Attachment_2_-_Section_01_11_00_Summary_of_Work.pdf

PDF 107 KB Posted

Attached to
Paint and Protective Coatings IDIQ Federal contract opportunity
Solicitation number
FA4419-14-R-0102
Issued by
Department of the Air Force Air Education and Training Command

About this file

Attachment 2 - Section 01 11 00 Summary of Work

View the file

Other files for this federal contract opportunity

Other files attached to Paint and Protective Coatings IDIQ, newest first.
File Type Posted
Questions_and_Answers.xlsx XLSX spreadsheet
Site_Visit_Presentation.pptx PPTX presentation
Attachment_22_-_Section_09_97_13.00_40_Steel_Coatings.pdf PDF
Attachment_23_-_Section_09_97_13.16_Interior_Coating_of_Welded_Steel_Water_Tanks.pdf PDF
Attachment_4_-_Section_01_30_00_Administrative_Requirements.pdf PDF
FA4419-14-R-0102_Paint_and_Protective_Coatings_IDIQ.doc DOC document
Attachment_13_-_Section_01_55_00_Temporary_Environmental_Controls.pdf PDF
Attachment_7_-_Section_01_35_00_Quality_Control.pdf PDF
Attachment_34_-_Paint_Coefficient_(FINAL).xlsx XLSX spreadsheet
Attachment_14_-_Section_01_75_00_Starting_and_Adjusting.pdf PDF
Attachment_9_-_Section_01_35_40.00_20_Environmental_Management.pdf PDF
Attachment_17_-_Section_03_01_30.71_Concrete_Rehabilitation.pdf PDF
Attachment_6_-_Section_01_33_00_Submittal_Procedures.pdf PDF
Attachment_30_-_Wage_Determination-Highway.pdf PDF
Attachment_10_-_Section_01_37_00_Construction_Schedule.pdf PDF
Attachment_28_-_Section_32_17_24.00_10_Pavement_Markings.pdf PDF
Attachment_8_-_Section_01_35_26_Government_Safety_Requirements.pdf PDF
Attachment_20_-_Section_09_64_66_Athletic_Wood_Flooring.pdf PDF
Attachment_29_-_Wage_Determination-Building.pdf PDF
Attachment_27_-_Section_32_17_23.00_20_Pavement_Markings.pdf PDF
Attachment_33_-_EMS_Training_Statement.pdf PDF
Attachment_3_-_Section_01_15_00_Work_Restrictions.pdf PDF
Attachment_16_-_Section_02_81_00_Transportation_and_Disposal_of_Hazardous_Materials.pdf PDF
Attachment_25_-_Section_09_97_13.27_Exterior_Coating_of_Steel_Structures.pdf PDF
Attachment_1_-_Statement_of_Work.pdf PDF
Attachment_15_-_Section_01_78_00_Project_Closeout.pdf PDF
Attachment_21_-_Section_09_90_00_Paints_and_Coatings.pdf PDF
Attachment_26_-_Section_32_01_11.51_Rubber_and_Paint_Removal_from_Airfield_Pavements.pdf PDF
Attachment_18_-_Section_09_23_00_Gypsum_Plastering.pdf PDF
Attachment_32_-_Form_66_Submittal_Register.xls XLS spreadsheet
Attachment_11_-_Section_01_40_00_Safety.pdf PDF
Attachment_24_-_Section_09_97_13.17_Three-Coat_Epoxy_Interior_Coating_of_Welded_Steel_Petroleum_Fuel_Tanks.pdf PDF
Attachment_12_-_Section_01_50_00_Temporary_Construction_Facilities_and_Controls.pdf PDF
Attachment_35_-_Past_Performance_Questionnaire.pdf PDF
Attachment_19_-_Section_09_29_00_Gypsum_Board.pdf PDF
Attachment_31_-_NAF_Provisions_Clauses.pdf PDF
Attachment_5_-_Section_01_30_60_Background_Checks_for_Contractor_Personnel.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4419-14-R-0102

Attachment 2

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 WORK COVERED BY CONTRACT DOCUMENTS

1.1.1 Project Description

The work includes the following general types and classes of work and incidental related work.

1.1.1.1 The basic requirements of this contract include coating/painting and associated work related to these, such as testing and cleaning of surfaces, paint removal, and prep work.

1.1.1.1.1 Painting of the interiors & exteriors of various facilities. Paint wall panels to include sealing. Paint acoustical tiles and grid, texture walls or ceilings, and plaster walls or ceilings. Painting will include primers plus 1 - 2 coats of paint as required by paint schedule.

1.1.1.1.2 Painting of exterior insulated finishing system, metal fence, buildings, doors

(regular door, roll-up, sliding, and hangar doors) and roofs/fascia/soffits. Lay out and paint stripes on roads/parking lots/airfield (to include stencils). Paint concrete balusters, metal handrails and ladders, metal equipment (exterior equipment to match bldg. or trim, and equipment in mechanical rooms), metal trims, concrete floors

(including mechanical rooms), and gutters/downspouts. Lay out and paint tennis courts, basketball courts, racquetball courts, volleyball courts as per NCAA Court

Markings (confirm layout with gym manager). Hangar Chemically Resistant Urethane floor coating preparation & installation.

1.1.1.1.3 Paint/stain/varnish of wood surfaces, i.e. fences (UV protection), exterior doors

(UV protection), interior doors, cabinet work, trims, baseboards, balusters/handrails, gym floors, club dance floors.

1.1.1.1.4 Paint of asbestos cement siding surfaces, concrete, stucco, bricks, plaster and masonry, porous, metal, galvanized, aluminum, lead, copper, and wood surfaces.

Protective coating shall be applied to, but not limited to wood, metal, and concrete.

1.1.1.1.5 Prep work to include surface preparation and minor repairs. Any loose or cracked caulking or glazing putty shall be removed and refilled with new caulking or putty. Tape/spackle and seal surface from smoke/moisture damage. Prepare surfaces to receive new coating, in accordance with manufacturers’ standard.

1.1.1.1.6 Paint removal, i.e., water blast, sandblast, shell blast, cob blast, scarify

(grinding), and white metal blast or other blast media, as well as approved chemical paint removal to remove paint debris or thermoplastic from surfaces of the interior or exterior of facilities, floors, streets/parking lots, water towers, fences and other real property.

1.1.1.1.7 Cleaning surfaces before painting due to dirt/grime, smoke, and the elements, by washing with environmentally safe soap and water, chemicals (solvents), sanding

(power tools), scraping (hand tools), blasting or other approved chemical method.

1.1.1.1.8 Testing for Lead Base Paint (LBP) and Asbestos and possible abatement before painting; refer to specifications.

1.1.2 Location

The work shall be located on Altus AFB, OK. The exact location will be shown by the

Contracting Officer per Task Order.

1.2 OCCUPANCY OF PREMISES

Building(s) may or may not be occupied during performance of work under this Contract.

Occupancy notifications will be posted in a prominent location in the work area.

Before work is started, the Contractor shall arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

1.3 EXISTING WORK

In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the

Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.

1.4 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged shall remain the property of the

Government. The salvaged property shall be segregated, itemized, delivered, and off-loaded at the Government designated storage area. The Contractor shall maintain property control records for material or equipment designated as salvage. The Contractor's system of property control may be used if approved by the Contracting Officer. The Contractor shall be responsible for storage and protection of salvaged materials and equipment until disposition by the Contracting Officer.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --