Attachment_2_-_Section_01_11_00_Summary_of_Work.pdf
PDF 107 KB Posted
- Attached to
- Paint and Protective Coatings IDIQ Federal contract opportunity
- Solicitation number
- FA4419-14-R-0102
About this file
Attachment 2 - Section 01 11 00 Summary of Work
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4419-14-R-0102
Attachment 2
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
The work includes the following general types and classes of work and incidental related work.
1.1.1.1 The basic requirements of this contract include coating/painting and associated work related to these, such as testing and cleaning of surfaces, paint removal, and prep work.
1.1.1.1.1 Painting of the interiors & exteriors of various facilities. Paint wall panels to include sealing. Paint acoustical tiles and grid, texture walls or ceilings, and plaster walls or ceilings. Painting will include primers plus 1 - 2 coats of paint as required by paint schedule.
1.1.1.1.2 Painting of exterior insulated finishing system, metal fence, buildings, doors
(regular door, roll-up, sliding, and hangar doors) and roofs/fascia/soffits. Lay out and paint stripes on roads/parking lots/airfield (to include stencils). Paint concrete balusters, metal handrails and ladders, metal equipment (exterior equipment to match bldg. or trim, and equipment in mechanical rooms), metal trims, concrete floors
(including mechanical rooms), and gutters/downspouts. Lay out and paint tennis courts, basketball courts, racquetball courts, volleyball courts as per NCAA Court
Markings (confirm layout with gym manager). Hangar Chemically Resistant Urethane floor coating preparation & installation.
1.1.1.1.3 Paint/stain/varnish of wood surfaces, i.e. fences (UV protection), exterior doors
(UV protection), interior doors, cabinet work, trims, baseboards, balusters/handrails, gym floors, club dance floors.
1.1.1.1.4 Paint of asbestos cement siding surfaces, concrete, stucco, bricks, plaster and masonry, porous, metal, galvanized, aluminum, lead, copper, and wood surfaces.
Protective coating shall be applied to, but not limited to wood, metal, and concrete.
1.1.1.1.5 Prep work to include surface preparation and minor repairs. Any loose or cracked caulking or glazing putty shall be removed and refilled with new caulking or putty. Tape/spackle and seal surface from smoke/moisture damage. Prepare surfaces to receive new coating, in accordance with manufacturers’ standard.
1.1.1.1.6 Paint removal, i.e., water blast, sandblast, shell blast, cob blast, scarify
(grinding), and white metal blast or other blast media, as well as approved chemical paint removal to remove paint debris or thermoplastic from surfaces of the interior or exterior of facilities, floors, streets/parking lots, water towers, fences and other real property.
1.1.1.1.7 Cleaning surfaces before painting due to dirt/grime, smoke, and the elements, by washing with environmentally safe soap and water, chemicals (solvents), sanding
(power tools), scraping (hand tools), blasting or other approved chemical method.
1.1.1.1.8 Testing for Lead Base Paint (LBP) and Asbestos and possible abatement before painting; refer to specifications.
1.1.2 Location
The work shall be located on Altus AFB, OK. The exact location will be shown by the
Contracting Officer per Task Order.
1.2 OCCUPANCY OF PREMISES
Building(s) may or may not be occupied during performance of work under this Contract.
Occupancy notifications will be posted in a prominent location in the work area.
Before work is started, the Contractor shall arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
1.3 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the
Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
1.4 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the Contracting Officer to be salvaged shall remain the property of the
Government. The salvaged property shall be segregated, itemized, delivered, and off-loaded at the Government designated storage area. The Contractor shall maintain property control records for material or equipment designated as salvage. The Contractor's system of property control may be used if approved by the Contracting Officer. The Contractor shall be responsible for storage and protection of salvaged materials and equipment until disposition by the Contracting Officer.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --