The file's text, extracted by GovTribe without its formatting.
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
| DOCUMENT TYPE |
| DESCRIPTION |
| PAGES |
| DATE |
| Attachment 01 |
| Site Visit Map |
| 2 |
| 12-JUN-2012 |
| Attachment 02 |
| Schedule B Totals Page |
| 1 |
| 12-JUN-2012 |
| Attachment 03 |
| Schedule B, Basic Year |
| 11 |
| 12-JUN-2012 |
| Attachment 04 |
| Schedule B, First Option |
| 13 |
| 12-JUN-2012 |
| Attachment 05 |
| Schedule B, Second Option |
| 13 |
| 12-JUN-2012 |
| Attachment 06 |
| Price Proposal, Bldg 2160 |
| 8 |
| 12-JUN-2012 |
| Attachment 07 |
| Price Proposal, Bldg 4477 |
| 8 |
| 12-JUN-2012 |
| Attachment 08 |
| Schedule of Material Submittals |
| 2 |
| 07-JUN-2012 |
| Attachment 09 |
| Drawing G001 1 of 3 |
| 1 |
| 07-JUN-2012 |
| Attachment 10 |
| Drawing A101 2 of 3 |
| 1 |
| 07-JUN-2012 |
| Attachment 11 |
| Drawing A102 3 of 3 |
| 1 |
| 07-JUN-2012 |
| Attachment 12 |
| Base Pass Forms |
| 3 |
| 07-JUN-2012 |
| Attachment 13 |
| Asbestos Report Bldg 2160 |
| 8 |
| 12-JUN-2012 |
| Attachment 14 |
| Asbestos Report Bldg 4477 |
| 6 |
| 12-JUN-2012 |
| Attachment 15 |
| Wage Determination TX268 |
| 4 |
| 07-JUN-2012 |
| Attachment 16 |
| Wage Determination TX6 |
| 7 |
| 07-JUN-2012 |
| Attachment 17 |
| Wage Determination OK14 |
| 13 |
| 07-JUN-2012 |
| Attachment 18 |
| Past Performance Questionnaire |
| 7 |
| 12-JUN-2012 |
| Attachment 19 |
| Disclosure of Lobbying Activities |
| 2 |
| 07-JUN-2012 |
| Attachment 20 |
| 00 00 00 Cover |
| 1 |
| 12-JUN-2012 |
| Attachment 21 |
| 00 00 00 TOC |
| 4 |
| 12-JUN-2012 |
| Attachment 22 |
| 01 11 02 10 Summary of Work |
| 24 |
| 12-JUN-2012 |
| Attachment 23 |
| 01 11 02 10A, Atch A Performance Tables |
| 6 |
| 12-JUN-2012 |
| Attachment 24 |
| 01 11 02 10B, Atch B Forms |
| 14 |
| 12-JUN-2012 |
| Attachment 25 |
| 01 11 02 20 Measurement and Payment |
| 56 |
| 12-JUN-2012 |
| Attachment 26 |
| 01 11 02 30 Contractor Quality Control |
| 20 |
| 12-JUN-2012 |
| Attachment 27 |
| 01 33 00 Project Submittals |
| 14 |
| 12-JUN-2012 |
| Attachment 28 |
| 01 33 00A, Atch A Submittals |
| 12 |
| 12-JUN-2012 |
| Attachment 29 |
| 01 35 26 Governmental Safety Requirements |
| 14 |
| 12-JUN-2012 |
| Attachment 30 |
| 01 62 35 Recycled Recovered Materials |
| 2 |
| 12-JUN-2012 |
| Attachment 31 |
| 01 78 00 10 Project Closeout |
| 6 |
| 12-JUN-2012 |
| Attachment 32 |
| 02 82 14 00 15 Asbestos Hazard Control |
| 30 |
| 12-JUN-2012 |
| Attachment 33 |
| 06 10 00 Rough Carpentry |
| 12 |
| 12-JUN-2012 |
| Attachment 34 |
| 07 21 16 Blanket Insulation |
| 6 |
| 12-JUN-2012 |
| Attachment 35 |
| 07 22 00 Roof and Deck Insulation |
| 12 |
| 12-JUN-2012 |
| Attachment 36 |
| 07 31 13 Asphalt Shingle |
| 8 |
| 12-JUN-2012 |
| Attachment 37 |
| 07 42 13 Metal Wall Panel |
| 16 |
| 12-JUN-2012 |
| Attachment 38 |
| 07 51 13 Built Up Asphalt Roofing |
| 28 |
| 12-JUN-2012 |
| Attachment 39 |
| 07 51 13A, Atch A BUR Details |
| 30 |
| 12-JUN-2012 |
| Attachment 40 |
| 07 60 00 Flashing and Sheet Metal |
| 16 |
| 12-JUN-2012 |
| Attachment 41 |
| 07 61 14 Steel Standing Seam Roofing |
| 32 |
| 12-JUN-2012 |
| Attachment 42 |
| 07 61 14A, Atch A SSM Details |
| 26 |
| 12-JUN-2012 |
| Attachment 43 |
| 07 92 00 Joint Sealants |
| 6 |
| 12-JUN-2012 |
| Attachment 44 |
| 07 95 00 Maintenance and Repair |
| 26 |
| 12-JUN-2012 |
to:
Exhibit/Attachment Table of Contents
| DOCUMENT TYPE |
| DESCRIPTION |
| PAGES |
| DATE |
| Attachment 01 |
| Site Visit Map |
| 2 |
| 12-JUN-2012 |
| Attachment 02 |
| Schedule B Totals Page |
| 1 |
| 12-JUN-2012 |
| Attachment 03 |
| Schedule B, Basic Year |
| 11 |
| 12-JUN-2012 |
| Attachment 04 |
| Schedule B, First Option |
| 13 |
| 12-JUN-2012 |
| Attachment 05 |
| Schedule B, Second Option |
| 13 |
| 12-JUN-2012 |
| Attachment 06 |
| Price Proposal, Bldg 2160 |
| 8 |
| 12-JUN-2012 |
| Attachment 07 |
| Price Proposal, Bldg 4477 |
| 8 |
| 12-JUN-2012 |
| Attachment 08 |
| Schedule of Material Submittals |
| 2 |
| 07-JUN-2012 |
| Attachment 09 |
| Drawing G001 1 of 3 |
| 1 |
| 07-JUN-2012 |
| Attachment 10 |
| Drawing A101 2 of 3 |
| 1 |
| 07-JUN-2012 |
| Attachment 11 |
| Drawing A102 3 of 3 |
| 1 |
| 07-JUN-2012 |
| Attachment 12 |
| Base Pass Forms |
| 3 |
| 07-JUN-2012 |
| Attachment 13 |
| Asbestos Report Bldg 2160 |
| 8 |
| 12-JUN-2012 |
| Attachment 14 |
| Asbestos Report Bldg 4477 |
| 6 |
| 12-JUN-2012 |
| Attachment 15 |
| Wage Determination TX268 |
| 4 |
| 07-JUN-2012 |
| Attachment 16 |
| Wage Determination TX6 |
| 7 |
| 07-JUN-2012 |
| Attachment 17 |
| Wage Determination OK14 |
| 13 |
| 07-JUN-2012 |
| Attachment 18 |
| Past Performance Questionnaire |
| 7 |
| 12-JUN-2012 |
| Attachment 19 |
| Disclosure of Lobbying Activities |
| 2 |
| 07-JUN-2012 |
| Attachment 20 |
| 00 00 00 Cover |
| 1 |
| 12-JUN-2012 |
| Attachment 21 |
| 00 00 00 TOC |
| 4 |
| 12-JUN-2012 |
| Attachment 22 |
| 01 11 02 10 Summary of Work |
| 24 |
| 12-JUN-2012 |
| Attachment 23 |
| 01 11 02 10A, Atch A Performance Tables |
| 6 |
| 12-JUN-2012 |
| Attachment 24 |
| 01 11 02 10B, Atch B Forms |
| 14 |
| 12-JUN-2012 |
| Attachment 25 |
| 01 11 02 20 Measurement and Payment |
| 56 |
| 12-JUN-2012 |
| Attachment 26 |
| 01 11 02 30 Contractor Quality Control |
| 20 |
| 12-JUN-2012 |
| Attachment 27 |
| 01 33 00 Project Submittals |
| 14 |
| 12-JUN-2012 |
| Attachment 28 |
| 01 33 00A, Atch A Submittals |
| 12 |
| 12-JUN-2012 |
| Attachment 29 |
| 01 35 26 Governmental Safety Requirements |
| 14 |
| 12-JUN-2012 |
| Attachment 30 |
| 01 62 35 Recycled Recovered Materials |
| 2 |
| 12-JUN-2012 |
| Attachment 31 |
| 01 78 00 10 Project Closeout |
| 6 |
| 12-JUN-2012 |
| Attachment 32 |
| 02 82 14 00 15 Asbestos Hazard Control |
| 30 |
| 12-JUN-2012 |
| Attachment 33 |
| 06 10 00 Rough Carpentry |
| 12 |
| 12-JUN-2012 |
| Attachment 34 |
| 07 21 16 Blanket Insulation |
| 6 |
| 12-JUN-2012 |
| Attachment 35 |
| 07 22 00 Roof and Deck Insulation |
| 12 |
| 12-JUN-2012 |
| Attachment 36 |
| 07 31 13 Asphalt Shingle |
| 8 |
| 12-JUN-2012 |
| Attachment 37 |
| 07 42 13 Metal Wall Panel |
| 16 |
| 12-JUN-2012 |
| Attachment 38 |
| 07 51 13 Built Up Asphalt Roofing |
| 28 |
| 12-JUN-2012 |
| Attachment 39 |
| 07 51 13A, Atch A BUR Details |
| 30 |
| 12-JUN-2012 |
| Attachment 40 |
| 07 60 00 Flashing and Sheet Metal |
| 16 |
| 12-JUN-2012 |
| Attachment 41 |
| 07 61 14 Steel Standing Seam Roofing |
| 32 |
| 12-JUN-2012 |
| Attachment 42 |
| 07 61 14A, Atch A SSM Details |
| 26 |
| 12-JUN-2012 |
| Attachment 43 |
| 07 92 00 Joint Sealants |
| 6 |
| 12-JUN-2012 |
| Attachment 44 |
| 07 95 00 Maintenance and Repair |
| 26 |
| 12-JUN-2012 |
| Attachment 45 |
| 01-G-001 Project Location Plan |
| 1 |
| 19-JUN-2012 |
| Attachment 46 |
| 02-A-101 Existing Fill and New B2160 Roof Plan |
| 1 |
| 19-JUN-2012 |
| Attachment 47 |
| 03-A-102 Existing Fill and New B4477 Roof Plan |
| 1 |
| 19-JUN-2012 |
(End of Summary of Changes)