Schedule of Material Submittals.xls
XLS spreadsheet 51 KB Posted
- Attached to
- Roofing Maintenance, Repair and Installation IDIQ Federal contract opportunity
- Solicitation number
- FA3020-12-R-0008
About this file
Schedule of Material Submittals
View the file
Other files for this federal contract opportunity
Show all 50
Roofing Maintenance, Repair and Installation IDIQ has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: VNVP 111080B | PROJECT TITLE: | ||||||||||||||||||||||||
| Replace BUR, Bldg 2160 and Bldg 4477 | SOLICITATION / CONTRACT NO. | |||||||||||||||||||||||||
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | |||||||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | ROOFING SYSTEM INSTALLER'S (CONTRACTOR) WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | OTHER: | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||
| APPROVED | DISAPPROVED | |||||||||||||||||||||||||
| 1 | SUBMITTALS REQUIRED FOR BASIC CONTRACT | |||||||||||||||||||||||||
| a | All required marterial submittals submittted and approved under Basis Contrct | |||||||||||||||||||||||||
| 2 | SUBMITTALS REQUIRED FOR EACH TASK ORDER: | |||||||||||||||||||||||||
| a | Written results of roof core Sample(s) | 4 | Withing 7 days afeter award of task order | |||||||||||||||||||||||
| b | Written results of material testing for presence of asbestos | 4 | Withing 7 days afeter award of task order | |||||||||||||||||||||||
| c | Copies of notification(s) required by state of Texas for asbestos abatement. | 4 | Withing 24 hours of mailing, faxing, or hand delivering of or | |||||||||||||||||||||||
| d | A one year materials and labor warranty for protection from latent defects | 4 | 4 | Prior to government acceptance of roof system | ||||||||||||||||||||||
| e | A one year materials and labor warranty for protection from latent defects for each task order | 4 | 4 | Prior to government acceptance of roof system | ||||||||||||||||||||||
| f | A 5, 10, 15, or 20 year No Dollar Limit (NDL) warrarnty for Built Up Roofing System, as specified in task order. | 4 | 4 | Prior to government acceptance of roof system | ||||||||||||||||||||||
| g | A 20 year finish warranty for Standing Seam Metal Roofs as specified in task order. | 4 | 4 | Prior to government acceptance of roof system | ||||||||||||||||||||||
| h | A 5 year warranty for watertightness of Standing Seam Metal Roof, as specificed in task order. | 4 | 4 | Prior to government acceptance of roof system | ||||||||||||||||||||||
| i | A 5 year installer's warranty for each task order. | 4 | 4 | Prior to government acceptance of roof system | ||||||||||||||||||||||
| j | End of Delivery Order Requirements: (Section 1B, Para. 2.8.) | 4 | 4 | 4 | 4 | 4 | Prior to government acceptance of roof system |
&LSchedule of Material Submittals Template, Feb 05 (SAF/AQCP)&RPage &P of &N Pages Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
Enter any comments pertaining to the submittal
File details come from the government source that posted it. Updated .