Roofing Maintenance, Repair and Installation IDIQ Federal contract opportunity
Solicitation number
FA3020-12-R-0008
Issued by
Department of the Air Force Air Education and Training Command

About this file

Schedule B Totals Page

View the file

Other files for this federal contract opportunity

Other files attached to Roofing Maintenance, Repair and Installation IDIQ, newest first.
File Type Posted
Amendment 5.pdf PDF
amendment 3.doc DOC document
PrepProposal conference.pdf PDF
amendment 1.doc DOC document
amendment 2.doc DOC document
01-G-001-PROJECT LOCATION PLAN.pdf PDF
03-A-102-EXISTING- FILL AND NEW BLDG 4477 ROOF PLAN ELEVATION VIEW AND SECTION.pdf PDF
02-A-101-EXISTING- FILL AND NEW BLDG 2160 ROOF PLAN ELEVATION VIEW AND DETAIL.pdf PDF
07 22 00 Roof and Deck Insulation-1111(Nov).pdf PDF
07 95 00 Maintenance and Repair-1204(Apr).pdf PDF
01-G-001.dwf DWF file
OK14.doc DOC document
Disclosure of Lobbying Activities.pdf PDF
01 62 35 Recycled Recovered Materials-1111(Nov).pdf PDF
07 60 00 Flashing and Sheet Metal-1111(Nov).pdf PDF
07 61 14 Steel Standing Seam Roofing-1111(Nov).pdf PDF
WD TX268.doc DOC document
Site Visit Map.doc DOC document
06 10 00 Rough Carpentry-1111(Nov).pdf PDF
01 33 00A Attachment A-Submittals-1206(Jun).pdf PDF
WD TX6.doc DOC document
Asbestos Bldg 4477 Roof Summary.pdf PDF
Schedule B-First Option-1206.xls XLS spreadsheet
00 00 00 TOC-1206(Jun).pdf PDF
02-A-101.dwf DWF file
01 11 02 10B Attachment B-Forms-1206(Jun).pdf PDF
01 11 02 20 Measurement And Payment-1204(Apr).pdf PDF
07 92 00 Joint Sealants-1111(Nov).pdf PDF
Asbestos Bldg 2160 Roof Summary.pdf PDF
01 78 00 10 Project Closeout-1206(Jun).pdf PDF
07 42 13 Metal Wall Panel-1111(Nov).pdf PDF
07 21 16 Blanket Insulation-1111(Nov).pdf PDF
01 33 00 Project Submittals-1111(Nov).pdf PDF
Proposal Bldg 4477.xls XLS spreadsheet
FA3020-12-R-0008 Solicitation.pdf PDF
Past Performance Questionnaire.pdf PDF
01 11 02 10 Summary of Work-1204(Apr).pdf PDF
01 11 02 30 Contractor Quality Control-1111(Nov).pdf PDF
03-A-102.dwf DWF file
02 82 14 00 15 Asbestos Hazard Control Activities-Roofing-1206(Jun).pdf PDF
Base Pass Forms.doc DOC document
07 51 13 Built Up Asphalt Roofing-1111(Nov).pdf PDF
01 35 26 Governmental Safety Requirements-1111(Nov).pdf PDF
00 00 00 Cover Stamped 1111(Nov).pdf PDF
Proposal Bldg 2160.xls XLS spreadsheet
Schedule of Material Submittals.xls XLS spreadsheet
07 61 14A Attachment A-SSM Details-1111(Nov).pdf PDF
Schedule B-Basic Year-1206.xls XLS spreadsheet
07 31 13 Asphalt Shingle-1111(Nov).pdf PDF
01 11 02 10A Attachment A-Performance Tables-1201(Jan).pdf PDF
Show all 50

Roofing Maintenance, Repair and Installation IDIQ has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE B

PROJECT: VNVP 111080B, Replace BUR, Bldg 2160 and Bldg 4477.

BASE: SHEPPARD AIR FORCE BASE, TEXAS 76311

BID SCHEDULE: Bidder will enter in the space below the following: The Base Bid amount, and the project total.

AWARD OF CONTRACT: The low bidder for the purposes of award shall be the conforming responsible bidder offering the low amount on the total bid within the funds available before the bids are opened.

FOR OFFICIAL USE ONLY WHEN FILLED IN

BASIC BID ITEMS: At the time of award, the contracting officer will determine which, if any of the below bid items will be included in the final contract and awarded to the successful bidder. NOTE: The bid items, as listed, are not in their order of priority. For each line item listed below, bidder shall provide a detailed bid breakout utilizing CLIN’s (Contract Line Item Number) from basic contract Schedule B

Item No
Description
Unit
Quantity
Unit Price
Total Price
1
Totally furnish and install all material, equipment, and labor in accordance with plans and specifications for the replacement of Built-Up roofing for Building 2160.
LS
1
$_________
$_________
2
Totally furnish and install all material, equipment, and labor in accordance with plans and specifications for the replacement of Built-Up roofing for Building 4477.
LS
1
$_________
$_________

Total Contract Price: $____________