07 31 13 Asphalt Shingles

View the file

Other files for this federal contract opportunity

Other files attached to Roofing Maintenance, Repair and Installation IDIQ, newest first.
File Type Posted
Amendment 5.pdf PDF
Amendment 4.pdf PDF
PrepProposal conference.pdf PDF
amendment 3.doc DOC document
amendment 1.doc DOC document
amendment 2.doc DOC document
01-G-001-PROJECT LOCATION PLAN.pdf PDF
03-A-102-EXISTING- FILL AND NEW BLDG 4477 ROOF PLAN ELEVATION VIEW AND SECTION.pdf PDF
02-A-101-EXISTING- FILL AND NEW BLDG 2160 ROOF PLAN ELEVATION VIEW AND DETAIL.pdf PDF
07 21 16 Blanket Insulation-1111(Nov).pdf PDF
01 33 00 Project Submittals-1111(Nov).pdf PDF
Proposal Bldg 4477.xls XLS spreadsheet
FA3020-12-R-0008 Solicitation.pdf PDF
Past Performance Questionnaire.pdf PDF
01 11 02 10 Summary of Work-1204(Apr).pdf PDF
01 11 02 30 Contractor Quality Control-1111(Nov).pdf PDF
Schedule B Total.doc DOC document
03-A-102.dwf DWF file
02 82 14 00 15 Asbestos Hazard Control Activities-Roofing-1206(Jun).pdf PDF
Base Pass Forms.doc DOC document
07 51 13 Built Up Asphalt Roofing-1111(Nov).pdf PDF
01 35 26 Governmental Safety Requirements-1111(Nov).pdf PDF
00 00 00 Cover Stamped 1111(Nov).pdf PDF
Proposal Bldg 2160.xls XLS spreadsheet
Schedule of Material Submittals.xls XLS spreadsheet
07 61 14A Attachment A-SSM Details-1111(Nov).pdf PDF
Schedule B-Basic Year-1206.xls XLS spreadsheet
01 11 02 10A Attachment A-Performance Tables-1201(Jan).pdf PDF
07 51 13A Attachment A-BUR Details-1111(Nov).pdf PDF
Schedule B-Second Option-1206.xls XLS spreadsheet
07 60 00 Flashing and Sheet Metal-1111(Nov).pdf PDF
07 61 14 Steel Standing Seam Roofing-1111(Nov).pdf PDF
WD TX268.doc DOC document
Site Visit Map.doc DOC document
06 10 00 Rough Carpentry-1111(Nov).pdf PDF
01 33 00A Attachment A-Submittals-1206(Jun).pdf PDF
WD TX6.doc DOC document
Asbestos Bldg 4477 Roof Summary.pdf PDF
Schedule B-First Option-1206.xls XLS spreadsheet
00 00 00 TOC-1206(Jun).pdf PDF
02-A-101.dwf DWF file
01 11 02 10B Attachment B-Forms-1206(Jun).pdf PDF
01 11 02 20 Measurement And Payment-1204(Apr).pdf PDF
07 92 00 Joint Sealants-1111(Nov).pdf PDF
Asbestos Bldg 2160 Roof Summary.pdf PDF
01 78 00 10 Project Closeout-1206(Jun).pdf PDF
07 42 13 Metal Wall Panel-1111(Nov).pdf PDF
07 22 00 Roof and Deck Insulation-1111(Nov).pdf PDF
07 95 00 Maintenance and Repair-1204(Apr).pdf PDF
01-G-001.dwf DWF file
Show all 50

Roofing Maintenance, Repair and Installation IDIQ has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDIQ ROOF MAINTENANCE/REPAIR/REPLACEMENT VNVP 111080

07 31 13 Asphalt Shingles

Page 1 of 8 Pages

November 2011

07 31 13

ASPHALT SHINGLES

PART 1 - GENERAL:

1.1. REFERENCES: The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D 1970 (2009) Self-Adhering Polymer Modified Bituminous Sheet

Materials Used as Steep Roofing Underlayment for Ice Dam Protection

ASTM D 226/D 226M (2009) Standard Specification for Asphalt-Saturated

Organic Felt Used in Roofing and Waterproofing

ASTM D 3018/D 3018M (2009) Class A Asphalt Shingles Surfaced With Mineral

Granules

ASTM D 3462/D 3462M (2009a) Asphalt Shingles Made From Glass Felt and

Surfaced with Mineral Granules

ASTM D 41 (2005) Asphalt Primer Used in Roofing, Dampproofing, and

Waterproofing ASTM D 4586 (2007) Asphalt Roof Cement, Asbestos-Free

ASTM D 4869 (2005; E 2006) Standard Specification for Asphalt-Saturated

Organic Felt Underlayment Used in Steep Slope Roofing

ASTM D 6380 (2003; R 2009) Standard Specification for Asphalt Roll Roofing

(Organic Felt)

UNDERWRITERS LABORATORIES (UL)

UL 790 (2004; R 2008) Standard for Test Methods for Fire Tests of Roof

Coverings

UL 997 (1995; Rev Jul 1998) Wind Resistance of Prepared Roof Covering

Materials

1.2. DEFINITIONS:

1.2.1. Top Lap: That portion of shingle overlapping shingle in course below.

1.2.2. Head Lap: The triple coverage portion of top lap which is the shortest distance from the butt edge of an overlapping shingle to the upper edge of a shingle in the second course below.

1.2.3. Exposure: That portion of a shingle exposed to the weather after installation.

1.3. SUBMITTALS: Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control

07 31 13 Asphalt Shingles

Page 2 of 8 Pages

November 2011 approval. The following shall be submitted in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-03 Product Data

Shingles, G

Submit data including type, weight, class, UL labels, and special types of underlayment and eave flashing.

SD-04 Samples

Shingles; G

Full shingle sample and manufacturer's standard size samples of materials and products requiring color or finish selection.

Color charts; G

SD-08 Manufacturer's Instructions

Application

1.4. DELIVERY AND STORAGE: Deliver materials in the manufacturer's unopened bundles and containers bearing the manufacturer's brand name. Keep materials dry, completely covered, and protected from the weather. Store material according to manufacturer's written instructions. Roll goods shall be stored on end in an upright position or in accordance with manufacturer's recommendations. Immediately before laying, roofing felt shall be stored for 24 hours in an area maintained at a temperature not lower than 50 degrees F.

1.5. WARRANTIES: Warranties shall begin on the date of Government acceptance of the work.

1.5.1. Manufacturer's Warranty: Furnish the asphalt shingle manufacturer's standard 25 year warranty for the asphalt shingles. The warranty shall run directly to the

Government.

1.5.2. Contractor's Warranty: The Contractor shall warrant for 5 years that the asphalt shingle roofing system, as installed, is free from defects in workmanship. When repairs due to defective workmanship are required during the Contractor's warranty period, the

Contractor shall make such repairs within 72 hours of notification. When repairs are not performed within the specified time, emergency repairs performed by others will not void the warranty.

PART 2 - PRODUCTS:

2.1. MATERIALS:

2.1.1. Shingles: Mineral granule-surfaced asphalt shingles, self-sealing, square tab, strip. ASTM D 3018/D 3018M, Type I, and ASTM D 3462/D 3462M , weighing not less than 210 pounds per 100 square feet. Shingles shall meet the fire resistance requirements of UL 790 for Class A and the wind resistance requirements of UL 997.

Color shall be as selected from the manufacturer's standard color charts.

07 31 13 Asphalt Shingles

Page 3 of 8 Pages

November 2011

2.1.2. Mineral-Surfaced Asphalt Roll Roofing: ASTM D 6380.

2.1.3. Smooth-Surfaced Asphalt Roll Roofing: ASTM D 6380, Type II.

2.1.4. Underlayment: Asphalt-saturated felt conforming to ASTM D 4869 or ASTM D

226/D 226M, Type II, number 30, without perforations or other material specified by the shingle manufacturer for use as underlayment.

2.1.4.1. Leak Barrier Underlayment: Self-adhering leak barrier or ice dam underlayment shall comply with ASTM D 1970 for the barrier’s ability to seal around nails.

2.1.5. Self-Adhering Membrane: Self-adhering rubberized asphaltic membrane, a minimum of 40 mils thick, and recommended by the shingle manufacturer for use as eaves flashing.

2.1.6. Nails for Applying Shingles and Asphalt-Saturated Felt: Aluminum or hot-dipped galvanized steel or equivalent corrosion resistant with sharp points and flat heads 3/8 to 7/16 inch in diameter. Shank diameter of nails shall be a minimum of

0.105 inch and a maximum of 0.135 inch with garb or otherwise deformed for added pull-out resistance. Nails shall be long enough to penetrate completely through or extend a minimum of 3/4 inch into roof deck, whichever is less, when driven through materials to be fastened.

2.1.7. Asphalt Roof Cement: ASTM D 4586, Type II.

2.1.8. Asphalt Primer: ASTM D 41.

2.1.9. Ventilators:

2.1.9.1. Nailable Plastic Shingle Over Type Ridge Vents: Ridge vents shall be constructed of UV stabilized nailable rigid polypropylene material, approximately

1 foot wide and 1 inch thick, and shall be in 4 foot long interlocking sections with self-aligning ends or corrugated polyethylene rigid roll or rigid strip ridge vent with aluminum wind deflectors on each side. Vents shall be designed to prevent infiltration of insects, rain, and snow.

2.1.9.2. Nailable Mesh Shingle Over Type Ridge Vents: Ridge vents shall be constructed of UV stabilized nailable polyester mesh material, approximately one foot wide. Vents shall be designed to prevent infiltration of insects, rain, and snow.

PART 3 - EXECUTION:

3.1. VERIFICATION OF CONDITIONS: Ensure that roof deck is smooth, clean, dry, and without loose knots. Roof surfaces shall be firm and free from loose boards, large cracks, and projecting ends that might damage the roofing. Vents and other projections through roofs shall be properly flashed and secured in position, and projecting nails shall be driven flush with the deck.

3.2. SURFACE PREPARATION: Cover knotholes and cracks with sheet metal nailed securely to sheathing. Flash and secure vents and other roof projections, and drive projecting nails firmly home.

07 31 13 Asphalt Shingles

Page 4 of 8 Pages

November 2011

3.3. APPLICATION: Apply roofing materials as specified herein unless specified or recommended otherwise by shingle manufacturer's written instructions.

3.3.1. Underlayment:

3.3.1.1. Provide for roof slopes 4 inches per foot and greater. Apply one layer of shingle underlayment to roof deck. Lay underlayment parallel to roof eaves, starting at eaves. Provide minimum 2 inch head laps, 4 inch end laps, and 6 inch laps from both sides over hips and ridges. Nail sufficiently to hold until shingles are applied. Turn up vertical surfaces a minimum of 4 inches.

3.3.1.2. Provide for roof slopes between 2 inches per foot and 4 inches per foot.

Apply two layers to roof deck. Provide a 19 inch wide strip as starter sheet to maintain specified number of layers throughout roof. Lay parallel to eaves, starting at eaves. Provide minimum 19 inch head laps, 6 inch laps from both sides over hips and ridges, and 12 inch end laps in the field of the roof. Nail sufficiently to hold until shingles are applied. Turn up vertical surfaces a minimum of 4 inches. When a self-adhering membrane is used for eave flashing, start underlayment from upper edge of eave flashing.

3.3.2. Eave Flashing: Eave flashing is a self-adhering waterproof underlayment membrane. The installation of eave flashing is the recommend method for preventing leakage from ice dams. Eave flashing shall be installed at eaves, rakes,ridges, and valleys. Eave flashing shall also be installed around chimneys, skylights or dormers to prevent water damage.

3.3.2.1. On eave and rake, begin by applying eave flashing along the edge flush with drip edge. All succeeding courses will be overlapped according to the manufacturer’s instructions. In all applications, eave flashing shall extend to minimum of 24 inches inside the interior wall line of the building.

3.3.2.2. On ridges and valleys, Install with center eave flashing aligned with center line of ridge or valley and flashing shall extend a minimum of 18 inches on each side of ridge or valley.

3.3.2.3. Chimneys, skylights, and dormers: Install flashing where all vertical surfaces meet roof. Flashing shall continue at least 4 inches up vertical surface and at least 12 inches on roof surface.

3.3.3. Drip Edges: Provide metal drip edges as specified in Section 07 57 13

FLASHING AND SHEET METAL applied directly on the wood deck at eaves and over the underlayment at rakes. Extend back from edge of deck a minimum of 3 inches, and secure with nails spaced a maximum of 7 inches O.C. along inner edge.

3.3.4. Starter Strip: Apply starter strip at eaves, using 9 inch wide strip of mineral-surfaced roll roofing of a color to match shingles. Optionally, use a row of shingles with tabs removed and trimmed to ensure that joints are not exposed at shingle cutouts.

Apply starter strip along eaves, overhanging the metal drip edge at eaves and rake edges

1/4 inch to 3/8 inch; fasten in a line parallel to and 3 to 4 inches above eave edge. Place

07 31 13 Asphalt Shingles

Page 5 of 8 Pages

November 2011 nails so top of nail is not exposed in cutouts of first course of shingles. When roll roofing is provided, seal tabs of first course of shingles with asphalt roof cement.

3.3.5. Shingle Courses: Start first course with full shingle, and apply succeeding courses with joints staggered at thirds or halves. Butt-end joints of shingles shall not align vertically more often than every fourth course. Apply shingle courses as follows:

a. Fastening: Do not drive fasteners into or above the factory-applied adhesive unless adhesive is located 5/8 inch or closer to top of cutouts. Place fasteners so they are concealed by shingle top lap and penetrate the head lap.

b. Shingles applied with nails: Nominal 5 inch exposure. Apply each shingle with minimum of four nails. Place one nail one inch from each end, and evenly space nails on a horizontal line a minimum of 5/8 inch above top of cutouts. Cement each tab with one spot of asphalt roof cement placed one to 2 inches from bottom edge of shingle.

c. Nailing: Apply shingles with nominal 5 inch exposure. Apply each shingle with minimum of six nails. Place one nail one inch from each end and one nail on each side of each cutout, on a horizontal line 5/8 inch above cutouts.

d. Sealing: Seal each tab with continuous, 9 inch long, 1/4 inch diameter bead of asphalt roof cement, applied to the surface of course below. Place bead on horizontal line 5/8 inch above cutouts so bead will be one inch from bottom edge of tab to be sealed and so bead will not show through cutouts. After nailing each shingle, press tabs down to ensure spreading and bonding of asphalt roof cement.

3.3.6. Hips and Ridges: Form with 9 by 12 inch individual shingles or with 12 by 12 inch shingles cut from 12 by 36 inch strip shingles. Bend shingles lengthwise down center with equal exposure on each side of hip or ridge. Lap shingles to provide a maximum 5 inch exposure, and nail each side in unexposed area 5 1/2 inches from butt and one inch in from edge.

3.3.7. Valleys: Provide either closed cut, or woven valleys.

3.3.7.1. Closed Cut Valleys: Provide 36 inch wide valley lining of single layer of smooth-surfaced or mineral-surfaced roll roofing, with mineral-surface facing down, for full length of valley as follows:

a. Center lining in valley over underlayment. Provide minimum 12 inch end laps in the lining and seal laps with asphalt roof cement. Fasten lining to hold it in place until shingles are applied.

b. Apply first regular course of shingles along eaves of one of the intersecting roof planes and across valley. Extend course at least 12 inches onto adjoining roof.

c. Apply succeeding courses in same manner as first course, extending across valley and onto adjoining roof.

07 31 13 Asphalt Shingles

Page 6 of 8 Pages

November 2011

d. Press shingles tightly into valley and nail in normal manner, except apply nails not closer than 6 inches to valley centerline, and apply additional nail in top corner of each shingle crossing valley.

e. Apply shingles on the adjoining roof plane, starting along eaves and across valley onto previously applied shingles. Trim overlapping courses back to a line parallel to and a minimum of 2 inches back from valley centerline.

f. Trim one inch on a 45 degree angle from upper corner of each end shingle.

Embed end shingles in a 3 inch wide band of asphalt roof cement.

3.3.7.2. Woven Valleys: Provide valley lining as specified for closed cut valley.

Lay valley shingles over lining by either of the following methods:

a. Method I: Apply regular shingles on both roofs simultaneously. Weave each course in turn over the valley. Lay the first regular course of shingles along eaves of roof up to and over valley. Extend course along adjoining roof deck at least 12 inches. Carry first regular course of shingles of adjoining roof over valley on top of previously applied shingles. Lay succeeding courses alternately, weaving valley shingles over each other for full length of valley.

b. Method II: Apply regular shingles on each roof surface separately to a line about 3 feet from center of valley, and weave valley shingles in place later, as specified for Method I. In following either method, press shingles tightly into valley, and fasten in normal manner; except apply nails not closer than 6 inches to valley centerline, and apply additional nail in top corner of terminal shingle on both sides of valley.

3.3.8. Flashing:

3.3.8.1. Eave Flashing: See paragraph 3.3.2 above.

3.3.8.2. Stepped Flashing: For sloping roofs which abut vertical surfaces, provide stepped metal flashing as specified in Section 07 57 13 FLASHING AND SHEET

METAL.

3.3.8.3. Vent and Stack Flashing: Apply shingles up to point where vent or stack pipe projects through roof, and cut nearest shingle to fit around pipe. Before applying shingles beyond pipe, prepare flange of metal pipe vent flashing as specified in Section 07 57 13 FLASHING AND SHEET METAL, by applying a

1/8 inch thick coating of asphalt roof cement on bottom side of flashing flange. Slip flashing collar and flange over pipe, and set coated flange in 1/16 inch coating of asphalt roof cement. After applying flashing flange, continue shingling up roof.

Lap lower part of flange over shingles. Overlap flange with side and upper shingles. Fit shingles around pipe, and embed in 1/16 inch thick coating of asphalt roof cement where shingles overlay flange.

3.3.8.4. Chimney Flashing: Provide treated wood crickets as specified in Section

06 10 00 ROUGH CARPENTRY. Provide metal base and counterflashing as specified in Section 07 57 13 FLASHING AND SHEET METAL. Uniformly coat masonry surfaces which are to receive flashing with asphalt primer applied at rate

07 31 13 Asphalt Shingles

Page 7 of 8 Pages

November 2011 of one gallon per 100 square feet. Apply shingles over underlayment up to front face of chimney. Apply metal front base flashing with lower section extending at least 4 inches over shingles. Set base flashing in a 1/16 inch coating of asphalt roof cement on shingles and chimney face. Apply metal step flashing at sides in a coating of asphalt roof cement. Embed end shingles in each course that overlaps step flashing with asphalt roof cement. Apply metal rear base flashing over cricket and back of chimney in coating of asphalt roof cement. Apply end shingles in each course up to cricket, and cement in place. Lap base flashing minimum of 3 inches with metal counter flashing.

-- End of Section –