WD TX6.doc
DOC document 41 KB Posted
- Attached to
- Roofing Maintenance, Repair and Installation IDIQ Federal contract opportunity
- Solicitation number
- FA3020-12-R-0008
About this file
Wage Determination TX6
View the file
Other files for this federal contract opportunity
Show all 50
Roofing Maintenance, Repair and Installation IDIQ has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: TX120006 04/20/2012 TX6
Superseded General Decision Number: TX20100007
State: Texas
Construction Type: Building
Counties: Grayson and Wise Counties in Texas.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories). (Use current heavy & highway general wage determination for Paving incidental to Building Construction).
Modification Number Publication Date
0 01/06/2012
1 04/20/2012
* ASBE0021-001 05/01/2011
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 20.12 7.05
* BOIL0074-001 01/01/2012
Rates Fringes
BOILERMAKER......................$ 23.06 20.28
BRTX0005-001 05/01/2011
GRAYSON COUNTY
Rates Fringes
BRICKLAYER.......................$ 21.06 7.18
BRTX0006-001 05/01/2011
WISE COUNTY
Rates Fringes
BRICKLAYER.......................$ 21.06 7.18
CARP0198-001 05/01/1996
WISE COUNTY
Rates Fringes
Acoustical, Drywall, Insulation and Metal Door
Frames...........................$ 14.00 2.92
Carpenter & Piledrivermen........$ 14.00 2.92
MILLWRIGHT.......................$ 16.49 3.92
CARP0304-001 05/01/1993
GRAYSON COUNTY
Rates Fringes
CARPENTER........................$ 14.61 1.655
MILLWRIGHT.......................$ 15.01 1.655
PILEDRIVERMAN....................$ 15.11 1.655
ELEC0020-004 12/01/2011
Rates Fringes
Electricians:
Cable Splicer...............$ 26.41 4.50+12.5%
Electrician.................$ 24.50 12.25% + 4.70
* ELEV0021-001 01/01/2012
Rates Fringes
ELEVATOR MECHANIC................$ 36.29 23.535
FOOTNOTES: a - A. 6% under 5 years based on regular hourly rate for all hours worked. 8% over 5 years based on regular hourly rate for all hours worked.
New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and Veterans Day.
ENGI0178-002 06/01/2009
Rates Fringes
Power equipment operators:
GROUP I.....................$ 24.70 9.35
GROUP II....................$ 24.70 9.35
GROUP III...................$ 23.20 9.35
GROUP IV....................$ 22.70 9.35
GROUP V.....................$ 21.70 9.35
GROUP VI....................$ 21.20 9.35
GROUP VII...................$ 20.95 9.35
GROUP VIII..................$ 20.45 9.35
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP I - Cranes (Including conventional, hydraulic over 35 tons, derricks, overhead, gantry, stiffleg, tower, etc. and cranes with piledriving or caisson attachments), clamshell, dragline, shovel, tunnel boring machine, hoist (motor driven - 2 drums or more, chimney hoist
GROUP II - Hydraulic cranes (35 ton and under), cableway, batch plant, asphalt plant, standard track type backhoes
(over 2 cy)
GROUP III - Motor grader (finish), truck mounted concrete pump, crusher, screening plant, standard track type backhoes (under 2 cy), field mechanic/welder, farm type rubber-tired backhoe
GROUP IV - Loaders (over 1 yd), wagon drills, foundation drilling machine, shaft hoists, concrete pump, fork lifts
GROUP V - Crawler tractor, bulldozer (over D4 or equivalent), trenching and ditching machines (over 66" depth), hoist
(over 2 drums - air driven), mucking machine, scraper, motor grader (general), sideboom, work boats
GROUP VI - boom truck, placing boom, loaders (1 cy and under), gradall, skytrack, carrylift and similar equipment
GROUP VII - A-frame, winch truck, pull cats, straddle buggies, crawler tractors, bulldozers (D4 and under), lube or combination truck serviceman, hydralifts, double drum hoists (air driven), single drum hoist, winch cats
(hoisting), road pavers, asphalt spreader, locomotives, rotomill, curb & gutter machine, personnel/material hoist, farm type tractor w/attachments (excluding backhoe), rollers, bobcat type loaders Group VIII - Unit operator, well point water pump (over 6"), fireman, assistant to engineer (oiler, signalman), motorized sweeper broom,inside elevator, kolum buff machine, bull floats, concrete spreader/conveyor, finishing machines, dowel bar lmachines, distributor (bitum surface), bitchwitch & similar equipment
(under 66" depth), power saw, concrete power driven, concrete/pavement breakers or hydrohammer
IRON0263-007 06/01/2009
Rates Fringes
IRONWORKER.......................$ 21.60 4.40
LABO0648-001 05/01/2000
Rates Fringes
LABORER..........................$ 10.83 1.62
MARB0029-001 07/01/2005
Rates Fringes
Marble, Tile & Terrazzo
Finisher.........................$ 18.77 6.33
PAIN0053-001 12/01/2009
Rates Fringes
Painters:
Group 1 - Brush.............$ 16.40 4.80
Group 2 - All wall covering work; paper.
fabric. sheeting, flexwood, etc...............$ 16.65 4.80
Group 3 - Ames tool oper....$ 16.78 4.80
Group 4 - Structural steel, stage work, bosun chair, spray gun, sandblasting & window jack
& fire escapes..............$ 17.15 4.80
Group 5 - Steeple jack work consisting of watertowers, smoke stacks, & breeching; chimneys, flag poles, radio & TV towers, cable work 16' & over above ground where cables are strung to scaffolds & running boards..$ 17.15 4.80
PLAS0061-002 05/01/1990
Rates Fringes
PLASTERER........................$ 17.33 1.09
PLAS0549-001 07/01/1988
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 12.50 2.09
PLUM0100-003 05/01/2011
GRAYSON COUNTY
Rates Fringes
Plumbers and Pipefitters.........$ 27.79 9.56
PLUM0146-001 05/17/2011
WISE COUNTY
Rates Fringes
PLUMBER/PIPEFITTER...............$ 26.33 7.45
* ROOF0123-001 10/01/2011
Rates Fringes
Roofers:
Slate, Tile Asbestos, Roofing and Siding..........$ 20.86 5.05
* SFTX0669-001 04/01/2012
Rates Fringes
SPRINKLER FITTER (Fire
Sprinklers)......................$ 25.84 16.47
SHEE0068-004 11/01/2011
Rates Fringes
Sheet metal worker...............$ 26.54 8.54
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be
July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007
5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .