EXISTING BLDG 2160 ROOF PLAN FILL INSULATION LAYOUT - BLDG 2160 NEW BLDG 2160 ROOF PLAN
GENERAL PROJECT NOTES
1. THIS FACILITY MUST REMAIN IN OPERATION DURING ALL PHASES OF THE WORK. UNLESS OTHER
ARRANGEMENTS ARE MADE, PUBLIC ACCESS DOORS SHALL REMAIN OPEN FOR USE AT ALL TIMES
DURING THE WORK. IN ORDER TO ENABLE OVERHEAD WORK TO PROCEED WITHOUT ENDANGERING
PERSONNEL, THE CONTRACTOR SHALL COORDINATE WITH THE OCCUPANTS AND ERECT WARNING
TAPE, SIGNS, OR EMPLOY OTHER MEASURES ADEQUATE TO ENSURE THAT NEITHER THE PUBLIC, BUILDING OCCUPANTS OR EQUIPMENT ARE STRUCK BY FALLING OBJECTS. CLOSED AREAS MAY BE EMPLOYED. CONTRACTOR SHALL FURNISH SUFFICIENT BARRICADES TO ADEQUATELY IDENTIFY THE
CLOSED AREA(S). BARRICADING SHALL BE ACCOMPLISHED AT NO ADDITIONAL COST TO THE
GOVERNMENT.
2. LOCATION AND SIZE OF ROOF PENETRATIONS AND EQUIPMENT ARE APPROXIMATE, CONTRACTOR
SHALL FIELD VERIFY LOCATION AND SIZE OF ROOF PENETRATIONS AND EQUIPMENT.
3. DISPOSE OF CONSTRUCTION DEBRIS ON A DAILY BASIS. ENSURE THAT ALL MATERIALS LEFT
UNATTENDED ARE SECURED AGAINST BLOWING. THE CONSTRUCTION AND DEMOLITION DEBRIS
DISPOSAL REPORT SHALL BE SUBMITTED AS REQUIRED IN SPECIFICATIONS
4. THE CONTRACTOR SHALL:
A. CHECK ALL DRAWINGS FURNISHED IMMEDIATELY UPON RECEIPT;
B. COMPARE ALL DRAWINGS AND VERIFY THE FIGURES BEFORE LAYING OUT THE WORK;
C. PROMPTLY NOTIFY THE CONTRACTING OFFICER OF ANY DISCREPANCIES;
D. BE RESPONSIBLE FOR ANY ERRORS THAT MIGHT HAVE BEEN AVOIDED BY COMPLYING WITH THIS
REQUIREMENT; AND
E. REPRODUCE AND PRINT CONTRACT DRAWINGS AND SPECIFICATIONS, AS NEEDED.
5. IN GENERAL
A. LARGE SCALE DRAWINGS SHALL GOVERN SMALL SCALE DRAWINGS; AND
B. THE CONTRACTOR SHALL FOLLOW FIGURES MARKED ON DRAWINGS IN PREFERENCE TO SCALE
MEASUREMENTS.
6. OMISSIONS FROM DRAWINGS OR SPECIFICATIONS OR THE MISDESCRIPTION OF DETAILS OF WORK THAT ARE MANIFESTLY NECESSARY TO CARRY OUT THE INTENT OF THE DRAWINGS AND SPECIFICATIONS OR
THAT ARE CUSTOMARILY PERFORMED SHALL NOT RELIEVE THE CONTRACTOR FROM PERFORMING
SUCH OMITTED OR MISDESCRIBED DETAILS OF THE WORK. THE CONTRACTOR SHALL PERFORM SUCH
DETAILS AS IF FULLY AND CORRECTLY SET FORTH AND DESCRIBED IN THE DRAWINGS AND
SPECIFICATIONS
DEMOLITION PLAN KEY NOTES
CONTRACTOR SHALL REMOVE AND DISPOSE AGGREGATE
SURFACING, AND BUR MEMBRANE DOWN TO BARE
CONCRETE DECKING.
REMOVE AND DISPOSE EXISTING EDGE METAL LOCATED
ALONG ROOF EDGES.
REMOVE AND DISPOSE LEAD PLUMBING VENT JACKS
ASSUME THAT SOME WOODEN PRODUCTS ON THE ROOF,
HAVE DETERIORATED AND WILL BE REPLACED. ASSUME
THAT ONE FOURTH OF THE WOOD FASCIA BOARD IS TO BE
REPLACED
SPECIALIZED PROJECT NOTES
1. THE WORK CONSISTS OF THE DEMOLITION OF EXISTING BUILT-UP ROOFING MEMBRANE DOWN TO BARE
DECK. INSTALL BASE SHEET OVER LIGHT WEIGHT CONCRETE DECKING, FOLLOWED BY INSTALLATION OF A 4-PLY BUILT-UP ROOFING MEMBRANE. WORK INCLUDES THE INSTALLATION OF RAISED EDGES.
WORK WILL BE LOCATED ON THE ROOF OF THIS BUILDING.
2. CONTRACTOR SHALL PROVIDE MANUFACTURE'S 10 YEAR NDL WARRANTY, AND ROOFING SYSTEM
INSTALLER'S 5 YEAR WARRANTY.
3. AT LOCATION CHOSEN BY CONTRACTING OFFICER'S REPRESENTATIVE, CONTRACTOR SHALL PERFORM "ROOF CORING IN PREPARATION OF REROOFING". BUILDING 2160, SHALL HAVE ONE CORE PERFORMED.
ROOF CORING REPORT SHALL BE SUBMITTED AS REQUIRED IN SPECIFICATIONS.
4. ASBESTOS RECORDS AND SURVEYS, MAINTAINED BY THE ENVIRONMENTAL SECTION INDICATES BUILT
UP ROOF CONTAINS ASBESTOS. AT LOCATIONS CHOSEN BY CONTRACTING OFFICER AND
REPRESENTATIVE OF CONTRACTOR, ROOFING SAMPLES SHALL BE TAKEN AND TESTED FOR THE
PRESENCE OF ASBESTOS CONTAINING MATERIAL. UNTIL TEST RESULTS PROVIDE CONFIRMATION, ASSUME THIS ROOF CONTAINS ASBESTOS AND REMOVE MEMBRANE AND FLASHINGS ACCORDINGLY.
THREE SAMPLES FOR TESTING WILL BE TAKEN FROM THIS ROOF.
CONSTRUCTION PLAN KEY NOTES
FOR THIS ROOF, INSTALL BASE SHEET FOLLOWED BY THE
INSTALLATION OF A 4-PLY ASPHALT BUILT-UP ROOFING
MEMBRANE WITH AGGREGATE SURFACING OVER
CONCRETE DECKING.
INSTALL A QUARTER INCH PER FOOT TAPERED
INSULATION OVER ROOF AS INDICATED ON DRAWING.
ADDITIONALLY, INSTALL PERLITE FILL INSULATION, AS
NECESSARY TO INSTALL TAPERED INSULATION..
AT EQUIPMENT, INSTALL CRICKET (WITH 1/2 INCH PER
FOOT SLOPE). PROVIDE AND INSTALL STRIP IN FLASHING
AS REQUIRED.
PROVIDE AND INSTALL APPROVED JACKS FOR PLUMBING
VENTS. INSTALL STRIP-IN FLASHING AS REQUIRED.
AT EDGE OF ROOF, FABRICATE AND INSTALL KYNAR
FINISHED GALVANIZED DRIP EDGE. REFERENCE DETAILS
FOR APPROXIMATE PROFILE OF NEW EDGE METAL.
INSTALL EDGE ENVELOPE AND STRIP-INFLASHING, AS
REQUIRED.
1" PERLITE FILL INSULATION
NO PERLITE FILL INSULATION
SECTION BLDG 2160 - INFORMATION ONLYINFORMATION ONLY