07 92 00 Joint Sealants

View the file

Other files for this federal contract opportunity

Other files attached to Roofing Maintenance, Repair and Installation IDIQ, newest first.
File Type Posted
Amendment 5.pdf PDF
Amendment 4.pdf PDF
amendment 3.doc DOC document
PrepProposal conference.pdf PDF
amendment 1.doc DOC document
amendment 2.doc DOC document
03-A-102-EXISTING- FILL AND NEW BLDG 4477 ROOF PLAN ELEVATION VIEW AND SECTION.pdf PDF
02-A-101-EXISTING- FILL AND NEW BLDG 2160 ROOF PLAN ELEVATION VIEW AND DETAIL.pdf PDF
01-G-001-PROJECT LOCATION PLAN.pdf PDF
07 22 00 Roof and Deck Insulation-1111(Nov).pdf PDF
07 95 00 Maintenance and Repair-1204(Apr).pdf PDF
01-G-001.dwf DWF file
OK14.doc DOC document
Disclosure of Lobbying Activities.pdf PDF
01 62 35 Recycled Recovered Materials-1111(Nov).pdf PDF
07 60 00 Flashing and Sheet Metal-1111(Nov).pdf PDF
07 61 14 Steel Standing Seam Roofing-1111(Nov).pdf PDF
WD TX268.doc DOC document
Site Visit Map.doc DOC document
06 10 00 Rough Carpentry-1111(Nov).pdf PDF
01 33 00A Attachment A-Submittals-1206(Jun).pdf PDF
WD TX6.doc DOC document
Asbestos Bldg 4477 Roof Summary.pdf PDF
Schedule B-First Option-1206.xls XLS spreadsheet
00 00 00 TOC-1206(Jun).pdf PDF
02-A-101.dwf DWF file
01 11 02 10B Attachment B-Forms-1206(Jun).pdf PDF
01 11 02 20 Measurement And Payment-1204(Apr).pdf PDF
Asbestos Bldg 2160 Roof Summary.pdf PDF
01 78 00 10 Project Closeout-1206(Jun).pdf PDF
07 42 13 Metal Wall Panel-1111(Nov).pdf PDF
Base Pass Forms.doc DOC document
07 51 13 Built Up Asphalt Roofing-1111(Nov).pdf PDF
01 35 26 Governmental Safety Requirements-1111(Nov).pdf PDF
00 00 00 Cover Stamped 1111(Nov).pdf PDF
Proposal Bldg 2160.xls XLS spreadsheet
Schedule of Material Submittals.xls XLS spreadsheet
07 61 14A Attachment A-SSM Details-1111(Nov).pdf PDF
Schedule B-Basic Year-1206.xls XLS spreadsheet
07 31 13 Asphalt Shingle-1111(Nov).pdf PDF
01 11 02 10A Attachment A-Performance Tables-1201(Jan).pdf PDF
07 51 13A Attachment A-BUR Details-1111(Nov).pdf PDF
Schedule B-Second Option-1206.xls XLS spreadsheet
07 21 16 Blanket Insulation-1111(Nov).pdf PDF
01 33 00 Project Submittals-1111(Nov).pdf PDF
Proposal Bldg 4477.xls XLS spreadsheet
FA3020-12-R-0008 Solicitation.pdf PDF
Past Performance Questionnaire.pdf PDF
01 11 02 10 Summary of Work-1204(Apr).pdf PDF
01 11 02 30 Contractor Quality Control-1111(Nov).pdf PDF
Show all 50

Roofing Maintenance, Repair and Installation IDIQ has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDIQ ROOF MAINTENANCE/REPAIR/REPLACEMENT VNVP 111080

SECTION 07 92 00 Joint Sealants

Page 1 of 6 Pages

November 2011

07 92 00

JOINT SEALANTS

PART 0 – INTENT:

0.1. This guide specification covers the requirements for sealants for normal building construction.

PART 1 - GENERAL:

1.1. REFERENCES: The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C 920 (2008) Standard Specification for Elastomeric Joint Sealants

1.2. SUBMITTALS: Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-03 Product Data

Sealants, G

Primers

Bond breakers

Backstops, G

Manufacturer's descriptive data including storage requirements, shelf life, curing time, instructions for mixing and application, and primer data (if required). Provide a copy of the Material Safety Data Sheet for each solvent, primer or sealant material.

1.3. ENVIRONMENTAL CONDITIONS: Apply sealant when the ambient temperature is between 40 and 90 degrees F.

1.4. DELIVERY AND STORAGE: Deliver materials to the job site in unopened manufacturers' external shipping containers, with brand names, date of manufacture, color, and material designation clearly marked thereon. Label elastomeric sealant containers to identify type, class, grade, and use. Carefully handle and store materials to prevent inclusion of foreign materials or subjection to sustained temperatures exceeding 90 degrees F or less than 0 degrees F.

1.5. QUALITY ASSURANCE:

1.5.1. Compatibility with Substrate: Verify that each of the sealants are compatible for use with joint substrates.

SECTION 07 92 00 Joint Sealants

Page 2 of 6 Pages

November 2011

1.5.2. Joint Tolerance: Provide joint tolerances in accordance with manufacturer's printed instructions.

1.6. SPECIAL WARRANTY: Guarantee sealant joint against failure of sealant and against water penetration through each sealed joint for five years.

PART 2 - PRODUCTS:

2.1. SEALANTS: Provide sealant that has been tested and found suitable for the substrates to which it will be applied.

2.1.1. Exterior Sealant: For joints in vertical surfaces, provide ASTM C 920, Type S or

M, Grade NS, Class 25, Use NT. For joints in horizontal surfaces, provide ASTM C

920, Type S or M, Grade P, Class 25, Use T. Provide location(s) and color(s) of sealant as follows:

a. Joints and recesses formed where frames and vents adjoin masonry, concrete, or metal frames. Use sealant at exterior surfaces of exterior wall penetrations.

b. Joints between new and existing exterior masonry walls.

c. Masonry joints where shelf angles occur.

d. Joints in wash surfaces of stonework.

e. Expansion and control joints.

f. Interior face of expansion joints in exterior concrete or masonry walls where metal expansion joint covers are not required.

g. Voids where items pass through exterior walls.

h. Metal reglets, where flashing is inserted into masonry joints, and where flashing is penetrated by coping dowels.

i. Metal-to-metal joints where sealant is indicated or specified.

j. Joints between ends of gravel stops, fascias, copings, and adjacent walls.

2.1.2. The following type sealants are not used.

2.1.2.1. Interior Sealant, Floor Joint Sealant, Acoustical Sealant, Preformed

Sealant

2.2. PRIMERS: Provide a nonstaining, quick-drying type and consistency when recommended by the sealant manufacturer for the particular application.

2.3. BOND BREAKERS: Provide the type and consistency recommended by the sealant manufacturer to prevent adhesion of the sealant to backing or to bottom of the joint.

2.4. BACKSTOPS: Provide glass fiber roving or neoprene, butyl, polyurethane, or polyethylene foams free from oil or other staining elements as recommended by sealant manufacturer. Provide 25 to 33 percent oversized backing for closed cell and 40 to 50 percent oversized backing for open cell material, unless otherwise indicated. Make backstop

SECTION 07 92 00 Joint Sealants

Page 3 of 6 Pages

November 2011 material compatible with sealant. Do not use oakum and other types of absorptive materials as backstops.

2.5. CAULKING: Not Used

2.6. CLEANING SOLVENTS: Provide type(s) recommended by the sealant manufacturer .

PART 3 - EXECUTION:

3.1. SURFACE PREPARATION: Clean surfaces from dirt frost, moisture, grease, oil, wax, lacquer, paint, or other foreign matter that would tend to destroy or impair adhesion.

Remove oil and grease with solvent. Surfaces must be wiped dry with clean cloths. When resealing an existing joint, remove existing caulk or sealant prior to applying new sealant.

For surface types not listed below, contact sealant manufacturer for specific recommendations.

3.1.1. Steel Surfaces: Remove loose mill scale by sandblasting or, if sandblasting is impractical or would damage finish work, scraping and wire brushing. Remove protective coatings by sandblasting or using a residue-free solvent.

3.1.2. Aluminum or Bronze Surfaces: Remove temporary protective coatings from surfaces that will be in contact with sealant. When masking tape is used as a protective coating, remove tape and any residual adhesive just prior to sealant application. for removing protective coatings and final cleaning, use nonstaining solvents recommended by the manufacturer of the item(s) containing aluminum or bronze surfaces.

3.1.3. Concrete and Masonry Surfaces: Where surfaces have been treated with curing compounds, oil, or other such materials, remove materials by sandblasting or wire brushing. Remove laitance, efflorescence and loose mortar from the joint cavity.

3.1.4. Wood Surfaces: Keep wood surfaces to be in contact with sealants free of splinters and sawdust or other loose particles.

3.2. SEALANT PREPARATION: Do not add liquids, solvents, or powders to the sealant.

Mix multi-component elastomeric sealants in accordance with manufacturer's instructions.

3.3. APPLICATION:

3.3.1. Joint Width-To-Depth Ratios:

a. Acceptable Ratios:

JOINT JOINT WIDTH JOINT DEPTH

Minimum

JOINT DEPTH

Maximum

For metal, glass, or other nonporous surfaces:

1/4 inch (minimum) over 1/4 inch

1/4 inch

1/2 of width

Equal to width

SECTION 07 92 00 Joint Sealants

Page 4 of 6 Pages

November 2011

JOINT JOINT WIDTH JOINT DEPTH

Minimum

JOINT DEPTH

Maximum

For wood, concrete, masonry, stone,:

1/4 inch (minimum)

Over 1/4 inch to 1/2 inch

Over 1/2 inch to 2 inch

Over 2 inch.

1/2 inch

(As recommended by sealant manufacturer)

Equal to width

5/8 inch

(As recommended by sealant manufacturer)

b. Unacceptable Ratios: Where joints of acceptable width-to-depth ratios have not been provided, clean out joints to acceptable depths and grind or cut to acceptable widths without damage to the adjoining work. Grinding is not required on metal surfaces.

3.3.2. Masking Tape: Place masking tape on the finish surface on one or both sides of a joint cavity to protect adjacent finish surfaces from primer or sealant smears. Remove masking tape within 10 minutes after joint has been filled and tooled.

3.3.3. Backstops: Install backstops dry and free of tears or holes. Tightly pack the back or bottom of joint cavities with backstop material to provide a joint of the depth specified. Install backstops in the following locations:

a. Where indicated. :

b. When backstop is not indicated but joint cavities exceed the acceptable maximum depths specified in paragraph entitled, "Joint Width-to-Depth Ratios".

3.3.4. Primer: Immediately prior to application of the sealant, clean out loose particles from joints. Where recommended by sealant manufacturer, apply primer to joints in concrete masonry units, wood, and other porous surfaces in accordance with sealant manufacturer's instructions. Do not apply primer to exposed finish surfaces.

3.3.5. Bond Breaker: Provide bond breakers to the back or bottom of joint cavities, as recommended by the sealant manufacturer for each type of joint and sealant used, to prevent sealant from adhering to these surfaces. Carefully apply the bond breaker to avoid contamination of adjoining surfaces or breaking bond with surfaces other than those covered by the bond breaker.

3.3.6. Sealants: Provide a sealant compatible with the material(s) to which it is applied.

Do not use a sealant that has exceeded shelf life or has jelled and can not be discharged in a continuous flow from the gun. Apply the sealant in accordance with the manufacturer's printed instructions with a gun having a nozzle that fits the joint width.

Force sealant into joints to fill the joints solidly without air pockets. Tool sealant after application to ensure adhesion. Make sealant uniformly smooth and free of wrinkles.

Upon completion of sealant application, roughen partially filled or unfilled joints, apply sealant, and tool smooth as specified. Apply sealer over the sealant when and as specified by the sealant manufacturer.

3.4. PROTECTION AND CLEANING:

SECTION 07 92 00 Joint Sealants

Page 5 of 6 Pages

November 2011

3.4.1. Protection: Protect areas adjacent to joints from sealant smears. Masking tape may be used for this purpose if removed 5 to 10 minutes after the joint is filled.

3.4.2. Final Cleaning: Upon completion of sealant application, remove remaining smears and stains and leave the work in a clean and neat condition.

a. Masonry and Other Porous Surfaces: Immediately scrape off fresh sealant that has been smeared on masonry and rub clean with a solvent as recommended by the sealant manufacturer. Allow excess sealant to cure for 24 hour then remove by wire brushing or sanding.

b. Metal and Other Non-Porous Surfaces: Remove excess sealant with a solvent-moistened cloth.

-- End of Section –

SECTION 07 92 00 Joint Sealants

Page 6 of 6 Pages

November 2011

THIS PAGE LEFT BLANK