About this file

Attachment 21 - Section 09 90 00 Paints and Coatings

View the file

Other files for this federal contract opportunity

Other files attached to Paint and Protective Coatings IDIQ, newest first.
File Type Posted
Questions_and_Answers.xlsx XLSX spreadsheet
Site_Visit_Presentation.pptx PPTX presentation
Attachment_22_-_Section_09_97_13.00_40_Steel_Coatings.pdf PDF
Attachment_23_-_Section_09_97_13.16_Interior_Coating_of_Welded_Steel_Water_Tanks.pdf PDF
Attachment_4_-_Section_01_30_00_Administrative_Requirements.pdf PDF
FA4419-14-R-0102_Paint_and_Protective_Coatings_IDIQ.doc DOC document
Attachment_13_-_Section_01_55_00_Temporary_Environmental_Controls.pdf PDF
Attachment_7_-_Section_01_35_00_Quality_Control.pdf PDF
Attachment_34_-_Paint_Coefficient_(FINAL).xlsx XLSX spreadsheet
Attachment_26_-_Section_32_01_11.51_Rubber_and_Paint_Removal_from_Airfield_Pavements.pdf PDF
Attachment_18_-_Section_09_23_00_Gypsum_Plastering.pdf PDF
Attachment_32_-_Form_66_Submittal_Register.xls XLS spreadsheet
Attachment_11_-_Section_01_40_00_Safety.pdf PDF
Attachment_24_-_Section_09_97_13.17_Three-Coat_Epoxy_Interior_Coating_of_Welded_Steel_Petroleum_Fuel_Tanks.pdf PDF
Attachment_12_-_Section_01_50_00_Temporary_Construction_Facilities_and_Controls.pdf PDF
Attachment_35_-_Past_Performance_Questionnaire.pdf PDF
Attachment_19_-_Section_09_29_00_Gypsum_Board.pdf PDF
Attachment_31_-_NAF_Provisions_Clauses.pdf PDF
Attachment_5_-_Section_01_30_60_Background_Checks_for_Contractor_Personnel.pdf PDF
Attachment_14_-_Section_01_75_00_Starting_and_Adjusting.pdf PDF
Attachment_9_-_Section_01_35_40.00_20_Environmental_Management.pdf PDF
Attachment_17_-_Section_03_01_30.71_Concrete_Rehabilitation.pdf PDF
Attachment_6_-_Section_01_33_00_Submittal_Procedures.pdf PDF
Attachment_30_-_Wage_Determination-Highway.pdf PDF
Attachment_10_-_Section_01_37_00_Construction_Schedule.pdf PDF
Attachment_2_-_Section_01_11_00_Summary_of_Work.pdf PDF
Attachment_28_-_Section_32_17_24.00_10_Pavement_Markings.pdf PDF
Attachment_8_-_Section_01_35_26_Government_Safety_Requirements.pdf PDF
Attachment_20_-_Section_09_64_66_Athletic_Wood_Flooring.pdf PDF
Attachment_29_-_Wage_Determination-Building.pdf PDF
Attachment_27_-_Section_32_17_23.00_20_Pavement_Markings.pdf PDF
Attachment_33_-_EMS_Training_Statement.pdf PDF
Attachment_3_-_Section_01_15_00_Work_Restrictions.pdf PDF
Attachment_16_-_Section_02_81_00_Transportation_and_Disposal_of_Hazardous_Materials.pdf PDF
Attachment_25_-_Section_09_97_13.27_Exterior_Coating_of_Steel_Structures.pdf PDF
Attachment_1_-_Statement_of_Work.pdf PDF
Attachment_15_-_Section_01_78_00_Project_Closeout.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4419-14-R-0102

Attachment 21

SECTION 09 90 00

PAINTS and COATINGS, GENERAL

PART 1 - GENERAL

1.1 SCOPE: There are a variety of heights where work shall be accomplished at

Altus AFB. The maximum height will not exceed 150 FT. Painting at any height in this range can be expected during the course of the contract. The Contractor may paint interior and exterior components of Base Facilities. The Contractor shall use maximum effort to match Federal Standard 595B colors. All exterior colors will be in accordance with the Exterior Paint Plan. The Base Interior Designer or Base Architect will identify all interior paint colors on each Task Order (TO). The Contractor shall patch or repair and paint to match existing areas to achieve complete repair of assigned surfaces to match adjoining surfaces. Any loose or cracked caulking or glazing putty shall be removed and refilled with new caulking by the Contractor. Holes and cracks shall be filled with compatible materials and then taped/spackled, sealed and possibly textured prior to painting. Contractor shall scarify, blast or use chemicals to remove paint, debris or other foreign matter from surfaces of the interior or exterior of buildings, facilities, floors, and other real property prior to application of new paint. Do not paint pre-finished items, concealed surfaces, finished metal surfaces, operating parts, and labels.

A. The Contractor shall be fully responsible for covering or otherwise protecting all items from coating, dust, etc. during the Contractor’s performance. Areas, devices, or items not to be coated must be masked off. The Contractor will provide proper masking material, masking tape, polyethylene sheet, or other materials as required to protect areas from over-spray, splatter, foot tracking, and spills.

B. The Contracting Officer (CO), Inspector, Project Manager, User, and the

Contractor shall jointly inspect the work area before work commences. Coordinate testing with user 24 hours in advance, before testing. Any existing damage to the area shall be documented at that time. The Contractor shall repair damage incurred during the contracted operations.

C. Work may be phased so that only part of a building or other facility is turned over to the Contractor at one time. Any equipment or material temporarily stored will be moved by government personnel upon reasonable notice of at least 5 days of intent to work in the area. Due to unplanned or emergency conditions, the government may require the facility to be returned to government use prior to Contractor completion.

D. The Contractor will protect areas adjacent to surface preparation and coating operations, and will protect the work area with barricades, warning tape, and signs. When work is complete, the Contractor will remove these items (including masking tape); and will remove accumulated debris.

E. Remove building identification numbers prior to painting building. Existing signs, emblems and numbering plates shall be removed from the building by the contractor and reinstalled after painting is completed.

1.2 REFERENCE STANDARDS: Most current editions of publications listed below or in distribution shall apply. Contractor shall make available to the CO at least one copy each of: ASTM D 3276, ASTM D 3925, ASTM D 4285, SSPC SP CPM, SSPC

SP 1, SSPC VIS 3, SSPC PA 1, SSPC PA 3, SSPC Guide 12, and an SSPC Certified

Contractor Evaluation Form at the job site. The following publications shall be considered to be part of the overall contract at all times, as applicable, for the particular

Task Order that is being performed at any time.

AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL

HYGIENISTS (ACHIH)

http://www.acgih.org

ACGIH TLV-BKLT 1993 - 1994 Threshold Limit Values (TLVs)for Chemical

Substances and Physical Agents and Biological Exposure

Indices (BEIs)

ACGIH TLV-DOC Documentation of Threshold Limit Values and Biological

Exposure Indices

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

http://www.ansi.org

ANSI A13.1 Scheme for Identification of Piping Systems

AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)

http://www.astm.org

ASTM C 150 Portland Cement

ASMT C 669 Glazing Compounds for Back Bedding and Face Glazing of

Metal Sash

ASMT C 920 Elastomeric Joint Sealants

ASTM D 16 Definitions of Terms Relating to Paint, Varnish, Lacquer, and Related Products

ASTM D 235 Standard Specification for Mineral Spirits (Petroleum

Spirits) (Hydrocarbon Dry Cleaning Solvent)

ASTM D 523 Standard Test Method for Specular Gloss

ASMT D 659 Evaluating Degree of Chalking of Exterior Paints

ASTM D 2016 Test Method for Moisture Content of Wood

ASTM D 2092 Preparation of Zinc-Coated (Galvanized) Steel Surfaces for

Painting

ASTM D 2824 Aluminum-Pigmented Asphalt Roof Coatings, Non-Fibered, Asbestos Fibered, and Fibered Without Asbestos

ASTM D 3274 Evaluating Degree of Surface Disfigurement of Paint Films by Microbial (Fungal or Alga) Growth or Soil and Dirt

Accumulation

ASTM D 3276 Standard Guide for Painting Inspectors (Metal Substrates)

ASTM D 3925 Sampling Liquid Paints and Related Pigmented Coatings

ASMT D 4214 Evaluating the Degree of Chalking of Exterior Paint Films

ASMT D 4263 Indicating Moisture in Concrete by the Plastic Sheet

Method

ASMT D 4444 Standard Test Methods for Use and Calibration of Hand-

Held Moisture Meters

ASTM D 4825 Indicating Oil or Water in Compressed Air

ASTM F 1869 Measuring Moisture Vapor Emission Rate of Concrete

Subfloor Using Anhydrous Calcium Chloride

CODE OF FEDERAL REGULATIONS (CFR)

http://www.setonresourcecenter.com

29 CFE 1910.1000 Air Contaminants

29 CFE 1910.1001 Asbestos, Tremolite, Anthophyllite, and Actinolite

29 CFE 1910.1025 Lead

29 CFE 1926.62 Lead Exposure in Construction

COMMERCIAL ITEM DESCRIPTIONS (CID)

CID A-A-2904 Thinner, Paint, Mineral Spirits, Regular and Odorless

FEDERAL STANDARDS (FED-STD)

http://www.fss.gsa.gov/pub/fedspecs

FED-STD- 313 Material Safety Data, Transportation Data and Disposal

Data for Hazardous Materials Furnished to Government

Activities

FED-STD- 595 Colors

MASTER PAINTERS INSTITUTE (MPI)

http://www.paintinfo.com

MPI 1 Aluminum Paint

MPI 2 Aluminum Heat Resistant Enamel (Up to 427 C and 800 F)

MPI 4 Interior/Exterior Latex Block Filler

MPI 5 Exterior Alkyd Wood Primer

MPI 6 Exterior Latex Wood Primer

MPI 7 Exterior Oil Wood Primer

MPI 8 Exterior Alkyd, Flat

MPI 9 Exterior Alkyd Enamel

MPI 10 Exterior Latex, Flat

MPI 11 Exterior Latex, Semi-Gloss

MPI 13 Exterior Semi-Transparent Stain (Solvent Based)

MPI 16 Exterior Solid Color Latex Stain

MPI 19 Inorganic Zinc Primer

MPI 21 Heat Resistant Enamel, Gloss, (Up to 205 C or 400 F)

MPI 22 High Heat Resistant Coating

MPI 23 Surface Tolerant Metal Primer

MPI 26 Cementitious Galvanized Metal Primer

MPI 27 Exterior/Interior Alkyd Floor Enamel, Gloss

MPI 31 Polyurethane, Moisture Cured, Clear Gloss

MPI 39 Interior Latex-based Wood Primer

MPI 42 Latex Stucco and Masonry Textured Coating

MPI 44 Interior Latex, MPI Gloss Level 2

MPI 45 Interior Primer Sealer

MPI 46 Interior Enamel Undercoat

MPI 47 Interior Alkyd, Semi-Gloss

MPI 48 Interior Alkyd, Gloss

MPI 49 Interior Alkyd, Flat

MPI 50 Interior Latex Primer Sealer

MPI 51 Interior Alkyd, Eggshell

MPI 52 Interior Latex, MPI Gloss Level 3

MPI 54 Interior Latex, Semi-Gloss

MPI 56 Interior Alkyd Dry Fog/Fall

MPI 57 Interior Oil Modified Clear Urethane, Satin

MPI 59 Interior/Exterior Alkyd Porch and Floor Enamel, Low

Gloss

MPI 60 Interior/Exterior Latex Porch and Floor Paint, Low Gloss

MPI 68 Interior/Exterior Latex Porch and Floor Paint, Gloss

MPI 71 Polyurethane, Moisture Cured, Clear, Flat

MPI 72 Polyurethane, Two Component, Pigmented, Gloss

MPI 77 Epoxy Cold Cured, Gloss

MPI 79 Marine Alkyd Metal Primer

MPI 90 Interior Wood Stain, Semi-Transparent

MPI 94 Exterior Alkyd, Semi-Gloss

MPI 95 Fast Drying Metal Primer

MPI 101 Cold Curing Epoxy Primer

MPI 107 Rust Inhibitive Primer (Water-Based)

MPI 108 High Build Epoxy Marine Coating

MPI 110 Interior/Exterior High Performance Acrylic

MPI 113 Elastomeric Coating

MPI 116 Epoxy Block Filler

MPI 119 Exterior Latex, High Gloss (acrylic)

MPI 134 Waterborne Galvanized Primer

MPI 138 High Performance Latex, White and Tints – MPI Gloss

Level 2

MPI 139 High Performance Latex, White and Tints – MPI Gloss

Level 3

MPI 140 High Performance Architectural Latex – MPI Gloss Level 4

MPI 141 High Performance Semigloss Latex, White and Tints – MPI

Gloss Level 5

MPI 144 Institutional Low Odor/VOC Interior Latex, MPI Gloss

Level 2

MPI 145 Institutional Low Odor/VOC Interior Latex, MPI Gloss

Level 3

MPI 146 Institutional Low Odor/VOC Interior Latex – MPI Gloss

Level 4 (a ‘satin-like’ finish)

MPI 147 Institutional Low Odor/VOC Interior Latex, MPI Gloss

Level 5

MILITARY STANDARDS (MIL-STD)

MIL-STD- 101 Color Code for Pipelines and for Compressed Gas

Cylinders

SCIENTIFIC CERTIFICATION SYSTEMS (SCS)

http://www.scs1.com

SCS-EPP-SP01-01 Environmentally Preferable Product Specification for

Architectural and Anti-Corrosive Paints

STEEL STRUCTURES PAINTING COUNCIL (SSPC)

http://www.sspc.org

SSPC PA 1 Shop, Field, and Maintenance Painting

SSPC PA 2 Measurement of Dry Paint Thickness with Magnetic Gages

SSPC PA 2 Safety in Paint Application

SSPC PA 5 Zinc Dust, Zinc Oxide and Phenolic Varnish Paint

SSPC Paint 18 Chlorinated Rubber Intermediate Coat Paint

SSPC PA 25 Paint, Oil: Iron-Oxide, Ready-Mixed, Red and Brown

SSPC SP CPM Surface Preparation Commentary

SSPC SP 1 Solvent Cleaning

SSPC SP 2 Hand Tool Cleaning

SSPC SP 3 Power Tool Cleaning

SSPC SP 5 White Metal Blast Cleaning

SSPC SP 6 Commercial Blast Cleaning

SSPC SP 7 Brush-Off Blast Cleaning

SSPC SP 8 Pickling

SSPC SP 10 Near-White Metal Blast Cleaning

SSPC SP 11 Power Tool Cleaning to Bare Metal

SSPC SP 12 Surface Preparation and Cleaning of Steel and Other Hard

Materials by High-and Ultra high-Pressure Water Jetting

Prior to Recoating

SSPC SP 13 Surface Preparation of Concrete

SSPC Guide 6 Containing Debris Generated During Paint Removal

Operations

SSPC Guide 7 Disposal of Lead-Contaminated Surface Preparation

Debris

SSPC Guide 12 Guide for Illumination of Industrial Painting Projects

SSPC QP 1 Evaluating Qualifications of Painting Contractors (Field

Application to Complex Industrial Structures)

SSPC VIS 1 Visual Standard for Abrasive Blast Cleaned Steel

(Standard Reference Photographs)

SSPC VIS 3 Visual Standard for Power-and Hand-Tool Cleaned Steel

(Standard Reference Photographs)

SSPC VIS 4 Guide and Reference Photographs for Steel Surfaces

Prepared by Water Jetting)

1.3 ENVIRONMENTAL CONDITIONS:

A. Unless otherwise recommended by the paint manufacturer, the surface and temperature shall be as follows: No paints shall be applied when ambient or surface temperature is above 95 degrees F. Do not apply coating when air or substrate conditions are less than 37degrees F above dew point. Paints, except water-thinner types, shall be applied only to surfaces that are completely free of surface moisture as determined by sight or touch. In no case shall paint be applied to surfaces upon which there is visible frost or ice.

B. Minimum Application Temperatures for Latex Paints: 44 degrees F for interiors;

unless required otherwise by manufacturer’s instructions.

C. Minimum Application Temperature for Varnish Finishes: 64 degrees F for interior or exterior, unless required otherwise by manufacturer’s instructions.

D. Epoxy and moisture-curing polyurethane coatings shall be applied only within the minimum and maximum temperatures recommended by the coating manufacturer.

Moisture-curing polyurethane shall not be applied when the relative humidity is below 30 percent.

E. Water-thinned coatings, epoxy, and moisture-curing polyurethane coatings shall only be applied when ambient and surface temperature is between 50 and 95 degrees

Fahrenheit (F)). Unless specifically pre-approved by the CO and the product manufacturer. Under no circumstances shall application conditions exceed manufacturer recommendations.

F. Wind velocity should be below 15 miles per hour (MPH)) and relative humidity below 80 percent for any exterior applications.

G. Moisture content of wood shall not exceed 12 percent when checked with a moisture meter by the Contractor prior to painting. Moisture content of plaster shall not exceed 8 percent when checked with a moisture meter by the Contractor prior to painting.

1.4 SUBMITTALS: The current Master Painter’s Institute (MPI) “Approved

Product List” which lists paint by brand, label, product name and product code as of the date of task order award, will be used to determine compliance with the submittal requirements of this specification. The Contractor may choose to use a subsequent MPI

"Approved Product List”. However, only one list may be used for each task order and each coating system is to be from a single manufacturer. All coats on a particular substrate must be from a single manufacturer. No variation from the MPI “Approved

Products List” is acceptable. In keeping with the intent of Executive Order 13101, “Greening the government through Waste Prevention, Recycling, and Federal

Acquisition”, products certified by Scientific Certification Systems (SCS) as meeting

SCS-EPP-SP01-01 shall be given preferential consideration over registered products.

Products that are registered shall be given preferential consideration over products not carrying any Environmentally Preferred Product (EPP) designation. No paints or stains containing lead (0.06% or greater) may be used (see section 00004). Products must comply with the EPA’s Comprehensive Procurement Guidelines (CPG) list at http://www.epa.gov/cpg/products.htm, biobased product list at http://www.usda.gov/aarc/aarcsrbk.html, and cleaning products list at http://www.epa.gov/opptintr/epp/cleaners/select.

A. Data: The names, quantity represented, and intended use for the proprietary brands of materials proposed to be substituted for the specified materials when the required quantity of a particular batch is 50 gallons (GL) or less. Provide an inclusive list of required coating materials. Indicate each material and cross-reference specific coating, finish system, and application. Identify each material by manufacturer’s catalog number and general classification.

B. Instructions: Manufacturer’s current printed product description, material-safety-data-sheets (MSDS) and technical data sheets for each coating system. MSDS submittals shall meet the requirements of FED-STD 313. Submit formulator’s printed instructions to include brand names, catalog numbers, and names of manufacturers. Indicate detailed mixing, thinning and application instructions; minimum and maximum application temperature and humidity, potlife; curing and drying times between coats for epoxy, moisture-curing polyurethane, and liquid glaze coatings. Detailed application instructions for textured coatings shall be provided. Provide six copies of MSDS (or one

(1) hard copy and electronic media copy of the MSDS) for materials to be used at the job site in accordance with CFR 29 CFR 1910.1200. Preprinted cleaning and maintenance instructions for all coating systems shall be provided.

C. Reports: A statement as to the quantity represented and the intended use, plus the following test report as specified in Fed Spec 141. The Contractor shall furnish either one of the following reports:

1. A test report showing that the proposed batch to be used meets all specification requirements, or:

2. A test report showing that a previous batch of the same formulation as the batch to be used met all specification requirements, plus, on the proposed batch to be used, a report of test results for properties of weight per gallon, viscosity, fineness of grind, drying time, color, and gloss.

D. Certificates: Volatile Organic Compound (VOC) Content; Certificate stating that paints proposed for use contain not more than 0.06% lead. Certificate stating that paints proposed for use meet the VOC regulations of the local Air Pollution Control Districts having jurisdiction over the geographical area in which the project is located. Original certification by manufacturer that products supplied comply with local regulations controlling use of Volatile Organic Compounds (VOC’s), shall be submitted to the CO not less than 10 days before the material is required in the work

E. Samples: With each task order submit color board, illustrating selected colors for each color selected. Provide color board for verification of each color and material to be applied, with texture to simulate actual conditions, on representative Samples of the actual substrate. Provide stepped Samples, defining each separate coat, including primers. Use representative colors when preparing Samples for review. Provide a list of materials and applications for each coat of each sample.

1. Provide “Textured Wall Coating System”. Three complete samples of each indicated type, pattern, and color of textured wall coating system applied to a panel of the same material as that on which the coating system will be applied in the work. Samples of wall coating systems shall be minimum 5 x 7 IN and of sufficient size to show pattern repeat and texture.

2. Provide manufacturer’s samples of paint colors

F. Quality Assurance Provisions: Notify the CO 3 days in advance when the materials are available for sampling at the site or source of supply. Obtain a one-liter

(quart) sample of each batch of each base material, and proportional samples of each activator based on mix ratio, by random selection from sealed containers in accordance with ASTM D 3925. The samples shall be taken in the presence of the CO. Prior to sampling, mix contents of the sealed container to ensure uniformity. A batch is defined as that quantity of material processed by the manufacturer at one time and identified by number on the label. Clearly identify samples by designated name, specification number, batch number, project contract number, intended use, and quantity involved. These samples, or parts thereof, not used in testing shall be retained for one year for examination in the event of premature failure of the coating. The Contractor shall do shipping and testing of the samples. Test samples of all primer, intermediate, and topcoat materials for compliance. Reject entire batch represented by samples that fail one or more tests, reselect, and retest samples. Obtain primers and undercoat materials for each coating system from the same manufacturer as the finish coats.

1. Provide Batch Quality Conformance Test for specified products, as defined by and performed by MPI. As an alternative to Batch Quality Conformance Testing, the

Contractor may provide Qualification Testing for specified products above to the appropriate MPI product specification, using the third-party laboratory. The qualification testing lab report shall include the backup data and summary of the test results. The summary shall list all of the reference specification requirements and the result of each test. The summary shall clearly indicate whether the tested paint meets each test requirement. Note that the Qualification Testing may take 4 to 6 weeks to perform, due to the extent of testing required.

2. Submit name, address, telephone number, FAX number, and e-mail address of the independent third party laboratory selected to perform testing of coating samples for compliance with specification requirements. Submit documentation that laboratory is regularly engaged in testing of paint samples for conformance with specifications, and that employee performing testing is qualified. If the Contractor chooses MPI to perform the Batch Quality Conformance Testing, the above submittal information is not required, only a letter is required from the Contractor stating that MPI will perform the testing.

G. Lists of proposed equipment to be used in performance of construction work, including descriptive data, and notifications of proposed Contractor actions as specified in this section. A list of safety equipment and precautions required at the job site. The list will include written procedures for handling non-hazardous waste, a chemical composite-sample breakdown, and pH testing of the etching compound.

1. Submit design details of the proposed environmental control system to include ventilation, humidity control, and temperature regulation. Provide calculations for humidity control during separate surface preparation and coating application procedures, ventilation requirements during coating application, and maximum allowable coating application rates to coincide with ventilation. Include basis of design data on local conditions. Provide equipment layout sketches and procedures showing function of each piece of equipment and fail-safe measures. A Certified Industrial Hygienist shall approve calculations, work procedures and personal protective equipment.

2. Submit a written plan describing in detail all phases of the coating operations.

Address work sequencing, surface preparations, coating application, recoats and cure time projections, as well as how each step will be controlled, tested, and evaluated.

Provide detailed procedures, including manufacturer’s instructions, for repairing defects in the coating film such as runs, drips, sags, holidays, overspray, etc. Address safety measures, work scheduling based on expected weather condition extremes, and record keeping.

H. All Contractor/subcontractors that perform surface preparation or coating application shall be certified by the Society for Protective Coatings (formerly Steel

Structures Painting Council) (SSPC) to the requirements of SSPC QP 1 prior to contract award, and shall remain certified while accomplishing any surface preparation or coating application of this type. SSPC QP 1 is not required for painting projects such as training facilities, general administration buildings, and VOQ’s. If the task order involves removal of paint containing hazardous materials, the requirements of SSPC QP 2 certification is required. The painting Contractor / subcontractors must remain so certified for the duration of the project. If a Contractor / subcontractor’s certification expires, the firm will not be allowed to perform any work until the certification is reissued. Requests for extension of time, for any delay to the completion of the project due to an inactive certification will not be considered and liquidated damages will apply.

Notify the CO of any change in Contractor certification status. Submit the name, address, telephone number, FAX number, and e-mail address of the

Contractor/subcontractor that will be performing all surface preparation and coating application. The coating applicator must have a minimum of 5 years’ experience applying the specified coating system. Work experience should include at least 10 jobs or 250,000 square feet (SF) of successful applications. The required number of jobs and

SF of applications may be increased with concurrence of the CO. List information by individual and include the following:

Name of individual and proposed position for this work.

Information about each previous assignment in applying the specified coating system including:

Position or responsibility

Employer (if other than the Contractor)

Mailing address, telephone number, and telex number (if non-US) of Base/Post

Name of individual in owner’s organization who can be contacted as a reference

Location, size and description of hangar floor

Dates work was carried out

Description of work carried out on hangar floor

I. Test Strip Demonstration: For each task order the Contractor shall test all equipment and demonstrate on the designated areas the proposed method to be used to remove coating, repair, and reapply coating. Coordinate testing with user 24 hours in advance, before testing. At least 48 hours prior to testing, the Contractor shall submit written notification to the Contracting Officer’s Representative.

1. The CO will designate a test strip within the work area. The test strip shall be

15 feet by 15 feet and include at least 10 feet of repair. The test strip shall be used to demonstrate the effectiveness of the Contractor’s methods and equipment to satisfactorily remove existing coating from the area at the specified removal rate without damaging the area. The CO shall be present at the test area to examine the texture obtained on the test strip. The test strip shall be the measure of performance required of the Contractor for the coating removal and replacement.

a. A test application will be accomplished in accordance with the contract specifications, including temperature and humidity. The test will include all phases of coating system application: surface preparation (cleaning); repair; and application of each coat. Each coat will be cured for the recommended time and evaluated for application properties, curing, and film properties. The total system will be cured 10 days prior to test and evaluation. After 10 day’s curing, the final coat will be evaluated for:

(1) adhesion between coats and to the substrate surface.

(2) film properties

(3) chemical resistance spot test

(4) color

(5) conductivity

(6) reflectance

2. If the coated area fails in any one of the criteria, the coating system should be rejected. The Contractor shall not proceed with the work until the results of the test strip are satisfactory to the CO.

3. The Contractor will identify to the Government what method he/she will use for removing the coating. The Contractor shall test his/her equipment on actual areas to be cleaned. The test shall be continued until the CO approves an acceptable surface condition.

4. For maintenance operations, use of ASTM D 5064, “Standard Practice for

Conducting a Patch Test to Assess Coating Compatibility,” will be warranted.

1.5 APPROVAL OF MATERIALS: When samples are tested, approval of materials will be based on tests of the samples; otherwise, materials will be approved based on test reports furnished with them. If materials are approved based on test reports furnished, samples will be retained by the Government for testing should the materials appear defective during or after application. In addition to any other remedies under the contract, the cost of re-testing defective materials will be at the Contractor’s expense.

The Contractor shall not deviate from using the Government approved products without the written authorization of the CO.

1.6 PACKAGING, LABELING, AND STORING: Paints shall be in sealed containers that legibly show the designated name, formula or specification number, batch number, color, quantity, date of manufacture, manufacturer’s formulation number, manufacturer’s directions including any warnings and special precautions, and name of manufacturer. Pigmented paints shall be furnished in containers not larger than 5 GL.

Paints and thinner shall be stored in accordance with the manufacturer’s written directions. A minimum stored off the ground, under cover, with sufficient ventilation to prevent the buildup of flammable vapors and at temperatures between 40 to 95 degrees F.

Paints shall be stored on the project site or segregated at the source of supply sufficiently in advance of need to allow 30 days for testing.

1.7 SAFETY AND HEALTH: Work shall comply with applicable Federal, State, and local laws and regulations, and with ACCIDENT PREVENTION PLAN, including the Activity Hazard Analysis as specified in Appendix A of COE EM-385-1-1. The

Activity Hazard Analysis shall include analyses of the potential impact of painting operations on painting personnel and on others involved in and adjacent to the work zone.

Safety methods used during coating applications must comply with the requirements of

SSPC PA 3. Spray painting may only be used after the Contractor submits and the

Government approves the Contractor’s Spray Paint Plan. The Contractor’s plan shall state the procedures, which indicates methods of isolating the contract area from other areas of the building. The plan must provide for air filtration, isolation of work area and complete work safety methods as outlined and defined in the following paragraphs. Bio-

Environmental Engineering, the Fire Department and the CO will evaluate the plan and determine if Contractor’s method of spraying will be permitted. Adherence to the performance requirements listed below is mandatory for continued operation of spray painting.

A. Worker Exposures: Under no circumstances will workers (Government and

Contractor) be exposed to levels of air contaminants that exceed those established by the newest versions listed below, or any other more stringent applicable regulation. Both particulate and gaseous contaminant limits may not be exceeded. Under no circumstances shall consumable food items such as lunches or vendable food items be allowed in the contract spray area.

1. OSHA Permissible Exposure Limit (PEL)

2. ACGIH TLV-BKLT, threshold limit values

3. OSHA standard in 19 CFR 1910.1000

4. The applicable manufacturer’s Material Safety Data Sheets (MSDS) or local regulation.

5. The appropriate OSHA standard in 29 CFR 1910.1025 and 29 CFR 1926.62 for surface preparation on painted surfaces containing lead. Additional guidance is given in

SSPC Guide 6 and SSPC Guide 7.

6. The appropriate OSHA standards in 29 CFR 1910.1001 for surface preparation of painted surfaces containing asbestos.

B. Toxic Compounds: Toxic compounds having ineffective physiological properties, such as odor or irritation levels, shall not be used unless approved by the CO.

C. Training: Workers having access to an affected work area shall be informed of the contents of the applicable material data safety sheets (MSDS). They shall be informed of potential health and safety hazard and protective controls associated with materials used on the project. An affected work area is one that may receive mists and odors from the painting operations. Workers involved in preparation, painting and clean up shall be trained in the safe handling and application, and the exposure limit, for each material, which the worker will use in the project. Personnel having a need to use respirators and masks shall be instructed on the use and maintenance of such equipment by the Contractor and will comply with 29 CFR 1910.134.

D. Coordination: Work shall be coordinated to minimize exposure of building occupants, other Contractor personnel, and visitors to mists and odors from preparation, painting and clean up operations. When spray painting is being performed in occupied areas, all personnel with the exception of painters and their helpers must be removed.

E. Protection Against Liquids: Wear protective clothing, gloves and eye and face protection when applying coatings or when handling liquid materials. Face protective equipment must meet the requirements of ANSI 287.1. All spray painters are required to wear respiratory protection. This can range from a simple dust fume and mist type respirator for water based nontoxic paints up to an airline-supplied respirator for spraying paints containing isocyanates or carcinogens. Contractor will provide respirators to employee, and the Contractor must comply with 29 CFR 1910.143 and OSHA expanded standards.

F. Ventilation: The area must be physically isolated from the occupied areas by the use of plastic or some other vapor proof barrier. This isolation must remain in place until the paint is no longer emitting air contaminants. The work area must be ventilated properly at all times to prevent accumulation of hazardous fumes. Return air inlets in the work zone shall be temporarily sealed before start of work until the coatings have dried.

Local exhaust ventilation may be needed in the isolated area to remove air contaminants so they do not build to an explosive level or exceed the capacity of the respirator being worn. This local exhaust ventilation shall not be directly vented to the outdoors unless a permit has already been obtained from the County Health Department for air contaminants prior to discharge to the environment.

G. Compressors for spray painting shall not produce noise levels greater than 80 decibels A- weighted pressure level (dbA) and preferably should not be located in occupied areas. Fossil Fueled compressors shall not be permitted inside buildings unless their exhausts are vented to the outdoors.

1.8 MEASUREMENT FOR PAYMENT:

A. Measurement for payment will be by square feet. It will include all surface preparation and repairs, complete hiding of existing surfaces by painting, including but not limited to frames, trim, returns, kitchen cabinets, walls baseboards, baseshoes, ceiling, both sides and edges of doors, cupboards, and storage areas. Work will be paid for on the bases of actual wall or ceiling areas. Where complete hiding of the existing surface was obtained by painting: i.e., a wall 32 feet long by 45 feet high with an 81 feet square opening(s) will be 1,359 square feet (SF) and will include all of the above items.

Ceiling surfaces will include all vents, louvers, and furred areas and will be based on ceiling dimensions: i.e. a ceiling 32 feet by 20 feet will contain 640 SF. An opening shall consist of an unpainted surface or a painted item paid for and included in another bid item.

1. Closets: Painting shall include all surfaces of shelves (regardless of number), and interior walls and ceilings of the closets.

2. Doors: The measurement unit for swing doors shall include hiding by painting both sides and all edges. The entire jamb shall be painted. All rolling doors, such as warehouse doors that are hung from rails or roll on tracks, shall be painted on both sides and on all edges. Included, also, are door tracks and cap sheets. Overhead doors will be painted both sides and all edges. The term trim shall include but not be limited to doors, windows, and door and window casings and trim molding.

3. Screen frames including security screens and security bars and frames shall be painted two coats on all sides, top and bottom and edges.

4. Porches, steps, platforms and stoops: All exposed surfaces including handrails, posts, underside of eaves, and exposed edges.

5. All ladders and stairs attached to buildings shall be painted.

6. All evaporative cooler stands and cooling towers even though remote from building. (Exception to this will be air-conditioning condensers that have factory enameled finishes and are not showing rust spots.)

7. Concrete foundations, loading docks and porches not previously painted, will not be painted. Metal bumper guards shall be painted.

8. Firewalls extending out from and above rooflines that have been previously painted will be repainted on both sides as specified herein.

9. Gutters, downspouts, grilles, gravel guards, fascia, exhaust vents, roof vents and stacks and all other galvanized, aluminum and copper of other metal surfaces on walls or roofs will be painted, only if they have been previously painted. Existing surfaces painted with aluminum paint will be repainted aluminum. Existing surfaces painted with building colors will be primed with the appropriate primer and painted to match the building or trim. Contractor shall paint behind appurtenant structures to provide complete coverage of building exterior so previous finish cannot be seen.

10. Painting Included: Where a space or surface is indicated to be painted, include the following unless indicated otherwise:

a. Surfaces behind portable objects and surface mounted articles readily detachable by removal of fasteners, such as screws and bolts.

b. New factory finished surfaces that require identification or color-coding and factory finished surfaces that are damaged during performance of the work.

c. Existing coated surfaces that are damaged during performance of the work.

11. Exterior Painting: Includes new surfaces, existing coated surfaces, and existing uncoated surfaces of the facility and appurtenances as indicated. Also included are existing coated surfaces made bare by cleaning operations.

12. Interior Painting: Includes new surfaces, existing uncoated surfaces, and existing coated surfaces and appurtenances as indicated and existing coated surfaces made bare by cleaning operations. Where a space or surface is indicated to be painted, included the following items, unless indicated otherwise: exposed columns, girders, beams, joists, and metal deck; other contiguous surfaces.

13. Painting Excluded: Do not paint the following unless indicated otherwise.

Surfaces concealed and made inaccessible by panel boards, fixed ductwork, machinery, and equipment fixed in place. Surfaces that are in concealed spaces. Concealed spaces are defined as enclosed spaces above suspended ceilings, furred spaces, attic spaces, crawl spaces, elevator shafts and chases. Steel to be embedded in concrete. Copper, stainless steel, aluminum, brass, and lead except existing coated surfaces. Hardware, fittings, and other factory finished items.

14. Mechanical and Electrical Painting:

a. Includes field coating of interior and exterior new and existing surfaces.

Where a space or surface is indicated to be painted, include the following items unless indicated otherwise: exposed piping, conduit, and ductwork; supports, hangers, air grilles, and registers; miscellaneous metalwork and insulation coverings.

b. Do not paint the following, unless indicated otherwise: new zinc-coated, aluminum, and copper surfaces under insulation; new aluminum jacket on piping; and new interior ferrous piping under insulation.

15. Fire Extinguishing Sprinkler Systems: Clean, pretreat, prime, and paint new fire extinguishing sprinkler systems including valves, piping, conduit, hangers, supports, miscellaneous metalwork, and accessories. Apply coatings to clean, dry surfaces, using clean brushes. Clean the surfaces to remove dust, dirt, rust, and loose mill scale.

Immediately after cleaning, provide the metal surfaces with one coat primer per schedules. Shield sprinkler heads with protective covering while painting is in progress.

Upon completion of painting remove protective covering from sprinkler heads. Remove sprinkler heads, which have been painted and replace with new sprinkler heads. Provide primed surfaces with the following:

a. Piping in Unfinished Areas: Provide primed surfaces with one coat of red alkyd gloss enamel applied to a minimum dry film thickness of 1/4 IN. in attic spaces, spaces above suspended ceilings, crawl spaces, pipe chases, mechanical equipment room, and spaces where walls or ceiling are not painted or not constructed of a prefinished material. (In lieu of red enamel finish coat, provide piping with 2 IN wide red enamel bands or self-adhering red plastic bands spaced at maximum of 20 FT intervals.

b. Piping in Finished Areas: Provide primed surfaces with two coats of paint to match adjacent surfaces, except provide valves and operating accessories with one coat of red alkyd gloss enamel applied to a minimum dry film thickness of ¼ IN. Provide piping with 2 IN wide red enamel bands or self-adhering red plastic bands spaced at maximum of 20 FT intervals through out the piping system.

16. Miscellaneous Painting:

a. Lettering Building and Room Numbers: Lettering shall be provided as indicated on the drawing. The Base Architect shall determine if they shall be block or gothic type; black enamel or water-type decalcomania, finished with a protective coating of spar varnish. Samples shall be approved before application. The Contractor shall provide and apply stencils on but not limited to, tanks, pavements, walls, bumper blocks, cabinets, etc. Stencils shall vary in height from 1/2 IN to 10 IN. Stencils applied to parking lot surfaces shall have a reflective white background. Average measurement of each reflective background is 3 SF.

b. Obstructions to Aviation: Obstructions to aviation shall be painted in the pattern and color prescribed by the Airfield Manager.

1.9 WARNING SIGNS: Place suitable warning signs near the beginning of the work site warning people of wet paint. Signs shall be removed by the contractor upon completion of the work, but not before the object is completely dry.

1.10 DEFINITION:.

A. Qualification Testing: Qualification testing is the performance of all test requirements listed in the product specification. This testing is accomplished by MPI to qualify each product for the MPI “Approved Product List”, and may also be accomplished by Contractor’s third party testing lab if an alternative to Batch Quality

Conformance Testing by MPI is desired.

B. Batch Quality Conformance Testing: Batch quality conformance testing determines that the product provided is the same as the product qualified to the appropriate product specification. This testing shall only be accomplished by MPI testing lab.

C. Coating: A film or thin layer applied to a base material called a substrate. A coating may be a metal, alloy, paint, or solid/liquid suspensions on various substrates

(metals, plastics, wood, paper, leather, cloth, etc.). The coatings may be applied by electrolysis, vapor deposition, vacuum, or mechanical means such as brushing, spraying, calendering, and roller coating. A coating may be applied for aesthetic or protective purposes or both. The term “coating” as used herein includes emulsions, enamels, stains, varnishes, sealers, epoxies, and other coatings, whether used as primer, intermediate, or finish coat. The terms paint and coating is used interchangeably.

D. DFT or dft: Dry film thickness, the film thickness of the fully cured, dry paint or coating.

E. DSD: Degree of Surface Degradation, the MPI system of defining degree of surface degradation. Five (5) levels are generically defined under the Assessment sections in the MPI Maintenance Repainting Manual.

F. EPP: Environmentally Preferred Products, a standard for determining environmental preferability in support of Executive Order 13101.

G. EXT: MPI short-term designation for an exterior coating system.

H. INT: MPI short-term designation for an interior coating system.

I. Micron/microns: The metric measurement for 0.001 MM or one/one-thousandth of a MM.

J. Mil/mils: The English measurement for 0.001 IN or one/one-thousandth of an IN, equal to 25.4 microns or 0.0254 MM.

K. MM: The metric measurement for millimeter, 0.001 MR or one/one-thousandth of a MR.

L. MPI Gloss Levels: MPI system of defining gloss. Seven (7) gloss levels (G1 to

G7) are generically defined under the Evaluation sections of the MPI Manuals.

Traditionally, Flat refers to G1/G2, Eggshell refers to G3, Semi gloss refers to G5, and

Gloss refers to G6. Gloss levels are defined by MPI as follows:

Gloss Level Description Units @ 60 degrees Units @ 85 degrees

G1 Matte or Flat 0 to 5 10 maximum

G2 Velvet 0 to 10 10 to 35

G3 Eggshell 10 to 25 10 to

G4 Satin 20 to 35 35 minimum

G5 Semi-Gloss 35 to 70

G6 Gloss 70 to 85

G7 High Gloss

Gloss is tested in accordance with ASTM D 523. Historically, the Government has used

Flat (G1/G2), Eggshell (G3), Semi-Gloss (G5), and Gloss (G6).

M. MPI System Number: The MPI coating system number in each Division found in either the MPI Architectural Painting Specification Manual or the Maintenance

Repainting Manual and defined as an exterior (EXT/REX) or interior system (INT/RIN).

The Division number follows the CSI Master Format.

N. Paint: See Coating definition.

O. REX: MPI short term designation for an exterior coating system used in repainting projects or over existing coating systems.

P. RIN: MPI short term designation for an interior coating system used in repainting projects or over existing coating systems.

1.11 COLOR SELECTION: Color Coding for Utility Connections: Paint connection fittings and shut-off valves the designated color. In addition to color-coding provided 50 MM (2 IN) high-stenciled letters using black stencil paint, clearly designating service for each connection.

Service Color FED-STD-595 No.

Potable Water* Blue 15044

Water Provided for Fire Protection Red 11105

Chilled Water Striped Blue/White 15044/17886

Oily Waste Water Striped Yellow/Black 13538/17038

Sewer Gold 17043

Steam White 17886

High Pressure Air Gray 16081

Low Pressure Air Tan 10324

Fuel Yellow 13655

* This includes connections serving domestic functions.

PART 2 - PRODUCTS

2.1 ACCEPTABLE MANUFACTURERS: Materials and equipment shall be standard products of a manufacturer regularly engaged in the manufacture of such products, which are of similar material, design and workmanship. The standard products shall have been in satisfactory commercial and/or industrial use for 2 years prior to date of solicitation and still is in production. No obsolete or out of production materials, shall be installed. The 2 years experience must be satisfactorily completed by a product that has been sold or is offered for sale on the commercial market through advertisements, manufacturers’ catalogs or brochures. All Federal and MPI Specification designations shall be used as a guide as to the type of material required.

2.2 PAINT: Paint shall conform to the respective specifications listed for use, in the painting schedule Attachment 2 and MPI. Manufacturers’ names and color identification are used for the purpose of color identification only. Named products are acceptable for use only if they conform to specified requirements. Products of other manufacturers are acceptable if the colors approximate colors indicated and the product conforms to specified requirements. Except when the required amount of a material of a particular batch is 50 gallons or less, an approved first-line, proprietary paint material with similar intended usage and color to that specified may be used. Ready mixed, except field-catalyzed coatings. Paints shall not be mixed with one another unless they are from the same manufacturer. Have the same formulation or specification number, color and date of manufacture except when multi-component paints are required to be mixed in compliance with manufacturer’s directions. Paints shall have good flowing and brushing properties and be capable of dry or curing free of streaks or sags. Additional requirements are as follows:

A. Colors and Tints: Colors and tints including shades of stain, shall match colors on

“Paint Schedule” SEE ATTACHMENT 2. Colors and tints shall comply with Federal

Standard No. 595B (or more recent update of the Standard). Manufacturer’s standard color is for identification of color only. Tinting of epoxy, and urethane, paints shall be done by the manufacturer. Stains shall conform in shade to manufacturer’s standard color. Tint each coat progressively darker to enable confirmation of the number of coats.

B. Lead Content Paints containing lead in excess of 0.06% by weight of the total nonvolatile content (calculated as lead metal) shall not be used. The Contractor shall comply with Federal Regulation 16 CFR-1303 in the use of lead, used for paints, children’s articles, toys, playground equipment, furniture, or any exterior or interior surface of a dwelling or facility.

C. Chromate Content: Paint containing zinc chromate or strontium chromate pigments shall not be used.

D. Volatile Organic Compound (VOC) Content: Paints shall comply with applicable

State and local laws enacted to insure compliance with Federal Clean Air Standards and shall conform to the restrictions of the local air pollution control authority.

E. Pigmented paints shall be furnished in containers not larger than 5 gallons.

Ready-mixed. Pigments fully ground maintaining a soft paste consistency, capable of readily and uniformly dispersed to a complete homogeneous mixture.

F. Hiding: Materials will have sufficient hiding power to obtain complete hiding of the surface to be painted. It is the intent of these specifications to permit the

Contractor to utilize a product of such quality that it will accomplish complete hiding with a one-coat application. The Contractor may at his/her own option select to use the minimum acceptable material and apply the number of coats required to achieve complete hiding at no additional cost, regardless of which quality material the Contractor selects to use: he/she must comply with the provisions contained in these specifications.

G. Mercury Content: Mercurial fungicides shall not be used in exterior oil paints.

Materials shall not contain mercury or mercury compounds.

H. Handling of Coating Materials: Mix in accordance with manufacturer’s instructions, which may differ for each product. Do not mix partial kits, or alter mix ratios. Mix materials in same temperature and humidity conditions. Allow mixed material to stand for the required induction time based on its temperature. Apply mixed products within stated pot life for each product. Stop applying when material becomes difficult to apply in a smooth, uniform wet film. Do not add solvent to extend pot life.

Add all required solvent at time of mixing. When mixing components, “boxing”

(pouring from can to can) is prohibited except one time to examine the bottom of

Component A can to ensure pigment has been mixed.

I. Asbestos Content: Materials shall not contain asbestos.

J. Silica Content: Abrasive blast media shall not contain free crystilline silica.

K. Human Carcinogens Content: Materials shall not contain ACGIH TLV-BKLT and ACGIG TLV-DOC confirmed human carcinogens (A1) or suspected human carcinogens (A2).

2.3 ACCESSORY MATERIALS:

A. Brushes are to be pure hog bristle or nylon. Horsehair shall not be used. Use size and shape to be appropriate to surface being painted.

B. Rollers are to have Dacron polyester or dynel fiber for application on wood trim and siding. Rollers for applying paint shall have the nap length recommended by the manufacturer of the paint for application to the specific surfaces (blown on ceiling texture and/or plain textured ceiling or walls).

C. Linseed oil, shellac, turpentines and other materials not specifically indicated herein but required achieving the finishes specified of high quality and approved manufacturer.

D. Patching Materials: Latex filler

E. Fastener Head Cover materials: Latex filler

F. Interior spray painting may only be used after the Contractor submits and

Government approves the Contractor’s Spray Paint Plan. The Contractor’s plan shall state the procedures, which indicates methods of isolating the contract area from other areas of the building.