amendment 1.doc

DOC document 98 KB Posted

Attached to
Roofing Maintenance, Repair and Installation IDIQ
Solicitation number
FA3020-12-R-0008
Issued by

About this file

Amendment 1 (attachment to Amendment 2)

View the file

Other files

File Type Posted
Amendment 5.pdf PDF
Amendment 4.pdf PDF
amendment 3.doc DOC document
PrepProposal conference.pdf PDF
amendment 2.doc DOC document
03-A-102-EXISTING- FILL AND NEW BLDG 4477 ROOF PLAN ELEVATION VIEW AND SECTION.pdf PDF
02-A-101-EXISTING- FILL AND NEW BLDG 2160 ROOF PLAN ELEVATION VIEW AND DETAIL.pdf PDF
01-G-001-PROJECT LOCATION PLAN.pdf PDF
Schedule B-Second Option-1206.xls XLS spreadsheet
03-A-102.dwf DWF file
02 82 14 00 15 Asbestos Hazard Control Activities-Roofing-1206(Jun).pdf PDF
07 51 13A Attachment A-BUR Details-1111(Nov).pdf PDF
07 42 13 Metal Wall Panel-1111(Nov).pdf PDF
Asbestos Bldg 2160 Roof Summary.pdf PDF
07 92 00 Joint Sealants-1111(Nov).pdf PDF
01 78 00 10 Project Closeout-1206(Jun).pdf PDF
07 22 00 Roof and Deck Insulation-1111(Nov).pdf PDF
01-G-001.dwf DWF file
07 95 00 Maintenance and Repair-1204(Apr).pdf PDF
WD TX268.doc DOC document
07 60 00 Flashing and Sheet Metal-1111(Nov).pdf PDF
07 61 14 Steel Standing Seam Roofing-1111(Nov).pdf PDF
Base Pass Forms.doc DOC document
06 10 00 Rough Carpentry-1111(Nov).pdf PDF
Site Visit Map.doc DOC document
OK14.doc DOC document
Disclosure of Lobbying Activities.pdf PDF
07 51 13 Built Up Asphalt Roofing-1111(Nov).pdf PDF
01 33 00A Attachment A-Submittals-1206(Jun).pdf PDF
WD TX6.doc DOC document
01 35 26 Governmental Safety Requirements-1111(Nov).pdf PDF
00 00 00 Cover Stamped 1111(Nov).pdf PDF
Proposal Bldg 2160.xls XLS spreadsheet
Schedule of Material Submittals.xls XLS spreadsheet
Schedule B-First Option-1206.xls XLS spreadsheet
Asbestos Bldg 4477 Roof Summary.pdf PDF
00 00 00 TOC-1206(Jun).pdf PDF
07 31 13 Asphalt Shingle-1111(Nov).pdf PDF
Schedule B-Basic Year-1206.xls XLS spreadsheet
07 61 14A Attachment A-SSM Details-1111(Nov).pdf PDF
01 11 02 10A Attachment A-Performance Tables-1201(Jan).pdf PDF
01 62 35 Recycled Recovered Materials-1111(Nov).pdf PDF
01 11 02 10B Attachment B-Forms-1206(Jun).pdf PDF
02-A-101.dwf DWF file
01 11 02 20 Measurement And Payment-1204(Apr).pdf PDF
Schedule B Total.doc DOC document
Proposal Bldg 4477.xls XLS spreadsheet
Past Performance Questionnaire.pdf PDF
01 11 02 10 Summary of Work-1204(Apr).pdf PDF
01 11 02 30 Contractor Quality Control-1111(Nov).pdf PDF
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE
DESCRIPTION
PAGES
DATE
Attachment 01
Site Visit Map
2
12-JUN-2012
Attachment 02
Schedule B Totals Page
1
12-JUN-2012
Attachment 03
Schedule B, Basic Year
11
12-JUN-2012
Attachment 04
Schedule B, First Option
13
12-JUN-2012
Attachment 05
Schedule B, Second Option
13
12-JUN-2012
Attachment 06
Price Proposal, Bldg 2160
8
12-JUN-2012
Attachment 07
Price Proposal, Bldg 4477
8
12-JUN-2012
Attachment 08
Schedule of Material Submittals
2
07-JUN-2012
Attachment 09
Drawing G001 1 of 3
1
07-JUN-2012
Attachment 10
Drawing A101 2 of 3
1
07-JUN-2012
Attachment 11
Drawing A102 3 of 3
1
07-JUN-2012
Attachment 12
Base Pass Forms
3
07-JUN-2012
Attachment 13
Asbestos Report Bldg 2160
8
12-JUN-2012
Attachment 14
Asbestos Report Bldg 4477
6
12-JUN-2012
Attachment 15
Wage Determination TX268
4
07-JUN-2012
Attachment 16
Wage Determination TX6
7
07-JUN-2012
Attachment 17
Wage Determination OK14
13
07-JUN-2012
Attachment 18
Past Performance Questionnaire
7
12-JUN-2012
Attachment 19
Disclosure of Lobbying Activities
2
07-JUN-2012
Attachment 20
00 00 00 Cover
1
12-JUN-2012
Attachment 21
00 00 00 TOC
4
12-JUN-2012
Attachment 22
01 11 02 10 Summary of Work
24
12-JUN-2012
Attachment 23
01 11 02 10A, Atch A Performance Tables
6
12-JUN-2012
Attachment 24
01 11 02 10B, Atch B Forms
14
12-JUN-2012
Attachment 25
01 11 02 20 Measurement and Payment
56
12-JUN-2012
Attachment 26
01 11 02 30 Contractor Quality Control
20
12-JUN-2012
Attachment 27
01 33 00 Project Submittals
14
12-JUN-2012
Attachment 28
01 33 00A, Atch A Submittals
12
12-JUN-2012
Attachment 29
01 35 26 Governmental Safety Requirements
14
12-JUN-2012
Attachment 30
01 62 35 Recycled Recovered Materials
2
12-JUN-2012
Attachment 31
01 78 00 10 Project Closeout
6
12-JUN-2012
Attachment 32
02 82 14 00 15 Asbestos Hazard Control
30
12-JUN-2012
Attachment 33
06 10 00 Rough Carpentry
12
12-JUN-2012
Attachment 34
07 21 16 Blanket Insulation
6
12-JUN-2012
Attachment 35
07 22 00 Roof and Deck Insulation
12
12-JUN-2012
Attachment 36
07 31 13 Asphalt Shingle
8
12-JUN-2012
Attachment 37
07 42 13 Metal Wall Panel
16
12-JUN-2012
Attachment 38
07 51 13 Built Up Asphalt Roofing
28
12-JUN-2012
Attachment 39
07 51 13A, Atch A BUR Details
30
12-JUN-2012
Attachment 40
07 60 00 Flashing and Sheet Metal
16
12-JUN-2012
Attachment 41
07 61 14 Steel Standing Seam Roofing
32
12-JUN-2012
Attachment 42
07 61 14A, Atch A SSM Details
26
12-JUN-2012
Attachment 43
07 92 00 Joint Sealants
6
12-JUN-2012
Attachment 44
07 95 00 Maintenance and Repair
26
12-JUN-2012

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE
DESCRIPTION
PAGES
DATE
Attachment 01
Site Visit Map
2
12-JUN-2012
Attachment 02
Schedule B Totals Page
1
12-JUN-2012
Attachment 03
Schedule B, Basic Year
11
12-JUN-2012
Attachment 04
Schedule B, First Option
13
12-JUN-2012
Attachment 05
Schedule B, Second Option
13
12-JUN-2012
Attachment 06
Price Proposal, Bldg 2160
8
12-JUN-2012
Attachment 07
Price Proposal, Bldg 4477
8
12-JUN-2012
Attachment 08
Schedule of Material Submittals
2
07-JUN-2012
Attachment 09
Drawing G001 1 of 3
1
07-JUN-2012
Attachment 10
Drawing A101 2 of 3
1
07-JUN-2012
Attachment 11
Drawing A102 3 of 3
1
07-JUN-2012
Attachment 12
Base Pass Forms
3
07-JUN-2012
Attachment 13
Asbestos Report Bldg 2160
8
12-JUN-2012
Attachment 14
Asbestos Report Bldg 4477
6
12-JUN-2012
Attachment 15
Wage Determination TX268
4
07-JUN-2012
Attachment 16
Wage Determination TX6
7
07-JUN-2012
Attachment 17
Wage Determination OK14
13
07-JUN-2012
Attachment 18
Past Performance Questionnaire
7
12-JUN-2012
Attachment 19
Disclosure of Lobbying Activities
2
07-JUN-2012
Attachment 20
00 00 00 Cover
1
12-JUN-2012
Attachment 21
00 00 00 TOC
4
12-JUN-2012
Attachment 22
01 11 02 10 Summary of Work
24
12-JUN-2012
Attachment 23
01 11 02 10A, Atch A Performance Tables
6
12-JUN-2012
Attachment 24
01 11 02 10B, Atch B Forms
14
12-JUN-2012
Attachment 25
01 11 02 20 Measurement and Payment
56
12-JUN-2012
Attachment 26
01 11 02 30 Contractor Quality Control
20
12-JUN-2012
Attachment 27
01 33 00 Project Submittals
14
12-JUN-2012
Attachment 28
01 33 00A, Atch A Submittals
12
12-JUN-2012
Attachment 29
01 35 26 Governmental Safety Requirements
14
12-JUN-2012
Attachment 30
01 62 35 Recycled Recovered Materials
2
12-JUN-2012
Attachment 31
01 78 00 10 Project Closeout
6
12-JUN-2012
Attachment 32
02 82 14 00 15 Asbestos Hazard Control
30
12-JUN-2012
Attachment 33
06 10 00 Rough Carpentry
12
12-JUN-2012
Attachment 34
07 21 16 Blanket Insulation
6
12-JUN-2012
Attachment 35
07 22 00 Roof and Deck Insulation
12
12-JUN-2012
Attachment 36
07 31 13 Asphalt Shingle
8
12-JUN-2012
Attachment 37
07 42 13 Metal Wall Panel
16
12-JUN-2012
Attachment 38
07 51 13 Built Up Asphalt Roofing
28
12-JUN-2012
Attachment 39
07 51 13A, Atch A BUR Details
30
12-JUN-2012
Attachment 40
07 60 00 Flashing and Sheet Metal
16
12-JUN-2012
Attachment 41
07 61 14 Steel Standing Seam Roofing
32
12-JUN-2012
Attachment 42
07 61 14A, Atch A SSM Details
26
12-JUN-2012
Attachment 43
07 92 00 Joint Sealants
6
12-JUN-2012
Attachment 44
07 95 00 Maintenance and Repair
26
12-JUN-2012
Attachment 45
01-G-001 Project Location Plan
1
19-JUN-2012
Attachment 46
02-A-101 Existing Fill and New B2160 Roof Plan
1
19-JUN-2012
Attachment 47
03-A-102 Existing Fill and New B4477 Roof Plan
1
19-JUN-2012

(End of Summary of Changes)

File details come from the government source that posted it. Updated .