Schedule of Material Submittals.xls

XLS spreadsheet 51 KB Posted

Attached to
Roofing Maintenance, Repair and Installation IDIQ Federal contract opportunity
Solicitation number
FA3020-12-R-0008
Issued by
Department of the Air Force Air Education and Training Command

About this file

Schedule of Material Submittals

View the file

Other files for this federal contract opportunity

Other files attached to Roofing Maintenance, Repair and Installation IDIQ, newest first.
File Type Posted
Amendment 5.pdf PDF
Amendment 4.pdf PDF
amendment 3.doc DOC document
PrepProposal conference.pdf PDF
amendment 1.doc DOC document
amendment 2.doc DOC document
01-G-001-PROJECT LOCATION PLAN.pdf PDF
03-A-102-EXISTING- FILL AND NEW BLDG 4477 ROOF PLAN ELEVATION VIEW AND SECTION.pdf PDF
02-A-101-EXISTING- FILL AND NEW BLDG 2160 ROOF PLAN ELEVATION VIEW AND DETAIL.pdf PDF
07 22 00 Roof and Deck Insulation-1111(Nov).pdf PDF
07 95 00 Maintenance and Repair-1204(Apr).pdf PDF
01-G-001.dwf DWF file
OK14.doc DOC document
Disclosure of Lobbying Activities.pdf PDF
01 62 35 Recycled Recovered Materials-1111(Nov).pdf PDF
07 21 16 Blanket Insulation-1111(Nov).pdf PDF
01 33 00 Project Submittals-1111(Nov).pdf PDF
Proposal Bldg 4477.xls XLS spreadsheet
FA3020-12-R-0008 Solicitation.pdf PDF
Past Performance Questionnaire.pdf PDF
01 11 02 10 Summary of Work-1204(Apr).pdf PDF
01 11 02 30 Contractor Quality Control-1111(Nov).pdf PDF
Schedule B Total.doc DOC document
03-A-102.dwf DWF file
02 82 14 00 15 Asbestos Hazard Control Activities-Roofing-1206(Jun).pdf PDF
Base Pass Forms.doc DOC document
07 51 13 Built Up Asphalt Roofing-1111(Nov).pdf PDF
01 35 26 Governmental Safety Requirements-1111(Nov).pdf PDF
00 00 00 Cover Stamped 1111(Nov).pdf PDF
Proposal Bldg 2160.xls XLS spreadsheet
07 61 14A Attachment A-SSM Details-1111(Nov).pdf PDF
Schedule B-Basic Year-1206.xls XLS spreadsheet
07 31 13 Asphalt Shingle-1111(Nov).pdf PDF
01 11 02 10A Attachment A-Performance Tables-1201(Jan).pdf PDF
07 51 13A Attachment A-BUR Details-1111(Nov).pdf PDF
Schedule B-Second Option-1206.xls XLS spreadsheet
07 60 00 Flashing and Sheet Metal-1111(Nov).pdf PDF
07 61 14 Steel Standing Seam Roofing-1111(Nov).pdf PDF
WD TX268.doc DOC document
Site Visit Map.doc DOC document
06 10 00 Rough Carpentry-1111(Nov).pdf PDF
01 33 00A Attachment A-Submittals-1206(Jun).pdf PDF
WD TX6.doc DOC document
Asbestos Bldg 4477 Roof Summary.pdf PDF
Schedule B-First Option-1206.xls XLS spreadsheet
00 00 00 TOC-1206(Jun).pdf PDF
02-A-101.dwf DWF file
01 11 02 10B Attachment B-Forms-1206(Jun).pdf PDF
01 11 02 20 Measurement And Payment-1204(Apr).pdf PDF
07 92 00 Joint Sealants-1111(Nov).pdf PDF
Show all 50

Roofing Maintenance, Repair and Installation IDIQ has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER: VNVP 111080BPROJECT TITLE:
Replace BUR, Bldg 2160 and Bldg 4477SOLICITATION / CONTRACT NO.
(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYROOFING SYSTEM INSTALLER'S (CONTRACTOR) WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSOTHER:REQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
1SUBMITTALS REQUIRED FOR BASIC CONTRACT
aAll required marterial submittals submittted and approved under Basis Contrct
2SUBMITTALS REQUIRED FOR EACH TASK ORDER:
aWritten results of roof core Sample(s)4Withing 7 days afeter award of task order
bWritten results of material testing for presence of asbestos4Withing 7 days afeter award of task order
cCopies of notification(s) required by state of Texas for asbestos abatement.4Withing 24 hours of mailing, faxing, or hand delivering of or
dA one year materials and labor warranty for protection from latent defects44Prior to government acceptance of roof system
eA one year materials and labor warranty for protection from latent defects for each task order44Prior to government acceptance of roof system
fA 5, 10, 15, or 20 year No Dollar Limit (NDL) warrarnty for Built Up Roofing System, as specified in task order.44Prior to government acceptance of roof system
gA 20 year finish warranty for Standing Seam Metal Roofs as specified in task order.44Prior to government acceptance of roof system
hA 5 year warranty for watertightness of Standing Seam Metal Roof, as specificed in task order.44Prior to government acceptance of roof system
iA 5 year installer's warranty for each task order.44Prior to government acceptance of roof system
jEnd of Delivery Order Requirements: (Section 1B, Para. 2.8.)44444Prior to government acceptance of roof system

&LSchedule of Material Submittals Template, Feb 05 (SAF/AQCP)&RPage &P of &N Pages Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)

Enter any comments pertaining to the submittal

File details come from the government source that posted it. Updated .