amendment 1.doc

DOC document 98 KB Posted

Attached to
Roofing Maintenance, Repair and Installation IDIQ Federal contract opportunity
Solicitation number
FA3020-12-R-0008
Issued by
Department of the Air Force Air Education and Training Command

About this file

Amendment 1 (attachment to Amendment 2)

View the file

Other files for this federal contract opportunity

Other files attached to Roofing Maintenance, Repair and Installation IDIQ, newest first.
File Type Posted
Amendment 5.pdf PDF
Amendment 4.pdf PDF
PrepProposal conference.pdf PDF
amendment 3.doc DOC document
amendment 2.doc DOC document
03-A-102-EXISTING- FILL AND NEW BLDG 4477 ROOF PLAN ELEVATION VIEW AND SECTION.pdf PDF
02-A-101-EXISTING- FILL AND NEW BLDG 2160 ROOF PLAN ELEVATION VIEW AND DETAIL.pdf PDF
01-G-001-PROJECT LOCATION PLAN.pdf PDF
07 60 00 Flashing and Sheet Metal-1111(Nov).pdf PDF
07 61 14 Steel Standing Seam Roofing-1111(Nov).pdf PDF
WD TX268.doc DOC document
Site Visit Map.doc DOC document
06 10 00 Rough Carpentry-1111(Nov).pdf PDF
01 33 00A Attachment A-Submittals-1206(Jun).pdf PDF
WD TX6.doc DOC document
Asbestos Bldg 4477 Roof Summary.pdf PDF
Schedule B-First Option-1206.xls XLS spreadsheet
00 00 00 TOC-1206(Jun).pdf PDF
02-A-101.dwf DWF file
01 11 02 10B Attachment B-Forms-1206(Jun).pdf PDF
01 11 02 20 Measurement And Payment-1204(Apr).pdf PDF
07 92 00 Joint Sealants-1111(Nov).pdf PDF
Asbestos Bldg 2160 Roof Summary.pdf PDF
01 78 00 10 Project Closeout-1206(Jun).pdf PDF
07 42 13 Metal Wall Panel-1111(Nov).pdf PDF
Base Pass Forms.doc DOC document
07 51 13 Built Up Asphalt Roofing-1111(Nov).pdf PDF
01 35 26 Governmental Safety Requirements-1111(Nov).pdf PDF
00 00 00 Cover Stamped 1111(Nov).pdf PDF
Proposal Bldg 2160.xls XLS spreadsheet
Schedule of Material Submittals.xls XLS spreadsheet
07 61 14A Attachment A-SSM Details-1111(Nov).pdf PDF
Schedule B-Basic Year-1206.xls XLS spreadsheet
07 31 13 Asphalt Shingle-1111(Nov).pdf PDF
01 11 02 10A Attachment A-Performance Tables-1201(Jan).pdf PDF
07 51 13A Attachment A-BUR Details-1111(Nov).pdf PDF
Schedule B-Second Option-1206.xls XLS spreadsheet
07 21 16 Blanket Insulation-1111(Nov).pdf PDF
01 33 00 Project Submittals-1111(Nov).pdf PDF
Proposal Bldg 4477.xls XLS spreadsheet
FA3020-12-R-0008 Solicitation.pdf PDF
Past Performance Questionnaire.pdf PDF
01 11 02 10 Summary of Work-1204(Apr).pdf PDF
01 11 02 30 Contractor Quality Control-1111(Nov).pdf PDF
Schedule B Total.doc DOC document
03-A-102.dwf DWF file
02 82 14 00 15 Asbestos Hazard Control Activities-Roofing-1206(Jun).pdf PDF
07 22 00 Roof and Deck Insulation-1111(Nov).pdf PDF
07 95 00 Maintenance and Repair-1204(Apr).pdf PDF
01-G-001.dwf DWF file
Show all 50

Roofing Maintenance, Repair and Installation IDIQ has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE
DESCRIPTION
PAGES
DATE
Attachment 01
Site Visit Map
2
12-JUN-2012
Attachment 02
Schedule B Totals Page
1
12-JUN-2012
Attachment 03
Schedule B, Basic Year
11
12-JUN-2012
Attachment 04
Schedule B, First Option
13
12-JUN-2012
Attachment 05
Schedule B, Second Option
13
12-JUN-2012
Attachment 06
Price Proposal, Bldg 2160
8
12-JUN-2012
Attachment 07
Price Proposal, Bldg 4477
8
12-JUN-2012
Attachment 08
Schedule of Material Submittals
2
07-JUN-2012
Attachment 09
Drawing G001 1 of 3
1
07-JUN-2012
Attachment 10
Drawing A101 2 of 3
1
07-JUN-2012
Attachment 11
Drawing A102 3 of 3
1
07-JUN-2012
Attachment 12
Base Pass Forms
3
07-JUN-2012
Attachment 13
Asbestos Report Bldg 2160
8
12-JUN-2012
Attachment 14
Asbestos Report Bldg 4477
6
12-JUN-2012
Attachment 15
Wage Determination TX268
4
07-JUN-2012
Attachment 16
Wage Determination TX6
7
07-JUN-2012
Attachment 17
Wage Determination OK14
13
07-JUN-2012
Attachment 18
Past Performance Questionnaire
7
12-JUN-2012
Attachment 19
Disclosure of Lobbying Activities
2
07-JUN-2012
Attachment 20
00 00 00 Cover
1
12-JUN-2012
Attachment 21
00 00 00 TOC
4
12-JUN-2012
Attachment 22
01 11 02 10 Summary of Work
24
12-JUN-2012
Attachment 23
01 11 02 10A, Atch A Performance Tables
6
12-JUN-2012
Attachment 24
01 11 02 10B, Atch B Forms
14
12-JUN-2012
Attachment 25
01 11 02 20 Measurement and Payment
56
12-JUN-2012
Attachment 26
01 11 02 30 Contractor Quality Control
20
12-JUN-2012
Attachment 27
01 33 00 Project Submittals
14
12-JUN-2012
Attachment 28
01 33 00A, Atch A Submittals
12
12-JUN-2012
Attachment 29
01 35 26 Governmental Safety Requirements
14
12-JUN-2012
Attachment 30
01 62 35 Recycled Recovered Materials
2
12-JUN-2012
Attachment 31
01 78 00 10 Project Closeout
6
12-JUN-2012
Attachment 32
02 82 14 00 15 Asbestos Hazard Control
30
12-JUN-2012
Attachment 33
06 10 00 Rough Carpentry
12
12-JUN-2012
Attachment 34
07 21 16 Blanket Insulation
6
12-JUN-2012
Attachment 35
07 22 00 Roof and Deck Insulation
12
12-JUN-2012
Attachment 36
07 31 13 Asphalt Shingle
8
12-JUN-2012
Attachment 37
07 42 13 Metal Wall Panel
16
12-JUN-2012
Attachment 38
07 51 13 Built Up Asphalt Roofing
28
12-JUN-2012
Attachment 39
07 51 13A, Atch A BUR Details
30
12-JUN-2012
Attachment 40
07 60 00 Flashing and Sheet Metal
16
12-JUN-2012
Attachment 41
07 61 14 Steel Standing Seam Roofing
32
12-JUN-2012
Attachment 42
07 61 14A, Atch A SSM Details
26
12-JUN-2012
Attachment 43
07 92 00 Joint Sealants
6
12-JUN-2012
Attachment 44
07 95 00 Maintenance and Repair
26
12-JUN-2012

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE
DESCRIPTION
PAGES
DATE
Attachment 01
Site Visit Map
2
12-JUN-2012
Attachment 02
Schedule B Totals Page
1
12-JUN-2012
Attachment 03
Schedule B, Basic Year
11
12-JUN-2012
Attachment 04
Schedule B, First Option
13
12-JUN-2012
Attachment 05
Schedule B, Second Option
13
12-JUN-2012
Attachment 06
Price Proposal, Bldg 2160
8
12-JUN-2012
Attachment 07
Price Proposal, Bldg 4477
8
12-JUN-2012
Attachment 08
Schedule of Material Submittals
2
07-JUN-2012
Attachment 09
Drawing G001 1 of 3
1
07-JUN-2012
Attachment 10
Drawing A101 2 of 3
1
07-JUN-2012
Attachment 11
Drawing A102 3 of 3
1
07-JUN-2012
Attachment 12
Base Pass Forms
3
07-JUN-2012
Attachment 13
Asbestos Report Bldg 2160
8
12-JUN-2012
Attachment 14
Asbestos Report Bldg 4477
6
12-JUN-2012
Attachment 15
Wage Determination TX268
4
07-JUN-2012
Attachment 16
Wage Determination TX6
7
07-JUN-2012
Attachment 17
Wage Determination OK14
13
07-JUN-2012
Attachment 18
Past Performance Questionnaire
7
12-JUN-2012
Attachment 19
Disclosure of Lobbying Activities
2
07-JUN-2012
Attachment 20
00 00 00 Cover
1
12-JUN-2012
Attachment 21
00 00 00 TOC
4
12-JUN-2012
Attachment 22
01 11 02 10 Summary of Work
24
12-JUN-2012
Attachment 23
01 11 02 10A, Atch A Performance Tables
6
12-JUN-2012
Attachment 24
01 11 02 10B, Atch B Forms
14
12-JUN-2012
Attachment 25
01 11 02 20 Measurement and Payment
56
12-JUN-2012
Attachment 26
01 11 02 30 Contractor Quality Control
20
12-JUN-2012
Attachment 27
01 33 00 Project Submittals
14
12-JUN-2012
Attachment 28
01 33 00A, Atch A Submittals
12
12-JUN-2012
Attachment 29
01 35 26 Governmental Safety Requirements
14
12-JUN-2012
Attachment 30
01 62 35 Recycled Recovered Materials
2
12-JUN-2012
Attachment 31
01 78 00 10 Project Closeout
6
12-JUN-2012
Attachment 32
02 82 14 00 15 Asbestos Hazard Control
30
12-JUN-2012
Attachment 33
06 10 00 Rough Carpentry
12
12-JUN-2012
Attachment 34
07 21 16 Blanket Insulation
6
12-JUN-2012
Attachment 35
07 22 00 Roof and Deck Insulation
12
12-JUN-2012
Attachment 36
07 31 13 Asphalt Shingle
8
12-JUN-2012
Attachment 37
07 42 13 Metal Wall Panel
16
12-JUN-2012
Attachment 38
07 51 13 Built Up Asphalt Roofing
28
12-JUN-2012
Attachment 39
07 51 13A, Atch A BUR Details
30
12-JUN-2012
Attachment 40
07 60 00 Flashing and Sheet Metal
16
12-JUN-2012
Attachment 41
07 61 14 Steel Standing Seam Roofing
32
12-JUN-2012
Attachment 42
07 61 14A, Atch A SSM Details
26
12-JUN-2012
Attachment 43
07 92 00 Joint Sealants
6
12-JUN-2012
Attachment 44
07 95 00 Maintenance and Repair
26
12-JUN-2012
Attachment 45
01-G-001 Project Location Plan
1
19-JUN-2012
Attachment 46
02-A-101 Existing Fill and New B2160 Roof Plan
1
19-JUN-2012
Attachment 47
03-A-102 Existing Fill and New B4477 Roof Plan
1
19-JUN-2012

(End of Summary of Changes)