verification of successful test
1.2.1.2 Training qualifications and licenses of personnel performing operational tests and adjustments.
1.2.2 Shop Drawings:
1.2.2.1 Diagrams and schedules illustrating portions of the system.
1.2.2.2 Drawings illustrating coordination of system with interdisciplinary work, existing work, and multiple systems.
1.2.3 Manufacturer’s Instructions:
Procedural requirements for initial checkout, startup, and adjusting to ensure safe operation during acceptance testing and commissioning.
1.2.4 Test Report:
Comply with means and methods specified by separate Task Order for successful system operation.
1.3 Pre-Test Requirements
1.3.1 Provide equipment and services to meet testing requirements. Provide clearly defined acceptance criteria to establish baseline for testing, adjusting, and system operation and maintenance.
1.3.2 Government reserves option to elect performance of acceptance testing by internal personnel or designated third party. Regardless of who performs acceptance testing, the
Contractor will remain responsible for meeting the requirements for acceptance.
1.4 Tests Required
FA4419-14-R-0102
Attachment 14
Perform tests to verify proper functioning of fire protection and suppression system; surveillance and security systems; HVAC equipment; electrical equipment; fluid and gas systems; hydraulic and pneumatic systems; energy control and monitoring systems; boiler systems; and other assemblies and components that need to be tested as an interrelated whole.
1.4.1 Factory Test: Submit certified test report performed at the factory to verify proper build. Report will be used to verify no shipping damage and proper installation.
1.4.2 Functional Field Test
1.4.2.1 Perform functional field tests, in the presence of designated Government personnel, to verify system and components have been properly installed and system functions properly.
1.4.2.2 Include Manufacturer’s verification that field installation complied with
Manufacturer’s standards and instructions.
1.4.2.3 Acceptance will be issued when system has performed per other sections and referenced industry standards.
1.4.3 Final Acceptance Test: Perform a formal test, in the presence of designated
Government personnel. Provide full documentation using approved recording forms.
Include description of testing procedures stating step by step instructions followed to verify system parameters, components and function.
Part 2 Products
Not Used
Part 3 Execution
Not Used
-- End of Section --
File details come from the government source that posted it. Updated .